Enclosure_1_S-1_Bidders_Questions_1-7.pdf

PDF 9 KB Posted

Attached to
Post Shakedown Availabilities for the LCS Class Shipbuilding Program (Mayport, FL)
Solicitation number
N00024-16-R-2302
Issued by

About this file

Enclosure 1 S-1_Bidders Questions 1-7

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP N00024-16-R-2302

Question Submittal form

Question Number:

Question Source:

(RFP, attachment #, GFI title, etc.)

Page number and paragraph header from source: Question: Response:

1 RFP Page 78 of 161, Place of Performance; Section L, page 138 of 161, Section II: Factor #2 – Facilities/ Production Capabilities

The RFP includes the following guidance from Section F: "The Government agrees to locate the vessel at the Contractor's facility on or about the following Commencement Dates." And from Section L, Section II: Factor #2 - Facilities/ Production Capabilities listed requirements. Does the government contemplate a portion of the scope of the contract to be performed Naval Station, Mayport and other CONUS ports?

No the plan is to complete the full scope of the contract at the Contractor's facility.

2 RFP page 140, Subsection 1.1 Prime Contractor Cost Exhibits

For bidding purposes, if the Government contemplates accomplishment of work other that at the Contractor's facility, please provide guidance identifying other locations and associated level of effort (LOE) percentages to be perfromed at those locations (i.e. for CLIN 003 & asscoiated Options work locations & percentages: Contractor's facility - 20%; Naval Station, Mayport FL - 75%; TBD CONUS port - 5%)

The plan is to complete the full scope of the contract at the Contractor's facility.

3 RFP RFP Section L and Attachment J-9, Page 139, Section L, Paragraph C, Section III:

Factor#3 – PSA Execution and Attachment J-9, Craft or Trade Hours and Matl

Unlike the previous San Diego LCS PSA Solicitation and other recent PSA Solicitations that require presentation of only a single page Attachment J-9, Craft/Trade Hours breakdown, the subject paragraph requires presentation of separate J-9 Tables for prime contractor, each subcontractor, plus one for the total effort. This could consume 10 or more additional pages of the 80 page limit than is typical on an 80-page PSA Non-Price Proposal. This in turn, restricts the ability of the offeror to fully address the other Non-Price Proposal requirements. Will the Government consider exempting the J-9 tables from the page limitation, or alternately, increasing the page limitation for Volume I?

Per Section L Additional Instructions to Offerors (pg. 133), the 80 page limit for Volume I does not include the Executive Summary, cover pages, title pages, tables of contents, lists of illustrations, tab pages, resumes, or glossaries of abbreviations and acronym, Section II facility utilization loading schedules, man-power loading charts, or the craft/trade staffing plan. As outlined on pg. 139, the offeror shall provide a craft/trade staffing plan in accordance with Attachment J-9.

4 Temporary Wireless Flooding Alarm System Installation;

accomplish

436-90-001 Paragraph 1.2.10 How many additional repeater locations are TBD? Please see the revised work specification for work item 436-90-001.

5 Escape Trunk Access Doors; remove, stow, and reinstall

123-90-002 Is it the Government’s intent to have the contractor install temporary fire curtains in place of removed doors for the duration of the availability?

Yes. It is the Government's intent to have the contractor install temporary fire curtains in place of removed doors for the duration of the availability.

6 Drydocking and Undocking;

accomplish

997-90-001 paragraph 3.15.1.1

Is it the Government's intent to issue a temporary services item for vessel while in contractor facility as listed in paragraph 3.15.1.1?

Yes tasking for the temporary services item to provide coverage for the vessels while in the contractor facility as listed in paragraph

3.15.1.1 will be issued under the Level of Effort CLINs with material charged to the material CLINs (xxx8 series CLINs) .

Enclosure 1

RFP N00024-16-R-2302

Question Submittal form

7 Post Shakedown Availability (PSA) Support Team Facility Ashore; provide

980-90-002 paragraph 3.4.2.3 T-1 lines are not available at contractor facility, will the Government allow commercial high speed internet services in lieu of T-1?

Yes the Government allow commercial high speed internet services in lieu of T-1.