mtr-nps2021-1_plans.pdf
PDF 16 MB Posted
- Solicitation number
- 69056723B000012
About this file
This federal contract opportunity notice is for road improvement projects near Yellowtail Dam in Montana. The Department of Transportation Federal Highway Administration is soliciting bids under solicitation number 69056723B000012 for MT BOR NPS 2021(1), Yellowtail Dam Area Road Improvements. Bids are due by the date specified in the 16MB plans file. The work required includes road construction and repair services near Yellowtail Dam to improve transportation infrastructure in the area. Interested contractors should review the detailed plans to understand the full scope of services sought and prepare their responses accordingly.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidTab_MT BOR NPS 2021(1).pdf | ||
| BidSum_MT BOR NPS 2021(1).pdf | ||
| QA2_11-02-2023.pdf | ||
| QA_11-02-2023.pdf | ||
| Amendment A002.pdf | ||
| QA_11-01-2023.pdf | ||
| QA_10-25-2023.pdf | ||
| QA_10-17-2023.pdf | ||
| Amendment A001.pdf | ||
| BICA_C6_Final_Report.pdf | ||
| FLH Bridge oversized or overload vehicle permit request form.pdf | ||
| IFB 69056723B000012.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9.30)
:2
P
M
J u ly
S H
E E
T I
N D
E X c p w w o r k \d
\m tr n p s g e n .d g n
SHEET INDEX
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) A.2
NPS PMIS No. 326359B
BH TP
W
RIP
DI
G W G WV
CP GPS
36 31
36 31
N
E
N 1000EL. 1234.56
TP
TP
SEC.
SEC.
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
M.P.
M.L.
monument minimum thousand gallon maximum material mile post main line
NO SCALE
θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
between bearing bridge balance point bench mark back face back btwn brg.
br.
BP
BM
b.f.
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
A A
DI
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
W west drwg(s).
dist.
diaph.
dia.
DHV
D exp. jt.
exc.
EW
EQ or eq.
EOP
emb.
elev.
El. 94.16 e.f.
e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge) jt.
IE
ID
joint invert elevation inside diameter ftg.
flg.
fin.
f.f.
footing flange finish front face
LW
lt. or LT Ls
LPSM
long.
LNFT
lat.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph V vertical point of intersection vehicles per hour design speed (velocity)
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sect.
SC
SADT
S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
KSI
square inch thousand pounds per pvmt.
PT
PST
PSC
PSI
PSF
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve
OHWM
OG
OD
o. to o.
o.c.
ordinary high water mark original ground outside diameter out to out on center
NC
N normal crown north
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Control Point (Terrestrial and GPS)
Gas & Water Meter; Gas & Water Valve
Flagpole; Fire Hydrant
Cooking Grate; Garbage Can; Picnic Table
Boulder; Well; Antenna; Grave
Above Ground Tank; Underground Tank
Spot Elevation; Coordinate Grid Tick
Material Source; Bore Hole; Test Pit
Treeline; Individual Trees
Spring or Seep
Section Line 4
Section Corner (Found, Projected) 4
Section Line 16
Section Corner (Found, Projected)16
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservior; Marshland
North Arrow
Slope Stake Limits Top of Cut
Toe of Fill
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail
Concrete Barrier and Guard Wall
Retaining Wall wall face
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
Overhead/Above Ground Utilities
Underground Utilities
Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
- no symbol -
Section A-A
EXISTING PROPOSED
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,
- no symbol -
11/2001 DETAIL APPROVED FOR USE
6/2022
10/2014 10/2009 1/2007 9/2005 REVISED: 101-1W
WFLHD DETAIL
ABBREVIATIONS
PLAN SYMBOLS AND
:1
J u n e
U p d a te d v ic in it y m a p p w
-w o rk
\d \m tr -n p s -1 g e n -3
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) A.3
Sheet and Description
SECTION D SECTION E SECTION F
PLANS TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 20302-1200 REMOVAL OF GUARDRAIL LNFT 9,398.5 471.5 9,870.0
A0140 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 115 10 125
A0160 30302-2000 SHOULDER RECONDITIONING LNFT 1,320 90 1,410
A0180 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 6,546 194 6,740
A0200 40702-0300 CHIP SEAL, TYPE 1C SQYD 625,474 18,526 644,000
A0240 40711-0000 EMULSIFIED ASPHALT TON 1,122 38 1,160
A0260 40901-2000 MICRO SURFACING, TYPE 2 SQYD 17,570 430 18,000
A0280 41201-0000 TACK COAT TON 35 5 40
A0300 41301-0800 ASPHALT PAVEMENT MILLING, 3-INCH DEPTH SQYD 40,489 1,211 41,700
A0320 41401-3000 CRACKS, CLEANING AND FILLING LNFT 14,858 752 15,610
A0340 41402-2000 CRACKS, CLEANING AND SEALING MILE 33.5 2.0 35.5
A0360 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 (A) SQYD 408 22 430
A0380 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 (B) SQYD 1,372 68 1,440
A0400 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 7,082 358 7,440
A0420 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS LNFT 7,455 225 7,680
A0440 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (TL-2) EACH 27 27
A0460 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (TL-3) EACH 8 8
A0480 61702-1700 TERMINAL SECTION, TYPE MGS-BAT EACH 2 2
A0500 61711-0000 IMPACT ATTENUATOR (CRASH CUSHION) EACH 1 1
A0520 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
A0540 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY
BUCKET, 18-INCH WIDTH HOUR 40 40
A0560 62201-2360 VACUUM SWEEPER HOUR 80 80
A0580 62301-0000 GENERAL LABOR HOUR 80 80
A0600 63302-0000 SIGN SYSTEM SQFT 341 341
A0620 63309-0900 DELINEATOR, TYPE FLEXIBLE (BROWN) EACH 19 1 20
A0640 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 709,851 35,489 745,340
A0660 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 657,604 32,876 690,480
A0680 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW) LNFT 125,498 6,272 131,770
A0700 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 5 5
A0720 63405-0600 PAVEMENT MARKINGS, TYPE B, STRAIGHT/TURN ARROW COMBINATION EACH 2 2
A0740 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL EACH 18 18
A0760 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 200 20 220
A0780 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE
SIGN EACH 4 4
MileStone: 100% Date Completed: 08/03/23 Report Date: 08/03/23
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - BASE
3-
A ug
-2
1:
P
M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0 su m m ar y.
xl sm
]S he et
STATE PROJECT
B.1BOR NPS 2021(1)MT
SHEET
NUMBER
NPS PMIS No.326359B
PLANS TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL ALLOWANCE Bid Schedule
A0800 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 175,719 8,781 184,500
A0820 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 219 71 290
A0840 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 3,520 180 3,700
A0860 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 300 300
A0880 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 110 115
3- A ug
-2
1:
P
M
MileStone: 100% Date Completed: 08/03/23 Report Date: 08/03/23 c:
\p w -w or k\ d0 su m m ar y.
xl sm
]S he et
2)
SUMMARY OF QUANTITIES - BASE
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.2BOR NPS 2021(1)MT
SHEET
PLANS TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL ALLOWANCE Bid Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
X0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0080 15401-0000 CONTRACTOR TESTING LPSM ALL
X0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0120 20302-0400 REMOVAL OF CURB, ASPHALT LNFT 1,000 100 1,100
X0140 20302-1200 REMOVAL OF GUARDRAIL LNFT 2,541 129 2,670
X0160 40702-0300 CHIP SEAL, TYPE 1C SQYD 13,710 290 14,000
X0200 40711-0000 EMULSIFIED ASPHALT TON 24 6 30
X0220 41401-3000 CRACKS, CLEANING AND FILLING LNFT 1,685 80 1,765
X0240 41402-2000 CRACKS, CLEANING AND SEALING MILE 1.09 0.05 1.14
X0260 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 (A) SQYD 592 28 620
X0280 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 111 9 120
X0300 60901-2100 CURB, ASPHALT, 4-INCH DEPTH LNFT 1,000 50 1,050
X0320 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS LNFT 2,300 70 2,370
X0340 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (TL-2) EACH 12 12
X0360 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 20 20
X0380 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY
BUCKET, 18-INCH WIDTH HOUR 20 20
X0400 62201-2360 VACUUM SWEEPER HOUR 40 40
X0420 62301-0000 GENERAL LABOR HOUR 40 40
X0440 63302-0000 SIGN SYSTEM SQFT 7 7
X0460 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 23,866 1,194 25,060
X0480 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
X0500 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 200 20 220
X0520 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 6,019 301 6,320
X0540 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 20 10 30
X0560 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 16 4 20
3- A ug
-2
1:
P
M
MileStone: 100% Date Completed: 08/03/23 Report Date: 08/03/23 c:
\p w -w or k\ d0 su m m ar y.
xl sm
]S he et
3)
SUMMARY OF QUANTITIES - OPTION X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.3BOR NPS 2021(1)MT
SHEET
NO SCALE
CRACK SEALING AND FILLING
CRACK SEALING CRACK FILLING
AND FILLING DETAIL
CRACK SEALING
ASPHALT PAVEMENT
Fill crack with pre-formulated mastic material flush with existing surface
" to 1"4 flush with the existing surface
Ensure all remaining overband isStrike off material to flush with existing surface
C.3
STATE PROJECT
NUMBER
SHEET
D
D e s ig n I n tl
F t p w w o r k
\d
\m tr n p s c c .d g n
MT BOR NPS 2021(1)
:4 u n e
L a n g e
/2
/2
C h e c k e d b y
D e s ig n e d b y
T P h a n
Greater than 1"
Seal crack with hot applied crack sealant
30202 -2000
30302 -2000
40301 -0100
40702 -0300
40711-
40901-
41201 -0000
41301 -0800
41401 -3000
41402 -2000
41801 -1000
41801 -1000
41801 -2000
B
EG
IN
M
IL
E
EN
D
M
IL
E
LE
N
G
TH
W
ID
TH
A R
EA
R O
A D
W A Y
A G
G R
EG
A
TE
M
ET
H
O D
S H
O U
LD
ER
R
EC
O N
D
IT
IO
N
IN
G
A S
PH
A
LT
C O
N C R
ET
E
PA
V
EM
EN
T, T
YP
E
C H
IP
S
EA
L, T
YP
E 1C
EM
U
LS
IF
IE
D
A S
PH
A
LT
M
IC
R O
S U
R
FA
C
IN
G
TY
PE
TA
C K C
O A T
A S
PH
A
LT
P A V
EM
EN
T
M
IL
LI
N
G
3-
IN
C H
EP
TH
C R A C K S
C
LE
A N
IN
G
N
D F
IL
LI
N G
C R A C K S
C
LE
A N
D S
EA
LI
N G
A S
PH
A
LT
C O
N C R
ET
E
PA
V
EM
EN
T
PA
TC
H
TY
PE
(A
A S
PH
A
LT
C O
N C R
ET
E
PA
V
EM
EN
T
PA
TC
H
TY
PE
(B
A S
PH
A
LT
C O
N C R
ET
E
PA
V
EM
EN
T
PA
TC
H
TY
PE
MILE MILE FT FT SQFT TON LNFT TON SQYD TON SQYD TON SQYD LNFT MILE SQYD SQYD SQYD BICA 0010 NPS Highway 313 Access Road 71756 0.00 0.20 1,056 25.2 478 2,957 5 3 2,957 89 0.20
BICA 0010 NPS Highway 313 Access Road 71756 0.20 3.00 14,784 25.2 41,395 74 1,242 2.8
BICA 0010 NPS Highway 313 Access Road 71756 3.00 3.50 2,640 25.2 1,195 7,392 13 6 7,392 0.50
BICA 0010 NPS Highway 313 Access Road 71756 3.50 4.40 4,752 25.2 13,306 24 399 0.9
BICA 0010 NPS Highway 313 Access Road 71756 4.40 4.40 0.12 25.2 28
BICA 0010 NPS Highway 313 Access Road 71756 4.40 5.00 3,168 25.2 8,870 16 266 0.6
BICA 0010 NPS Highway 313 Access Road 71756 5.00 5.10 528 25.2 239 1,478 3 1 1,478 0.10
BICA 0010 NPS Highway 313 Access Road 71756 5.10 5.20 528 25.2 1,478 3 44 0.1
BICA 0010 NPS Highway 313 Access Road 71756 5.20 5.20 0.49 25.2 112
BICA 0010 NPS Highway 313 Access Road 71756 5.20 5.37 898 25.2 2,513 5
BICA 0011 OK-A-BEH Road 77037 0.00 9.30 49,104 26.3 143,493 257 2,583 9.3
BICA 0011 OK-A-BEH Road 77037 0.70 0.70 0.03 26.3 7
BICA 0011 OK-A-BEH Road 77037 6.60 6.60 0.03 26.3 7
BICA 0012 Afterbay Road 75346 0.00 0.60 3,168 32.8 11,546 21 346 0.6
BICA 0012 Afterbay Road 75346 0.60 0.60 0.19 32.8 55
BICA 0012 Afterbay Road 75346 0.60 1.60 5,280 32.8 19,243 34 577 1
BICA 0012 Afterbay Road 75346 1.60 1.60 0.25 32.8 73
BICA 0012 Afterbay Road 75346 1.60 1.91 1,637 32.8 5,965 11 179 0.31
BICA 0013 Bad Pass Road 71794 0.09 0.16 370 33.4 1,372
BICA 0013 Bad Pass Road 71794 8.00 8.50 2,640 33.4 115 1,320 Verify shoulder construciton limits with CO prior to work.
BICA 0013 Bad Pass Road 71794 0.00 13.60 71,808 33.4 266,487 477 13.35
BICA 0200 Afterbay Campground Road 75577 0.00 0.23 1,214 24.3 3,279 6
BICA 0203 Horseshoe Bend Road 72381 0.00 1.66 8,765 24.5 23,860 43 7,158 1.66
BICA 0204 Devil's Canyon Overlook Road 72534 0.00 0.80 4,224 29.2 13,705 25
BICA 0207Z Horseshoe Bend Campground Access Road 77521 0.00 0.16 845 19.7 1,849 4
115 1,320 1,912 568,816 1,021 0 10 11,827 12,883 31.42 240 1,372 42
NOTE: The following material application rate and weight values are assumed for estimating purposes.
1.94 = Hot Asphalt Concrete (ton/cuyd) 0.43 = Emulsified Asphalt (Gal./sqyd)
0.10 = Tack Coat (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)
233.0 = Tack Coat (Gal./ton) 22.0 = Roadway Width (ft/mi)
ROUTE NUMBER ROUTE NAME
SHEET TOTAL
FMSS No.
PAY ITEM NUMBER
Remarks
TABULATION OF QUANTITIES - BASE
c:
\p w -w or k\ d0
Su rf ac e Ta bu la ti on
S he et .x ls x]
S he et
-M ay
-2
2:
K
S m it h
4/
D es ig ne d
C he ck ed
STATE PROJECT
D.1
SHEET
NUMBER
BOR NPS 2021(1)MT
Note: The quantities shown hereon are approximate and are subject to field adjustments.
30302 -2000
30302 -2000
40301 -0100
40702 -0300
40711-
40901-
41201 -0000
41301 -0800
41401 -3000
41402 -2000
41801 -1000
41801 -1000
41801 -2000
B
EG
IN
M
IL
E
EN
D
M
IL
E
LE
N
G
TH
W
ID
TH
A R
EA
R O
A D
W A Y
A G
G R
EG
A
TE
M
ET
H
O D
S H
O U
LD
ER
EC
O N
D
IT
IO
N
IN
G
A S
PH
A
LT
C O
N C R
ET
E
PA
V
EM
EN
T, T
YP
E
C H
IP
S
EA
L, T
YP
E 1C
EM
U
LS
IF
PH
A
LT
M
IC
R O
S U
R
FA
C
IN
G
TY
PE
TA
C K C
O A T
A S
PH
A
LT
P A V
EM
EN
T
M
IL
LI
N
G
3-
IN
C H
EP
TH
C R A C K S
C
LE
A N
D F
IL
LI
N G
C R A C K S
C
LE
A N
D S
EA
LI
N G
A S
PH
A
LT
C O
N C R
ET
E
PA
V
EM
EN
T
PA
TC
H
TY
PE
(A
A S
PH
A
LT
C O
N C R
ET
E
PA
V
EM
EN
T
PA
TC
H
TY
PE
(B
A S
PH
A
LT
C O
N C R
ET
E
PA
V
EM
EN
T
PA
TC
H
TY
PE
MILE MILE FT FT SQFT TON LNFT TON SQYD TON SQYD TON SQYD LNFT MILE SQYD SQYD SQYD
BICA 0210 Wappa Upper Switchyard Road 77027 0.00 0.81 4,277 21.6 10,264 18 0.81 3,168
Verify patch construciton limits with CO prior to work.
BICA 0212AZ Avenue B (West) 102671 0.00 0.35 1,848 33 6,776 12 0.35 3,872
Verify patch construciton limits with CO prior to work.
BICA 0212BZ Avenue B (East) 102671 0.00 0.16 845 33.8 3,173 6
BICA 0219 Barry's Landing Boat Ramp Road 110972 0.00 2.10 11,088 28.5 35,112 63
BICA 0903 Upper OK-A-BEH Parking 77041 109,240 1,962 10 12,138
BICA 0904 Lower OK-A-BEH Parking 77041 55,750 6,194 200 0.28
BICA 0913AZ Park Headquarters Parking North 103172 7,700 856 1,000 0.09
BICA 0913BZ Park Headquarters Parking South 103172 7,400 133 1 822
BICA 0919 Lovell Visitors Center Parking 72160 72,790 1,308 7 8,088 168
BICA 0920 Horseshoe Bend Parking 77532 68,525 1,231 7 7,614
BICA 0927 Horseshoe Bend Marina Parking 77537 51,630 5,737 500 0.28 BICA 0930 Horseshoe Bend Dump Station 102654 12,000 1,333 2
BICA 0900 Yellowtail Dam Visitor Center Parking 77034 25,240 2,804 275 0.25 BICA 0921 Devil's Canyon Overlook Parking 72537 17,147 1,979
0 0 4,634 56,658 101 17,570 25 28,662 1,975 2 168 0 7,040 115 1,320 6,546 625,474 1,122 17,570 35 40,489 14,858 33 408 1,372 7,082
NOTE: The following material application rate and weight values are assumed for estimating purposes.
1.94 = Hot Asphalt Concrete (ton/cuyd) 0.43 = Emulsified Asphalt (Gal./sqyd)
0.10 = Tack Coat (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)
233.0 = Tack Coat (Gal./ton) 22.0 = Roadway Width (ft/mi)
Remarks
BASE TOTAL
PAY ITEM NUMBER
ROUTE NUMBER ROUTE NAME FMSS No.
SHEET TOTAL
TABULATION OF QUANTITIES - BASE
c:
\p w -w or k\ d0
Su rf ac e Ta bu la ti on
S he et .x ls x]
S he et
2)
-M ay
-2
K S m it h
4/
D es ig ne d
C he
D.2
SHEET
NUMBER
BOR NPS 2021(1)MT
Note: The quantities shown hereon are approximate and are subject to field adjustments.
20302 -0400
40702 -0300
40711-
41402 -2000
41401 -3000
41801 -1000
41801 -2000
60901 -2100
B
EG
IN
M
IL
E
EN
D
M
IL
E
LE
N
G
TH
W
ID
TH
A R
EA
R
EM
O V A L
O F
C U
R B
A S
PH
A
LT
C H
IP
S
EA
L, T
YP
E 1C
EM
U
LS
IF
IE
D
A S
PH
A
LT
C R A C K S
C
LE
A N
D S
EA
LI
N G
C R A C K S
C
LE
A N
D F
IL
LI
N G
A S
PH
A
LT
C O
N C R
ET
E
PA
V
EM
EN
T
PA
TC
H
TY
PE
(A
A S
PH
A
LT
C O
N C R
ET
E
PA
V
EM
EN
T
PA
TC
H
TY
PE
C U
R B
A S
PH
A
LT
4-
IN
C H
D
EP
TH Remarks
MILE MILE FT FT SQFT LNFT SQYD TON MILE LNFT SQYD SQYD LNFT
BICA 0211 Yellowtail Power Plant Road 77026 0.53 0.72 1,000 20.5 1,000 111 1,000 Verify patch construction limits with CO prior to work.
BICA 0211 Yellowtail Power Plant Road 77026 0.00 0.42 2,218 20.5 5,051 9 0.42 649
BICA 0211 Yellowtail Power Plant Road 77026 0.47 1.14 3,538 20.5 8,058 14 0.67 1,036
BICA 0211 Yellowtail Power Plant Road 77026 0.42 0.47 264 20.5 601 1 592
1,000 13,710 24 1.09 1,685 592 111 1,000
NOTE: The following material application rate and weight values are assumed for estimating purposes.
1.94 = Hot Asphalt Concrete (ton/cuyd) 0.43 = Emulsified Asphalt (Gal./sqyd)
0.10 = Tack Coat (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)
233.0 = Tack Coat (Gal./ton) 22.0 = Roadway Width (ft/mi)
ROUTE NUMBER ROUTE NAME
OPTION X TOTAL
FMSS No.
PAY ITEM NUMBER
TABULATION OF QUANTITIES - OPTION X
c:
\p w -w or k\ d0
Su rf ac e Ta bu la ti on
S he et .x ls x]
S he et
-M ay
-2
2:
K
S m it h
4/
D es ig ne d
C he
SHEET
NUMBER
BOR NPS 2021(1)MT
Note: The quantities shown hereon are approximate and are subject to field adjustments.
Scale in miles
0 0.25 0.5 1
N
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
N
PS
H
IG
H W
AY
A C C
ES
S R O
A D
2. Verify asphalt concrete pavement patch limits with CO.
to create one continues surface treatment.
patch locations as well as mill and overlay sections
1. Place chip seal treatment over asphalt concrete
O K A B
E H R
O A
D
YELLOWTAIL POWER PLANT ROAD
AFTER BAY ROAD
:0 u n e
B
IC
A -0 p w w o r k
\d
\m tr n p s d b .d g n
NORTH UNIT
NPS HIGHWAY 313 ACCESS ROAD
BICA-0010
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) D.4
NPS PMIS No. 326359B
Begin chip seal
Begin mill and overlay
BICA 0010 (MP 0.00)
End mill and overlay
BICA 0010 (MP 0.20)
Begin mill and overlay
BICA 0010 (MP 3.00)
End mill and overlay
BICA 0010 (MP 3.50)
Patch, type 2
Asphalt concrete pavement
BICA 0010 (MP 4.40)
Begin mill and overlay
BICA 0010 (MP 5.00)
mill and overlayEnd
BICA 0010 (MP 5.10)
Asphalt concrete pavement patch, type 1(A)
BICA 0010 (MP 5.20)
End chip seal
BICA 0010 (MP 5.37)
Yellowtail Afterbay Boat Ramp and Chip Seal
Asphalt Concrete Pavement Patch, Type 2 and Chip Seal
Asphalt Concrete Pavement Patch, Type 1
Mill and Overlay and Chip Seal
Chip SealLegend: Note:
0 0.5 1
© 2023 Microsoft Corporation Earthstar Geographics SIO
2. Verify asphalt concrete pavement patch limits with CO.
to create one continues surface treatment.
1. Place chip seal treatment over asphalt concrete patch locations
:0 u n e
B
IC
A -0 p w w o r k
\d
\m tr n p s d b .d g n
NORTH UNIT
OK-A-BEH ROAD
BICA-0011
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) D.5
NPS PMIS No. 326359B
Asphalt concrete pavement patch, type 2
BICA 0011 (MP 0.70)
Asphalt concrete pavement patch, type 2
BICA 0011 (MP 6.60)
Begin chip seal
BICA 0011 (MP 0.00)
End chip seal
BICA 0011 (MP 9.30)
Mill and overlay
BICA 0903 (Upper OK-A-BEH Parking)
Micro Surfacing
BICA 0904 (Lower OK-A-BEH Parking) and Chip Seal
Asphalt Concrete Pavement Patch, Type 2
Micro Surfacing
Mill and Overlay
Chip Seal
Legend:
O K -A -B
EH
R
O A D
0.25
ACCESS ROAD
NPS HIGHWAY 313
Note:
500 10000250500
Scale in feet
N
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
2. Verify asphalt concrete pavement patch limits with CO.
locations to create one continues surface treatment.
1. Place chip seal treatment over asphalt concrete patch
:0 u n e
B
IC
A -0 p w w o r k
\d
\m tr n p s d b .d g n
NORTH UNIT
BICA-0212BZ AVENUE B (EAST)
BICA-0212AZ AVENUE B (WEST)
AFTERBAY CAMPGROUND ROAD
BICA-0200
BICA-0012 AFTERBAY ROAD
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) D.6
NPS PMIS No. 326359B
Begin chip seal
BICA-0200 (MP 0.0)
End chip seal
BICA-0200 (MP 0.23)
Begin chip seal
BICA 212AZ (MP 0.00)
End chip seal
BICA 212AZ (MP 0.35)
End chip seal
BICA 212BZ (MP 0.16)
Begin chip seal
BICA 212BZ (MP 0.00)
End chip seal
BICA 0012 (MP 1.91)
Asphalt concrete pavement patch, type 1(A)
BICA 0012 (MP 1.60)
Asphalt concrete pavement patch, type 1(A)
BICA 0012 (MP 0.60)
Begin chip seal
BICA 0012 (MP 0.00)
Afterbay ranger and contact station Staging area
Micro Surfacing
(PARK HEADQUARTERS PARKING NORTH)
BICA 0913AZ
Mill and overlay
(PARK HEADQUARTERS PARKING SOUTH)
BICA 0913BZ
Yellowtail Afterbay Boat Ramp
Micro Surfacing
Mill and Overlay and Chip seal
Asphalt Concrete Pavement Patch, Type 1
Chip Seal
Legend: Note:
A F T E R B A Y C
A M P G
R O
U N
D R
O A D
AFTERBAY ROAD
AVENUE B (WEST)
A V E N
U E B E A S T
NPS HIGHWAY 313 ACCESS ROAD
YELLOWTAIL POWER PLANT ROAD
0 0.5 1 2
N
© 2023 Microsoft Corporation Earthstar Geographics SIO patch locations to create one continues surface treatment.
1. Place chip seal treatment over asphalt concrete
:4 e p te m b e r
B
IC
A -0
B a d P a s s R o d p w w o r k
\d
\m tr n p s d b .d g n
SOUTH UNIT
BAD PASS ROAD
BICA-0013
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) D.8
NPS PMIS No. 326359B
Begin asphalt concrete pavement patch, type 1(B)
BICA 0013 (MP 0.09)
End asphalt concrete pavement patch, type 1(B)
BICA 0013 (MP 0.16)
Begin shoulder stabilization
BICA 0013 (MP 8.00)
End shoulder stabilization
BICA 0013 (MP 8.50)
End chip seal
BICA 0013 (MP 13.6)
Begin chip seal
BICA 0013 (MP 0.00)
Legend:
Shoulder Construction and Chip Seal and Chip Seal
Asphalt Concrete Pavement Patch, Type 1
Chip Seal
BAD PASS ROADBAD PASS ROADBAD PASS ROAD
Note:
H O
R S E S H
O E
B E N
D R
O A D
D E
V
IL
S C
A N
Y O
N
O V
E R
L O
O K R
O A
D
B A R R Y 'S L
A N
D
IN
G B
O A T
R A
M P R
O A D
M O
N T
A N
A
W Y
O M
300 0 300 600 900
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
HORSESHOE BEND ROAD
BAD P
ASS
ROAD
:3
J u n e
B
IC
A p w w o r k
\d
\m tr n p s d b .d g n
SOUTH UNIT
HORSESHOE BEND ROAD
BICA-0203
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) D.9
NPS PMIS No. 326359B
Begin chip seal
BICA 0203 (MP 0.00)
No work
BICA 0203 (Horseshoe Bend Road Boat Ramp)
Begin chip seal
BICA 0207Z (MP 0.00)
End chip seal
BICA 0207Z (MP 0.16)
Mill and overlay
BICA 0920 (HORSESHOE BEND PARKING)
Micro Surfacing
BICA 0927 (HORSESHOE BEND MARINA PARKING)
Chip seal
BICA 0930 (HORSESHOE BEND DUMP STATION)
End chip seal
BICA 0203 (MP 1.66)
Micro Surfacing
Mill and Overlay
Chip Seal
Legend:
0 125 250 500 750 1000
N
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
BAD
PASS
R
OAD
D E V
IL
'S C
A N
Y O
N O
V E R L O
O K R
O A
D
:0
M a y
B
I C
A
S h e t] p w w o r k
\d
\m tr n p s d b .d g n
SOUTH UNIT
DEVIL'S CANYON OVERLOOK PARKING
BICA-0921
DEVIL'S CANYON OVERLOOK ROAD
BICA-0204
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) D.10
NPS PMIS No. 326359B
Begin chip seal
BICA 0204 (MP 0.00)
End chip seal
BICA 0204 (MP 0.80)
Micro Surfacing
BICA 0921 (DEVIL'S CANYON OVERLOOK PARKING)
Legend:
Micro Surfacing
0.1 0.05 0 0.1 0.2 0.3
N
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
BAD PASS ROAD
BARRY'S LANDING BOAT RAMP ROAD
:2
M a y
B
I C
A
S h e p w w o r k \d
\m tr n p s d b .d g n
SOUTH UNIT
BARRY'S LANDING BOAT RAMP ROAD
BICA-0219
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) D.11
NPS PMIS No. 326359B
Begin chip seal
BICA 0219 (MP 0.0)
End chip seal
BICA 0219 (MP 2.1)
Legend:
MT BOR NPS 2021(1) E.2
4" Broken yellow centerline
4" Broken yellow centerline
NO SCALE
2.
1.
Traffic flow yellow centerline yellow centerline solid yellow centerline and solid yellow centerline
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
2' 18'
20'
40'
2' 38'
2' 18'
20'
2' 38'
40'
4" Broken yellow and
4" Broken yellow
4" Solid double
4" Solid double
2' broken line: two pavement markers spaced 2' apart
Single solid line: pavement markers spaced on 10' centers.
10' centers.
pavement markings as shown on Standard 635-3.
NOTE:
Two-way traffic
No passing zone one direction
DETAIL A2
Two-way traffic
No Passing zone one direction
DETAIL B2
Two-way traffic
No passing zone both directions
DETAIL A3
Two-way traffic
No Passing zone both directions
DETAIL B3
Shoulder
Shoulder
Shoulder Shoulder
Shoulder
Shoulder
On two- or three-lane roads, signs may be used instead of temporary patterns:
To substitute raised pavement markers for lines, use the following
Double solid line: two pavement markers, side by side, spaced on allowed by the gap shown based on curvature.
Two-way traffic
Passing zone both directions
DETAIL B1
Two-way traffic
Passing zone both directions
DETAIL A1
DETAIL A DETAIL B
Curves < 500' Radius Tangents or Curves ≥ 500' Radius
:1
M a y
U n ti tl e d S h e p w
-w o rk
\d \t e m p p a v e m a rk in g s .d g n
TEMPORARY PAVEMENT MARKINGS
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) E.3
MT BOR NPS 2021(1) E.4
MT BOR NPS 2021(1) E.5
MT BOR NPS 2021(1) E.6
MT BOR NPS 2021(1) E.7
See post detail (typ.)
Break-away holes.
See table for hole size parallel to sign face.
Field drill holes through post
Bottom of sign panel
Post�
Local tangent
< 10
NOTE:
90°
93°
WOOD POST SELECTION TABLE
X X
0.75X
H
H
X
0.2X0.6X 0.2X
Y
H
D
H
D
H
D
Long side of post
D
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
E d g e o f p a v e d s h o u ld e r
E d g e o f tr a v e le d w a y
S e e N o te m in
S e e N o te m in
See Note 4
6' - 12'
On tangent alignment
200'
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
7.
6.
5.
4.
3.
2.
1.
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
by the CO.
State standards may be used as an alternative if approved
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
(INCH) (INCH) (INCH)
Diamond ≤ 48"
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
> 30'
> 17'
12' - 16'
> 13'
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
1.5
1.5
1.5
1.5
" dia. bolts 4 1Attach sign panels with a minimum of 2 -a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, 6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign
6/2005 STANDARD APPROVED FOR USE
7/2022 REVISED: 635-14
:0 a y
B a s e .B
.U p w
-w o rk
\d \F
L H
-C e ll s .c e l
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) E.8
.2
See USDOT Pictograph spaced 0.5-inch apart
Three 0.5-inch stripes
1.175
0.5C
0.7
0.5C
0.7
0.5C
1.175
14.25
See NPS and BOR Pictographs and Note 3
Background - White (retroreflective)
Border - White (retroreflective)
Legend - PMS 1615, Brown (retroreflective)Colors:
NPS PICTOGRAPH
Background - White (retroreflective)
PMS 1245 Brown, PMS 468 Brown (retroreflective)
Legend, Border - PMS 3035 Blue, PMS 633 Blue,Colors:
BOR PICTOGRAPH
5. Verify location with CO.
4. See vicinity maps for sign locations.
Ensure all pictographs are vector-based, vinyl-ready.
All incorporated pictographs are subject to approval. 3.
requirements.
Refer to Standard 635-14 for post and sign mounting 2.
Unless otherwise noted, dimensions are inches.1.
NOTES:
9.7652.489.76
22.52722.5
164016
3.7664.483.76
5.660.85.6
9.76 9.76
.3
.2
E
E
C
C .3
BIL PROJECT FUNDING SOURCE SIGN
24 sqftArea:
Background - Green (retroreflective)
Legend, Border - White (retroreflective)Colors:
2.3" Radius, 1" BorderDimensions:
.2
.5
.2
.5
0.4510.2
0.675
2.25
0.675
0.4510.23.6
0.4510.23.6
0.52 sqftArea:
Background - Blue (retroreflective)
Legend - White (retroreflective)Colors:
USDOT PICTOGRAPH
4.5
.2
:2
M a y
N p w w o r k
\d
\b il s ig n .d g n
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) E.9
:1
M a y
T
A B
U L
A T
IO
N
O F
Q U
A N
T
IT
p w w o r k
\d
\m tr n p s f a .d g n
TABULATION OF QUANTITIES
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.1
:1
M a y
T
A B
U L
A T
IO
N
O F
Q U
A N
T
IT
p w w o r k
\d
\m tr n p s f d
.d g n
TABULATION OF QUANTITIES
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.2
:1
M a y
T
A B
U L
A T
IO
N
O F
Q U
A N
T
IT
p w w o r k
\d
\m tr n p s f b
.d g n
TABULATION OF QUANTITIES
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.3
:1
M a y
.4 p w w o r k
\d
\m tr n p s f c .d g n
TABULATION OF QUANTITIES
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.4
:2
M a y
.5 p w w o r k
\d
\m tr n p s f c .d g n
TABULATION OF QUANTITIES
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.5
Class A wood posts, 487.5 LNFT
Guardrail system MGS, Type 2, Class A wood posts, 762.5 LNFT
Guardrail system MGS, Type 2, MP 0.27
MGS tangent (TL-3)
Terminal section type
MP 0.27
MGS tangent (TL-3)
Terminal section type
N
MP 0.43
MGS tangent (TL-3)
Terminal section type
MP 0.38
MGS tangent (TL-3)
Terminal section type
Class A wood posts, 487.5 LNFT
Guardrail system MGS, Type 2, Class A wood posts, 762.5 LNFT
Guardrail system MGS, Type 2, N
NPS HIGHWAY 313 ACCESS ROAD
NPS HIGHWAY 313 ACCESS ROAD
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
:5 u n e
B
I C
A
G
U A
R D
R A
I L
.2 M
P
.4
T
.2 M
P .3
T p w w o r k
\d
\m tr n p s f h
.d g n
MP 0.27-MP0.38 LT
MP 0.27-MP 0.43 RT
BICA 0010 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.7
MP 1.37
MGS tangent (TL-3)
Terminal section type
MP 1.33
MGS tangent (TL-3)
Terminal section type Class A wood posts, 150 LNFT
Guardrail system MGS, Type 2, MP 1.33
MGS tangent (TL-3)
Terminal section type
MP 1.37
MGS tangent (TL-3)
Terminal section type
Class A wood posts, 150 LNFT
Guardrail system MGS, Type 2, N
Class A wood posts, 387.5 LNFT
Guardrail system MGS, Type 2, MP 3.19
MGS tangent (TL-2)
Terminal section type
MP 3.10
MGS tangent (TL-2)
Terminal section type
MP 3.10
MGS tangent (TL-2)
Terminal section type
MP 3.19
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 387.5 LNFT
Guardrail system MGS, Type 2, NPS HIGHWAY 313 ACCESS ROAD
NPS HIGHWAY 313 ACCESS ROAD
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
:3
M a y
B
I C
A
G
U A
R D
R A
.3 M
P
.3
.1 M
P
.9 p w w o r k
\d
\m tr n p s f h
.d g n
MP 3.10-MP 3.90
MP 1.33-MP 1.37
BICA 0010 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.8
Class A wood posts, 462.5 LNFT
Guardrail system MGS, Type 2, MP 3.53
MGS tangent (TL-2)
Terminal section type
MP 3.62
MGS tangent (TL-2)
Terminal section type
MP 3.53
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 100 LNFT
Guardrail system MGS, Type 2, MP 3.56
MGS tangent (TL-2)
Terminal section type
N
MP 3.88
MGS tangent (TL-2)
Terminal section type
MP 3.89
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 125 LNFT
Guardrail system MGS, Type 2, MP 3.88
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 192.5 LNFT
Guardrail system MGS, Type 2, MP 3.93
MGS tangent (TL-2)
Terminal section type
Delineator, type flexible (brown)
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
NPS HIGHWAY 313 ACCESS ROAD
NPS HIGHWAY 313 ACCESS ROAD
:2
M a y
B
I C
A
G
U A
R D
R A
.5 M
P
.6
.8 M
P
.9 p w w o r k
\d
\m tr n p s f h
.d g n
MP 3.88-MP 3.93
MP 3.53-MP 3.62
BICA 0010 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.9
Class A wood posts, 300 LNFT
Guardrail system MGS, Type 2, MP 4.20
MGS tangent (TL-2)
Terminal section typeMP 4.15
MGS tangent (TL-2)
Terminal section type
MP 4.16
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 200 LNFT
Guardrail system MGS, Type 2, MP 4.20
MGS tangent (TL-2)
Terminal section type
N
MP 4.40
MGS tangent (TL-2)
Terminal section type Class A wood posts, 275 LNFT
Guardrail system MGS, Type 2, MP 4.46
MGS tangent (TL-2)
Terminal section type
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
NPS HIGHWAY 313 ACCESS ROAD
NPS HIGHWAY 313 ACCESS ROAD
:3
M a y
B
I C
A
G
U A
R D
R A
.1 M
P
.2
.4 M
P
.4 p w w o r k
\d
\m tr n p s f h
.d g n
MP 4.40-MP 4.46
MP 4.15- MP 4.20
BICA 0010 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.10
Class A wood posts, 475 LNFT
Guardrail system MGS, Type 2, MP 4.52
MGS tangent (TL-2)
Terminal section type
MP 4.52
MGS-BAT
Terminal section type Class A wood posts, 225 LNFT
Guardrail system MGS, Type 2, MP 4.56
MGS-BAT
Terminal section type
N
MP 4.67
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 300 LNFT
Guardrail system MGS, Type 2, MP 4.59
MGS tangent (TL-2)
Terminal section type Delineator, type flexible (brown)
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
NPS HIGHWAY 313 ACCESS ROAD
NPS HIGHWAY 313 ACCESS ROAD
:4
M a y
B
I C
A
G
U A
R D
R A
.5 M
P
.5 M
P p w w o r k
\d
\m tr n p s f h
.d g n
MP 4.52-MP 4.59
MP 4.52-MP 4.56
BICA 0010 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.11
MP 4.72
MGS tangent (TL-2)
Terminal section type
Delineator, type flexible (brown)
MP 4.78
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 300 LNFT
Guardrail system MGS, Type 2, N
Class A wood posts, 2400 LNFT
Guardrail system MGS, Type 2, © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
NPS HIGHWAY 313 ACCESS ROAD
N
PS
H
IG
H W
A Y A
C C E S S R
O A D
:2 u n e
B
IC
A
G U
A R
D R
IL
.6
-M P
.K
.L
-M
P .L p w w o r k
\d
\m tr n p s f h
.d g n
MP 4.78-MP 4.90
MP 4.67-MP 4.79
BICA 0010 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.12
Class A wood posts, 2400 LNFT
Guardrail system MGS, Type 2, N
Class A wood posts, 2400 LNFT
Guardrail system MGS, Type 2, © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
NPS HIGHWAY 313 ACCESS ROAD
NPS HIGHWAY 313 ACCESS ROAD
:5
M a y
B
IC
A
G
U A
R D
R
M
-M
P .M
.N
-M
P .N p w w o r k
\d
\m tr n p s f h
.d g n
MP 4.99-MP 5.09
MP 4.87-MP 4.99
BICA 0010 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.13
Class A wood posts, 2400 LNFT
Guardrail sysytem MGS, Type 2, N
MP 5.25
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 2400 LNFT
Guardrail sysytem MGS, Type 2, © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
NPS HIGHWAY 313 ACCESS ROAD
NPS HIGHWAY 313 ACCESS ROAD
:5
M a y
B
IC
A
G U
A R
D R
.O
-M P
.O
.P
-M
P .P p w w o r k
\d
\m tr n p s f h
.d g n
MP 5.2-MP 5.25
MP 5.09-MP 5.2
BICA 0010 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.14
MP 0.44
Connect to existing guardrail
Class A wood posts, 25 LNFT
Guardrail system MGS, Type 2, MP 0.44
MGS tangent (TL-2)
Terminal section type
N
Class A wood posts, 25 LNFT
Guardrail system MGS, Type 2, MP 0.54
Connect to existing guardrail
MP 0.53
MGS tangent (TL-2)
Terminal section type
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
AFTERBAY ROAD
AFTERBAY ROAD
:2 u n e
B
IC
A
G
U A
R D
R
.A
-M
P .A
.B
-M
P .B p w w o r k
\d
\m tr n p s f h
.d g n
MP 0.53
MP0.44
BICA 0012 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.15
Class A wood posts, 100 LNFT
Guardrail system MGS, Type 2, MP 0.12
MGS tangent (TL-2)
Terminal section type MP 0.15
MGS tangent (TL-2)
Terminal section type
MP 0.12
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 100 LNFT
Guardrail system MGS, Type 2, MP 0.15
MGS tangent (TL-2)
Terminal section type
N
MP 0.28
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 200 LNFT
Guardrail system MGS, Type 2, Class A wood posts, 750 LNFT
Guardrail system MGS, Type 2, MP 0.32
MGS tangent (TL-2)
Terminal section type
MP 0.35
MGS tangent (TL-2)
Terminal section type
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
YELLOWTAIL POWER PLANT ROAD
YELLOWTAIL POWER PLANT ROAD
:3
M a y
B
I C
A G
U A
R D
R A
.A
M
P .A
.B
M
P .B p w w o r k
\d
\m tr n p s f h
.d g n
(OPTION X)
MP 0.28-0.38
MP 0.12-MP 0.15
BICA 0211 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.16
Class A wood posts, 750 LNFT
Guardrail system MGS, Type 2, N
MP 0.50
MGS tangent (TL-2)
Terminal section typeClass A wood posts, 750 LNFT
Guardrail system MGS, Type 2, MP 0.54
MGS tangent (TL-2)
Terminal section type
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
YELLOWTAIL POWER PLANT ROAD
YELLOWTAIL
POWER PL
ANT ROAD
:3
M a y
B
IC
A
G
U A
R D
R
.C
-M
P .C
.D
-M
P .D p w w o r k
\d
\m tr n p s f h
.d g n
(OPTION X)
MP.49-MP 0.57
MP 0.38-MP 0.49
BICA 0211 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.17
MP 0.54
MGS tangent (TL-2)
Terminal section type
MP 0.62
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 387.5 LNFT
Guardrail system MGS, Type 2, N
MP 0.98
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 762.5 LNFT
Guardrail system MGS, Type 2, © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
YELLOWTAIL POWER PLANT ROAD
YELLOWTAIL POWER PLANT ROAD
:3
M a y
B
I C
A
G
U A
R D
R A
.E
M
P .E
.F
M
P .F p w w o r k
\d
\m tr n p s f h
.d g n
(OPTION X)
MP 0.98-MP 1.09
MP 0.54-MP 0.62
BICA 0211 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.18
MP 1.14
MGS tangent (TL-2)
Terminal section type
Class A wood posts, 762.5 LNFT
Guardrail system MGS, Type 2, © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
YELLOWTAIL POWER PLANT ROAD
:3
M a y
B
IC
A
G
U A
R D
R
.G
-M
P .G p w w o r k
\d
\m tr n p s f h
.d g n
(OPTION X)
MP 1.09-MP 1.14
BICA 0211 GUARDRAIL
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.19
11' typ.
ty p
8' typ.
' t yp
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS accessibility symbol
Pavement markings, type B, solid white
Pavement markings, D E
V
IL
'S C
A N
Y O
N O
V E
R L
O O
K R
O A
D
NOTE:
before applying pavement markings.
1. Layout the striping for the CO approval type B, solid white
Pavement markings, type B, solid white
Pavement markings, No Scale
NPS PMIS No. 326359B ty p
9' typ.
9' typ.
:2 e p te m b e r
D e v il
's C a n y o n O v e r lo o k P a r k in g lo t S h e p w w o r k \d
\m tr n p s f x .d g n
PARKING
DEVIL'S CANYON OVERLOOK
BICA 0921
PAVEMENT MARKING PLAN
STATE PROJECT
NUMBER
MT BOR NPS 2021(1) F.20
12' ty p.
ty p
' ty p
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
HORSESHOE BEND ROAD
before applying pavement markings.
1. Layout the striping for the CO approval
NOTE:
type B, solid white
Pavement markings, type B, solid white
Pavement markings, No Scale ty p
15' typ.
15' typ.
:4 e p te m b e r
H o r s e s h o e B e n d R d
P la n
S h e p w w o r k \d
\m tr n p s f x .d g n
PARKING
HORSESHOE BEND
BICA 0920
PAVEMENT MARKING PLAN
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.21
ty p
11' typ.
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
HORSESHOE BEND ROAD
NOTE:
before applying pavement markings.
1. Layout the striping for the CO approval type B, solid white
Pavement markings, type B, solid white
Pavement markings, ty p
No Scale
10' typ.
10' typ.
10' typ.
' ty p ty p
:3 e p te m b e r
H o r s e s h o e B e n d R d
P la n
S h e p w w o r k \d
\m tr n p s f x .d g n
MARINA PARKING
HORSESHOE BEND
BICA 0927
PAVEMENT MARKING PLAN
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.22
ty p
8' typ.
(R5-11)
Sign system
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS straight arrow
Pavement markings, accessibility symbol
Pavement markings, OK-A-BEH ROAD pavement markings.
2. Layout the striping for the CO approval before applying
1. West bay parking layout updated to reflect new traffic flow.
NOTE:
type B, solid white
Pavement markings, R
R
' typ
31' t yp.
No Scale
42' typ ty p . 1 ty p ty p
:0 e p te m b e r
L O
W E
R O
K -A
-B E
H P
A R
K p w w o r k \d
\m tr n p s f x .d g n
LOWER OK-A-BEH PARKING
BICA 0904
PAVEMENT MARKING PLAN
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.23
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS accessibility symbol
Pavement markings, 8" typ.
Pavement markings, stop bar
OK-A-BEH ROAD
NOTE:
before applying pavement markings.
1. Layout the striping for the CO approval type B, solid white
Pavement markings, 57' typ.
' ty p
'R
R
R
R
No Scale
NPS PMIS No. 326359B ty p
' t yp
' t yp
' ty p
'ty p
57' typ.
' t yp ty p
' t yp
:4 e p te m b e r
O k
A
B e h
U p p e r
S h e p w w o r k \d
\m tr n p s f x .d g n
UPPER OK-A-BEH PARKING
BICA 0903
PAVEMENT MARKING PLAN
STATE PROJECT
NUMBER
MT BOR NPS 2021(1) F.24
type B, solid white
Pavement markings, type B, solid white
Pavement markings, © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
AVENUE B (W
EST)
before applying pavement markings.
1. Layout the striping for the CO approval
NOTE:
9' typ.
' ty p
9' typ.
' ty p
No Scale
:0 e p te m b e r
P a r k
H e a d q u a r te r s P a r k in g
S h e p w w o r k \d
\m tr n p s f x .d g n
PARK HEADQUARTERS PARKING SOUTH
BICA 0913BZ
PARK HEADQUARTERS PARKING NORTH
BICA 0913AZ
PAVEMENT MARKING PLAN
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.25
accessibility symbol
Pavement markings, type B, solid white
Pavement markings, NPS HIGHWAY 313 ACCESS ROAD
NOTE:
before applying pavement markings.
1. Layout the striping for the CO approval
9' typ.
.5 ty p
No Scale
NPS PMIS No. 326359B
.5 ' ty p
.5 ty p ty p
' ty p
:2 e p te m b e r
Y e ll o w ta il
D a m
V is it o r C e n te r P a r k in g l o t O ld
S h e p w w o r k \d
\m tr n p s f x .d g n
CENTER PARKING
YELLOWTAIL DAM VISITOR
BICA 0900
PAVEMENT MARKING PLAN
STATE PROJECT
NUMBER
MT BOR NPS 2021(1) F.26
' t yp type B, solid white
Pavement markings, © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS accessibility symbol
Pavement markings, straight arrow
Pavement markings, type B, U S H
IG
H W
A Y
A
L T combination type B, straight/turn arrow
Pavement markings, before applying pavement markings.
1. Layout the striping for the CO approval
NOTE:
type B, solid white
Pavement markings, ty p
19' typ.
' t yp
' ty p
19' typ.
' ty p
11' typ.
ty p
No Scale
R
R
27'R ty p
:4 e p te m b e r
L o v e ll
V is it o r C e n te r
P a rk in g
A re a
S h e p w w o r k
\d
\m tr n p s f x
.d g n
CENTER PARKING
LOVELL VISITORS
BICA 0919
PAVEMENT MARKING PLAN
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.27
REF-1
REF-3
REF-2
78"78"
84"
66½" 5¾"5¾"
6½"
6" C, Width = 43¾"
6"
6"
6" C, Width = 53⅝"
13½"
Height = 10", Width = 13½"
6½" Height = 6", Width = 6⅞"
18"
Height = 10", Width = 10"
5½" 4" C, Width = 20⅜"
4"
54"
BORDER
R=3"
TH=0¾"
18½"
Height = 6", Width = 6⅞"
29½"
66½" 5¾"5¾"
BORDER
R=3"
TH=0¾"
6½" 6" C, Width = 43¾"
6" 6" C, Width = 53⅝"
6"
Height = 10", Width = 13½"
4" 4" C, Width = 20⅜"
5½"
30½"
13½"
Height = 10", Width = 13½"
54"
67⅝" 8¼"8¼"
6" 6" C, Width = 45⅜"
14¾"
6" 6" C, Width = 42¾" 2½"
BORDER
R=3"
TH=0¾"
Divider TH=0¾"
6"
30"
Height = 6", Width = 6⅞"
6" Height = 6", Width = 6⅞"
5⅛" 6" C, Width = 13⅛"
18"
42"
NOTE:
Design custom signs according to NPS Uniguide standards.
Panel, letter, and symbol dimensions are approximate.1.
:0
M a y
C
U S
T O
M S
IG
N
D E
T A p w
-w o rk \d
\m tr -n p s
-1 fy
.d g n
CUSTOM SIGN DETAILS
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.28
5.
4.
3.
2.
1.
Case 1: Overlying material Case 2: Overlying material between drilled holes
Excavate area between drilled holes
Excavate area
Overlying material Overlying material
Rock material Rock material backfill or overlying material
Crushed coarse aggregate backfill or overlying material
Crushed coarse aggregate aggregate backfill
Crushed coarse aggregate backfill
Crushed coarse
Finished gradeFinished grade depth (A) is 18" or less depth (A) is greater than 18"
NOTE:
the base metal with two coats of zinc-oxide paint.
Treat field cut galvanized steel post surfaces that expose requirements in Section 617.
Place crushed coarse aggregate according to the post underdrain pipe with geotextile" in Section 703.
"coarse aggregate for concrete" or "granular backfill for
Use crushed coarse aggregate backfill that conforms to oblong hole configuration for Case 1 conditions.
Unless otherwise specified, use either the circular or the
Use this standard when posts cannot be embedded to the
ELEVATION
PLAN VIEWPLAN VIEW
ELEVATION
Steel Post
Wood Post
Wood Post
Steel Post
POST EMBEDMENT DIMENSIONS
B A
E m b e d m e n t
D e p th
B A
E m b e d m e n t
D e p th
23"
23"
21"
21"
12"
8"
617-31 or 617-32.
minimum depth shown on Standard 617-10, 617-11, f o r
M G
S f o r G f o r
M G
S f o r G
21" or 23" 8" or 12"
DEPTH
EMBEDMENT
Case 1
Case 2
DEPTH (B)
DRILLING
MATERIAL (A)
OVERLYING
TYPE
HOLE
42”
30" to 42”
24" to 42”
> 30”
> 18" to 30”
0 to 18”
42" - A
12”
24”
INSTALLATION IN ROCK
W-BEAM GUARDRAIL
MGS AND G4
:1
A u g u s t
S td
-1 p w
-w o rk
\d \S td -1
.d g n
STATE PROJECT
NUMBER
SHEET
MT BOR NPS 2021(1) F.29
steeper
1V:4H or
1 Drawing for other details.
See Standard 617-31 (wood posts) and 617-32 (steel posts)
" x 5" Bolt8
" dia. hole in post4
Field drill
Typical post spacing is 6'-3" unless otherwise noted.
except that steel posts are required for Posts 1-3.
Steel posts shown. Wood posts may be used as an alternate,1.
2.
3.
NOTE:
Steel postWood block w h e n r u b r a il i s r e q u ir e d bolt and nut guardrail
See Detail B
See Detail A
Field bend
Dith bottom
Edge of shoulder
Mid-span splice (typ.)
Top of cut " span2
12 ga. W-beam, 9'-4
" 2
12 ga. W-beam, 9'-4
Wood block
Rubrail (typ.)
Steel post Steel post
Steel post
Wood block
Wood block
Steel post V ditch (typ.)
Washer
Pipe sleeve spacer
D
C
BA
B C
D
A
S e e T a b le
See Note 3
Shoulder Shoulder VariesShoulder
VariesShoulder
Terminal section, Type MGS-BAT
Pay Limits
Guardrail system MGS
Pay limits
Length of Need
M in im u m p o s t le n g th
" x 2"8
6'-3
"21
3'-1
"21
3'-1
8" W6 x 8.5
W6 x 9 or c o v e r m in
AND BLOCK DETAIL
STEEL POST
ELEVATION
PLAN
ALONG RAIL
ELEVATION
DETAIL B
DETAIL A
SECTION A-A SECTION B-B SECTION C-C SECTION D-D NO SCALE
POST DISTANCE
FROM EDGE OF SHOULDER
POST OFFSETS
22 13 or st ee pe r1V:
3H or st ee pe r1V:
3H or steeper
1V:4H
4681012141618202224 or steeper
1V:4H or steeper
1V:4H "4
13'-11
10'-11"
"4
8'-10
5'-9"
75'-0"
25'-0"
12'-6
12'- 6"
Sheet 1 of 2
MGS-BATTYPE
BACK SLOPE ANCHOR TERMINAL
MGS W-BEAM GUARDRAIL
:1
A u g u s t
S td p w w o r k
\d
\S td
.d n
SHEET
MT BOR NPS 2021(1) F.30
rail of Posts 1 -3 and rub rail at Post 4.
Anchor plate and hardware are typical on top
Use zinc rich paint to coat field drilled holes.
See Sheet 1 of 2 for terminal layout.
3.
2.
1.
Steel plate (see Detail)
Washer of post� slots (typ.)
hole (typ.)
" dia. (typ.)4
" dia. (typ.)4
" dia. (typ.)4
" dia. (typ.)4
" dia.16
" dia. (typ.)16 13 " dia. (typ.)16
1" dia.
W6 x 8.5 W6 x 9 or W6 x 8.5
W6 x 9 or W6 x 8.5 W6 x 9 or
" bolts8 7as needed for
Field drill 1" holes
" x 2" bolt (typ.)8
" Nut (typ.)8
1" dia. hole
1" dia.
NOTE:
AT POSTS 1, 2, AND 3
SPECIAL RAIL TO POST CONNECTION
GALVANIZED SQUARE WASHER
GALVANIZED STEEL PLATE
See Note 3
STEEL PLATE AND WASHER
POSTS 5-21POST 4POSTS 1-3
4"
" Thickness2 1 Thickness"16
14"
"2 12"2
12"4 12"4
31"2 12"2
"8 16"8
"4
"8
" 8
4" 4"
"4
"4
"4 12 "4
"8
"4 31" x 1
" dia.4
"4
Sheet 2 of 2
MGS-BATTYPE
BACK SLOPE ANCHOR TERMINAL
MGS W-BEAM GUARDRAIL
:2
A u g u s t
S td
-1 b p w
-w o rk
\d \S td -1
.d
SHEET
MT BOR NPS 2021(1) F.31
6.
5.
4.
3.
2.
1.
embankment
Edge of widened post section. See Note 4 face of the rail in the standard
Tangent line projected from the embankment
Edge of widened post section. See Note 4 face of the rail in the standard
Tangent line projected from the
Varies by manufacturer end of terminal not shown.
Terminal posts and
Varies by manufacturer end of terminal not shown.
Terminal posts and
NOTE:
terminal grading extents where practical.
Construct a 1V:4H slope outside of the guardrail terminal.
Install a reflectorized object marker on the end of the according to the manufacturer's recommendations.
end farther from the edge of shoulder, or use a taper
Install terminal at a 1:25 taper or flatter to position the the manufacturer's recommendations.
necessary to install the tangent terminal according to manufacturer for a specific product. Adjust grading as begin at post 3. Verify the length of need with the
For design purposes, the length of need is assumed to of site limitations, use the alternative grading layout.
as practical within site constraints. If necessary because are provided, use the preferred grading layout as much staking notes or model. If no staking notes or model
Construct the terminal grading layout as shown in the other details.
recommendations. See manufacturer's drawings for
Install tangent terminal according to the manufacturer's
See Note 6
Guardrail terminal grading o r f la tt e r
V
:1 H
Front of rail face
PLAN
PREFERRED GRADING
Post section
Standard
See Note 6
Guardrail terminal grading o r f la tt e r
V
:1
H
Hinge point line
See Note 3
Length of Need
Guardrail system
Pay limits
Pay limits terminal section type tangent or type MGS tangent
Back of post
Back of post
Front of rail face
Hinge point line
PLAN
ALTERNATIVE GRADING
post section
Standard
Guardrail system
Pay limits
Pay limits terminal section type tangent or type MGS tangent
See Note 3
Length of Need
12'-6"
(min.)
10'-0" m in m in m in
12'-6" m in
TEST LEVEL
L
50 (for MGS)
37.5 or 50 (for G4)
(FT)
3 (> 45 mph)
2 (≤ 45 mph)
AND GRADING
TYPE TANGENT TERMINAL
W-BEAM GUARDRAIL
MGS AND G4
:2
A u g u s t
S td
-2 p w
-w o rk
\d \S td -2
.d
SHEET
MT BOR NPS 2021(1) F.32
4.
3.
2.
1.
on terminal sections
All posts except those guardrail bolt guardrail post bolt
NOTE:
OMITTED POST DETAIL
PLAN VIEW
See Note 1
TYPICAL GUARDRAIL CROSS SECTION
TYPICAL GUARDRAIL ELEVATION
POST BOLT ASSEMBLY GUARDRAIL MOUNT
FLEXIBLE DELINEATOR
POST AND BLOCK
of traffic
Lap in direction splice
Mid-span of rail as applicable ground line at face
Edge of pavement or
1V:10H or flatter slope 1V:10H or flatter slope fill slope
Variable
Hinge point steeper than fill slope
Variable slope but not departure terminal sections required for approach and
Subgrade shoulder. Widening on each side of block
16d galvanized nail
Toenail with one groundline at face of rail
Edge of pavement or groundline at face of rail
Edge of pavement or on each side of block
16d galvanized nail
Toenail with one shown on Typical Section
Aggregate base or as shown on Typical Section
Aggregate base or as
See Note 4 sheeting
Retroreflective
W beam rail
Post and block block (typ.)
Post and
Hinge point departure terminal sections required for approach and
Subgrade shoulder. Widening
1V:2H or flatter slope
TYPICAL GUARDRAIL CROSS SECTION
P o s t le n g th recommendations.
or mechanical means according to the manufacturer's delineator to the top of the wood post using either an adhesive
Install a flexible hinged delineator every fourth post. Fasten including its appearance, and accepted manufacturing practices.
those consistent with the proper functioning of the part, Dimensional tolerances not shown or implied are intended to be block rotation.
the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .