Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00024-16-R-5230-0002_Conformed.docx | DOCX document | |
| N00024-16-R-5230-0002.docx | DOCX document | |
| Attch_L-1_Bidders_Questions_20161221_(2).xls | XLS spreadsheet | |
| Attachment_4_SDP-S_GFP_List_for_Incorporation_Page_1_20161013.pdf | ||
| Attachment_3_SDP-S_GFP_List_for_Performance_Page_1_20161013.pdf | ||
| Attachment_3_SDP-S_GFP_List_for_Performance_Page_3_20161013.pdf | ||
| Attachment_8__Bidder's_Question_Responses.pdf | ||
| N00024-16-R-5230-0001.docx | DOCX document | |
| Attachment_2_SDP-S_GFI__List_20161013.pdf | ||
| CDRL_A011_20161013.pdf | ||
| Attachment_3_SDP-S_GFP_List_for_Performance_Page_2_20161013.pdf | ||
| Attachment_4_SDP-S_GFP_List_for_Incorporation_Page_2_20161013.pdf | ||
| N00024-16-R-5230-0001_Conformed.docx | DOCX document | |
| N00024-16-R-5230.docx | DOCX document | |
| J_Attach.zip | ZIP file | |
| L_Attach.zip | ZIP file |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE SF-30 CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
S 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Feb-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-16-R-5230
X 9B. DATED (SEE ITEM 11)
31-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Feb-2017
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-16-R-5230
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
The purpose of Amendment 0003 to solicitation N00024-16-R-5230 is to clarify the procedures that the Government will follow in evaluating proposals. Specifically, paragraph M-4.0 under Section M of this solicitation is amended to add the following:
“The Government will evaluate all Offerors' price proposals to determine their Total Evaluated Price (TEP) first, in accordance with Paragraph M.3 of this solicitation. The technical proposal of the Offeror with the lowest TEP will be evaluated for technical acceptability first. If the Offeror with the lowest TEP is found to be technically acceptable, the Government will not evaluate the technical acceptability of any other proposals. If the Offeror with the lowest TEP is found to be technically unacceptable, then the Government will evaluate the technical acceptability of the Offeror with the next lowest TEP, and will continue in this fashion until a technically acceptable Offeror is determined. If at any point in this process, the Government determines that it is necessary to enter into discussions, the Government may evaluate the technical proposals of all Offerors not otherwise excluded from competition.”
This amendment does not change any of the previously disclosed evaluation factors. The Government will evaluate proposals already submitted and is not seeking nor accepting proposal revisions, or requiring Offerors to update proposals in any way. This amendment does not extend the due date for proposals. However, the Government is requiring each Offeror to confirm the validity of its proposal submission in light of the clarification to the evaluation procedures described in this amendment. Each Offeror must accept the Government's updated proposal evaluation procedures by submitting a letter on company letterhead bearing the signature of an authorized company representative. All letters must be submitted via email to the following points of contact no later than 5:00pm EST on Tuesday, February 14, 2017:
Shawn Fu: shawn.fu@navy.mil
Richard Waterstreet: richard.waterstreet@navy.mil
SUMMARY OF CHANGES
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been modified:
M-4.0
BASIS FOR AWARD
Offerors are notified that, in accordance with FAR clause 52.215-1, which is incorporated in Section L, the Government intends to make an award on the basis of initial proposals without conducting discussions. The Government will not perform a tradeoff analysis in its evaluation. Award will be made to that responsible Offeror whose proposal is determined by the Government to offer the LOWEST PRICE TECHNICALLY ACCEPTABLE proposal. Award will be made on the basis of the proposal with lowest Total Evaluated Price (TEP) meeting or exceeding the acceptability standards for non-cost factors (Total Evaluated Price is defined in M.3). To be
N00024-16-R-5230 technically acceptable, the proposal must be acceptable in Factor 1, Factor 2, Factor 3, and Factor 4. If any technical (non-price) factor is unacceptable, then the entire proposal will be unacceptable regardless of price.
The Government will evaluate all Offerors' price proposals to determine their Total Evaluated Price (TEP) first, in accordance with Paragraph M.3 of this solicitation. The technical proposal of the Offeror with the lowest TEP will be evaluated for technical acceptability first. If the Offeror with the lowest TEP is found to be technically acceptable, the Government will not evaluate the technical acceptability of any other proposals. If the Offeror with the lowest TEP is found to be technically unacceptable, then the Government will evaluate the technical acceptability of the Offeror with the next lowest TEP, and will continue in this fashion until a technically acceptable Offeror is determined. If at any point in this process, the Government determines that it is necessary to enter into discussions, the Government may evaluate the technical proposals of all Offerors not otherwise excluded from competition.
(End of Summary of Changes)