RFP N00024‐16‐R‐2302
Question Submittal form
Question Number:
Question Source:
(RFP, attachment #, GFI title, etc.)
Page number and paragraph header from source:
Question: Response:
8 Temporary Wireless Flooding Alarm System Installation;
accomplish
436-90-001 Is it the Government's intent to provide the temporary wireless alarm system materials and instruction required for installation in this work item?
Yes, please see the revised work specification for work item 436-90-
001. Additionally, Attachment J-10 is provided in Amendment 0004 which contains a list of Government Furnished Equipment.
9 RFP Pg. 79 , F-2 Place of Performance;
Pg. 138, Section II: Factor #2 - Facilities/productions Capabiltiies
The Solicitation includes the following guidance: "Work on all vessel(s) covered under this contract shall be performed in the Mayport, FL area at:" and "Describe the facility plan for accomplishing the FREEDOM Variant Hull 1 PSA and option ship PSAs at an availability pier in the Mayport homeport. Bidder's Question: Please define the terms "Mayport, FL area" and "Mayport homeport".
The homeport area for solicitation purposes is defined as a grouping of ports within a 75 mile radius of, and less than 1.5 hours one way travel (using normal modes of transportation of the particular region) from the Navy facility where the ship will be ported at Naval Station Mayport.
10 RFP Section B, pages 4-24, Option CLINs 0005, 0105, 0205, 0305, 0405, and
Can NAVSEA please confirm that for those option CLINs requiring a dry dock that the successful offeror will be required to have ownership and/or access to a dry-dock?
And that access is defined as a teaming arrangement with an owner of a dry dock in the Mayport, FL homeport area?
Per Sections C and L, the contractor shall provide Dry dock facilities, including certification and availability. This can be achieved through a teaming arrangement.
Enclosure 1 Page 1 of 2
RFP N00024‐16‐R‐2302
Question Submittal form
11 RFP Section L, page 146 of 161, Subsection 1.4 Other Data, para d.
Solicitation provides the following direction; “d. In accordance with Section B, Note B, the Offeror shall submit completed CDRLs. Completed CDRLs shall include completed “Price Group” and “Estimated Total Price” blocks for each solicitation CDRL.”
Bidder’s Question: The solicitation provides the Attachment J-2 Contract Data Requirements List (CDRL) in .pdf format. In order to complete the CDRLs as instructed in the solicitation’s Section L instruction, Bidder requests the Attachment J-2 CDRL’s in MS word.doc format. The .pdf format provided does not allow Bidder to complete the “Price Group” and “Estimated Total Price” blocks as required.
An updated Attachment J-2 is provided in Amendment 0004 as a more legible version of the original Attachment J-2. The bidder should complete the "Price Group" and "Estimated Total Price" blocks with pen and ink, or by inserting a text box in the appropriate locations.
Enclosure 1 Page 2 of 2