N00024-19-R-5414 MK 9 TIS Replacement CWTI RFP_07-01-2020.pdf
PDF 2 MB Posted
- Attached to
- MK 9 Tracker Illuminator System (TIS) Replacement Continuous Wave Tracking Illuminator (CWTI) Federal contract opportunity
- Solicitation number
- N0002419R5414
About this file
This solicitation seeks proposals for the MK 9 Tracker-Illuminator System (TIS) Replacement Continuous Wave Tracking Illuminator (CWTI). Offerors must be a United States company or independent U.S. subsidiary to be eligible for award. The Navy seeks to develop, produce, and deploy the MK 9 TIS Replacement CWTI to directly replace the MK 73 Mod 3 Transmitter Group. The replacement unit must meet dimensional requirements and utilize existing MK 9 TIS infrastructure to minimize shipboard changes. The contractor will perform engineering, manufacturing, and development work under CLIN 0001, with option CLINs for additional units, engineering services, and data delivery. Proposals are due by 02:00 PM local time on 14 August 2020.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 14 Aug 2020
X
A
X B
X C X D
EX
X
G
F 128 - 134
135 - 162
X H 163 - 170 akansha.anand@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-A5 1 170
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
See Section L conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
ANAND AKANSHA (202)-7813837
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 24
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
25 - 54
55 - 57
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
58 - 61
62 - 67 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 68 - 77 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 78 - 81 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
82 - 125
PART II - CO NTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
126 - 127
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
01 Jul 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0002419R5414
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
1 Each
EM&D
FFP
Engineering, Manufacturing, and Development (EM&D)
FOB: Destination
PSC CD: K012
NET AMT
2 Each
OPTION Engineering Development Model
FFP
MK 9 TIS CWTI Engineering Development Model
FOB: Origin (Shipping Point)
OPTION MK 9 TIS Replacement CWTI
FFP
PSC CD: 1265
4 Each
FFP
FFP
1 Each
FFP
FFP
FFP
FFP
OPTION Provisioned Item Orders (PIO)
0010AA
1 Lot
OPTION PIO Ceiling Tracker
See Section B, Note A
OPTION Provisioned Item Orders (PIO)
CPFF
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0011AA
OPTION PIO Ceiling Tracker
CPFF
See Section B, Note B
OPTION Engineering Services
See Section H, H-1 OPTION CLINS 0012-0018
0012AA
5,052 Hours
OPTION Engineering Services Ceiling Tracker
CPFF
See Section H, H-1 OPTION CLINS 0012-0018
0013AA
994 Hours
CPFF
See Section H, H-1 OPTION CLINS 0012-0018
0014AA
CPFF
See Section H, H-1 OPTION CLINS 0012-0018
0015AA
CPFF
See Section H, H-1 OPTION CLINS 0012-0018
0016AA
CPFF
See Section H, H-1 OPTION CLINS 0012-0018
0017AA
CPFF
See Section H, H-1 OPTION CLINS 0012-0018
0018AA
CPFF
See Section H, H-1 OPTION CLINS 0012-0018
OPTION Other Direct Cost
COST
ODC in support of CLIN 0012
0019AA
1 Lot $37,373.00 $37,373.00
OPTION Other Direct Cost Ceiling Tracker
COST
ODC in support of CLIN 0012
ESTIMATED COST $37,373.00
ODC in support of CLIN 0013
0020AA
1 Lot $68,532.00 $68,532.00
COST
ODC in support of CLIN 0013
ESTIMATED COST $68,532.00
ODC in support of CLIN 0014
0021AA
1 Lot $68,532.00 $68,532.00
COST
ODC in support of CLIN 0014
ESTIMATED COST $68,532.00
ODC in support of CLIN 0015
0022AA
1 Lot $21,557.00 $21,557.00
COST
ODC in support of CLIN 0015
ESTIMATED COST $21,557.00
ODC in support of CLIN 0016
0023AA
1 Lot $39,578.00 $39,578.00
COST
ODC in support of CLIN 0016
ESTIMATED COST $39,578.00
ODC in support of CLIN 0017
0024AA
1 Lot $72,731.00 $72,731.00
COST
ODC in support of CLIN 0017
ESTIMATED COST $72,731.00
ODC in support of CLIN 0018
0025AA
1 Lot $72,731.00 $72,731.00
COST
ODC in support of CLIN 0018
ESTIMATED COST $72,731.00
Data
FFP
OPTION Data Rights License Upgrade Option
FFP
See Section B, Note C
NOTE A
It is understood and agreed that the Government has no obligation under this contract to issue any orders hereunder. Orders will be placed in accordance with the terms and conditions of Section C, paragraph 3.8. Delivery and inspection/acceptance criteria as well as funding will be provided with each order that is placed. The negotiated profit rate for any PIO under this line item shall be [TO BE COMPLETED AT AWARD BASED ON OFFEROR’S
PROPOSAL].
NOTE B
It is understood and agreed that the Government has no obligation under this contract to issue any orders hereunder. Orders will be placed in accordance with the terms and conditions of Section C, paragraph 3.8. Delivery and inspection/acceptance criteria as well as funding will be provided with each order that is placed. The negotiated fee rate for any PIO under this line item shall be [TO BE COMPLETED AT AWARD BASED ON OFFEROR’S
PROPOSAL].
NOTE C
If the Offeror so chooses, the Offeror shall fill this in with their proposed cumulative price for those license rights which the Offeror is willing to license in accordance with Section L. The cumulative Data Rights License Upgrade
Option price is a summation of the Section J, Attachments 3B, 4B and 5B.
CLAUSES INCORPORATED BY FULL TEXT
B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)
(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.
(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:
(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.
(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR
52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.
(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.
(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.
(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor.
Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid.
If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the
Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).
(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the
Contracting Officer.
(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.
(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the
Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.
(End of text)
B-216-H006 FEE TABLE (NAVSEA) (MAR 2019)
Labor CLIN Labor Hours Cost Per Hour* Fee Rate Per Hour* Loaded Hourly Rate
0012 5,052
0013 994
0014 994
0015 994
0016 994
0017 994
0018 994
*The offeror shall divide the proposed fee for each CLIN by the quantity of labor hours indicated to complete the table. Fee is calculated based on cost less FCCOM; if FCCOM is proposed, necessary columns may be added.
In the event of any inconsistency between the above table and the CLIN pricing, the CLIN pricing shall take precedence.
B-231-H001 TRAVEL COSTS (NAVSEA) (OCT 2018)
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The travel costs to be reimbursed shall be those costs for which the Contractor has maintained appropriate documentation and which have been determined to be allowable, allocable, and reasonable by the
Procuring Contracting Officer, Administrative Contracting Officer, or their duly authorized representative.
(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.
(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35;
however, Procuring Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.
(d) The Contractor shall not be reimbursed for the following daily local travel costs:
(i) travel at U.S. Military Installations where Government transportation is available,
(ii) travel performed for personal convenience/errands, including commuting to and from work, and
(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the
Contractor's or employee's convenience.
Applicable CLINs: 0019, 0020, 0021, 0022, 0023, 0024, 0025
B-232-H005 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--ALTERNATE I (NAVSEA) (OCT 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed
Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost and Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable. Fee paid per hour shall be based on total fee dollars divided by total hours to be provided. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.
Applicable CLINs: 0012, 0013, 0014, 0015, 0016, 0017, 0018
B-232-H006 LIMITATION OF COST OR LIMITATION OF FUNDS CLARIFICATION (NAVSEA) (OCT 2018)
The clause entitled "Limitation of Cost" (FAR 52.232-20) or "Limitation of Funds" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.
Section C - Descriptions and Specifications
STATEMENT OF WORK
1.0 SCOPE
This Statement of Work (SOW) establishes the requirements for the Engineering and Manufacturing Development
(EMD), production and integration of the MK 9 Tracker-Illuminator System (TIS) Replacement Continuous Wave
Tracking Illuminator (CWTI) used in the MK 9 TIS, and installed shipboard as part of the MK 57 NATO
SEASPARROW Surface Missile System (NSSMS) onboard Aircraft Carrier, Nuclear (CVN), Landing Helicopter
Deck (LHD), and Landing Helicopter Assault (LHA) class ships. In order to meet Required Delivery Dates (RDD), the MK 9 TIS Replacement CWTI must be compatible with the in-service MK 73 MOD 3 Transmitter Group, meet dimensional requirements and utilize the existing MK 9 TIS infrastructure. To ensure compliance with MK 57 NSSMS performance and shipboard installation requirements, the full breadth and limitations of integration are specified in
Section J, Attachments 7-17. Unless otherwise specified herein, Attachments 7-17 form a part of this SOW to the extent specified herein and encompass the collective documentation set for all contract line items.
2.0 APPLICABLE DOCUMENTS
Unless otherwise specified herein, the following documents form a part of this SOW to the extent specified herein and encompass the collective documentation set for all contract line items.
2.1 Department Of Defense (DOD) Standards
The contractor shall comply with the latest version of all DOD Standards listed below:
NUMBER TITLE
MIL-DTL-901
Shock Tests, High Impact Shipboard Machinery, Equipment, and Systems, Requirements For
MIL-STD-167-1A, Type 1
Department of Defense Test Method standard
Mechanical Vibration of Shipboard Equipment
(Type I – Environmental)
MIL-STD-461
Part 5, Class A4, CE03 and CS06 (emissions and conducted susceptibility requirements)
MIL-STD-882 System Safety, Task 108
MIL-STD-1561 Provisioning Procedures, Uniform DOD
MIL-STD-1388-2 DOD Requirements for a Logistic Support Analysis Record
MIL-STD-1472 Department Of Defense Design Criteria Standard, Human Engineering
MIL-STD-1399 Military Standard, Interface Standard for Shipboard Systems
MIL-STD-740-1 Military Standard, Airborne Sound Measurements and Acceptance Criteria for
Shipboard Equipment
MIL-STD-740-2 Military Standard, Structureborne Vibratory Acceleration Measurements and
Acceptance Criteria for Shipboard Equipment
MIL-STD-3034 Department Of Defense Standard Practice, Reliability-Centered Maintenance (RCM)
Process
MIL-STD-3046 Defense Standard, Configuration Management
MIL-STD-31000 Department Of Defense Standard Practice, Technical Data Packages (TDP)
2.2 Other Government Documents
DOD-M-86001(NS) Manual, Technical; Content and Format Requirements for Equipment, Subsystems and
Systems
H290754 Installation Drawing of the Auxiliary & Environmental Support Cabinets
H290755 Installation Drawing of the Controller & Power Amplifier Cabinets
N/A NAVSEA Technical Review Manual (TRM) Version 2.0
2.3 Industry Documents
ANSI/EIA-649B Configuration Management Requirements For Defense Contracts
ASME Y14.100 Engineering Drawing Practices
ASME Y14.34 Associated Lists
ASME Y14.41 Digital Product Definition Data Practices
GEIA-HB-0007 Logistics Product Data Handbook
GEIA-STD-0007 Logistics Product Data
NAS411 Hazardous Materials Management Program
NAS411-1 Hazardous Material Target List
TA-HB-0007-1 Handbook and Guide for Logistics Product Data Reports
3.0 REQUIREMENTS
3.1 General Requirements
The contractor shall deliver, in the quantities required by Section B, MK 9 TIS Replacement CWTI units that meet the specifications within the SOW and Section J, Attachments 7-17. The contractor shall provide the management, engineering and material necessary to complete the design, development, fabrication, testing and integration of the
MK 9 TIS Replacement CWTI in accordance with the detailed requirements stated within the SOW and Section J, Attachments 7-17.
3.1.1 Program Management
The contractor shall identify management processes that will be implemented for execution and accomplishment of the project objectives. This shall include but not limited to technical direction and administration, planning and cost control of all tasks described herein.
3.1.1.1 Program Manager
The contractor shall appoint a full-time Program Manager to serve as the contractor's principal point of contact with the Government. The contractor shall provide program administration, risk management and technical direction for the execution of all tasks described herein.
3.1.1.2 Releasability/Import/Export Compliance
The MK 57 NSSMS contains cooperatively developed, produced and supported weapon system elements integrated with the MK 2 Ship Self Defense System onboard CVN, LHD and LHA class ships. The MK 9 TIS Replacement
CWTI end-item shall be releasability-compliant to ensure NATO SEASPARROW Participating
Governments/Contributing Partner obtainability.
The contractor shall appoint an official for the execution of the MK 9 TIS Replacement CWTI program to ensure the appropriate level of support for International Releasability, Agreements, Licenses, and International Traffic and Arms
Regulations (ITAR) compliance.
3.1.1.3 Integrated Master Schedule (IMS)
The contractor shall develop an Integrated Master Schedule (IMS) for Government approval. The Contracting
Officer’s Representative (COR) shall be notified, in writing, of any schedule delays. The contractor’s IMS shall include Government conducted events such as testing or reviews that are necessary to complete the execution of all tasks described herein. (CDRL A001)
3.1.1.4 Contractor Work Breakdown Structure (CWBS)
The contractor shall implement and maintain a mutually agreed upon Contractor Work Breakdown Structure (CWBS), using MIL-STD-881C for all work to be performed under this contract. The contractor shall extend the CWBS to lower levels which represent how the contractor plans to accomplish the entire contract work scope and remains consistent with its established internal organization(s) and process(es). The contractor shall prepare and deliver a
CWBS Index that maps the CWBS elements against the SOW paragraphs and the lowest level of performance, either at the Contract Line Item Numbers (CLINs) or Sub Line Item Numbers (SLINs). (CDRL A002)
3.1.1.5 Functional Cost-Hour Report
The contractor shall develop and submit a Functional Cost-Hour Report. (CDRL A003)
3.1.1.6 Contract Funds Status Report
The contractor shall deliver a Contract Funds Status Report that supplies funding data over the life of this contract and updates, as well as forecasts, contract fund requirements. The contractor shall provide an annual assessment of reporting requirements, with a recommendation for change if necessary. (CDRL A004)
3.1.1.7 Configuration Management
The contractor shall identify and document the functional and physical characteristics of each hardware and software
Configuration Items (CIs) (hereafter referred to as MK 9 TIS Replacement CWTI CIs), control changes to those characteristics, record and document change processing and implementation status in accordance with the contractor’s
Configuration Management Plan (CMP). The contractor shall establish and maintain a baseline listing which represents the design configuration plus all approved changes. The contractor shall ensure that the baseline reflects the Engineering Development Model (EDM) and subsequent production build(s) required to procure, manufacture, assemble test and inspect hardware. The contractor shall store and maintain the baseline and approved changes or revision level of all impacted master engineering data and drawings. (CDRL A005)
3.1.1.8 Engineering Notebook/Data Accession List (DAL)
The contractor shall maintain an engineering notebook inclusive of technical documents not specifically covered in other CDRLs that are produced during the execution of this contract. The contractor shall document the rationale for design decisions. The contractor shall not delete data developed under this contract without written permission from the Procuring Contracting Officer (PCO). The engineering notebook is a collection of working level documents produced in support of this contract. Engineering notebook includes but is not limited to: analyses, trade studies and reports, technical memoranda, presentation material and subcontractor/third party selection criteria. (CDRL A006)
3.1.2 Security
The contractor is required to maintain a SECRET facility security clearance. The contractor is required to maintain a level of safeguarding for classified information/material at the SECRET level.
COMSEC Equipment: Contractor is required to utilize communications security (COMSEC) equipment to facilitate the use of secure communications between the contractor and the various Government Agencies in the execution of this contract. The installation and use of COMSEC equipment shall be in compliance with the ESSM Project
Security Instruction (PSI) dated 29 September 2015, PSI Appendix C dated 14 March 2018 and any subsequent approved revision(s) (hereafter referred to as ESSM PSI).
Non-SCI requirement: The contractor shall require access to non-SCI. This contract relates to the development and integration of transmitter technology to support ESSM capability to counter the threat of potential adversaries. Non-
SCI intelligence requirements shall be authorized by NAVSEA (SEA 00G). Questions regarding Non-SCI shall be referred to NAVSEA (SEA 00G). Requests to the Office of Naval Intelligence (ONI) for retention or release of intelligence information shall be through NAVSEA (SEA 00G) (NAVSEA STILO/SSO).
Foreign Government Information requirement: The contractor may be required to exchange MK 9 TIS Replacement
CWTI-specific Foreign Government Information to/from other Nations within the NATO SEASPARROW
Consortium. Any such
CUI (formerly “For Official Use Only (FOUO)”): The contractor shall be required to have access to CUI with developers and integrators.
SIPRNET requirement: The contractor requires access to the U.S. Secure Internet Protocol Routing Network
(SIPRNET) to facilitate the secure transfer of electronic NATO SEASPARROW Project Office Information between the contractor and various Government Agencies. Personnel who require access to SIPRNET backbone equipment must receive a NATO Security Briefing prior to access from the Contractor’s Facility Security Officer
(FSO).
Receive, Store, and Generate Classified Information: The contractor shall assist in producing and procuring systems that are classified. Techniques to produce this equipment, testing of this equipment and overall system performance could be classified and the subject to email and written reports. In this capacity, the contractor shall generate and be in receipt of classified material.
Fabricate, modify, or store classified hardware: The contractor shall fabricate and modify classified components (as required) in support of this contract and then store this hardware until completion of all requirements.
Classified Information Access outside U.S.: Contractor requires access to classified project information outside the
U.S., as required for execution of this contract. Classified Project Information shall only be handled in those facilities and by the personnel that fulfills all of the requirements addressed in the ESSM PSI. Access to classified material may take place in Australia, Belgium, Canada, Denmark, Greece, Germany, The Netherlands, Norway, Portugal, Spain, or
Turkey. Access to Classified ESSM Project Information and material requires a personnel security clearance.
Defense Technical Information Center (DTIC): In order to use the current contract specifications and applicable documentation, the contractor shall use the DTIC, or other secondary distribution centers.
COMSEC Account requirement: Contractor shall acquire all necessary COMSEC accounts to access COMSEC equipment, including SIPRNET, Secure Terminal equipment (STE) Telephone Equipment, Classified Facsimile
System, and Key Material, to facilitate secure communications and information exchanges between the contractor and the various Government Agencies in the execution of this contract. The contractor shall ensure a sufficient number of account holders to meet the needs of the contract. Access to COMSEC requires a final U.S. government National
Security Clearance.
Operations Security (OPSEC) requirement: The contractor shall implement an internally generated OPSEC plan to ensure operations security within all the contractor and sub-contractor facilities.
Defense Courier Service: The contractor shall use the Defense Courier Service as the preferred non-electronic transfer channel for MK 9 TIS Replacement CWTI Classified Information.
Receive, Store, or Generate CUI: The contractor shall assist in producing and procuring systems or information that is unclassified. In this capacity, the contractor shall receive, store, and generate unclassified material and information.
Installation and use of Secure Terminal Equipment (STE) or Secure Telephone Equipment (STE) connection (voice and data), when required to a subcontractor, must comply with National Security Agency (NSA) policy and procedures. If subcontractor in a Consortium country does not have a COMSEC account with NSA, crypto material
(for STE) shall be transferred to the National Distribution Authority (NDA) in that country. NDA will install and oversee the operation of the secure STE connection.
3.2 Technical Objectives (CLIN 0001, OPTION CLIN 0002)
It is anticipated that this initiative will leverage an existing qualified design, develop the MK 9 TIS interface modifications, produce and deploy a MK 9 TIS Replacement CWTI as part of the MK 57 MOD 14/15 NSSMS. The contractor’s proposed MK 9 TIS Replacement CWTI shall satisfy the requirements stated within the SOW and Section
J, Attachments 7-17. Parallel integration testing and qualification testing shall be accomplished in order to be compliant with Department of the Navy qualifications for shipboard use, and still meet RDDs. The MK 9 TIS
Replacement CWTI is to be a direct replacement for the MK 73 Mod 3 Transmitter Group. In order to minimize changes required on ships receiving the MK 57 NSSMS, the MK 9 TIS Replacement CWTI shall not exceed the dimensions of the MK 73 Mod 3 Transmitter Group as detailed within Section J, Attachments 7-17.
3.2.1 Systems Engineering (CLIN 0001, OPTION CLIN 0002)
The contractor shall utilize formal systems engineering processes for the development, definition, validation and maintenance of the MK 9 TIS Replacement CWTI requirements and interfaces. The contactor shall ensure that ITAR requirements are satisfied and that all documentation generated as a result of this SOW and Section J, Attachments 7-
17 are properly classified, marked, and safeguarded. The contractor shall manage the design engineering, or specialty engineering to ensure compatibility and performance requirements of the MK 9 TIS Replacement CWTI are in accordance with the detailed requirements stated within the SOW and Section J, Attachments 7-17.
3.2.1.1 System Engineering Technical Reviews (SETR) (CLIN 0001, OPTION CLIN 0002)
The Technical Review Action Plan defines the Government’s Systems Engineering Technical Review (SETR) process. The contractor shall participate in a SETR requirements review within two-weeks of contract award, to ensure the requisite systems engineering, integrated logistics, production and manufacturing documents and/or products are identified from the data elements identified within the SOW and Section J, Attachments 7-17.
3.2.1.1.1 Requirements Management (CLIN 0001, OPTION CLIN 0002)
The contractor shall establish and maintain a database to provide requirements management, traceability and verification of the requirements defined in the SOW and Section J, Attachments 7-17:
a) System/Subsystem Specification (CDRL A009)
b) Software Requirements Specification (CDRL A010)
3.2.1.3 System/Subsystem Design Description (CLIN 0001, OPTION CLIN 0002)
The contractor shall document the MK 9 TIS Replacement CWTI system/sub-system design and the MK 9 TIS
Replacement CWTI system/sub-system architectural design in a System/Subsystem Design Description. (CDRL
A011)
3.2.1.4 Schematic Block Diagrams (CLIN 0001, OPTION CLIN 0002)
The contractor shall develop schematic block diagrams that depict functional and technical requirements, intersystem relationships, intra-system relationships and subordinate detailed schematics as required to augment inter- and intra-system relationships. (CDRL A012)
3.2.1.5 Quality Assurance Plan (CLIN 0001, OPTION CLIN 0002)
The contractor shall develop a Quality Assurance Plan that identifies the required quality guidelines and meets the defined delivery schedule(s) for the MK 9 TIS Replacement CWTI CIs. (CDRL A013)
3.2.2 Hardware Engineering (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall provide engineering support to resolve technical, interface, and performance issues related to the
MK 9 TIS Replacement CWTI system and its interfaces within the MK 9 TIS as defined in Section J, Attachments 7-
17.
3.2.3 Software Engineering (CLIN 0001, OPTION CLIN 0002)
3.2.3.1 Software Development Plan (CLIN 0001, OPTION CLIN 0002)
The contractor shall develop and implement a Software Development Plan (SDP) that defines the contractor’s processes to be followed for MK 9 TIS Replacement CWTI software development, methods that will be used and the approach to be followed for each software development activity. The SDP shall include the project schedules, organization and resources required. (CDRL A014)
3.2.3.2 Software Design Description (CLIN 0001, OPTION CLIN 0002)
The contractor shall document the design of the MK 9 TIS Replacement CWTI Computer Software Configuration
Items (CSCI) including, but not limited to, CSCI-wide decisions, the CSCI architectural design and the detailed design needed to implement MK 9 TIS Replacement CWTI software in a Software Design Description document. (CDRL
A015)
3.2.3.3 Software Product Specifications (SPS) (CLIN 0001, OPTION CLIN 0002)
The contractor shall develop Software Product Specifications (SPS) to achieve delivery of software and to establish the requirements to be a valid copy of the MK 9 TIS Replacement CWTI CSCI. The MK 9 TIS Replacement CWTI
SPS shall include, but not limited to, Executable Software, Source Files, Packaging Requirements, Qualification
Provisions, Software Support Requirements and Requirements Traceability. (CDRL A016)
3.2.3.4 Software Version Description (SVD) (CLIN 0001, OPTION CLIN 0002)
The contractor shall develop a Software Version Description (SVD) for every released version of MK 9 TIS
Replacement CWTI software. The SVD shall include an inventory of materials released, an inventory of the software content, installed changes, adaptation data and documents pertinent to the released software, installation instructions, known errors and possible problems. (CDRL A017)
3.2.4 System Safety Engineering (CLIN 0001, OPTION CLIN 0002)
The contractor shall ensure that all production changes to deliverable hardware and production processes are accomplished in a manner that maintains safety requirements in accordance with MIL-STD-882. The contractor shall update all safety related analyses/reports affected by production changes and as required by MIL-STD-882. The contractor shall support, initiate and conduct meetings with the Government and, if applicable, industry partners to support and resolve System Safety issues.
3.2.4.1 System Safety Program Plan (CLIN 0001, OPTION CLIN 0002)
The contractor shall develop and implement a System Safety Program Plan for the MK 9 TIS Replacement CWTI that details the tasks and activities of system safety management and system safety engineering required to identify, evaluate, and eliminate or control hazards throughout the changes from the baseline configuration in accordance with
MIL-STD-882. (CDRL A018)
3.2.4.2 Hazardous Material Management Plan (HMMP) (CLIN 0001, OPTION CLIN 0002)
In consultation with the Government and, if applicable, industry partners, the contractor shall reduce hazardous material risks associated with the MK 9 TIS Replacement CWTI to acceptable levels to protect human health and the environment during the system planning and design processes during all life cycle phases. The contractor shall implement a Hazardous Material Management Plan (HHMP) in accordance with MIL-STD-882, System Safety, Task 108. The contractor shall document the efforts to eliminate or reduce the hazardous materials risk associated with the MK 9 TIS Replacement CWTI in a HMMP Report. (CDRL A019)
3.2.4.3 Health Hazard Analysis Report (CLIN 0001, OPTION CLIN 0002)
The contractor shall develop a Health Hazard Analysis Report to systematically identify and evaluate health hazards, evaluate proposed hazardous materials and propose measures to eliminate or control these hazards through engineering design changes. (CDRL A020)
3.2.4.4 System Safety Hazard Analysis (CLIN 0001, OPTION CLIN 0002)
The contractor shall systematically identify and evaluate hazards, both real and potential, for elimination or control, in a System Safety Hazard Analysis Report for the MK 9 TIS Replacement CWTI. (CDRL A021)
3.2.4.5 Programmatic, Environmental, Safety, And Health Evaluation Plan (CLIN 0001, OPTION CLIN
0002)
The contractor shall document how the MK 9 TIS Replacement CWTI implements, follows, maintains, and oversees the environmental planning and compliance with environmental regulations throughout the expected service life requirement in a Programmatic, Environmental, Safety, and Health Evaluation Plan. (CDRL A022)
3.3 Production (CLIN 0001, OPTION CLINS 0002-0009)
3.3.1 Production Engineering (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall provide production support engineering to maintain MK 9 TIS Replacement CWTI production, and to ensure MK 9 TIS Replacement CWTI hardware end items and computer program (software/firmware) end items are in compliance with Section J, Attachments 7-17.
3.3.2 Manufacturing Plan (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall identify and document the detailed factors necessary to achieve an effective and efficient manufacturing program in the MK 9 TIS Replacement CWTI Manufacturing Plan. (CDRL A023)
3.4 Qualification (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall provide systems engineering services in support of qualification, integrated test planning, and performance assessments of the MK 9 TIS Replacement CWTI.
3.4.1 Systems Performance (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall conduct a system performance analysis or system performance tests to ensure compliance with the detailed requirements stated within the SOW and Section J, Attachments 7-17.
3.4.2 System Modeling and Analysis (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall use modeling and simulation tools and techniques to perform reliability predictions, sensitivity studies and trade studies in order to minimize system testing and further reduce costs to the Government.
3.4.3 System Test and Evaluation (CLIN 0001, OPTION CLINS 0002-0009)
In order to validate that the technical baseline meets the performance requirements and that the interfaces (internal mechanical, electrical and functional) are in compliance with the detailed requirements stated within the SOW and
Section J, Attachments 7-17, the contractor shall provide Objective Quality Evidence via test, analysis, demonstration or inspection at the sub-system, unit (MK 9 TIS Replacement CWTI) and system levels (MK 9 TIS).
3.4.3.1 Test Strategy (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall develop a test strategy for the MK 9 TIS Replacement CWTI CIs to be tested, a test concept, test objectives, the list of requirements to be satisfied, test methods, elements, list of responsible activities associated with the testing, measures required and recording procedures to be used in all test planning documentation. (CDRL
A024)
3.4.3.2 Test Planning (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall develop a test plan for requirements verification of the MK 9 TIS Replacement CWTI CIs, inclusive of General Purpose Electronic & Special Purpose Electronic Test Equipment (GPETE & SPETE), in accordance with the detailed requirements stated within the SOW and Section J, Attachments 7-17 (CDRL A025):
a) Test Plan; Hardware Qualification Test
b) Test Plan; Software Qualification Test
3.4.3.3 Test Procedures (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall develop test procedures that identify the step-by-step testing operations to be performed on MK
9 TIS Replacement CWTI items undergoing developmental, qualification, integration or acceptance testing (AT).
The contractor shall develop test procedure documentation that is inclusive of MK 9 TIS Replacement CWTI CIs, Unit Under Test (UUT), test equipment and support required, test conditions to be imposed, parameters to be measured and pass/fail criteria against which the test results will be measured. The contractor shall deliver the following test procedures (CDRL A026):
a) Test Procedure; Engineering Development Model (EDM)
b) Test Procedure; Electromagnetic Interference (EMI)
c) Test Procedure; Humidity A&B
d) Test Procedure; Salt Fog
e) Test Procedure; Thermal
f) Test Procedure; Vibration – above
g) Test Procedure; Vibration –below
h) Test Procedure; High Impact Shock Qual
i) Test Procedure; Hazards of Electromagnetic Radiation to Personnel (HERP)
j) Test Procedure; Formal Qualification Test (FQT)
3.4.3.4 Test Reports (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall develop test reports that identify the step-by-step testing operations to be performed on MK 9
TIS Replacement CWTI items undergoing developmental, qualification, integration or AT. The contractor shall develop test report documentation that is inclusive of CI, UUT, test equipment and support required, test conditions to be imposed, parameters to be measured and pass/fail criteria against which the test results will be measured. The contractor shall deliver the following test reports (CDRL A027):
a) Test Report; EDM
b) Test Report; EMI
c) Test Report; Humidity A&B
d) Test Report; Salt Fog
e) Test Report; Thermal
f) Test Report; Vibration – above
g) Test Report; Vibration –below
h) Test Report; High Impact Shock Qual
i) Test Report; HERP
j) Test Report; FQT
3.4.3.5 Test Facilities (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall provide the test facilities required to maintain, operate, train and test the MK 9 TIS
Replacement CWTI. Specifically, the contractor shall host FQT and AT. The summary information contained within the Facilities Management Plan shall support planning for any modification to an existing facility (or development of a new facility). (CDRL A028)
3.4.3.6 Physical Configuration Audit (OPTION CLIN 0002)
The contractor shall conduct a Physical Configuration Audit to validate that the TDP matches the as-built configuration of the MK 9 TIS Replacement CWTI (CDRL A049)
3.4.4 System Integration (CLIN 0001, OPTION CLINS 0002-0009)
3.4.4.1 Internal Interface Requirements Specification (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall develop and document interface definitions/diagrams with qualification provisions and requirements traceability in a MK 9 TIS Replacement CWTI Interface Requirements Specification. (CDRL A029)
3.4.4.2 Interface Design Description (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall develop interface drawings for all MK 9 TIS Replacement CWTI CIs in an Interface Design
Description document. (CDRL A030)
3.4.4.3 External Interfaces (CLIN 0001, OPTION CLINS 0002-0009)
The contractor shall ensure the external mechanical, electrical and functional interfaces are documented in the
Interface Control Document/Drawing. (CDRL A031)
3.5 Installation Engineering
3.5.1 Installation Control Drawing (CLIN 0001)
The contractor shall develop Installation Control Drawings that meet the requirements set forth in Section J, Attachments 7-17. (CDRL A032)
3.5.2 Installation Engineering Support (OPTION CLIN 0003)
The contractor shall provide shipboard installation engineering support to ensure the requirements as detailed within
Section J, Attachments 7-17 are fulfilled for the first shipboard installation.
3.6 Maintenance Engineering (CLIN 0001)
3.6.1 Maintenance Support Plan (MSP) (CLIN 0001)
Comprehensive maintenance planning is required to assure that the MK 9 TIS Replacement CWTI can be maintained shipboard with minimum resources for achieving operational readiness and sustainability for the life of the system. The contractor shall develop a Maintenance Support Plan (MSP) that assures reliability, availability, and maintainability in the intended environment outlined within the SOW and Section J, Attachments 7-17. (CDRL
A033)
3.6.2 Reliability and Maintainability (R&M) Block Diagrams (CLIN 0001)
The contractor shall establish, implement and maintain a reliability program with Reliability and Maintainability
(R&M) Block Diagrams that documents the data used to support R&M allocations, predictions, assessments, design analyses and trade studies associated with MK 9 TIS Replacement CWTI CIs. (CDRL A034)
3.6.3 Maintenance Test and Support Equipment (MT&SE) (CLIN 0001)
The contractor shall develop requirements lists that identify MK 9 TIS Replacement CWTI test parameter requirements for maintenance, test, alignment and calibration in support of all levels of maintenance during the operational life cycle. Maintenance Test and Support Equipment (MT&SE) lists shall include the data necessary to register, or verify the registry of, the support or test equipment in the Government’s inventory. As applicable, the
MT&SE lists shall provide details of the Test Measurement and Diagnostic Equipment calibration procedures, technical parameters and any piece of support equipment needed to support the MK 9 TIS Replacement CWTI.
(CDRL A035)
3.6.4 Failure Mode, Effects and Criticality Analysis (FMECA) (CLIN 0001)
The contractor shall provide an analysis of independent single item failures and the resulting potential impact on mission success, performance, personnel safety and maintainability of the MK 9 TIS Replacement CWTI documented in a Failure Mode, Effects and Criticality Analysis (FMECA) report. The FMECA report shall provide the Government with conclusions and recommendations of the maintenance repair analysis. (CDRL A036)
3.6.5 Maintainer Requirements (CLIN 0001)
The contractor shall develop routine maintenance actions to be taken by shipboard personnel for the purpose of maintaining the MK 9 TIS Replacement CWTI in a state that achieves maximum operational readiness by providing for systematic inspection, detection and correction of failures either before they occur or before they develop into major defects. These maintenance actions include preventive measures (e.g., test, measurement, adjustment or cleaning) or corrective measures (e.g. part replacement) performed specifically to prevent faults from occurring.
3.6.5.1 Technical Manuals (CLIN 0001)
The contractor shall use source data to develop detailed operations and maintenance information intended for the operator and the maintenance technician of the MK 9 TIS Replacement CWTI (CDRL A037).
a) Technical Manual; Systems Maintenance Manual
b) Technical Manual; Systems Operation Manual
3.6.5.2 Preventive Maintenance Requirements (CLIN 0001)
The contractor shall develop procedures for routine preventive/preventative maintenance actions, in support of the US
Navy’s Preventive Maintenance System, on operational MK 9 TIS Replacement CWTI that contribute to uninterrupted operations within design characteristics. (CDRL A038)
3.6.5.3 Corrective Maintenance Requirements (CLIN 0001)
The contractor shall develop corrective maintenance procedures to be performed on an unscheduled/unplanned basis due to malfunction, failure or deterioration of the MK 9 TIS Replacement CWTI. The corrective maintenance procedures shall permit restoration to an operational condition within predetermined tolerance and limitations as stated in the Section J, Attachments 7-17. (CDRL A038)
3.7 Integrated Logistics Support (CLIN 0001)
3.7.1 Level Of Repair Analysis Report (CLIN 0001)
The contractor shall develop and deliver a Level of Repair Analysis Report that documents and supports the contractor’s conclusions, findings and recommendations on the economic, noneconomic and operational impacts to the Government concerning repair versus discard at failure, optimum repair levels, support equipment (which includes but is not limited to: test program sets, built-in-test equipment, test, measurement and diagnostic equipment requirements), maintenance facility requirements, maintenance and supply support life cycle costs, spare parts provisioning and specific design recommendations for the MK 9 TIS Replacement CWTI. (CDRL A039)
3.7.1.1 Provisioning Parts List (CLIN 0001)
In order for the Government to determine the range and quantity of support items required to maintain the MK 9 TIS
Replacement CWTI an initial period of service, the contractor shall develop a Provisioning Parts List. (CDRL A040)
3.7.1.2 Parts Lists (CLIN 0001)
The contractor shall develop a proposed spare parts list that includes detailed parts information (with Reference
Designator) and contains the contractor’s recommended quantities of every type of spare part required for the MK 9
TIS Replacement CWTI, inclusive of consumable and expendable items over the full service life the contractor believes the transmitter can serve. The contractor shall identify and explain any assumptions, formulas or models used by the contractor in the development of these lists. (CDRL A041)
a) Installation Kit Electronic Equipment (IKEE)
b) Installation and Checkout (INCO)
c) Depot level spares
3.7.1.3 Depot Level Repair Instructions (CLIN 0001)
The contractor shall develop Depot Level Repair Instructions inclusive of detailed instructions that describe the disassembly, cleaning, inspecting, repairing/refurbishing, reassembly and testing procedures of the end-item. Depot
Level Repair Procedures shall reference all applicable drawings and schematics of the MK 9 TIS Replacement
CWTI. (CDRL A042)
3.7.2 Diminishing Manufacturing Sources And Material Shortages (DMSMS) (CLIN 0001)
The contractor shall develop Diminishing Manufacturing Sources and Material Shortages (DMSMS) forecasting source data to enable the Government to identify, forecast and manage piece part obsolescence impacts and mitigations. The data may be obtained during any program life cycle phase using sources to include but not limited to: the preferred parts list, build-of materials, vendor surveys and inspections. The contractor shall develop and institute a “DMSMS Implementation Plan” that identifies MK 9 TIS Replacement CWTI requirements and a means for identifying and managing the loss, or impending loss, of manufacturers or suppliers of parts and/or material required for sustained operational availability of the MK 9 TIS Replacement CWTI. (CDRL A043)
3.7.3 Packaging, Handling, Storage, and Transportation (PHS&T) (CLIN 0001)
The contractor shall develop Packaging, Handling, Storage and Transportation (PHS&T) requirements for the MK 9
TIS Replacement CWTI. The PHS&T summary shall include the information relevant to the development of a transportability analysis report. (CDRL A044)
3.7.4 Technical Data Package (TDP) (CLIN 0001)
The contractor shall be responsible for custody, safeguarding, maintenance and delivery of all technical data, with the exception of Government managed requirements documentation, in a Technical Data Package (TDP). The TDP shall include three-dimensional (3D) models and/or drawings, compliable source code with build files, as well as incorporation of any changes required to drawings to the piece part level, specifications and drawings for acceptance test equipment. (CDRL A045)
3.7.4.1 Request For Variance (OPTION CLINS 0002-0009)
To allow the Government to determine the impact on performance, operational readiness, logistics support or other affected areas, the contractor shall develop a Request for Variance to describe a proposed departure from (a nonconformance with) the MK 9 TIS Replacement CWTI documentation for a specific number of units or for a specified period of time. (CDRL A046)
3.7.4.2 Engineering Change Proposals (ECP) (OPTION CLINS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .