Attachment_3_N00024-15-R-5202_Directions.pdf

PDF 375 KB Posted

Attached to
SQQ-89 Product Supportability and Installation
Solicitation number
N00024-15-R-5202
Issued by

About this file

Attachment 3 Directions

View the file

Other files

File Type Posted
Attachment_10_Govt_Questions_and_Comments_(Amendment_0002).pdf PDF
N00024-15-R-5202_Revised_Exhibit_A_CDRLs.pdf PDF
N00024-15-R-5202-0002_Conformed_Solicitation.docx DOCX document
N00024-15-R-5202-0002_Conformed_Solicitation.pdf PDF
N00024-15-R-5202-Amended_02-SPS.pdf PDF
N00024-15-R-5202-0001_Conformed_Solicitation.docx DOCX document
N00024-15-R-5202-0001_Conformed_Solicitation.pdf PDF
Revised_Attachment_3_Staffing_Plan.xlsx XLSX spreadsheet
Amendment_0001_N00024-15-R-5202.pdf PDF
Attachment_10_Govt_Questions_and_Comments_(Amendment_0001).pdf PDF
Attachment_4_Government_Furnished_Propoerty.docx DOCX document
Attachment_5_Subcontracting_Plan.docx DOCX document
Attachment_11_Past_Performance_Questionnaire.docx DOCX document
Attachment_8_Contractor_Award_Announcement_Information.docx DOCX document
Attachment_7_Contractor_Compliance_Checklist.docx DOCX document
N00024-15-R-5202_RFP.docx DOCX document
Exhibit_A_CDRLs.xls XLS spreadsheet
Attachment_10_Govt_Questions_and_Comments.docx DOCX document
Attachment_9_Government_Facility_Estimate.docx DOCX document
Attachment_1_DD254.pdf PDF
N00024-15-R-5202-RFP.pdf PDF
Attachment_3_Staffing_Plan.xlsx XLSX spreadsheet
Attachment_6_Technical_Data_Rights_List.docx DOCX document
Attachment_2_Installation_Schedule.docx DOCX document
Attachment_1_N00024-15-R-5202_Section_C.pdf PDF
Attachment_2_N00024-15-R-5202_Registration_Form.pdf PDF
PSM_SOW_12-23-2014_doc.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

• Keep left to merge onto I-64 WEST –

11.7 mi

• Keep LEFT at the fork to continue on I- 564 WEST, follow signs for US 64 WEST/ Hampton/ Richmond – 1.1 mi

• Keep LEFT to stay on I-564 WEST – i.8 mi

• Take the exit toward Navel St/ Gates 3A

• Continue on Bainbridge Ave.

• Turn RIGHT onto Pocahontas St. then keep left to Avionics Loop

• MARMC LF-18 will be on your left

Visit requests will not be required Base Entry: DoD or Military ID Those without a DoD or Military ID may enter being escorted by someone with a DoD or Military ID.

• The meeting will be held in the MARMC LF‐18 Granby Room

• LF‐18 Building Entry: Enter through the doors on the left side of the building (facing the building, south end).

• The Granby Room entrance is just inside to the right through the first set of doors. Signage will be posted.

• Visitors will not need to pass through the quarterdeck so no visit request required.

• Parking is authorized in green area shown below.

Directions from NAVSEA ILC Facility, Lockheed Martin Corporation - 500 Woodlake Drive, Suite 2, Chesapeake, VA

• From Woodlake Dr. turn RIGHT onto Greenbrier Pkwy.

• Take I-64 WEST ramp toward Beach/Hampton/Richmond

MARMC LF‐18

9727 Avionics Loop, Norfolk, VA

File details come from the government source that posted it. Updated .