D. Safety and Accident Prevention Plan TOC - MWR Rec Court - Updated.pdf
PDF 219 KB Posted
- Attached to
- Natick Recreation Court Project
- Solicitation number
- W911QY-25-R-A022
About this file
This document is an Accident Prevention Plan and Health and Safety Plan for the US Army Installation Management Command at the Natick Soldiers Systems Center. The comprehensive plan outlines detailed safety protocols and requirements across multiple areas including training, inspections, incident reporting, and specific safety programs. The table of contents reveals an extensive range of safety considerations, such as emergency response plans, medical support agreements, hazard communication, exposure control, and specialized monitoring plans for heat stress, cold stress, and mold remediation. The document includes sections on risk management processes and contains five appendices covering key personnel resumes, health and safety inspection forms, emergency action plan, accident prevention plan sign-off sheet, and OSHA-related fact sheets.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
US ARMY GARRISON DPW
NATICK SOLDIERS SYSTEMS CENTER
15 GENERAL GREENE AVENUE
NATICK MA 01760
1 | P a g e
ACCIDENT PREVENTION PLAN
HEALTH AND SAFETY PLAN
TABLE OF CONTENTS
A. Signature Sheet
1. Plan Preparer
2. Plan Approver
3. Plan Concurrence
B. Background Information
1. Contractor Name
2. Contract Number
3. Project Name
4. Brief Project Description
5. Location of the Project (Map)
6. Contractor Accident Experience
7. Phases of Work and Hazardous Activities Requiring an Activity Hazard Analyses (AHA).
C. Statement of Health and Safety Policy
1. Corporate Safety and Health Policy Statement
2. Contractor’s Written Safety Program Goals
3. Contractor’s Written Safety Program Objectives
4. Contractor Accident Experience
D. Responsibilities and Lines of Authority
1. Statement of Ultimate Responsibility
2. Identification and accountability of personnel responsible for safety and health at both the corporate and project level
3. Equivalent Training to the OSHA 30-Hour Classes is Being Presented as Qualification
4. Site Specific Competent Person(s)
5. Requirements and Details of the Employer’s Risk Management Process.
6. Requirements for Initial Activity-Specific AHAs to be Submitted and Accepted at Preparatory Meetings, Prior to Work Being Performed
7. No Work Requirement
8. Policies and Procedures Regarding Non-Compliance with Safety Requirements
9. Lines of authority
10. Written company procedures for holding managers and supervisors accountable for safety
E. Subcontractors and Suppliers
1. Identification of Subcontractors and Suppliers
2. Safety Responsibilities of Subcontractors and Suppliers
F. Training
1. New Comer Safety Orientation Training
2. Requirements for Mandatory Training and Certifications that are Applicable to this Project
US ARMY GARRISON DPW
NATICK SOLDIERS SYSTEMS CENTER
2 | P a g e
3. Procedures for Periodic Safety and Health Training for Supervisors and Employees
4. Emergency Response Training
G. Safety and Health Inspections
1. Specific Assignment of Responsibilities
1.a Name(s) of Individual(S) Responsible for Conducting Safety Inspections 1.b Documented Proof of Inspector's Training / Qualifications 1.c Frequency that Inspections Shall be Conducted 1.d Procedures for Documentation 1.e Deficiency Tracking System and Follow-Up Procedures
2. External Inspections/Certifications H. Incident Reporting and Investigation
1. Exposure Data 1.a Mishap Investigations, Reports and Logs 2.b Immediate Notification of Major Accidents 2.c KO/COR Notification
I. Plans, Programs and Procedures
1. Fatigue Management Plan
2. Emergency Response Plans
2.a Procedures & Test 2.b Spill Plans 2.c Fire Fighting Plan 2.d Posting of Emergency Telephone Numbers 2.e Plan for Prevention of Alcohol and Drug Abuse
3. Site Sanitation/Housekeeping Plan
4. Medical Support Agreement
5. Blood-Borne Pathogen Program
6. Exposure Control Plan
7. Automatic External Defibrillator (AED) Program
8. Site Layout Plan
9. Access and Haul Road Plan
10. Hearing Conservation Program
11. Respiratory Protection Plan
12. Health Hazard Control Program
13. Hazard Communication Program
14. Process Safety Management Plan
15. Lead Compliance Plan
16. Asbestos Abatement Plan
17. Abrasive Blasting
18. Heat Stress Monitoring Plan (HSMP)
19. Cold Stress Monitoring Plan (CSMP)
20. Mold Remediation Plan
21. Lighting Plan for Night Operations
US ARMY GARRISON DPW
NATICK SOLDIERS SYSTEMS CENTER
3 | P a g e
22. Traffic Control Plan
23. Fire Prevention Plan
24. Arc Flash Hazard Analysis
25. Assured Equipment Grounding Control Program (AEGCP)
26. Hazardous Energy Control Program and Procedures
27. Standard Pre-Lift Plan – LHE
Critical Lift Plan – LHE
28. Fall Protection and Prevention Plan
29. Demolition/Renovation Plan
30. Rope Access Work Plan
31. Excavation/Trenching Plan
32. Fire Prevention and Protection Plan for Underground Construction
33. Compressed Air Work Plan for Underground Construction
34. Erection and Removal Plan for Formwork and Shoring
35. Precast Concrete Plan
36. Lift-slab Plans
37. Masonry Bracing Plan
38. Steel Erection Plan
39. Tree Felling/Maintenance Program
40. Site Safety and Health Plan (HTRW)
J. Risk Management Processes
Appendixes Appendix A – Key Personnel Resumes Appendix B – Health and Safety Inspection Forms Appendix C - Emergency Action Plan Appendix D - Accident Prevention Plan Sign off Sheet Appendix E - OSHA Whistleblower Fact Sheet and OSHA Lightning Safety Fact Sheet
| ACCIDENT PREVENTION PLAN |
| HEALTH AND SAFETY PLAN |
| TABLE OF CONTENTS |
| B. Background Information |
| C. Statement of Health and Safety Policy |
| D. Responsibilities and Lines of Authority |
| E. Subcontractors and Suppliers |
| F. Training |
| G. Safety and Health Inspections |
| H. Incident Reporting and Investigation |
| I. Plans, Programs and Procedures |
| J. Risk Management Processes |
File details come from the government source that posted it. Updated .