E. MWR Recreation Court DRAW_Redacted.pdf

PDF 560 KB Posted

Attached to
Natick Recreation Court Project
Solicitation number
W911QY-25-R-A022
Issued by

About this file

This is a Deliberate Risk Assessment Worksheet (DD Form 2977, January 2014) for the MWR Recreation Court Project at USAG Natick, MA, dated 22/04/2025. The document systematically identifies and evaluates potential hazards associated with construction and installation activities, focusing on risks like vehicle movement, pedestrian access, personnel safety, and construction-related incidents.

The risk assessment matrix categorizes hazards with initial risk levels ranging from Medium (M) to Low (L), with control measures including maintaining pedestrian awareness, providing clear signage, implementing construction boundaries, and ensuring communication between USACE, contractors, and garrison personnel. The overall residual risk level is determined to be LOW, with recommended actions emphasizing safe construction practices, clear communication between contractors and installation personnel, and ongoing risk monitoring. Key implementing entities include USACE, contractors, sub-contractors, DES, and garrison safety teams.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .