About this file

This document contains a justification and approval for other than full and open competition related to the construction of a fire alarm system at Laughlin Air Force Base in Texas. The justification cites the authority of 10 USC 2304(c)(1) and FAR 6.302-1 for only one responsible source, as the incumbent contractor's existing system must remain compatible. The overall project cost is estimated at $3.2 million. Market research was not conducted due to past issues experienced integrating non-Monaco systems. The contracting office is 47th Contracting Flight. Coordination is documented from the project lead, requiring activity, and contracting officer. Approval is indicated from the chief of the contracting office.

The related federal contract opportunity is a solicitation for the construction of a new west gate, ID check area, and associated facilities at Laughlin AFB. The project includes demolition and construction to provide a new road, gatehouse, canopy, and utilities. The NAICS code is 236220 and small business size standard is $39.5 million. The solicitation is available for download and the agency is the Air Force Air Education and Training Command. The contract type will be firm-fixed-price.

View the file

Other files for this federal contract opportunity

Other files attached to ATFP Construct West Gate ID Check Area, newest first.
File Type Posted
Solicitation Amendment FA309920R00060005 SF 30.pdf PDF
Solicitation Amendment FA309920R00060004 SF 30.pdf PDF
Solicitation Amendment FA309920R00060003 SF 30.pdf PDF
Atch 11. West Gate Construction Questions and Answers B.pdf PDF
Solicitation Amendment FA309920R00060002 SF 30.pdf PDF
Atch 10. West Gate Construction Questions and Answers.pdf PDF
Solicitation Amendment FA309920R00060001.pdf PDF
Atch 8. HVAC Chiller J&A.pdf PDF
Solicitation - FA309920R0006 (1).pdf PDF
N_AF 3000 -Signable - Material Approval Submittal_cvt.pdf PDF
Atch 2. Wage Determination TX20200186.pdf PDF
I_UFC_1_200_01_2013_c1 Gen Bldg Requirements.pdf PDF
Atch 4. Notification of Compliance with Contract Insurance Requirements.pdf PDF
J_UFC_4_022_01_2017 ECF_ACP.pdf PDF
K_DD 1354 - Transfer and Acceptance of DoD Real Property.pdf PDF
E. Laughlin Division 01 Specifications.pdf PDF
R_EDF Location Sketch.pdf PDF
Atch 7. Past Performance Questionnaire.pdf PDF
A_ATFP Construct West Gate ID Check Area 100 Design Drawings.pdf PDF
Atch 3. Wage Determination TX20200008.pdf PDF
D_Schedule of Material Submittals - Copy.xlsx XLSX spreadsheet
O_Progress Schedule and Reports.xlsx XLSX spreadsheet
T_Final Report-2018.pdf PDF
Atch 1. SOW MXDP 14-3001 Construct West Gate ID Check Area.pdf PDF
M_AF IMT 103_Work Clearance Request.pdf PDF
U_LAUGHLIN AFB TOPO PLAT.pdf PDF
Atch 5. AETC 47.pdf PDF
MFR Request attachments West Gate.pdf PDF
Atch 6. Financial Institution Reference Sheet.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Justification and Approval (J&A) for Other Than Full and Open Competition

FOR OFFICIAL USE ONLY

March 2020 FOR OFFICIAL USE ONLY Page 1 of 3March 2020 FOR OFFICIAL USE ONLY Page 1 of 3

Was a J&A approved for the preceding acquisition? Yes No

Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )

Is this a Bridge Action as defined at AFFARS 5302.101? Yes No

Dollar Value of this Acquisition: < $700K > $700K and < $13.5M > $13.5M and < $93M > $93M

Contracting Activity: 47 CONF/PKA

Purchase Request (if available):

Program / Project (and PE, if applicable): West Gate Construct - Monaco Fire Alarm System

Program Type (PEO, Enterprise, of Operational): Operational

Authority: 6.302-1 – 10 USC 2304(c)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements

Estimated Contract Cost (including options): $ 3.2M J&A Type: Class Individual

COORDINATION (AFFARS 5306.304(a) ) Sign and Save Procedure

** The text in the signature blocks below is editable, including the title.

** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.

Date

02 Jul 2020

Project Lead / Program Mgr / Requiring Activity Howard C. Wan

47CES/CENMP 830-298-4922

Signature

X

Date

20 Jul 2020

Contracting Officer Kurt. C. Armbruster

47 CONF/PKA / 830-298-5115

Signature

X

APPROVAL (AFFARS 5306.304(a) )

Date

20 Jul 2020

Chief of the Contracting Office (COCO) Mark De La Rosa

47 CONF/CC1/ 830-298-5641

Signature

March 2020 FOR OFFICIAL USE ONLY Page 2 of 3March 2020 FOR OFFICIAL USE ONLY Page 2 of 3

I. Agency and Contracting Activity.

47th Contracting Flight, Laughlin AFB, Texas 78843

II. Nature and/or description of the action being approved.

This is for a small part of the West Gate construction project. This will add a Monaco Fire Alarm System under other than full and open competition. The overall cost for the Monaco Fire Alarm system is less than $50,000.00.

III. Description of supplies/services required to meet agency needs (including the estimated value).

Provide all labor, material, equipment, tools, transportation, and supervision necessary to construct West Gate as stated in 100% design attached to the contract. Work shall be performed in accordance with specifications attached to the basic contract.

IV. Statutory authority permitting other than full and open competition.

10 U.S.C.2304(c)(1) as implemented by FAR 6.302-1 -- Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements.

V. Demonstration that the contractor's unique qualifications or the nature of the acquisition requires use of the authority cited above (applicability of authority).

This authority is being cited as the manufacturer is the only responsible source available to provide the required systems.

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by subpart 5.2 and, if not, which exception under FAR 5.202 applies.

This portion of the project will be awarded to the existing contractor performing the work, and will be minor in nature with no efforts made to obtain competition.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

This portion of the project will not be negotiated. It will fall under the West Gate Construct Requirement.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

Market Research was not conducted. In previous construction projects, the Government has approved alarm control systems that claimed to be fully compatible with the Monaco system only to experience unacceptable results and the need to replace these similar products with the Monaco brand. This is very costly.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

Please see attached Brand Name Justification for Monaco Fire Alarm Receiving Equipment/

March 2020 FOR OFFICIAL USE ONLY Page 3 of 3March 2020 FOR OFFICIAL USE ONLY Page 3 of 3

Control Panel System letter from Fire Chief Isbell.

X. List of any sources that expressed, in writing, an interest in the acquisition.

N/A

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

In previous construction projects, the Government has approved alarm control systems that claimed to be fully compatible with the Monaco system only to experience unacceptable results and the need to replace these similar products with the Monaco brand.

XII. Certification by the Contracting Officer.

As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.

XIII. Certification by the technical/requirements personnel.

As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete to the best of my knowledge and belief.

Remove the Guidance pages below. Remove the IACR pages below.

March 2020 Page of International Agreement Competitive Restrictions (IACR) Page of March 2020 Was a J&A approved for the preceding acquisition?

!! Attach the preceding J&A in the staff package for this J&A. The preceding J&A will be used as a reference document.

Is this a new or amended J&A Document?

Is this a Bridge Action as defined at AFFARS 5302.101?

Dollar Value of this Acquisition:

J&A Type:

!! Provide estimated cost of all contracts.

COORDINATION (AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.

** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.

APPROVAL (AFFARS 5306.304(a)) NOTE: A signature block will appear here based on the "Dollar Value of this Acquisition" selected above.

(See "Specific Guidance for Completing this Template" below.)

I. Agency and Contracting Activity.

II. Nature and/or description of the action being approved.

III. Description of supplies/services required to meet agency needs (including the estimated value).

IV. Statutory authority permitting other than full and open competition.

V. Demonstration that the contractor's unique qualifications or the nature of the acquisition requires use of the authority cited above (applicability of authority).

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by subpart 5.2 and, if not, which exception under FAR 5.202 applies.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

X. List of any sources that expressed, in writing, an interest in the acquisition.

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

XII. Certification by the Contracting Officer.

XIII. Certification by the technical/requirements personnel.

Specific Guidance for Completing this Template

I. Agency and Contracting Activity.

II. Nature and/or description of the action being processed. (FAR 6.303-2(b)(2))

State whether the action is a new contract or a modification to an existing contract (identify contract number) and identify the contract type planned (e.g., firm-fixed-price, cost-plus-incentive-fee, hybrid etc.). If exception 2 is cited (unusual or compelling urgency), include the date of UCA/contract/modification issuance and amount.

For class J&As, where the number of contracts in the class can be identified: Provide the nature and/or description of each contract action and contract type. If the same information applies to more than one contract, it need only be stated once.

III. Description of the supplies/services required to meet agency needs (including the estimated value).

(FAR 6.303-2(b)(3))

Describe the supplies and/or services to be acquired and include the total estimated value of the acquisition and, for class J&As, by contract action, and the estimated periods of performance.

For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated J&A dollar value.

IV. Statutory authority permitting other than full and open competition. (FAR 6.303-2(b)(4))

10 USC 2304(c)(?) (see Note 1), as implemented by FAR 6.302-? (see Note 2), and required by FAR 6.303-2(b)(4).

Note 1: Complete the 10 USC 2304(c) citation with the statutory subparagraph cited in the (a) Authority (1) Citations portion of the Competition exception used for your J&A. Do not provide more than one citation.

Note 2: Complete the FAR citation with the appropriate subparagraph.

Note 3: For class J&As, all contracts within the class must fall within the same statutory authority.

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above. (FAR 6.303-2(b)(5))

Provide an explanation to support the use of the authority cited. The explanation should tie back to the conditions described in the FAR for using the particular authority cited.

A. Only One Responsible Source (FAR 6.302-1) (DFARS 206.302-1 and DFARS PGI 206.302-1)

When using this authority, thoroughly describe the contractor's unique/highly specialized capabilities and/or qualifications (e.g., facilities, personnel, special tooling acquired), and why no other type of supplies or services will satisfy the agency requirements. This authority shall be used, if appropriate, in preference to the authority in FAR 6.302-7. This authority shall not be used when any of the other authorities apply.

For example, in the case of a follow-on contract for continued development or production of a major system or highly specialized equipment/services, the rationale must first justify the supplies/services as being a “major system” or “highly specialized.” The rationale must then justify “either” substantial duplication of cost to the government that is not expected to be recovered through competition, or unacceptable delays in fulfilling the agency's requirements, whichever situation applies.

In accordance with DFARS 206.302-1(c)(2) Application for brand-name descriptions. Notwithstanding FAR 6.302-1(c)(2), in accordance with section 888(a) of the National Defense Authorization Act for Fiscal Year 2017 (Pub. L. 114-328), the justification and approval addressed in FAR 6.303 is required in order to use brand name or equal descriptions.

B. Unusual and Compelling Urgency (FAR 6.302-2, DFARS 206.302-2, and DFARS PGI 206.302-2)

Contracting Officers must notify SAF/AQC as soon as practicable when contemplating the use of this authority for a J&A requiring SPE approval.

Provide an explanation why (1) the supplies or services are needed at once and/or (2) essential equipment or repairs to that equipment are needed at once to preclude the ability to meet critical mission needs of the USAF and Defense of the Nation. In other words, identify the anticipated serious injury to the Government, the nature of the urgency, the reasons for it occurring and why it is “urgent and compelling” to preclude adverse impact to military readiness. Merely citing a Joint Urgent Operational Need (JUON), Force Activity Designator (FAD) rating, Program Management Directive (PMD)/Program Action Directive (PAD) guidance, or DX priority rating is not in and of itself sufficient reason to use this exception from the requirement to obtain full and open competition. Note that only the minimum quantity required to satisfy the unusual and compelling urgency qualifies for this exception. In addition, the period of performance may not exceed one year, including all options [FAR 6.302-2(d)(ii)]; thus, the inclusion of options, when using this authority, is not advised.

Note: This statutory authority requires that agencies request offers from as many potential sources as is practicable under the circumstances.

C. Industrial Mobilization; or Engineering, Developmental, or Research Capability (FAR 6.302-3)

Justifications citing this authority must demonstrate the need to establish or maintain an essential capability, or a contract for supplies or services incidental to establishing or maintaining an essential capability, possessed by the identified source(s). Some form of market survey must support the need to establish or maintain the capability being procured.

D. Authorized or Required by Statute (FAR 6.302-5)

Identify what is being acquired and the applicable statute authorizing other than full and open competition in accordance with FAR 6.302-5(b).

Note: Some statutes do not require a written J&A.

E. National Security (FAR 6.302-6)

This authority may be used for any acquisition when disclosure of the Government's needs would compromise the national security (e.g., would violate security requirements); it shall not be used merely because the acquisition is classified, or merely because access to classified material will be necessary to submit a proposal or to perform the contract. Full and open competition need not be provided for when the disclosure of the agency's needs would compromise the national security unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. This statutory authority requires that agencies shall request offers from as many potential sources as dis practicable under the circumstances.

F. Public Interest (FAR 6.302-7 and DFARS 206.302-7)

The use of this authority requires a written Determination and Finding (D&F) in accordance with FAR 1.7 in lieu of J&A. The D&F shall not be made on a class basis.

This authority may only be used when none of the other authorities apply. Provide detail addressing the reasons full and open competition is not in the public interest and why no other authority is appropriate for use.

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by FAR 5.2 and, if not, which exception under FAR 5.202 applies. (FAR 6.303-2(b)(6))

Describe all efforts taken, or to be to be taken, to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although market research is covered in Section VIII, the information in Section VI should correlate with the market research described in Section VIII. To ensure completeness, it is best to provide information such as the following:

If a sources sought synopsis or an RFI was issued, provide the date the synopsis was issued along with a brief description of its content. Identify the number of responses received, the results of the screening process, and the rationale for determining the unacceptability of any respondents. Note: An RFI or Sources Sought Synopsis is mandatory IAW DFARS PGI 206.303-2(b)(i) when citing the authority of 10 USC 2304(c)(1), “Only one (or a limited number of) responsible source(s)”.

Specify whether this acquisition will require a Notice of proposed Contract Action (NOCA) IAW FAR 5.201 and if not, provide the exception IAW FAR 5.202. If a NOCA was or will be publicized provide the dates or expected dates of publication of the NOCA. Address any other actions taken or planned to facilitate competition for this acquisition.

Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.

VII. Determination by the contracting officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))

Provide the basis for this determination.

VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))

Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research.

When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.

If market research was not conducted, so state and provide the rationale.

IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))

X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))

If a sources sought synopsis or RFI was issued and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))

If no actions are planned, provide rationale (i.e., sole-source to OEM, unable to compete due to inability to procure data rights, etc.) IAW DFARS PGI 206.304(a)(S-70)(ii), for a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a J&A citing the authority at FAR 6.302-1. Include a copy of the previous J&A and include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions; and

The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see DFARS 206.304). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.

XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))

As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.

XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))

As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.

Do You Need to "REDACT" Text?

This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.

The following page contains a suggested template for “International Agreement Competitive Restrictions (IACR)”.

The authority to prepare an IACR has been delegated from the HCA to the Contracting Officer.

(AFFARS 5306.302-4)

IV. Statutory Authority: 10 USC 2304(c)(4) as implemented by FAR 6.302-4, International Agreement.

VI. Certification of Accuracy and Completeness:

As evidenced by his/her signature, the contracting officer has determined the IACR to be both accurate and complete to the best of his/her knowledge and belief. The CO also approves the IACR.

As evidenced by his/her signature, the program/technical/requirements manager(s) have/has determined that any supporting data contained in the IACR, which is his/her responsibility, is both accurate and complete.

9.0.0.2.20120627.2.874785

security_markings: FOR OFFICIAL USE ONLY
CurrentPage:
PageCount:
Security_Markings:
Yes:
No:
new:
amended-with-original:
range_under-700K:
range_700K-13.5M:
range_13.5M-93M:
range_over-93M:
Contracting-Activity: 47 CONF/PKA
PR-ID-Number:
Program-Project: West Gate Construct - Monaco Fire Alarm System
Program-Project: 3.2M
Program-Type: Operational
Authority: 6.302-1 – 10 USC 2304(c)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements
class:
individual:
Sign_and_Save_1:
Date: 02 Jul 2020
Date: 20 Jul 2020
Date: 20 Jul 2020
Name:
Signature:
Hide-PM-Coord:
Hide-CO-Coord:
Hide-CSO-Coord:
Hide-Legal-Coord:
Hide-COCO-Coord:
Hide-CA-Coord:
Hide-SCO-Coord:
Hide-PEO-Coord:
Hide-AQC-Coord:
Hide-Blank-1-Coord:
Hide-Blank-2-Coord:
Section-I-Text:
Section-II-Text:
Section-III-Text:
Section-IV-Text:
Section-V-Text:
Section-VI-Text:
Section-VII-Text:
Section-VIII-Text:
Section-IX-Text:
Section-X-Text:
Section-XI-Text:
Section-XII-Text:
Section-XIII-Text:
Remove-Guidance-Pages: 1
Remove-IACR-Pages: 1
Remove-Pages-Above: 0
Section-I:
Section-II:
Section-III:
Section-V:

File details come from the government source that posted it. Updated .