Amendment A002.pdf
PDF 106 KB Posted
- Solicitation number
- 69056723B000012
About this file
This amendment modifies the solicitation for the MT BOR NPS 2021(1), Yellowtail Dam Area Road Improvements project. The amendment revises the special contract requirements to update the process for aggregate application, requiring documentation of calibrations and application rates be submitted each day and light vacuum sweeping of the roadway surface within 48 hours of aggregate application unless otherwise approved. The solicitation number is 69056723B000012 and is issued by the Department of Transportation Federal Highway Administration for road improvements in the Yellowtail Dam area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidTab_MT BOR NPS 2021(1).pdf | ||
| BidSum_MT BOR NPS 2021(1).pdf | ||
| QA2_11-02-2023.pdf | ||
| QA_11-02-2023.pdf | ||
| QA_11-01-2023.pdf | ||
| QA_10-25-2023.pdf | ||
| QA_10-17-2023.pdf | ||
| Amendment A001.pdf | ||
| mtr-nps2021-1_plans.pdf | ||
| BICA_C6_Final_Report.pdf | ||
| FLH Bridge oversized or overload vehicle permit request form.pdf | ||
| IFB 69056723B000012.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 11/02/2023 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056723B000012
9B. DATED (SEE ITEM 11)
10/05/2023
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MT BOR NPS 2021(1), Yellowtail Dam Area Road Improvements
Amendment A002 is issued to revise the following:
SPECIAL CONTRACT REQUIREMENTS Page F-6, Subsection 407.10, Aggregate Application. Revises 10th paragraph.
ENCLOSURES: Page F-6
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
F-6 DIVISION 400
Special Contract Requirements Project: MT BOR NPS 2021(1), Yellowtail Dam Area Road Improvements
Repeat the control strip process until an acceptable control strip is produced. Cease production until the material and the control strip are evaluated and accepted. The CO will indicate which strip will serve as the accepted project control strip.
Accepted control strips may remain in place and will be accepted as a part of the completed project. Correct rejected control strips.
Use these start-up procedures if changing construction procedures, if resuming production after a termination of production due to unsatisfactory quality according to Subsection 106.04, or the starting of a new construction season.
407.10 Aggregate Application. Delete this Subsection and substitute the following:
If emulsified asphalt is used, verify the aggregate stockpile moisture daily and use moist surfaced aggregate.
If asphalt binder is used, dry the aggregate. Precoat the aggregate uniformly with 2 to 3 percent of residual asphalt by mass of aggregate. Maintain the flow qualities of the precoated aggregate to allow uniform spreading with the aggregate spreader.
Calibrate aggregate spreaders before the start of project and if directed. Calibrate the longitudinal and transverse spread rates.
Apply aggregate uniformly at the optimum application rate determined from the accepted control strip. Apply the aggregate immediately after the asphalt material is applied. Operate the aggregate spreader so asphalt is covered with the aggregate before wheels pass over it. For part-width construction, leave an uncovered 6-inch wide asphalt strip to allow an overlap of asphalt material.
Cover excess asphalt with blotter.
Correct excesses and deficiencies by adding or removing aggregate to achieve a uniform texture before the asphalt cures.
Operate rollers at a maximum speed of 5 miles per hour. Do not allow the aggregate to be displaced by pickup or sticking of material to the tire surface. Roll the surface to bond the aggregate uniformly and thoroughly over the full width. Complete rolling within 1 hour after asphalt is applied to the surface. Perform three passes with the rollers. Do not allow traffic to travel over aggregate until rolling is completed and if used, the fog seal has cured.
Submit documentation for calibrations and application rates at the end of each day’s production.
Use a pilot car according to Section 635 to limit traffic speeds to 10 miles per hour for at least the first 45 minutes after rolling. Limit speeds to 20 miles per hour for the next 24 hours.
Vacuum sweep the surface to remove excess aggregate when the air temperature is below 90 °F.
Do not displace embedded material. Lightly vacuum sweep the roadway surface within 24 hours of aggregate application. Vacuum sweep the roadway surface within 48 hours after aggregate application to remove excess aggregate from the roadway surface unless otherwise approved. Hand broom in select locations to remove excess aggregate if directed. Dispose of material removed excess aggregate according to Subsection 203.06 203.05 (a) and (b).
Revised byAmendment A002