This Statement of Work (SOW) details a design/build project for the US Army Installation Management Command at Natick Soldiers Systems Center in Massachusetts. The project involves demolishing an existing outdoor basketball court and constructing a new multi-sport recreational court near building 93, which will include lines for basketball and two pickleball courts. Key construction requirements include relocating a catch basin, replacing drainage piping, making a water valve flush with the proposed court surface, installing two in-ground basketball hoops, constructing a new chain-link fence enclosure, and applying court surfacing and markings.
The project is scheduled for a 90-day performance period from the Notice to Proceed, with a targeted completion date of 31 March 2025. The contractor will be responsible for all labor, materials, and equipment, and must comply with all applicable codes and standards. Attachments include drawing sets, utility location maps, common specifications, an integrated solid waste management plan, contractor access forms, and a quality assurance surveillance plan (QASP). The project is located at the United States Army Garrison Natick, Massachusetts, and will be executed by the Directorate of Public Works (DPW) Morale, Welfare, and Recreation (MWR) department.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
US ARMY GARRISON DPW
NATICK SOLDIERS SYSTEMS CENTER
15 GENERAL GREENE AVENUE
NATICK MA 01760
STATEMENT OF WORK (SOW)
Directorate of Public Works (DPW)
Morale, Welfare, Recreation (MWR) Recreation Court Project Design/Build Project
31 March 2025
1. General:
1.1. All work is to be performed on MWR Recreation Court in vicinity of building 93, located at the United States Army Garrison Natick (USAG NATICK), General Greene Avenue (formerly Kansas St.), Natick, MA, 01760.
1.2. The Contractor shall provide all labor, materials, and equipment necessary to perform all work, purchase, and installation of items outlined in this SOW and accompanying documents.
1.3. The Contractor shall be responsible for performing all work as outlined in this SOW and all associated contract documents including project drawings/specifications and accompanying documents for the bid price submitted. The Contractor is responsible for a thorough understanding and comprehension of all content and requirements in this SOW and all associated contract documents. The Contractor shall carefully review the field conditions prior to bidding and performing any work. The design-build contractor is responsible for reviewing, verifying, and complying with all applicable codes, standards, and requirements.
2. Project Descriptions:
2.1. Project consists of all work required for the construction of a new multi-sport recreational court:
2.1.1. Demolish existing outdoor basketball court.
2.1.2. Design and build a new multi-sport recreational court. Court shall have lines for basketball and two pickleball courts. See Attachments F, G, and H.
2.1.3. Relocate existing catch basin. Replace associated drainage piping with kind, or approved, and route to same structures.
2.1.4. Make existing water valve flush to proposed court. See Attachment F for details.
3. Period of Performance:
3.1. Period of performance for all work shall be 90 (ninety) days from the date the Notice to Proceed (NTP) is issued.
3.2. Failure to complete the project by the stated completion date, when delay is not attributable to the
Government, will lead to a negative performance evaluation.
4. Scope of Demolition:
4.1. See drawing set enclosure Attachment F for details of demolition.
4.2. Verify location of all existing utilities on and nearby work area.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
US ARMY GARRISON DPW
NATICK SOLDIERS SYSTEMS CENTER
15 GENERAL GREENE AVENUE
NATICK MA 01760
4.3. Demolition includes removing pavement, curbs, chain link fence, gates as needed, and cleaning surrounding area.
4.4. See demolition drawings and demolition notes on drawings.
5. Scope of Construction:
5.1. See drawing set enclosure Attachment F, G, and H for construction details.
5.2. Relocate catch basin and replace associated stormwater pipes as shown on the drawings. Flow direction of drainage shall remain unchanged. Ensure existing drainage pattern is changed as little as possible. Confirm location with DPW Operations & Maintenance (O&M) and Contract Officer Representative (COR).
5.3. Existing water valve shall be protected and covered to be made flush with proposed court paving. Cover design and material shall be approved by COR.
5.4. Construct new court pavement, including installation of two (2) in-ground basketball hoops.
5.5. Install new chain-link fence enclosure, curbs, and gates and poles.
5.6. Apply court surfacing and paint markings.
5.7. Grade and contour to adequately drain court.
5.8. Identify location and protect any nearby monitoring wells. Cover(s) shall be made flush with proposed court pavement. See “Sheet V-101 – MONW dated March 2022” in Attachment H.
5.9. Return work area to like-new condition.
ATTACHMENTS:
A. Common Specifications B. Integrated Solid Waste Management Plan, US Army Natick Soldier Systems Center, Massachusetts, Issue
Date October 2024 (Natick ISWMP October 2024) C. NSSC Contractor Access Form D. Safety and Accident Prevention Plan Table of Contents E. MRW Recreation Court DRAW F. Drawing set dated 03 April 2025
1. C-101 Site Layout, Existing/Demolition
2. C-102 Court Layout Plan Proposed
G. Basketball Court Renov Photoset November 18, 2024.
H. Existing utilities drawing’s approximate locations:
1. Sheet V-101 – WATR dated March 2022.
2. Sheet V-101 – STRM dated March 2022.
3. Sheet V-101 – MONW dated March 2022
I. QASP MWR Recreation Court Project
END OF SOW