QA_10-25-2023.pdf
PDF 100 KB Posted
- Solicitation number
- 69056723B000012
About this file
This document contains answers to technical questions regarding federal solicitation number 69056723B000012 for Yellowtail Dam Area Road Improvements from the Department of Transportation Federal Highway Administration. The questions and answers specify details of the asphalt mix and paving requirements, clarify that a truck-mounted slurry machine will meet specifications for microsurfacing work, indicate that asphalt valley gutters next to a road will not require chip sealing, and address issues around sweeping loose chips, stockpiling locations, use of wood versus steel posts, and hauling distances for a chipper. Bidders are directed to submit bids according to the solicitation documents and staging/stockpile sites identified in the requirements. Response dates for questions ranged from October 17 to 25, 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidTab_MT BOR NPS 2021(1).pdf | ||
| BidSum_MT BOR NPS 2021(1).pdf | ||
| QA2_11-02-2023.pdf | ||
| QA_11-02-2023.pdf | ||
| Amendment A002.pdf | ||
| QA_11-01-2023.pdf | ||
| QA_10-17-2023.pdf | ||
| Amendment A001.pdf | ||
| mtr-nps2021-1_plans.pdf | ||
| BICA_C6_Final_Report.pdf | ||
| FLH Bridge oversized or overload vehicle permit request form.pdf | ||
| IFB 69056723B000012.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT BOR NPS 2021(1)
Yellowtail Dam Area Roads Improvement
# General Technical Question Answer Date
1 X Please confirm type of oil to be used in asphalt mix for this project.
In accordance with the plans, see FP‐14
Subsection 403.02(a) for Asphalt Concrete
Pavement, Type 1; see FP‐14 Subsection
403.02(b) for Asphalt Concrete Pavement
Patches; and see FP‐14 Subsections 403.02 for Asphalt Curbs.
10/17/2023
2 X
ISSA A 143, referenced under SCR 409, describes a continuous machine for the Micro‐ slurry work. Will a truck mount Slurry truck be acceptable for the work under SCR 409?
Use equipment that meets the requirements of Subsection 409.05.
10/25/2023
3 X
Will the asphalt valley gutters next to the road going to Ok‐A‐Beh Marina parking lot need to be chip sealed?
No. 10/25/2023
4 X Can the loose chips be swept to the edge of the road after the chip seal?
This will be addressed under Amendment
A002.
10/25/2023
5 X Can we stockpile chips in the Barry’s Landing parking lot?
Staging and stockpile sites are identified under Subsection 105.04. Note that the
Government will not approve other sites before a contract is awarded for this project.
10/25/2023
6 X Can steel posts be used in place of Wood for the Guardrail sections?
No. The descriptions for Pay Items 61701‐
4550 in Plan Section B specify wood posts.
10/25/2023
7 X
The ISSA A 143 spells out a continuous machine which is different than a truck mount slurry truck. The continuous machine will not work in a parking lot setting so I’m just wanting to clarify that a truck mount slurry truck will be acceptable as it doesn’t spell it out in ISSA A
143.
ISSA A 143 requires the mixing machine to be a continuous‐flow mixing unit, but ISSA
A 143 and SCR Section 409 do not require continuous machinery to minimize transverse joints. Use equipment that meets the requirements of Subsection
409.05.
10/25/2023
8 X
Bidding the project will make a big difference in price if we are hauling 25 miles to our chipper instead of 15 or even 10 which is why clarification on stock pile sites will make a big difference in price.
The Government does not intend to change the requirements under SCR 105.04.
Please submit bids according to the solicitation documents.
10/25/2023