Att_05_Electrical_Load_Analysis_sample_20Feb14.pdf

PDF 78 KB Posted

Attached to
Dive Support Boats
Solicitation number
N00024-14-R-2232
Issued by

About this file

Attachment 5 - Electrical Load Analysis

View the file

Other files

File Type Posted
Solicitation_14R2232_Q A_Amended_4.29.14.pdf PDF
Solicitation_14R2232_Q A_Update_4.29.14.pdf PDF
N00024-14-R-2232-MOD_0002_Extension.pdf PDF
Solicitation_14R2232_Q A_Update_4.22.pdf PDF
Solicitation_14R2232_Q A_Update_4.17.14.pdf PDF
Solicitation_Add_Att_Q A.pdf PDF
N00024-14-R-2232-0001.pdf PDF
NSWCCD_AEA_Tech_Guidance_(4th_Ed_-_2012).zip ZIP file
Att_11_-_ID_of_Commercial_Data_(Updated_10-10-13).doc DOC document
Att_06_-_Electrical_One_Line_Drawing_23Jan2014.pdf PDF
Att_12_-_Blank_Pricing_Spreadsheet.xlsx XLSX spreadsheet
Att_09_-_Past_Performance.doc DOC document
Att_08_-_Offeror_Commercial_Warranty.docx DOCX document
Att_07_-_Unique_Item_Identification_13Mar2014.doc DOC document
Att_02_-_Initial_Spare_Parts_List_4Feb14.pdf PDF
Att__1_-_DS_Boat_Specification_Rev_-__19Mar2014.docx DOCX document
Att_03_-_Embarked_Equipment_and_Unique_Dive_Features_6Mar2014.pdf PDF
Att_04_-_Notional_Dive_Support_Boat_Arrangement_13Feb2014.pdf PDF
N00024-14-R-2232_Solicitation.pdf PDF
Att_10_-_ID_of_Non-Commercial_Data_(Updated_10-10-13).doc DOC document
Response_to_Dive_Boat_questions_21_Mar_14.pdf PDF
Att__4_-_Notional_Dive_Support_Boat_Arrangement_13Feb2014.pdf PDF
Att__3_-_Embarked_Equipment_and_Unique_Dive_Features_23Jan2014.pdf PDF
FY14_DSB_SOW_Rev_2_2014_03_05.docx DOCX document
Att__1_-_DS_Boat_Specification_revdraft_26Feb2014.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Consumer OEM P/N Qty kW/unit Phase Volts Amps PF Total kW Usage Factor Load (kW)

Usage Factor Load (kW)

Usage Factor Load (kW)

Usage Factor Load (kW)

Usage Factor Load (kW)

Usage Factor

Load (kW)

Eng. Rm Fans 1 240 0.1 1 0.5 0.1 1 0.5 DER Fans 1 240 1 1 1 1 1 1 Water Heater 1 240 0.3 0.1 0.3 0.3 0.1 0.3 Fresh Water Pmp 1 240 0.1 0.2 0.5 0.1 0.2 0.5 LP Compressor 1 240 0.1 0 0.1 0.1 0 0.1 Battery Charger 1 120 0.5 0 0 0.5 0 0 Eng. Preheater 1 120 0.1 0 0 0.1 0 0 Black Water Pmp 1 240 0.1 0.1 0.1 0.1 0.1 0.1 Defogger 1 120 0 0.1 0.1 0 0.5 0.2

Eng Rm Heater (HVAC) 1 120 0 0 0 0.1 0.1 1 Heater (HVAC) 1 120 0 0 0 0.5 1 1 Fan (HVAC) 1 120 1 1 1 1 1 1 Seawater Pmp (HVAC) 1 240 1 1 1 1 1 1 Condenser (HVAC) 1 240 0.7 0.7 0.7 1 1 1 Evaporator (HVAC) 1 240 1 1 1 1 1 1

Lighting 1 120 0.3 1 1 0.3 1 1 lighting (below deck) 1 120 0.1 1 1 0.1 1 1 lighting (weather) 1 120 0.1 0.5 0.5 0.1 0.5 0.5

Receptacle (aft dk) 1 120 0.1 0.1 0.2 0.1 0.1 0.3 Receptacle (DER) 1 120 0.1 0.1 0.2 0.1 0.1 0.3 Receptacle (cabin) 1 120 0.1 0.5 0.5 0.1 0.5 0.5 Receptacle (galley) 1 120 0.1 0.5 0.5 0.1 0.5 0.5 Receptacle (Eng Rm) 1 120 0.1 0.1 0.1 0.1 0.1 0.1 Receptacle (Monkey) 1 120 0.1 0 1 0.1 0 1 Receptacle (Laz) 1 120 0.1 0 0 0.1 0 0 Receptacle (PH) 1 120 0.1 0.1 0.1 0.1 0.1 0.1 Receptacle (240V) 1 240 0.1 0.1 0.1 0.1 0.3 0.3

Refrigerator 1 120 0.3 0.3 0.3 0.3 0.3 0.3 Microwave 1 120 0.1 0.1 0.1 0.1 0.1 0.1 Coffee Maker 1 120 0.3 0.3 0.3 0.3 0.3 0.3

240/120 Vac Totals

HPU 3 480 0 0 0.3 0 0 0.3

Receptacle (480V) 3 480 0.1 0 0.1 0.1 0 0.1 Dive Compressor 3 480 0.9 0 0.9 0.9 0 0.9 Seawater Pump 3 480 0 0 0.3 0 0 0.3

480 Vac Totals

1. Tailor the first column of 'consumers' from above with details of the proposed design.

2. Input the value in the OEM/part number, Quantity and kW/unit columns.

3. Mathematically populate the remainder of the spreadsheet to perform the requisite

4. Total the load for each of the listed conditions (e.g. summer-shore, winter-transit, etc)

AC ELECTRICAL LOAD ANALYSIS SAMPLE WITH USAGE FACTORS

Dive Operations

Winter Conditions Shore Transit Dive Operations

Summer Conditions Shore Transit

Sheet1

File details come from the government source that posted it. Updated .