NAVSEA_Standard_Items_2016_CH2_Category_1_Items.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- N00024-16-R-4414
About this file
CAT I Standard Items List
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Item Number | Title | Utilization Category | Date |
| 009-01 | General Criteria; accomplish | I | 18-Jul-14 |
| 009-02 | Environmental Compliance Reports for Material Usage at Naval Facilities; provide | I | 18-Jul-14 |
| 009-03 | Toxic and Hazardous Substances; control | I | 18-Jul-14 |
| 009-04 | Quality Management System; provide | I | 18-Jul-14 |
| 009-05 | Temporary Accesses; provide | I | 18-Jul-14 |
| 009-06 | Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish | I | 18-Jul-14 |
| 009-07 | Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish | I | 18-Jul-14 |
| 009-08 | Fire Protection at Contractor's Facility; accomplish | I | 18-Jul-14 |
| 009-10 | Shipboard Asbestos-Containing Material (ACM); control | I | 18-Jul-14 |
| 009-19 | Provisioning Technical Documentation (PTD); provide | I | 18-Jul-14 |
| 009-20 | Government Property; control | I | 18-Jul-14 |
| 009-21 | Logistics and Technical Data; provide | I | 18-Jul-14 |
| 009-23 | Interferences; remove and install | I | 18-Jul-14 |
| 009-24 | Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish | I | 10-Jul-15 |
| 009-28 | Fire Prevention Requirements; accomplish | I | 10-Jun-14 |
| 009-29 | Asbestos-Free Pipe Hanger Liner Material; install | I | 29-Jul-04 |
| 009-34 | Fire Protection of Unmanned Vessels at Contractor's Facility; provide | I | 17-Jan-13 |
| 009-35 | Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish | I | 18-Jul-14 |
| 009-39 | Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/Component; provide | I | 19-Jul-07 |
| 009-40 | Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish | I | 18-Jul-14 |
| 009-59 | Organotin Antifouling Materials; control | I | 29-Jul-11 |
| 009-60 | Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage | I | 1-Sep-15 |
| 009-61 | Shipboard Use of Fluorocarbons; control | I | 18-Jul-14 |
| 009-64 | Synthetic Fire Resistant Hydraulic Fluid; control | I | 18-Jul-14 |
| 009-65 | Polychlorinated Biphenyls (PCBs); control | I | 29-Jul-11 |
| 009-67 | Integrated Total Ship Testing; manage | I | 18-Jul-14 |
| 009-69 | Heavy Weather/Mooring Plan; provide | I | 18-Jul-14 |
| 009-70 | Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish | I | 18-Jul-14 |
| 009-72 | Physical Security at Private Contractor's Facility; accomplish | I | 18-Jul-14 |
| 009-73 | Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install | I | 18-Jul-14 |
| 009-74 | Occupational, Safety and Health Requirements; accomplish | I | 10-Jul-15 |
| 009-77 | Cofferdam Requirements; accomplish | I | 18-Jul-14 |
| 009-79 | Government Owned Material (GOM); status reporting | I | 18-Jul-14 |
| 009-80 | Ship's Facilities; provide | I | 18-Jul-14 |
| 009-81 | Compartment Closeout; accomplish | I | 18-Jul-14 |
| 009-82 | Data Requirements When Installing an Equal Component Vice Specified Component; provide | I | 29-Jul-11 |
| 009-83 | Wire Rope Fitting Verification; provide | I | 17-Jan-13 |
| 009-84 | Accountability of Temporary Fasteners; provide | I | 18-Jul-14 |
| 009-86 | Recovery of Chlorofluorocarbon (CFC's) and Fire Suppressant Halon (H) Materials; accomplish | I | 1-Aug-08 |
| 009-87 | Chemical Disinfection Procedures; accomplish | I | 18-Jul-14 |
| 009-88 | Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify | I | 18-Jul-14 |
| 009-89 | Purchase and Inspection Requirements for Contractor Furnished Anodes; accomplish | I | 29-Jul-11 |
| 009-93 | Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide | I | 18-Jul-14 |
| 009-94 | General Environmental Requirements for Work at Contractor's Facility; accomplish | I | 17-Jan-13 |
| 009-95 | Mechanically Attached Fittings (MAFs) for Piping Systems; install | I | 18-Jul-14 |
| 009-97 | Ship Building and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coatings Information; provide | I | 17-Jan-13 |
| 009-99 | Ship Departure Report; provide | I | 18-Jul-14 |
| 009-100 | Ship's Stability Process Control Procedure (PCP); maintain | I | 18-Jul-14 |
| 009-101 | Requirements for Entry to and Departure from Contractor's Facility; accomplish | I | 18-Jul-14 |
| 009-102 | Alteration Verification; provide | I | 29-Jul-11 |
| 009-103 | Weight and Moment Change Data; provide | I | 18-Jul-14 |
| 009-106 | Work Authorization Form Coordinator (WAFCOR); provide | I | 6-Jan-14 |
| 009-112 | Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish | I | 18-Jul-14 |
| 009-120 | Fact Finding and Critique of Unplanned Events; manage | I | 18-Jul-14 |
| 009-121 | Ship Assessment/Inspection Requirements; provide | I | 18-Jul-14 |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .