D. Safety and Accident Prevention Plan TOC - MWR Rec Court - Updated.pdf

PDF 219 KB Posted

Attached to
Natick Recreation Court Project
Solicitation number
W911QY-25-R-A022
Issued by

About this file

This document is an Accident Prevention Plan and Health and Safety Plan for the US Army Installation Management Command at the Natick Soldiers Systems Center. The comprehensive plan outlines detailed safety protocols and requirements across multiple areas including training, inspections, incident reporting, and specific safety programs. The table of contents reveals an extensive range of safety considerations, such as emergency response plans, medical support agreements, hazard communication, exposure control, and specialized monitoring plans for heat stress, cold stress, and mold remediation. The document includes sections on risk management processes and contains five appendices covering key personnel resumes, health and safety inspection forms, emergency action plan, accident prevention plan sign-off sheet, and OSHA-related fact sheets.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

US ARMY GARRISON DPW

NATICK SOLDIERS SYSTEMS CENTER

15 GENERAL GREENE AVENUE

NATICK MA 01760

1 | P a g e

ACCIDENT PREVENTION PLAN

HEALTH AND SAFETY PLAN

TABLE OF CONTENTS

A. Signature Sheet

1. Plan Preparer

2. Plan Approver

3. Plan Concurrence

B. Background Information

1. Contractor Name

2. Contract Number

3. Project Name

4. Brief Project Description

5. Location of the Project (Map)

6. Contractor Accident Experience

7. Phases of Work and Hazardous Activities Requiring an Activity Hazard Analyses (AHA).

C. Statement of Health and Safety Policy

1. Corporate Safety and Health Policy Statement

2. Contractor’s Written Safety Program Goals

3. Contractor’s Written Safety Program Objectives

4. Contractor Accident Experience

D. Responsibilities and Lines of Authority

1. Statement of Ultimate Responsibility

2. Identification and accountability of personnel responsible for safety and health at both the corporate and project level

3. Equivalent Training to the OSHA 30-Hour Classes is Being Presented as Qualification

4. Site Specific Competent Person(s)

5. Requirements and Details of the Employer’s Risk Management Process.

6. Requirements for Initial Activity-Specific AHAs to be Submitted and Accepted at Preparatory Meetings, Prior to Work Being Performed

7. No Work Requirement

8. Policies and Procedures Regarding Non-Compliance with Safety Requirements

9. Lines of authority

10. Written company procedures for holding managers and supervisors accountable for safety

E. Subcontractors and Suppliers

1. Identification of Subcontractors and Suppliers

2. Safety Responsibilities of Subcontractors and Suppliers

F. Training

1. New Comer Safety Orientation Training

2. Requirements for Mandatory Training and Certifications that are Applicable to this Project

US ARMY GARRISON DPW

NATICK SOLDIERS SYSTEMS CENTER

2 | P a g e

3. Procedures for Periodic Safety and Health Training for Supervisors and Employees

4. Emergency Response Training

G. Safety and Health Inspections

1. Specific Assignment of Responsibilities

1.a Name(s) of Individual(S) Responsible for Conducting Safety Inspections 1.b Documented Proof of Inspector's Training / Qualifications 1.c Frequency that Inspections Shall be Conducted 1.d Procedures for Documentation 1.e Deficiency Tracking System and Follow-Up Procedures

2. External Inspections/Certifications H. Incident Reporting and Investigation

1. Exposure Data 1.a Mishap Investigations, Reports and Logs 2.b Immediate Notification of Major Accidents 2.c KO/COR Notification

I. Plans, Programs and Procedures

1. Fatigue Management Plan

2. Emergency Response Plans

2.a Procedures & Test 2.b Spill Plans 2.c Fire Fighting Plan 2.d Posting of Emergency Telephone Numbers 2.e Plan for Prevention of Alcohol and Drug Abuse

3. Site Sanitation/Housekeeping Plan

4. Medical Support Agreement

5. Blood-Borne Pathogen Program

6. Exposure Control Plan

7. Automatic External Defibrillator (AED) Program

8. Site Layout Plan

9. Access and Haul Road Plan

10. Hearing Conservation Program

11. Respiratory Protection Plan

12. Health Hazard Control Program

13. Hazard Communication Program

14. Process Safety Management Plan

15. Lead Compliance Plan

16. Asbestos Abatement Plan

17. Abrasive Blasting

18. Heat Stress Monitoring Plan (HSMP)

19. Cold Stress Monitoring Plan (CSMP)

20. Mold Remediation Plan

21. Lighting Plan for Night Operations

US ARMY GARRISON DPW

NATICK SOLDIERS SYSTEMS CENTER

3 | P a g e

22. Traffic Control Plan

23. Fire Prevention Plan

24. Arc Flash Hazard Analysis

25. Assured Equipment Grounding Control Program (AEGCP)

26. Hazardous Energy Control Program and Procedures

27. Standard Pre-Lift Plan – LHE

Critical Lift Plan – LHE

28. Fall Protection and Prevention Plan

29. Demolition/Renovation Plan

30. Rope Access Work Plan

31. Excavation/Trenching Plan

32. Fire Prevention and Protection Plan for Underground Construction

33. Compressed Air Work Plan for Underground Construction

34. Erection and Removal Plan for Formwork and Shoring

35. Precast Concrete Plan

36. Lift-slab Plans

37. Masonry Bracing Plan

38. Steel Erection Plan

39. Tree Felling/Maintenance Program

40. Site Safety and Health Plan (HTRW)

J. Risk Management Processes

Appendixes Appendix A – Key Personnel Resumes Appendix B – Health and Safety Inspection Forms Appendix C - Emergency Action Plan Appendix D - Accident Prevention Plan Sign off Sheet Appendix E - OSHA Whistleblower Fact Sheet and OSHA Lightning Safety Fact Sheet

ACCIDENT PREVENTION PLAN
HEALTH AND SAFETY PLAN
TABLE OF CONTENTS
B. Background Information
C. Statement of Health and Safety Policy
D. Responsibilities and Lines of Authority
E. Subcontractors and Suppliers
F. Training
G. Safety and Health Inspections
H. Incident Reporting and Investigation
I. Plans, Programs and Procedures
J. Risk Management Processes

File details come from the government source that posted it. Updated .