MSC REBID BID TAB REPORT.pdf

PDF 253 KB Posted

Attached to
R-7213 Multi-Service Center Energy Efficiency Upgrade REBID Project 3005010145
Solicitation number
PW-25-607
Issued by
California

About this file

This is a bid tabulation document for the R-7213 Multi-Service Center Energy Efficiency Upgrade REBID Project (3005010145), solicitation number PW-25-607. The project encompasses seven line items across multiple construction divisions, including selective demolition of roofing, wood rough carpentry, thermal and moisture protection with membrane roofing and sheet metal flashing, plumbing, mechanical packaged roof-top air-conditioning units, electrical identification systems, and mobilization/demobilization. All items are bid on a lump-sum basis with a quantity of 1.00 unit each. Four vendors submitted bids: VEN0002081 (United Mechanical Contractors), VEN0006246 (Green Building Corporation), VEN0008303 (Milender White Construction Co.), and VEN0009532 (MIK Construction Inc.).

United Mechanical Contractors submitted the apparent lowest responsive bid at $1,858,000.00, with a base bid of $1,768,000.00 and a self-performance rate of 60 percent. The bid includes $742,645.00 in subcontracted work, representing 40 percent of the total contract value. Mobilization/demobilization costs are set at 5 percent of the subtotal for items 1-6. Green Building Corporation and MIK Construction Inc. both submitted zero bids, while Milender White Construction Co. bid $2,549,733.00 with a 56 percent self-performance rate and $1,110,561.00 in subcontracted amounts (44 percent). The United Mechanical Contractors bid is flagged as the apparent lowest responsive bidder with review ongoing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VEN0002081 -

UNITED

MECHANICAL

CONTRACTORS

VEN0006246 -

green Building

Corporation

VEN0008303 -

Milender White Construction

Co.

VEN0009532 -

MIK

Construction Inc.

Short Description Item Number

Description Unit of Measure

Quantity Measures 00003095 00002897 00002976 00003101

1.00 Division 2 - Existing

Conditions Selective Demolition - Roofing

LS 1.00 Unit Cost 100,000.00 0.00 137,253.00 0.00

2.00 Division 6 - Wood

Rough Carpentry

LS 1.00 Unit Cost 100,000.00 0.00 750,132.00 0.00

3.00 Division 7 - Thermal and

Moisture Protection Membrane Roofing, Sheet Metal Flashing

LS 1.00 Unit Cost 700,000.00 0.00 809,723.00 0.00

4.00 Division 22 - Plumbing LS 1.00 Unit Cost 15,000.00 0.00 41,176.00 0.00

5.00 Division 23 - Mechanical

Packaged, Roof Top Air- Conditioning Units

LS 1.00 Unit Cost 653,000.00 0.00 401,617.00 0.00

6.00 Division 26 - Electrical

Identification for Electrical Systems

LS 1.00 Unit Cost 200,000.00 0.00 295,094.00 0.00

7.00 Mobilization/Demobilization

(No more than 5% of subtotal 1-6 above)

LS 1.00 Unit Cost 90,000.00 0.00 114,738.00 0.00

Base Bid: 1,768,000.00 0.00 2,434,995.00 0.00 Bid Total: 1,858,000.00 0.00 2,549,733.00 0.00

5% 5% 742,645.00 1,110,561.00

40% 44% 60% 56%

*Apparent Lowest Responsive Bidder

Review Ongoing

R-7213 Multi-Service Center Energy Efficiency Upgrade REBID Project 3005010145

Self-Performance Rate:

Moblization/Demobilization %:

Amount Subcontracted:

Percent Subcontracted:

PW-25-607