Amendment_N00019-12-R-0007-0001_04_September_2013.pdf

PDF 282 KB Posted

Attached to
Naval Strike and Air Warfare Center (NSAWC) Contractor Logistics Support (CLS) Services
Solicitation number
N00019-12-R-0007
Issued by

About this file

Amendment N00019-12-R-0007-0001 04 September 2013

View the file

Other files

File Type Posted
Question_and_Answer_Log_07_October_2013.xlsx XLSX spreadsheet
Amendment_N00019-12-R-0007-0005_30_September_2013.pdf PDF
Question_and_Answer_Log_30_September_2013.xlsx XLSX spreadsheet
NSAWC_DIRECT_MAINTENANCE_MAN_HR_PER_FH_PER_TMS_2011-2012_30_September_2013.pdf PDF
Question_and_Answer_Log_27_September_2013.xlsx XLSX spreadsheet
Amendment_N00019-12-R-0007-0004_25_September_2013.pdf PDF
Amendment_N00019-12-R-0007-0003_18_September_2013.pdf PDF
Att_L-6_Price_Matrix_13_September_2013.xlsx XLSX spreadsheet
Question_and_Answer_Log_18_September_2013.xlsx XLSX spreadsheet
Amendment_N00019-12-R-0007-0002_13_September_2013.pdf PDF
Question_and_Answer_Log_12_September_2013.xlsx XLSX spreadsheet
Question_and_Answer_Log_09_September_2013.xlsx XLSX spreadsheet
Question_and_Answer_Log_05_September_2013.xlsx XLSX spreadsheet
Att_L-2_Vol_1_ES_Tables_29_August_2013.xlsx XLSX spreadsheet
Exhibit_A_Contract_Data_Requirements_List_(CDRL) _DD_Form_1423_04_September_2013.pdf PDF
Att_L-8_Sub_CCS_30_August_2013.xlsx XLSX spreadsheet
Attachment_5_Government_Furnished_Property_List_(Part_1)_03_September_2013.xls XLS spreadsheet
Att_L-7_Prime_CCS_29_August_2013.xlsx XLSX spreadsheet
Attachment_6_Area_Wage_Determination_14_August_2013.pdf PDF
Attachment_1_Naval_Strike_and_Air_Warfare_Center_Aircraft_Maintenance_Performance_Work_Statement_(PWS)_28_August_2013.pdf PDF
Attachment_5_Government_Furnished_Property_List_(Part_2)_03_September_2013.xls XLS spreadsheet
Attachment_5_Government_Furnished_Property_List_(Part_3)_03_September_2013.xlsx XLSX spreadsheet
Att_L-6_Price_Matrix_29_August_2013.xlsx XLSX spreadsheet
NSAWC_Technical_Library_Content_29_August_2013.docx DOCX document
Question_and_Answer_Log_29_August_2013.xlsx XLSX spreadsheet
Question_and_Answer_Log_21_August_2013.xlsx XLSX spreadsheet
NSAWC_Technical_Library_Content_21_August_2013.docx DOCX document
Attachment_1_Naval_Strike_and_Air_Warfare_Center_Aircraft_Maintenance_Performance_Work_Statement_(PWS)_25_July_2013.pdf PDF
Att_L-9_Direct_Parts_Material_and_Travel.xlsx XLSX spreadsheet
Attachment_4_Quality_Assurance_Surveillance_Plan_22_July_2013.pdf PDF
Att_L-3_Vol_2_T-1_SB_Goals.xlsx XLSX spreadsheet
Att_L-1_GenInst_3.2_CRM.xlsx XLSX spreadsheet
Attachment_7_Predecessor_Contract_Collective_Bargaining_Agreement_(CBA)_18_June_2013.pdf PDF
N00019-12-R-0007_05_August_2013.pdf PDF
Att_L-5_Vol_3_PP-1_PP_Cont_Data.xlsx XLSX spreadsheet
Att_L-6_Price_Matrix.xlsx XLSX spreadsheet
Att_L-2_Vol_1_ES_Tables.xlsx XLSX spreadsheet
Attachment_5_Government_Furnished_Property_List_(Part_1)_29_July_2013.xls XLS spreadsheet
Att_L-4_Vol_3_PPQ.docx DOCX document
Att_L-10_Manpower_Chart.xlsx XLSX spreadsheet
Attachment_8_DD_Form_254_DOD_Contract_Security_Classification_Specification_20_November_2012.pdf PDF
Att_L-8_Sub_CCS.xlsx XLSX spreadsheet
Attachment_5_Government_Furnished_Property_List_(Part_2)_29_July_2013.xls XLS spreadsheet
Exhibit_A_Contract_Data_Requirements_List_(CDRL) _DD_Form_1423_29_July_2013.PDF PDF
Attachment_6_Area_Wage_Determination_18_June_2013.pdf PDF
Attachment_5_Government_Furnished_Property_List_(Part_3)_29_July_2013.xlsx XLSX spreadsheet
Att_L-7_Prime_CCS.xlsx XLSX spreadsheet
DRAFT_Attachment_5_Government_Furnished_Property_List_(Part_2).xls XLS spreadsheet
DRAFT_Attachment_4_QASP_NSAWC_Aircraft_Maintenance_13_May_2013.pdf PDF
OT-13-20041.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Point of Contact:

Contract Specialist: Steven Preston Phone: (301) 342-9867 Email: steven.j.preston@navy.mil

See contination page for a description of the changes made in Amendment 0001

1. CONTRACT ID CODE PAGE OF PAGES

S 1 26

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Sep-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00019-12-R-0007

X 9B. DATED (SEE ITEM 11)

05-Aug-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Sep-2013

CODE

NAVAL AIR SYSTEMS COMMAND

AIR-2.3.5.1

21936 BUNDY ROAD BLDG 442

PATUXENT RIVER MD 20670

N00019 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N00019-12-R-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001 SUMMARY

The following changes have been made:

Section I

Since the issuance of the solicitation, the Section I clauses cited as not yet being available in the Standard

Procurement System (SPS) have been added to SPS. Accordingly, the list in Section I of CLAUSES NOT

AVAILABLE IN SPS has been deleted and the location of the clauses previously on this list has been revised to add them to the primary list of CLAUSES INCORPORATED BY REFERENCE.

FAR clause 52.245-2 has been deleted

DFARS clause 252.227-7014 has been added

Section J, the following Exhibits and Attachments are deleted in their entirety and replaced with updated versions.

The following is a summary of the changes:

Exhibit A Contract Data Requirements List (CDRL), DD Form 1423 is updated in its entirety

Attachment 1 Naval Strike and Air Warfare Center Aircraft Maintenance Performance Work Statement (PWS)

NAVAIR 01-1A-509-2 Cleaning and Corrosion Control Volume II Aircraft has been added to the list of applicable documents under paragraph 2.6

In 4.1.1(e), “each site and” has been deleted from the first sentence

“in accordance with NAVAIR 01-1A-509-2” has been added to paragraphs 4.11 and 6

Under paragraphs 4.12, 4.23, and 4.24 the subparagraph numbering has been revised

In Subparagraph 4.23.2 WIS Functions the second sentence has been deleted

In paragraphs 12.1, 12.2, 12.3, 12.4, and 12.5 references to Key Professional have been changed to Key

Personnel

In paragraph 12.6 the reference to Key Professional has been deleted

Attachment 5 Government Furnished Property List

The Attachment 5 Government Furnished Property List (Part 3) spreadsheet has been modified to unhide columns F and G

Attachment 6 Area Wage Determination has been updated to incorporate Wage Determination No.: 2005-2333, Revision No.: 13, Date Of Revision: 06/19/2013 version

Section L, LA-1 CONTENT OF PROPOSALS (SERVICES)

Table T-1 Small Business Goals shall only be included in Annex A and not Volume 2 – Technical, as a result the following changes have been made

In Part A, Section 2.1.1, and Table T-1 (Small Business Goals) has been deleted

In Part A, Section 3.0, Table 3.0 Proposal Structure, the row referencing Table T-1 Small Business

Goals has been deleted

In Part A, Section 3.0, the sentence below Table 3.2 Cross Reference Matrix, and Table T-1 (Small

Business Goals) has been deleted

In Part B, Section 2.5 a. (4), within the second sentence and Table T-1 (Small Business Goals)) has been deleted

In Part A, Section 2.1.8, Table 2.1 Offeror Electronic File Naming Convention has been modified to remove forward slashes from the File naming convention column for the Price, Direct Parts / Material and

Travel, and Phase In/Transition Plan files

In Part B, Section 2.2.3 the reference to PWS Section 4.12.2 t. has been changed to 4.12.2

In Part B, Section 4.1 c. has been modified to provide additional instructions related to any proposed investments

In Part B, Section 4.2.1, Section 2, Direct Rates paragraph, within the fourth sentence current AWD/CBA has been changed to the attached AWD/CBA

Section L Attachments, the following Section L Attachments are deleted in their entirety and replaced with updated versions. The following is a summary of the changes:

Attachment L-2 Table ES-2 Relevant Contract Summary

In the Relevant Contract Example worksheet, columns F and G Referenced in: Volume 3 (Past

Performance) and Volume 4 (Experience) have been deleted

Attachment L-6 Price Matrix

In the Option Year 2 worksheet, the CLIN number for the Technical Data for Items 0201 through 0204

CLIN has been changed to 0205 and the Transition Phase-Out CLIN number has been changed to 0206

In the Summary, Base Year, Option Year 1, Option Year 2, Option Year 3, and Option Year 4 worksheets, for the Transition Phase-Out CLIN, RSVD has been added to clarify that offerors should only enter a price for the Transition Phase-Out CLIN in the Transition worksheet

Attachment L-7 Prime CCS

In the FFP PRICE ROLL-UP worksheet, columns were added to include a Total for Transition Period section

Attachment L-8 Sub CCS

In the FFP ROLL-UP worksheet, columns were added to include a Total for Transition Period section

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUL 2013

52.204-13 System for Award Management Maintenance JUL 2013

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

AUG 2013

52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters

JUL 2013

52.219-8 Utilization of Small Business Concerns JUL 2013

52.219-9 Alt II Small Business Subcontracting Plan (JULY 2013) Alternate II OCT 2001

52.219-25 Small Disadvantaged Business Participation Program--

Disadvantaged Status and Reporting

JUL 2013

52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013

52.222-54 Employment Eligibility Verification AUG 2013

52.232-25 Prompt Payment JUL 2013

52.232-25 Alt I Prompt Payment (July 2013) Alternate I FEB 2002

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.244-6 Subcontracts for Commercial Items JUL 2013

252.227-7014 Rights in Noncommercial Computer Software and

Noncommercial Computer Software Documentation

MAY 2013

The following have been deleted:

CLAUSES NOT AVAILABLE IN SPS

52.245-2 Government Property Installation Operation Services APR 2012

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

SECTION J

Document Description Pages Date

Exhibit A Contract Data Requirements List (CDRL), DD Form 1423 60 04 September 2013

Attachment 1 Naval Strike and Air Warfare Center Aircraft Maintenance 29 28 August 2013

Performance Work Statement (PWS)

Attachment 2 Approved Key Personnel Listing (To be proposed by TBD TBD offeror and may be incorporated at time of award)

Attachment 3 Small Business Subcontracting Plan (To be proposed by TBD TBD offeror and may be incorporated at time of award)

Attachment 4 Quality Assurance Surveillance Plan 14 22 July 2013

Attachment 5 Government Furnished Property List 315 03 September 2013

Attachment 6 Area Wage Determination 11 14 August 2013

Attachment 7 Predecessor Contract Collective Bargaining Agreement (CBA) 33 18 June 2013

Attachment 8 DD Form 254 DOD Contract Security Classification 3 20 November 2012

Specification

Attachment 9 Transition Phase-In Plan (To be proposed by offeror and may TBD TBD be incorporated at time of award)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

LA-1

LA-1 CONTENT OF PROPOSALS (SERVICES) (OCT 2012) (JUL 2013)

PART A GENERAL INSTRUCTIONS

1.0 GENERAL

Offerors are required to submit sufficient information concerning all evaluation factors to enable Government personnel to fully assess the capabilities of the Offeror to perform all requirements. The proposal must be sufficient in detail and scope to enable evaluation and provide the evaluators a clear understanding of the Offeror’s approach, expertise, experience and capability as required by the solicitation. All proposals must clearly and convincingly demonstrate that the Offeror has a thorough understanding of all requirements and associated risks; is able, willing, and competent to devote the resources necessary to meet all requirements; and has valid and practical solutions for all requirements and potential risk areas. The Offeror shall not alter or rearrange the solicitation. The burden of proof for all substantiation within the proposal rests with the Offeror. Offerors are advised that the Government may incorporate any part of the Offeror’s proposal deemed beneficial to the Government, into the final contract. With the exception of Volume 4 Price, no cost/price should appear in any other volume. Alternate proposals are not acceptable.

In presenting material in the proposal, the Offeror is advised that quality of information is more important than quantity. Clarity, brevity, and logical organization should be emphasized during proposal preparation. It is the responsibility of the Offeror to present enough information to allow the various work efforts, support, and management approaches, as well as cost/price, to be meaningfully evaluated. Unsubstantiated statements that the prospective Offeror understands, can or will comply with the specifications, or paraphrasing the requirements or parts thereof are considered inadequate and may render a rating of unacceptable.

The Offeror must include any data necessary to illustrate the adequacy of the various assumptions, approaches, and solutions to problems. There is no need to repeat information in more than one volume. The detailed information must be included in the most logical place and summarized and referenced in other areas if an overlap exists.

Unnecessarily elaborate brochures or other presentation beyond that sufficient to present a complete and effective proposal is neither necessary nor desired.

Throughout these instructions, Offeror is defined as the prime contractor with its CAGE code identified in Block

15A on Standard Form (SF)-33, Solicitation, Offer, and Award. “Principal Subcontractors” are defined as a subcontractor who provides at least 10% of the proposed total price for the contract. A “Joint Venture” (JV) is a partnership or teaming arrangement that is formed for the purpose of responding to this solicitation when the prime contractor consists of more than one legal entity. “JV Team Members” are the entities that make up a Joint Venture.

“Critical Subcontractors” are subcontractors that perform a critical function, whether technical or financial, in the performance of the resulting contract. The term entity is used to mean any or all of the following: Prime, principal subcontractor, critical subcontractor, JV, and/or each JV team member or other subcontractor.

2.0 PROPOSAL FORMAT AND SUBMISSION

Proposals must be formatted using a Times New Roman 12 point normal font (no reduction permitted), single-spaced with 1-inch margins all around, and formatted for/printed on standard 8.5 x 11 inch paper. All pages should be numbered with volume, paragraph, and page numbers. When fold-out pages are used, they must not exceed 11 x

17 inches and will be counted as 1 page. Drawings may be provided separately and may be any size but should be folded to approximately 8.5 x 11 inch standard size and will count as 1 page. If the Offeror uses graphs to convey information the graphs must show enough detail to easily discern the information described. Graphs and tables shall be presented in no smaller than a 10 pt font. Graphs should contain a grid, which allows values to be read directly from the graph to the same detail that a 10 x 10 to the ½ inch grid provides. Graphic resolution should be consistent with the purpose of the data presented. Text utilized in charts, figures, and graphics shall also be no smaller than a

10 pt font and may use a font type selected by the Offeror. Each volume, book, or annex shall be provided separately in a 3-ring binder. The binders should be of an appropriate thickness for the number of pages it contains

(e.g., a 30-page book shall not be placed in a 2-inch binder).

2.1 Electronic Submission of Proposal

This section is intended to provide information to the Offeror on the electronic format and application software to be used for submitting proposals. Use of the software and procedures described in this section will reduce the amount of time and effort needed to receive and install proposals onto the electronic evaluation system, and will ensure that the proposals received are suitable for reading electronically.

2.1.1 Electronic Proposal Media

The Offeror should submit all volumes of its proposal electronically on CD-ROM(s) compatible with the operating system and applications defined in Section 2.1.2 below. The Offeror should put as much proposal material as possible on each CD-ROM, keeping the portions of the proposal that contain pricing information on separate CD-

ROM(s) from the portions of the proposal that do not contain pricing information. For this solicitation, Annex A

(Small Business Subcontracting Plan); Volume 4 Cost/Price; and Volume 5 Contract Administration contain price information and should be delivered on separate CD-ROM(s) from the remainder of the proposal. The Offeror should submit two sets of CD-ROMs that contain its proposal. One set of CD-ROM disks should be marked

"Master," the other should be marked "Back-Up." Both sets of CD-ROM disks should be clearly marked with the

Offeror's name and address, the point of contact's name and phone number, and proposal volumes contained therein.

The Offeror is responsible for ensuring electronic proposals are virus free in accordance with Section 2.1.4.

2.1.2 Operating System and Applications

The proposals will be accessed utilizing the Microsoft XP Professional Operating System. The Offeror shall submit two identical proposals in separate, electronic versions: one version in Portable Document Format (.pdf) and one version in Microsoft Office 2007 Applications (Microsoft Word, Microsoft Excel, Microsoft PowerPoint, and

Microsoft Project). The .pdf document must be fully searchable. The Offeror is responsible for ensuring that the

.pdf and the appropriate Microsoft Office 2007 applications versions contain identical information. The

Government shall have the discretion to use the information in either version, and shall not be responsible for any differences in content between the two proposal formats submitted by the Offeror. Use of other application software for submission of proposals is prohibited except where specific instructions for non- PDF or Office 2007 applications are provided.

2.1.3 Hyperlinks

Offerors may use hyperlinks within and among proposal volumes that do not include price information. However, there shall be no links from any other volume into Volume 4 Price or any portion of the proposal that contains price information.

2.1.4 Virus Free Electronic Submission

Offerors are responsible for ensuring that its electronic proposal is virus free. The Offeror shall certify, in its proposal cover letter, that all electronic proposal information has been checked for viruses, and specify the software, version, and virus definition used to check the data. With each subsequent submission of proposal information (e.g., responses to Evaluation Notices, Final Proposal Revisions, etc.), the Offeror shall ensure and certify that its files are virus free.

2.1.5 Multimedia

The Offeror should not embed sound or video (e.g., MPEG) files within the proposal submission.

2.1.6 Graphics

Large files require greater computer system resources and are discouraged. The Offeror is encouraged to:

a. Simplify the color palette used in creating figures;

b. Minimize size of graphics files; and

c. Avoid scanned images.

2.1.7 Evaluation Hardware

The source selection facility uses the following type workstation computer systems and printers.

ITEM EQUIPMENT

Workstations Intel® Core ™ Duo CPU or better

2.94 GB RAM

19” Monitors

CD-ROM Drive

Windows XP Professional Operating System

Network Printers Xerox Phaser 6350DP PS

2.1.8 File Naming Conventions

There is no limit to the number of files that may be submitted. Valid extensions for files using their associated applications follow:

Type of Application/Files Valid Extensions

Portable Document Files .pdf

Microsoft Word documents .doc; .docx

Microsoft Excel documents .xls; .xlsx

Microsoft Power Point .ppt; .pptx

Microsoft Project .mpp

Files should have the following naming convention ("#" represents the sequential numbering of files and the suffix is for illustration, and may be .pdf, .docx, .xlsx, .pptx, . or .mpp). For electronic file submissions (e.g. proposal volumes, annexes, appendices, enclosures) the Offeror should follow the basic structure of the file naming convention suggested in Table 2.1 “Offeror Electronic File Naming Convention”. Offeror’s shall keep the file name as short as possible (under 40 characters) so that it is accessible on Government share drives. The Offeror shall ensure that the electronically submitted file names are directly traceable to hard copy submittals.

Table 2.1 Offeror Electronic File Naming Convention

Volume

Number

Title File naming convention

1 Executive Summary Vol 1 ES#.pdf and Vol 1

ES#.docx

Table ES-1 Offeror Summary

Table ES-2 Relevant Contract Summary

Vol 1 ES Tables.xlsx and

Vol 1 ES Tables.pdf

2 Technical Vol 2 Tech#.pdf and Vol 2

Tech#.docx

Cross Reference Matrix GenInst Tech CRM.xlsx and GenInst Tech CRM.pdf

3 Past Performance Vol 3 PP#.pdf and Vol 3

PP#.docx

Table PP-1 Past Performance Contract Data Vol 3 PP-1 PP Con

Data.pdf and Vol 3 PP-1 PP

Con Data.xlsx

Release of Adverse Past Performance Authorization Letters;

and/or Past Performance Point of Contact Information for

Subcontractors and Joint Venture Team Members

Rel Ad PP Ltr#.pdf and Rel

Ad PP Ltr #.docx; and/or

PP POC Info#.pdf and PP

POC Info#.docx

4 Price Vol 4 Cost Price#.pdf and

Vol 4 Cost Price#.docx

Price Matrix Price Matrix.xlsx

Prime CCS Prime CCS.xlsx

Sub CCS Sub CCS.xlsx

Direct Parts / Material and Travel Vol 4 Direct Parts Material and Travel.xlsx

5 Contract Administration Vol 5 CA#.pdf and Vol 5

CA#.docx

Annexes

Annex A Small Business Subcontracting Plan AnnA SB Sub Plan

Annex B Relevant Portions of Final Versions of Previous SOW/PWSs for AnnB Rel SOW PWSs#.pdf

Past Performance and AnnA Rel SOW PWSs

#.docx

Annex C Manpower Chart AnnC ManChart.xlsx

Annex D Phase In/Transition Plan AnnD Phase In Transition

Plan.docx

3.0 PROPOSAL CONTENT AND VOLUMES

The Offeror shall present its proposal information in a manner that facilitates a one for one comparison between the information presented and these proposal instructions. Proposal information must be structured such that its paragraph numbers/letters correspond to the proposal instructions paragraph numbers/letters, although the Offeror may add lower tier sub paragraphs.

In addition to the electronic copies requested in paragraph, 2.1, “Electronic Submission of Proposals,” each volume, book, and annex of the proposal shall be submitted as one paper original and additional paper copies as specified in

Table 3.0 Proposal Structure. The Offeror shall submit all paper and electronic copies of the proposal to the address provided in section 4.0. Suggested page counts for each volume, if any, are also specified in Table 3.0 Proposal

Structure (title and table of contents pages are not included in the suggested page count). Annexes do not have suggested page counts. Information submitted as an Annex to a particular proposal volume could include manuals, specifications, plans, procedures, and company policies, as well as other information requested in Section B Specific

Instructions and do not count towards the suggested page count. Additionally, the individual subcontracting reports for the past performance volume are not included in the suggested page count.

Table 3.0 Proposal Structure

Volume

Number/Attachmen t Number/Annex

Title

Volume Title Suggested page count

Copies Required

Proposal Cover Letter (Virus Free

Electronic Submission guarantee)

Provided as

Attachment L-1

Cross Reference Matrix *

Volume 1 Executive Summary 25 1 Original/5

Copies

Provided as

Attachment L-2

Table ES-1 Offeror Summary and

Table ES-2 Relevant Contract

Summary

Volume 2 Technical 100 1 Original/5

Copies

Volume 3 Past Performance As Needed 1 Original/5

Copies

Release of Adverse Past

Performance Authorization Letters;

and/or Past Performance Point of

Contact Information for

Subcontractors and Joint Venture

Team Members

Provided as

Attachment L-5

Table PP-1 Past Performance

Contract Data

L-4 Past Performance Questionnaire *

Volume 4 Price As Needed 1 Original/5

Copies

Provided as

Attachment L-6

Price Matrix As Needed 1 Original/5

Copies

Provided as

Attachment L-7

Prime CCS As Needed 1 Original/5

Copies

Provided as

Attachment L-8

Sub CCS As Needed 1 Original/5

Copies

Provided as

Attachment L-9

Direct Parts / Material and Travel As Needed 1 Original/5

Copies

Volume 5 Contract Administration As Needed 1 Original/5

Copies

ANNEXES

Annex A Small Business Subcontracting Plan As needed 1 Original/5

Copies

Annex B Relevant Portions of Final Versions of Previous SOW/PWSs for Past

Performance

As needed 1 Original/5

Copies

Annex C Manpower Chart As Needed 1 Original/5

Copies

Annex D Phase In/Transition Plan As Needed 1 Original/5

Copies

*Not included in the suggested page count

Each binder must contain the following information:

a. Cover and title page;

b. Title of proposal and proposal number as applicable;

c. Offeror’s name, address and POC;

d. Solicitation number;

e. Proposal volume/book/annex number;

f. Copy number;

g. Table of Contents (The table of contents must provide sufficient detail to easily locate important elements). At a minimum it must include the paragraphs identified in the CRM; and

h. Tabs and dividers.

Catalog Card - Each volume must contain an 8 1/2" x 11" Catalog Card containing the information required for the cover and title page. The back of the card must be formatted with three columns entitled "Name", "Date Out", and

"Date In". This card must be removable from the back of each binder.

The following table lists the attachments provided to the Offeror with Section L, to assist with proposal development.

SECTION L LIST OF ATTACHMENTS

Attachment Number Electronic File Title Attachment Name

L-1 GenInst Table 3.2 CRM Table 3.2 Cross Reference Matrix

L-2 Vol 1 ES Tables Table ES-1 Offeror Summary and

Table ES-2 Relevant Contract

Summary

L-3 Vol 2 T-1 SB Goals Table T-1 Small Business Goals

L-4 Vol 3 PPQ Past Performance Questionnaire

L-5 Vol 3 PP-1 PP Con Data Table PP-1 Past Performance

Contract Data

L-6 Vol 4 Price Matrix Price Matrix

L-7 Vol 4 Prime CCS Prime CCS

L-8 Vol 4 Sub CCS Sub CCS

L-9 Vol 4 Direct Parts / Material and Travel Direct Parts / Material and Travel

L-10 Vol 2 Manpower Chart Manpower Chart

A Cross Reference Matrix (CRM), Table 3.2, is included to help the Offeror develop its proposal and to ensure traceability of Section L paragraphs to the requirements. An electronic version of Table 3.2 (CRM) is provided as

Attachment L-1. The Offeror’s CRM may be identical to the one provided or revised to add information. For example, the Offeror’s CRM may cross-reference its proposal volumes, paragraph numbers, and pages to specific solicitation requirements identified within the table, as well as other parts of the proposal that contain relevant information.

Table 3.2 Cross Reference Matrix

Section L – Proposal

Instructions

PWS

Section M –

Evaluation Factors

Proposal

Reference

2.0 Vol. 2 Technical

2.1 Phase In/Transition Plan 4.1 II.A

2.2 Staffing and Manning

2.2.1 Staffing and Manning 4,5,11,12 II.A

2.2.1.1 Key Personnel 12 II.A

2.2.2 Training and

Qualification of Safety

Personnel

3.4.3, 4.20, 4.25

II.A

2.2.3 Supporting Multiple

Detachments

4.12 II.A

2.3 Maintenance and

Maintenance management

II.A

2.3.1 Maintenance

Management

3.2,4 II.A

2.3.2 Ready for Flight

(RFF)

9 II.A

2.3.3 Aircraft Maintenance 3.2,4,6 II.A

2.3.4 Aircraft Discrepancies 4.6, 4.23,4.24 II.A

2.3.5 GFP Management &

Tracking

3.3 II.A

2.4 Management Control

Systems

4 II.A

2.5 Small Business II.A

No price information, (e.g., DOLLAR VALUES AND / OR HOURLY RATES) shall be included in any volume other than Annex A (Small Business Subcontracting Plan); Volume 4 Price, or Volume 5 Contract Administration.

4.0 PROPOSAL PACKAGING AND SUBMISSION:

The Offerors shall package the proposal volumes in cartons or equivalent packaging containers in the most efficient manner possible, grouping like volumes to the maximum extent possible. Each box should identify its contents by including a packing slip detailing each volume/book number and title, and copy number. Each carton should be double wrapped. The outside of the carton should be plain and the inside carton shall be stamped or marked “For

Official Use Only; and Source Selection Information – See FAR 2.101 and 3.104,” marked for the intended recipient as identified below, and should only contain those proposals intended for that person. The master set of proposals and set No. 1 copy will be marked for NAVAIR Procuring Contracting Officer (PCO), AIR-2.3.5.1.4. The Master

Set shall include all original proposal volumes, all proposal volumes on CD-ROM, and a complete Model Contract as defined in Volume 5 Contract Administration. Documents which contain cost/price data shall be on a separate

CD-ROM(s).

Clearly mark all packages with the solicitation number. The submission date for all volumes shall be no later than the date and time specified in Block 9 of Standard Form 33 of the solicitation. However it is requested that one hard copy and one electronic copy on a CD-ROM of Volume 3 Past Performance, Table PP-1 (Past Performance Contract

Data); as well as Volume 1 Executive Summary, Table ES-1 (Offeror’s Summary); and Volume 1 Executive

Summary, Table ES-2 (Relevant Contract Summary) be submitted three weeks prior to the submission date/time specified on Standard Form 33 (Block 9). Please indicate any changes made to the information delivered three weeks early in the submission provided on the date and time specified in Block 9 of Standard Form 33 of the solicitation. If no changes are made, please state so at the beginning of Volume 1 Executive Summary and Volume

3 Past Performance.

The method of delivery shall be via United States Postal Service or commercial carrier to the address listed below.

Hand-carried proposals shall be coordinated with the contract specialist Mr. Steven Preston, at (301) 342-9867 and steven.j.preston@navy.mil. Initial and Final Proposal Revisions shall be submitted by mail or by hand. No other method is acceptable.

Naval Air Systems Command

Code: AIR-2.3.5.1.7 (Attn: Mr. Steven Preston)

Solicitation Number: N00019-12-R-0007

Bldg 442, 1st Floor

21936 Bundy Road

Patuxent River, MD 20670

5.0 CLASSIFIED DATA

All proposals must be UNCLASSIFIED

6.0 CHANGES TO SOLICITATION

All amendments to this solicitation shall be posted at https://www.fbo.gov/

Search the database for the solicitation number N00019-12-R-0007

7.0 TECHNICAL LIBRARY

A technical library of information directly related to the requirements of this contract is available to all offerors.

The technical library, called the Central Technical Publications Library (CTPL), is physically located at NSAWC, NAS Fallon NV. The POC to arrange access to the CTPL is the Contracting Officers Representative (COR) of the current contract, LCDR Michael Wagner. The COR is located at NSAWC, 4755 Pasture Road, Building 404

(Hangar 5), Floor 2, Room 240 and can be reached by phone at (775) 426-3961, (775) 426-3019 or via email michael.d.wagner5@navy.mil. The COR will receive all offeror requests for access to the CTPL and will escort offerors to the CTPL where they will be able to view any reference materials applicable to this proposal. The COR shall provide the offeror access to materials as follows:

a. The COR will assign an assistant to the offeror who will allow the offeror access to publications and instructions whether paper or electronic for viewing within the CTPL only.

b. The Government will not allow offerors to reproduce publications and instructions, whole or in part.

c. The Government will not allow offerors access to work spaces other than the CTPL.

https://www.fbo.gov/ mailto:michael.d.wagner5@navy.mil

If the offeror is having problems attaining reference materials, immediately contact the contract specialist Mr. Steven Preston, at (301) 342-9867 (email steven.j.preston@navy.mil) and the Procuring

Contract Officer Susan Holmes at (301) 757-7106 (email susan.holmes@navy.mil).

PART B SPECIFIC INSTRUCTIONS

1.0 VOLUME 1 – EXECUTIVE SUMMARY

Note: This volume shall not contain any reference to price aspects of the offer.

The following is a list of Section L Attachments that the Offeror shall utilize to provide information for this volume:

Attachment L-2 Executive Summary Tables

The purpose of the Executive Summary is to provide the Government with an overview of the Offeror’s entire proposal and strategy, excluding price. This Volume shall state the proposal validity date of 31 August 2014. Each section within the Executive Summary shall contain the salient points contained in each of the proposal volumes. In addition, this table should be used by the Offeror to identify and highlight significant features of its proposal. The

Executive Summary volume should be divided into the areas outlined below:

a. Offeror Summary Table

(1) The Offeror shall complete Table ES-1 (Offeror Summary), provided in Attachment L-2 (Executive

Summary Tables), according to the instructions within the attachment, and submit it within this section.

(2) The Offeror shall provide a written explanation if multiple CAGE codes/DUNS for the same physical location are provided in Table ES-1 (Offeror Summary). The written explanation shall detail the distinct roles and responsibilities for entities with different CAGE codes/DUNs at the same physical location for where the work is being performed or from where the work is being directed. The description shall include all changes in the organization as a result of a corporate acquisition, reorganization, merger, or other administrative reason.

Note: Place of Performance for this solicitation pertains to the physical location of the prime, all subcontractors, JV and JV team members that are deploying personnel or responsible for the work; not the

Government site where the work is being performed. If work is being performed at a contractor site, then that would also pertain to Place of Performance.

b. Relevant Contract Summary Table

The Offeror shall complete the Table ES-2 (Relevant Contract Summary) provided in Attachment L-2

(Executive Summary Tables), for all contracts proposed as relevant for Past Performance for the Prime, principal subcontractors, critical subcontractors, JV and JV team members. Complete the table according to the instructions within the attachment and submit it within this section and as a separate electronic file. The contract references designated in Table ES-2 (Relevant Contract Summary) shall be used in completing Volume

3 Table PP-1 (Past Performance Contract Data);

c. Technical

The Offeror shall provide a summary of the effort and identify how its approach addresses the requirements of this solicitation as well as the salient features of the Offeror’s management approach;

d. Past Performance

The Offeror shall provide a summary of the Prime’s, principal subcontractors’, critical subcontractors’, JV and

JV team members’ past performance and systemic improvements which pertains to the tasks required by this solicitation;

e. Contract Administration mailto:steven.j.preston@navy.mil

The Offeror shall provide a summary of any exceptions or deviations, and proposed Section H clauses addressed in Volume 5 Contract Administration.

2.0 VOLUME 2 - TECHNICAL

Note: This volume shall not contain any reference to price aspects of the offer.

The following is a list of Section L Attachments that the Offeror shall utilize to provide information for this volume:

Attachment L-3 Table T-1 Small Business Goals

Attachment L-10 Manpower Chart

Throughout the Technical Volume the Offeror should identify any proposed capability, approach or feature that exceeds a requirement or provides merit associated with a performance or operational benefit to the Government.

The Offeror should also identify any proposed capability, approach or feature that reduces risk inherent in the program. Specifically, explain the benefits to the Government in technical terms and the degree of impact it will have to performance, operations and/or risk. Appreciably exceeding requirements that are expressed as a minimum or threshold requirement can potentially produce performance or operational benefits. Beyond the point where there is no additional performance or operational benefit, risk reduction may be assessed. Additionally, a proposal that provides the Government with a capability, service or resource that is not specifically required, but benefits the

Government can have merit if it appreciably enhances performance and/or operations to benefit the Government.

Offerors are advised that any offer to exceed a requirement or to provide a feature with performance and/or operational benefits may be included in the resulting applicable Contract within the proposed price.

2.1 Phase In/Transition Plan

In Annex D, provide a Phase In Plan that addresses the elements listed in the solicitation, PWS, paragraph 4.1.

Describe the Offeror’s approach to initiating this program and provide a detailed Plan Of Action and Milestones

(POA&M) for actions that will be required to begin performing in accordance with the requirements of this solicitation, including obtaining base access. Identify the major challenges with regard to start-up and provide an approach to mitigate risk. Provide a detailed plan to train personnel during transition, including method for incorporation of lessons learned at previous site transition(s), and formal certification/licensing procedures for personnel. Provide a POA&M for the development of the work instructions, procedures, and planning documents that are needed to begin the program. The Offeror shall submit a detailed time phased manning plan that indicates staffing by site, and function during transition. Indicate an eventual "ramp-up" to achieve full manning levels and performance.

2.2 Staffing and Manning

2.2.1 Staffing and Manning

In the following section the offeror shall demonstrate the proposed manning, personnel skill levels, expertise, and experience are adequate to perform the work required by this solicitation. Identify the number of people and skill level mix for all periods of performance by platform using the three operational tempos described in RFP section B and CLIN 0X01, including the transition phase. Describe how the proposed manning and personnel plan will accomplish the requirements of this program using the three operational tempos described in RFP section B.

Provide a staffing plan that includes the following:

a. Manning Chart – Use attachment L-10 as a template for developing Annex C, a manpower staffing chart. Include proposals by position, by labor category and by the number of personnel assigned. Explain how the proposed manpower numbers were established. Specifically, provide definition of work year capabilities of the work force

(equivalent man hours/year analysis). Identify on-site and off-site personnel.

b. Manning Distribution – Provide the proposed maintenance organizational structure by department. For each department describe the composition, responsibilities, and titles for all on-site and off-site personnel. Identify all indirect labor classifications, titles, responsibilities.

c. Personnel - Describe the processes used in hiring, recruiting, and retaining personnel. . Describe the approach used to fill all positions required for each labor category and the approach for retention.

d. Training - Provide certification and skill level for each labor category to fulfill the requirements described in the

PWS. Describe how training certifications will be met and kept current.

2.2.1.1 Key Personnel

Provide the key personnel position descriptions and requirements of the key personnel position in each of the functional areas identified below. Describe the experience, skills, education, training, qualifications, and certifications that are required for each described position. Each position description shall not exceed one page (one side). Also, provide at least one resume for each of the key personnel proposed for the below positions. Offeror format for the presentation of this information is acceptable.

Program Manager

Contractor Operations Site Manager

Maintenance Supervisor

Material Control Supervisor

QA Supervisor/Manager

2.2.2 Training and Qualification of Safety Personnel

Describe the training, qualifications, and certifications required for System Safety, Industrial Safety, and Aviation

Safety personnel (Include any Ordnance Qualification and Certification as necessary). Describe the re-certification and training programs required to maintain the safety qualifications.

2.2.3 Supporting Multiple Detachments

Describe the approach for maintenance and logistics support of base operations at Fallon, NV and simultaneously supporting up to two detachments. Detachment sites may include any combination of sites identified in the PWS

Section 4.12.2. Include the following in the description of your approach:

a. Describe the coordination with the Government site operations personnel to ensure operational requirements and commitments are met. Describe how the tailoring of manpower, qualifications and work shifts will provide maintenance and logistics support coverage for any detachments.

b. Explain how the detachment support structure and personnel will interface and integrate with the primary operating site and the contractor’s home office for supporting the detachments in the following areas:

1. Maintenance support of the detachment

2. Supply and logistics support

3. Support equipment

4. Quality Assurance and quality oversight

5. Technical data support

6. Concurrent support between detachment and permanent site.

7. Maintenance support for issues that occur which are beyond capabilities of detachment on-hand personnel

2.3 Maintenance and maintenance management

2.3.1 Maintenance Management

Demonstrate how the offeror intends to manage all T/M/S as required by the PWS .

2.3.2 Ready for Flight (RFF)

Describe how the maintenance organization and the maintenance controls will react to operational changes, weather disruptions, and fluctuating carrier air wing training schedules. Describe how the maintenance organization and the maintenance controls will control the scheduled and unscheduled maintenance process to ensure meeting the minimum operational performance standards for Mission Capable (MC) and Ready for Flight (RFF) aircraft availability described in the solicitation.

2.3.3 Aircraft Maintenance

a. Process Description - Describe the planned on-site Organizational, and Intermediate level maintenance processes for aircraft, components, and associated support equipment.

b. Describe the procedures to store, update, distribute, and ensure that current technical data is used in the maintenance and logistics support process.

c. Describe your Quality Assurance Program as it applies to the “O”, and “I” levels of maintenance.

2.3.4 Aircraft Discrepancies

Offeror shall describe the processes used to recognize and correct aircraft discrepancies. Describe the offeror’s approach to control the number of awaiting maintenance actions (discrepancies) on the aircraft at all times during this program to ensure program metrics are met.

2.3.5 GFP Management & Tracking

The offeror shall describe how they intend to track, manage, and maintain calibration standards IAW the

NAVAIRINST 13650.1C AMMRL Program where applicable on, all GFP required for the performance of this solicitation.

2.4 Management Control Systems

a) Describe your Management Control System, specifically, the process to plan, control costs, measure performance, and generate timely, reliable and accurate management information for this program.

b) Describe how the system will enable the offeror to reliably plan, schedule, and monitor technical performance.

c) Describe how data collection and tracking will be accomplished.

2.5 Small Business Management

a. Small Business (SB) Utilization Strategy - All Offerors (Large and Small Businesses) shall address their strategies for utilizing SB Concerns in the performance of this contract, whether as a joint venture, teaming arrangement or subcontractor. SB Offerors may meet this requirement using work they perform themselves.

For purposes of this solicitation, the term SB Concern shall also include the subcategories of Veteran-Owned

Small Business (VOSB), Service-Disabled Veteran-Owned Small Business (SDVOSB), HUBZone Small

Business (HUBZone), Small Disadvantaged Business (SDB), and Women-Owned Small Business (WOSB).

Each subcategory of SB shall be addressed. This strategy is separate from, but shall be consistent with, the SB

Subcontracting Plan, if such a Plan is required. In describing its SB Utilization Strategy for this solicitation, the

Offeror shall, as applicable:

(1) Describe its approach to identifying SB Concerns;

(2) Describe the extent of participation of SB Concerns on this contract, including a detailed description of the supplies and services for each SB Concern subcategory, and the complexity and variety of the work SB

Concerns are to perform. For each SB Concern specifically identified in the proposal, provide the SB

Concern's CAGE Code, or, if the SB Concern is not registered in the System for Award Management

(SAM), as a minimum provide evidence of self-certification in accordance FAR 19.703(b) as a SB

Concern. Where possible, provide documentation regarding enforceable commitments to utilize each SB

Concern.

(3) Identify what processes have been implemented to correct past inabilities to meet proposed goals, and any validated improvements;

(4) Provide goals, expressed as dollars and percentages of total contract value and percentages of total subcontract value for SB Concerns and each subcategory of SB, using the format depicted below and provided electronically in Attachment L-3 (Table T-1 Small Business Goals). The Offeror shall provide

Table T-1 as part of Annex A (Small Business Subcontracting Plan). Use tab 1 for the prime and tab 2 etc.

for each Tier One subcontractor as goals for each subcontractor must be listed separately;

Table T-1 Small Business Goals

Offeror Name

Total Proposed Contract Value

(including options) $

Total Amount to be Subcontracted

$ to be

Subcontracted

% of Total

Contract Value

% of Total

Amount to be

Subcontracted

Large Business

Small Business

Total 100%

Small Business Concern Subcategories

(the sum of these small business subcategories will not necessarilyequal the Small Business total above):

$ to be

Subcontracted

% of Total

Contract Value

% of Total

Amount to be

Subcontracted

VOSB

SDVOSB

HUBZone

SDB

WOSB

(5) Describe its specific efforts and new, contract-specific initiatives to ensure the resulting contract meets or exceeds proposed goals. These efforts shall include, but are not limited to: sponsoring program specific outreach events and industry conferences, establishing Mentor-Protégé relationships and market research using websites such as the NAVAIR Office of Small Business Programs website

(http://www.navair.navy.mil/osbp ) to locate small business concerns; and

(6) Demonstrate (Large Businesses only) that its SB Utilization Strategy is consistent with its SB

Subcontracting Plan. If the Offeror is a participant in the DoD Comprehensive Subcontracting Test

Program specified in DFARS 219.7, or if the Offeror submits a Commercial Subcontracting Plan for this proposal, then the Offeror shall describe how SB participation on this contract will contribute to its overall

Comprehensive or Commercial Subcontracting Plan goals.

b. Small Business Subcontracting Plan - Each Large Business Offeror shall provide its Small Business

Subcontracting Plan conforming to the requirements of FAR 19.7 and DFARS 219.7 as part of Annex A. The

SB Subcontracting Plan of the successful Offeror(s) shall be reviewed and approved by the PCO prior to contract award. See FAR 19.702(a)(1) Statutory requirements, regarding failure of the apparent successful

Offeror to negotiate and submit a SB Subcontracting Plan or submit a Comprehensive SB Subcontracting Plan acceptable to the Contracting Officer. The successful Offeror’s approved Subcontracting Plan will be incorporated into the resultant contract.

3.0 VOLUME 3 - PAST PERFORMANCE

Note: This volume shall not contain any reference to the price aspects of the offer

The following is a list of Section L Attachments that the Offeror shall utilize to provide information for this volume:

Attachment L-4 Past Performance Questionnaire (PPQ)

Attachment L-5 Past Performance Contract Data (PP-1)

For this volume, the Offeror shall identify relevant contracts, or those portions of a relevant contract, whose performance is within five years of the proposal due date and contains efforts similar to those efforts (e.g., end product or service, type effort, contract tasks, contract type, contract dollar value, etc.), required by this solicitation for the Prime, principal subcontractors, critical subcontractors, JV and JV team members, identified in Table ES-1

(Offeror Summary). Offerors shall also identify relevant contracts within the past five years that had any show-cause notices, cure notices, or termination for default.

Contractor Performance Assessment Reporting System (CPARS) and Questionnaires will be the primary customer feedback data used to evaluate the Offeror’s past performance. The Past Performance Information Reporting

System (PPIRS) will be the primary paperless method used to retrieve the CPARS for this source selection. For all contracts identified that do not have a CPARS, the Offeror shall forward a copy of Attachment L-4 Past

Performance Questionnaire to that contract’s Procuring Contracting Officer (PCO), Administrative Contracting

Officer (ACO), and Program Manager (PM); or commercial contractor equivalents. Please forward all questionnaires within two weeks from this solicitation’s release date to allow adequate time for the recipient to respond. Note that the Offeror should not reference this solicitation’s number when distributing the past performance questionnaires to customers. The Offeror shall include instructions for the customers to send completed questionnaires within two weeks of its receipt via e-mail to Mr. Steven Preston, Contract Specialist, at steven.j.preston@navy.mil. The Offeror shall ensure that all points of contact are current and include an email address and phone number. The Offeror shall not conduct follow-up actions with regard to this questionnaire, other than to confirm receipt by the recipient. The Government may contact customers identified by the Offeror to obtain follow-up Past Performance Information as needed.

Offerors are reminded that the Government reserves the right to use information to evaluate past performance obtained from sources other than those identified by the Offeror. The Government may send additional questionnaires and/or obtain information from sources identified by the Government evaluation team.

http://www.navair.navy.mil/osbp

3.1 Authorization Letter(s)

Within this section, the Offeror should submit a signed “Release of Adverse Past Performance Authorization

Letter(s)” with written consent from each participating principal subcontractor,…