SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
REVISED SUMMARY OF CHANGES
The purpose of this amendment to solicitation N00024-15-R-2428 is to:
a) Respond to questions submitted by potential Offerors; and
b) To clarify Answer 013 from Amendment 0003
1. The following questions were submitted by potential Offerors. The Government’s response follows each question. Questions and Answers 021 through 022 are provided in this Amendment 00034.
Question 021: On LC 58, 64, 65, 76, and 84 Deck Plan Ref 2.4 8430414 Note 4 calls out for a 7325589-021 (whole new cabinet); Ref 2.5 7325589L Note 18 calls out for a 7325589-015 re-using the old cabinet with a new door.
Both configurations are wired the same.
On LC 85 Deck Plan Ref 2.4 7616076S Note 77 calls out for a 7325589-021 (whole new cabinet); Note 56 calls out for a 7325589-015. Ref 2.5 7325589L Note 18 calls out for a 7325589-015 re-using the old cabinet with a new door. Both configurations are wired the same.
Does the Government want a new cabinet using 7325589-021 for these panels or to re-use 7325589-015 the old with a new door?
Answer 021: For LC58, 64, 65, 76, and 84, the Contractor shall re-use the old panel with a new door, per 7325589-015. For LC85, the Contractor shall install a new panel as per reference 2.4, dwg 7616076S. Offerors shall consider this response when preparing their proposal. An Errata will be issued prior to contract award incorporating this change.
Question 022: Could the Government please confirm if recent changes to 009-74 (paragraphs 3.22 through 3.23) will be applicable to LCAC availabilities?
Answer 022: The Government intends to waive this requirement after contract award. Offerors shall consider this response when preparing their proposal. No change in the solicitation is made as a result of this answer.
2. The Government hereby clarifies Answer 013 from Amendment 0003:
Errata 1 will invoke drawing 7570008 Rev M to WI 120-11-001 and 234-90-001 and will be issued as a subsequent Amendment to this solicitation. Rev M adds the material necessary to install the oily waste drain fitting to the exhaust collector. Work item 234-90-001, paragraph 3.3.8.1 and 3.3.8.2 directs the contractor to inspect the new GFM exhaust collectors to verify the modifications associated with CCD 348 and CCD 505 Rev 2 have been incorporated. Additionally, paragraph 3.9.3, of 120-11-001, "Prior to installation of main engines, contractor is to remove existing and install new tadpole seal assemblies (to include the seal, retainer and rivets of Table 10-12, Index Nos. 2 through 5-A of 2.35) in each exhaust collector assembly in accordance with 2.26, 2.35 and 2.41.". Offerors shall consider this response in the preparation of their FFP proposals.
3. Receipt of Proposals is not extended as a result of this amendment.
4. Except as provided herein, all other terms and conditions of solicitation N00024-15-R-2428 remain unchanged.