N00024-16-R-5230
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 03-Jan-2017 02:00 PM to 25-Jan-2017 10:00 AM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C-3.3.1.2 Physical Configuration Audit (PCA). The Government will conduct the PCA. The Contractor shall be present at the PCA and assist the Government as required. The Contractor shall provide a Contractor’s Configuration Audit Plan, PCA Plan (CDRL A023). The PCA shall be conducted on the First Article Units (FAUs) and shall be performed using the Government approved Contractor’s Configuration Audit Plan, PCA Plan (CDRL A023). The PCA shall be performed prior to Final Acceptance Testing. During the PCA, the Government will confirm the FAUs are built in accordance with the provided Technical Data Package (TDP) and the contract. The PCA will be conducted at the Contractor facility. The FAUs shall conform in every respect to the requirements of this contract. Should the SDP fail PCA, the Contractor shall correct the findings of the audit and the PCA shall be repeated. All costs related to correction and PCA repetition shall be borne by the Contractor. DD 250 acceptance of FAU will be after successful PCA.
SECTION E - INSPECTION AND ACCEPTANCE
The following have been deleted:
| HQ E-1-0003 |
| INSPECTION AND ACCEPTANCE OF F.O.B. DESTINATION DELIVERIES |
| MAR 2003 |
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
The following document(s), exhibit(s), and other attachment(s) form a part of this contract:
| Attachment |
| Description |
| Revision Date (MOD) |
| Exhibit A |
| Contract Data Requirements List, DD Form 1423 |
| 10/13/2016 (0001) |
| Attachment 1 |
| Contract Security Classification Specification, Form DD 254 (Attached is the Solicitation DD-254. At Award the contract DD-254 will be attached. The contract DD-254 will have blocks 10a, 10b, 10c, 10d, 10e(2), 10h, 10j, 11c, 11d, 11g, 11h, and 11k marked YES. Blocks 2a and 2b will be completed. All other blocks will remain unchanged from the Solicitation DD-254.) |
| Attachment 2 |
| CEC Signal Data Processor Technical Data Package (TDP) / Government Furnished Information (GFI) List |
| 10/13/2016 (0001) |
| Attachment 3 |
| Government Furnished Property List for Performance |
| 10/13/2016 (0001) |
| Attachment 4 |
| Government Furnished Property for Incorporation |
| 10/13/2016 (0001) |
| Attachment 5 |
| Subcontracting Plan (To be submitted with the proposal and to be attached at award.) This attachment will not be distributed with the remainder of this contract due to the sensitive nature of the information contained herein. Any/all inquiries regarding this attachment shall be directed to the Purchasing Officer Representative identified under Section G of this contract. |
| Attachment 6 |
| Technical Data Rights List (To be submitted with the proposal and to be attached at award.) |
| Attachment 7 |
| Stepladder Pricing (To be submitted with the proposal and to be attached at award.) |
| Attachment 8 |
| Bidder’s Question Responses (Attachment will be changed to Reserved after contract award.) |
| 12/21/2016 (0002) |
(End of Summary of Changes) image1.wmf