Atch 10. West Gate Construction Questions and Answers.pdf

PDF 411 KB Posted

Attached to
ATFP Construct West Gate ID Check Area Federal contract opportunity
Solicitation number
MXDP143001
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains questions and answers regarding a federal construction solicitation. The solicitation is for the construction of a new road, gatehouse, identification check area, and canopy at Laughlin Air Force Base in Texas. Key requirements include demolition of existing facilities, construction phasing, and provision of all associated utilities to deliver a fully functional project. The design documents specify a field-welded space frame canopy structure that may not be substituted with a pre-engineered option. Joint ventures bidding on the work may meet experience requirements through the combined experience of both companies. Offerors must demonstrate a minimum of 10 years of accumulated construction experience in relevant trades but are only required to certify no prior environmental non-compliance issues with the Texas Commission on Environmental Quality. The solicitation will be set aside for Women Owned Small Businesses and issued by the Air Force under NAICS code 236220 with a $39.5 million size standard.

View the file

Other files for this federal contract opportunity

Other files attached to ATFP Construct West Gate ID Check Area, newest first.
File Type Posted
Solicitation Amendment FA309920R00060005 SF 30.pdf PDF
Solicitation Amendment FA309920R00060004 SF 30.pdf PDF
Solicitation Amendment FA309920R00060003 SF 30.pdf PDF
Atch 11. West Gate Construction Questions and Answers B.pdf PDF
Solicitation Amendment FA309920R00060002 SF 30.pdf PDF
Solicitation Amendment FA309920R00060001.pdf PDF
Atch 3. Wage Determination TX20200008.pdf PDF
D_Schedule of Material Submittals - Copy.xlsx XLSX spreadsheet
O_Progress Schedule and Reports.xlsx XLSX spreadsheet
T_Final Report-2018.pdf PDF
Atch 1. SOW MXDP 14-3001 Construct West Gate ID Check Area.pdf PDF
M_AF IMT 103_Work Clearance Request.pdf PDF
U_LAUGHLIN AFB TOPO PLAT.pdf PDF
Atch 5. AETC 47.pdf PDF
MFR Request attachments West Gate.pdf PDF
Atch 6. Financial Institution Reference Sheet.pdf PDF
Atch 9. Monaco J&A.pdf PDF
Atch 8. HVAC Chiller J&A.pdf PDF
Solicitation - FA309920R0006 (1).pdf PDF
J_UFC_4_022_01_2017 ECF_ACP.pdf PDF
K_DD 1354 - Transfer and Acceptance of DoD Real Property.pdf PDF
E. Laughlin Division 01 Specifications.pdf PDF
R_EDF Location Sketch.pdf PDF
Atch 7. Past Performance Questionnaire.pdf PDF
A_ATFP Construct West Gate ID Check Area 100 Design Drawings.pdf PDF
N_AF 3000 -Signable - Material Approval Submittal_cvt.pdf PDF
Atch 2. Wage Determination TX20200186.pdf PDF
I_UFC_1_200_01_2013_c1 Gen Bldg Requirements.pdf PDF
Atch 4. Notification of Compliance with Contract Insurance Requirements.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

West Gate Construction Pre-Proposal Questions

FA309920R0006

Question

Will the Government accept a pre-engineered, bolt-together canopy structure in lieu of the field-welded space frame structure shown in the project drawings? The pre-engineered option would present a significant cost savings to the Government and would still provide the curved roofline through the use of three curved trusses connected by purlins.

Answer

CE: No. The Government will only accept a pre-engineered space frame canopy as shown. The 100% Design Drawings only include a space frame canopy for design intent. The space frame structure itself is not designed. Refer to sheet S-001 Structural General Notes under “Pre-Engineered Space Frame Systems” and other places for instructions. It is the responsibility of the general contractor to solicit the services of a specialized space frame structure design contractor for a full design/built of the structure from design to fully assembled. The subcontractor shall provide 3-D CAD design models, engineering, testing, pre-assembling in factory, transporting, and final assembly of the space frame structure as described in the drawings. Bolted connections are preferred. The design should be submitted to the Government for approval during the design process. The General Contractor is responsible to coordinate and assist the space frame subcontractor in all related activities for a seamless transition.

Question

Referencing Part II, Evaluation Subfactor 1 – when the offeror is a Joint Venture, please confirm that the past performance requirements may be met by any combination of experience from one or both of the companies forming the Joint Venture.

Answer

Correct, as a joint-venture, the experience requirements can be met by any combination of experience from one or both of the companies.

Question

Referencing Part II, Evaluation Subfactor 1 – how shall the offeror demonstrate compliance with past environmental permitting requirements to the Texas Council of Environmental Quality? Must the offeror have past experience with projects specifically requiring a SWPPP filed with the Texas Council of Environmental Quality, or can the offeror demonstrate/ certify that they have performed all previous work without any regulatory non-compliance?

Answer

CE: The offeror companies are only required to demonstrate/certify that they have performed all previous work without any environmental regulatory non-compliance issues with TCEQ.

Question

Referencing Part II, Evaluation Subfactor 1 – is it the Government’s intent to exclude offeror companies with less than 10 years of experience from this acquisition, or can the offeror demonstrate that key personnel involved in the project hold the requisite experience?

Answer

CE: The Government will give consideration to offeror companies that demonstrate a minimum of 10 years in accumulated construction trade experience including the equipment, material, and construction disciplines required to complete the requirement. This requirement is separate from personnel experience; Subfactor 2 relays the personnel/team qualifications.