D_Schedule of Material Submittals - Copy.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
ATFP Construct West Gate ID Check Area Federal contract opportunity
Solicitation number
MXDP143001
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is a schedule of material submittals for the ATFP Construct West Gate ID Check Area solicitation issued by the Department of the Air Force Air Education and Training Command. The solicitation seeks a firm-fixed price contract to demolish existing facilities at the west gate entrance of Laughlin Air Force Base and construct a new road, gatehouse, ID check area, and canopy along with associated utilities. The schedule outlines 55 required submittals for items such as construction plans, quality control documentation, site safety plans, progress reports, materials lists, shop drawings, operation and maintenance manuals, and as-built drawings. Submittals are due no later than 30 to 60 days after notice to proceed with the exception of bi-weekly progress reports and meeting minutes. The solicitation is set aside for women-owned small businesses with a NAICS code of 236220 and size standard of $39.5 million. The government anticipates award of a firm-fixed price contract as a result of this opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to ATFP Construct West Gate ID Check Area, newest first.
File Type Posted
Solicitation Amendment FA309920R00060005 SF 30.pdf PDF
Solicitation Amendment FA309920R00060004 SF 30.pdf PDF
Solicitation Amendment FA309920R00060003 SF 30.pdf PDF
Atch 11. West Gate Construction Questions and Answers B.pdf PDF
Solicitation Amendment FA309920R00060002 SF 30.pdf PDF
Atch 10. West Gate Construction Questions and Answers.pdf PDF
Solicitation Amendment FA309920R00060001.pdf PDF
Atch 8. HVAC Chiller J&A.pdf PDF
Solicitation - FA309920R0006 (1).pdf PDF
J_UFC_4_022_01_2017 ECF_ACP.pdf PDF
K_DD 1354 - Transfer and Acceptance of DoD Real Property.pdf PDF
E. Laughlin Division 01 Specifications.pdf PDF
R_EDF Location Sketch.pdf PDF
Atch 7. Past Performance Questionnaire.pdf PDF
A_ATFP Construct West Gate ID Check Area 100 Design Drawings.pdf PDF
N_AF 3000 -Signable - Material Approval Submittal_cvt.pdf PDF
Atch 2. Wage Determination TX20200186.pdf PDF
I_UFC_1_200_01_2013_c1 Gen Bldg Requirements.pdf PDF
Atch 4. Notification of Compliance with Contract Insurance Requirements.pdf PDF
Atch 3. Wage Determination TX20200008.pdf PDF
O_Progress Schedule and Reports.xlsx XLSX spreadsheet
T_Final Report-2018.pdf PDF
Atch 1. SOW MXDP 14-3001 Construct West Gate ID Check Area.pdf PDF
M_AF IMT 103_Work Clearance Request.pdf PDF
U_LAUGHLIN AFB TOPO PLAT.pdf PDF
Atch 5. AETC 47.pdf PDF
MFR Request attachments West Gate.pdf PDF
Atch 6. Financial Institution Reference Sheet.pdf PDF
Atch 9. Monaco J&A.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittals Schedule SCHEDULE OF SUBMITTALS PROJECT # MXDP 14-3001 PROJECT TITLE ATFP Construct West Gate ID Check Area SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALLAUGHLIN DIV 01 SPECS REFERENCENUMBER OF PAPER COPIES REQUIRED. DIGITAL COPIES ARE REQUIRED FOR ALL SUBMITTALSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SAMPLESPRODUCT DATATEST REPORTSCERTIFICATIONSFIELD REPORTS
10.4.610.4.510.4.810.4.910.4.11APPR

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DIS

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Pre-Construction Submittals
1Construction Site Plan13.1NLT 30 Days after NTP 1
2AF From 1032.2NLT 7 Days after NTP 1
3Vehicle List1-10.2NLT 30 Days after NTP 1
4Project Schedule6.1.2NLT 7 Days after NTP 1
5Contractor Health and Safety Plan3.2.2NLT 30 Days after NTP 1
6Environmental Survey & Protection Plan7-4NLT 30 Days after NTP 1
7QC Plan4.3.1NLT 30 Days after NTP 1
8QC Manager Qualifications & Key Personnel Resumes4.2.4NLT 30 Days after NTP 1
9Safety Data Sheets10.4.6NLT 30 Days after NTP 1
10Records of Existing Conditionssect 7NLT 30 Days after NTP 1
11Shop Drawings10.4.42NLT 30 Days after NTP 1
12Phase Plan1-12NLT 30 Days after NTP 1
13Traffic Control Plan13.2NLT 30 Days after NTP 1
14OPSEC Training Approvalsect 2.2NLT 30 Days after NTP 1
Construction Submittals
15Progress Report6.1.3Bi-Weekly
16Meeting Minutes6.2.1NLT 3 Days after meeting
Materials
17Concrete1111NLT 60 Days after NTP 1
18Cold-Form metal framing111NLT 60 Days after NTP 1
19Mineral Fiber Blanket Insulation111NLT 60 Days after NTP 1
20Insulated Metal Roof Panel111NLT 60 Days after NTP 1Both flat and curved versions for the gatehouse and canopy respectively
21Metal Roof Panels & Trims111NLT 60 Days after NTP 1
22Flashing and Sheet Metal1NLT 60 Days after NTP 1
23Bullet Resistant Components111NLT 60 Days after NTP 1
24Door Hardwares11NLT 60 Days after NTP 1
25Security Glazing11NLT 60 Days after NTP 1
26Metal Louvers11NLT 60 Days after NTP 1
27Cement Stucco, lath & accessories11NLT 60 Days after NTP 1
28Gypsum Board111NLT 60 Days after NTP 1
29Ceramic Tiles1111NLT 60 Days after NTP 1
30Acoustic Ceiling111NLT 60 Days after NTP 1
31Resilient Flooring1111NLT 60 Days after NTP 1
32Paints and Coatings1111NLT 60 Days after NTP 1Submit to HazMat for approval.
33Exterior & Interior Signage1NLT 60 Days after NTP 1
34Toilet Accessories11NLT 60 Days after NTP 1
35Fire Extinguisher11NLT 60 Days after NTP 1
36Window Blinds111NLT 60 Days after NTP 1
37Plumbing Fixtures & Faucets111NLT 60 Days after NTP 1
38Pneumatic Sewage Ejector111NLT 60 Days after NTP 1
39Hvac Vibration and Seismic Controls1NLT 60 Days after NTP 1
40Bacnet DDC111NLT 60 Days after NTP 1
41Hvac Power Ventilator111NLT 60 Days after NTP 1
42Diffusers, Register & Grilles1NLT 60 Days after NTP 1
43Air Conditioning Equipment111NLT 60 Days after NTP 1
44Fan Coil Unit111NLT 60 Days after NTP 1
45Exterior & Interior Light Fixtures111NLT 60 Days after NTP 1
46Sealants1NLT 60 Days after NTP 1Submit to HazMat for approval
47Storm Drainage1NLT 60 Days after NTP 1
48Lightning Protection111NLT 60 Days after NTP 1
49Communications111NLT 60 Days after NTP 1
50Electrical Components111NLT 60 Days after NTP 1
Close-Out
50Quality Control Manager Punchlist14.51By Pre-Final Inspection
51O&M Manuals10.41NLT 2 weeks after Final Inspection
52Draft DD Form 135414.41Prior to Pre-Final Inspection
53Final DD Form 135414.41At the Final Inspection
54As Built Drawings14.21NLT 2 weeks after Final Inspection
55Warranty14.3NLT 2 weeks after Final Inspection
Schedule of Submittals Template, Feb 05 (SAF/AQCP)

Task Order # FA3099-16-D-0002-0002 SOW Atch 2