Q and A for EOCOE4.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- EOCOE 4
- Solicitation number
- N0001425R7001
About this file
This is a Questions and Answers document for the EOCOE4 (Executive Office Chief of Engineers 4) solicitation from the Office of Naval Research. The Q&A addresses four key areas: (1) clarification that the requirement to use GFE NMCI equipment is for data sharing and not SETA work, (2) confirmation that NMCI equipment for CUI handling applies only to key personnel, not subcontractors, (3) verification of the contract periods as a two-year base with three one-year options, which would repeat for years 6-10, and (4) clarification that connectivity requirements for shipyards and naval industries extends to the maritime industrial base and defense industrial base.
The pricing structure includes fixed fee caps as specified on page 92 of the solicitation, which were confirmed as correct in the Q&A. The draft RFP indicates this is for the EOCOE4 program, with the place of performance to be determined after award selection.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A
| Solicitation Reference | Solicitation Reference Page # | Solicitation Reference Section or Paragraph | Respondent's Question | Government Answer |
| Section L | 84-85 | Section L ONR - Organizational Conflict of Interest Provision | Request clarification whether the requirement to use GFE NMCI equipment interferes with the ONR OCI policy where a R&D performer cannot perform systems engineering and technical assistance (SETA). | The intent here is not for SETA, but rather the ability to use NMCI systems for data sharing. |
| Section L | 90 | L.8.1.7.d | Request clarification on extent of use of NMCI equipment to perform CUI. Is this intended only for the named Key Personnel under the prime contract? Would this apply to subcontractors? | This would only apply to key personnel. |
| Section L | 91-92 | L.9 Volume II | Requesting clarification on the base and option periods to be priced for Task Orders 1 and 2 (references 2-yr base and three 1-yr options) | It is still a two year base with three one year options. However, it would be a repeat for years 6-10 |
| Section L | 92 | L.10 | Requesting clarification whether the included Fixed Fee Caps table is current. | The numbers on page 92 look correct. |
| EOCOE Draft SOW | 7 | 2.1.3 Connectivity to Shipyards and Other Key Naval Industries | Request clarification on limitation to shipyards and other key naval industries. | This includes the maritime industrial base and or defense industrial base. |
File details come from the government source that posted it. Updated .