_MRFD_Reroofing_Drawings_J_+_B_12.9.22.pdf
PDF 1 MB Posted
- Attached to
- Reroofing of Fire Stations
- Solicitation number
- ITB-32-2023
- Issued by
- Rutherford County, Newport City, Tennessee
About this file
The document is a set of architectural roofing plans prepared by Johnson + Bailey Architects P.C. for the Murfreesboro Fire Rescue Department's reroofing project involving five fire stations located in Murfreesboro, Tennessee. The project scope includes reroofing Station No. 2 (2880 Runnymeade Drive), Station No. 5 (3016 Florence Road), Station No. 7 (2715 Thompson Lane), Station No. 8 (1730 East Northfield Blvd.), and Station No. 9 (802 Cason Lane). The detailed architectural drawings, dated December 5, 2022, provide comprehensive roof demolition and new construction plans, specifying the removal of existing roofing materials and the installation of new EPDM roofing, cover boards, pre-tapered rigid roof insulation, and associated flashing and ventilation components.
The plans indicate a systematic approach to reroofing, with consistent strategies across all five fire stations, including preserving existing roof structures, removing adhered EPDM roofing, installing new pre-tapered rigid roof insulation sloped 1/4" per foot, and applying new adhered EPDM roofing with mechanical attachments. Each station's roof plan shows detailed annotations for existing elements to remain, such as roof trusses, plywood decking, wood blocking, and various vents, as well as specific instructions for new installations like power roof ventilators, soffit vents, and metal flashing. The drawings provide technical details for demolition and new construction, ensuring a comprehensive and standardized approach to replacing the roofing systems across the Murfreesboro Fire Rescue Department's facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| _MFRD_Reroofing_Specifications_J+B_12.9.22_Final.pdf | ||
| Bid_Form_-_ITB-32-2023_-Reroofing_Fire_Stations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Johnson + Bailey Architects P.C.
34 35 36
Index
Murfreesboro, TN 37128 802 Cason Lane Station No. 9
Murfreesboro, TN 37130 1730 East Northfield Blvd.
Station No. 8
Murfreesboro, TN 37129 2715 Thompson Lane Station No. 7
Murfreesboro, TN 37129 3016 Florence Road Station No. 5
Murfreesboro, TN 37127 2880 Runnymeade Drive Station No. 2
PROJECT ADDRESS:
Rescue Department Murfreesboro Fire
Fire Stations Reroofing of
R e r o o f in g o f
F ir e
S t a t io n s
M u r f r e e s b o r o
F ir e
R s c u s
D p a r t m e n t
J
B
P r o j e c t
N o
2'-4"
64'-9"
64'-9"
64'-9"
64'-9"
A1.1 04'
SCALE 1/8" = 1'-0"
16'8'8'
ROOF PLAN
N O R T H P
L A N
04'
SCALE 1/8" = 1'-0"
16'8'8'
ROOF DEMOLITION PLAN
N O R T H P
L A N
RUMMEYMEADE DRIVE
STATION NO. 2
RUMMEYMEADE DRIVE
STATION NO. 2
04'
SCALE 1/8" = 1'-0"
16'8'8'
ROOF DEMOLITION PLAN N
O R T H
P L A N
04'
SCALE 1/8" = 1'-0"
16'8'8'
ROOF PLAN N
O R T H
P L A N
FLORENCE ROAD
STATION NO. 5
FLORENCE ROAD
STATION NO. 5
THIS DRAWING SHALL NOT BE
REPRODUCED, PUBLISHED, OR USED
IN ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THE ARCHITECT.
PROJECT N0.
DATEREVISION
CHECKED BY
DRAWN BY
DATE
NOTES:
J.R.P.
R.L.L.
12-5-22
Department Fire Rescue
Murfreesboro
Fire Stations Reroofing of
OUTLINE OF BUILDING
WALL BELOW
8:12
8:12
8:12
8:128:128:12
6:12 6:12
6:12
6:12
6:12
EXISTING
PIPE VENT
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
NEW POWER
ROOF VENTILATOR
NEW POWER
ROOF VENTILATOR
NEW POWER
ROOF VENTILATOR
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING GUTTERS
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING SHINGLE
ROOFING TO
REMAIN
EXISTING
PIPE VENT
TO REMAIN
OUTLINE OF BUILDING
WALL BELOW
8:12
8:12
8:12
8:128:128:12
6:12 6:12
6:12
6:12
6:12
EXISTING
PIPE VENT
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING GUTTERS
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING SHINGLE
ROOFING TO
REMAIN
EXISTING
PIPE VENT
TO REMAIN
NEW PREFINISHED
METAL FLASHING
WHERE EPDM
CONNECTS TO
EXISTING
SHINGLES
NEW VENT PIPE
FLASHING - SEE
DETAIL 5/A2.1
NEW CURB
FLASHING - SEE
DETAIL 4/A2.1
REMOVE
EXISTING
ADHERED EPDM
ROOFING
REMOVE
EXISTING
STEEL PLATE
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
NEW EPDM ROOFING
& 1/2" COVER
BOARD
OUTLINE OF BUILDING
WALL BELOW
8:12
8:12
8:12
8:128:128:12
6:12 6:12
6:12
6:12
6:12
EXISTING
PIPE VENT
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN NEW POWER
ROOF VENTILATOR
NEW POWER
ROOF VENTILATOR
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING GUTTERS
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING SHINGLE
ROOFING TO
REMAIN
EXISTING
PIPE VENT
TO REMAIN
OUTLINE OF BUILDING
WALL BELOW
8:12
8:12
8:12
8:128:128:12
6:12 6:12
6:12
6:12
6:12
EXISTING
PIPE VENT
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING GUTTERS
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING SHINGLE
ROOFING TO
REMAIN
EXISTING
PIPE VENT
TO REMAIN
NEW PREFINISHED
METAL FLASHING
WHERE EPDM
CONNECTS TO
EXISTING
SHINGLES
NEW VENT PIPE
FLASHING - SEE
DETAIL 5/A2.1
NEW CURB
FLASHING - SEE
DETAIL 4/A2.1
REMOVE
EXISTING
STEEL PLATE
EXISTING
RIDGE VENT
TO REMAIN
EXISTING
RIDGE VENT
TO REMAIN
REMOVE
EXISTING
ADHERED EPDM
ROOFING &
INSULATION
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
REMOVE
EXISTING
GRAVITY
VENTS
REMOVE
EXISTING
GRAVITY
VENTS
NEW 8" X 16' ALUM.
SOFFIT VENTS INSTALLED
ON EXISTING EIFS (4 REQD.)
NEW EPDM ROOFING
& RIGID ROOF INSULATION
64'-9"
64'-9"
64'-9"
A1.2 04'
SCALE 1/8" = 1'-0"
16'8'8'
ROOF PLAN
NORTH
P L
A N
04'
SCALE 1/8" = 1'-0"
16'8'8'
ROOF DEMOLITION PLAN
NORTH
P L
A N04'
SCALE 1/8" = 1'-0"
16'8'8'
ROOF DEMOLITION PLAN
N O
R T
H
PLAN
04'
SCALE 1/8" = 1'-0"
16'8'8'
ROOF PLAN
N O
R T
H
PLAN
THOMPSON LANE
STATION NO. 7
THOMPSON LANE
STATION NO. 7
PITTS LANE
STATION NO. 8
PITTS LANE
STATION NO. 8
THIS DRAWING SHALL NOT BE
REPRODUCED, PUBLISHED, OR USED
IN ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THE ARCHITECT.
PROJECT N0.
DATEREVISION
CHECKED BY
DRAWN BY
DATE
NOTES:
J.R.P.
R.L.L.
12-5-22
Department Fire Rescue
Murfreesboro
Fire Stations Reroofing of
OUTLINE OF BUILDING
WALL BELOW
8:12
8:12
8:12
8:128:128:12
6:12 6:12
6:12
6:12
6:12
EXISTING
PIPE VENT
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING GUTTERS
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING SHINGLE
ROOFING TO
REMAIN
EXISTING
PIPE VENT
TO REMAIN
OUTLINE OF BUILDING
WALL BELOW
8:12
8:12
8:12
8:128:128:12
6:12 6:12
6:12
6:12
6:12
EXISTING
PIPE VENT
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING GUTTERS
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING SHINGLE
ROOFING TO
REMAIN
EXISTING
PIPE VENT
TO REMAIN
NEW PREFINISHED
METAL FLASHING
WHERE EPDM
CONNECTS TO
EXISTING
SHINGLES
NEW VENT PIPE
FLASHING - SEE
DETAIL 5/A2.1
NEW CURB
FLASHING - SEE
DETAIL 4/A2.1
REMOVE
EXISTING
ADHERED EPDM
ROOFING
A2.1
EXISTING
RIDGE VENT
TO REMAIN
EXISTING
RIDGE VENT
TO REMAIN
REMOVE
EXISTING
TURBINE
VENTS
INSTALL
NEW
TURBINE
VENTS
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
NEW EPDM ROOFING
& 1/2" COVER
BOARD
8:12
8:12
8:12
8:12 8:12 8:12
6:12 6:12
6:12
6:12
6:12
NEW POWER
ROOF VENTILATOR
NEW POWER
ROOF VENTILATOR
NEW POWER
ROOF VENTILATOR
OUTLINE OF BUILDING
WALL BELOW
8:12
8:12
8:12
8:12 8:12 8:12
6:12 6:12
6:12
6:12
6:12
EXISTING
PIPE VENT
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING GUTTERS
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING SHINGLE
ROOFING TO
REMAIN
EXISTING
PIPE VENT
TO REMAIN
NEW PREFINISHED
METAL FLASHING
WHERE EPDM
CONNECTS TO
EXISTING
SHINGLES
NEW VENT PIPE
FLASHING - SEE
DETAIL 5/A2.1
NEW CURB
FLASHING - SEE
DETAIL 4/A2.1
REMOVE
EXISTING
ADHERED EPDM
ROOFING
EXISTING
PIPE VENT
TO REMAIN
EXISTING GUTTERS
TO REMAIN
EXISTING SHINGLE
ROOFING TO
REMAIN
OUTLINE OF BUILDING
WALL BELOW
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING
PIPE VENT
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
REMOVE EXISTING
GRAVITY VENTS
REMOVE
EXISTING
GRAVITY
VENTS
REMOVE
EXISTING
GRAVITY
VENTS
NEW EPDM ROOFING
& 1/2" COVER
BOARD
64'-9"
A1.3 04'
SCALE 1/8" = 1'-0"
16'8'8'
ROOF PLAN
N O R T H
P L A N
04'
SCALE 1/8" = 1'-0"
16'8'8'
ROOF DEMOLITION PLAN
N O R T H
P L A N
CASON LANE
STATION NO. 9
CASON LANE
STATION NO. 9
THIS DRAWING SHALL NOT BE
REPRODUCED, PUBLISHED, OR USED
IN ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THE ARCHITECT.
PROJECT N0.
DATEREVISION
CHECKED BY
DRAWN BY
DATE
NOTES:
J.R.P.
R.L.L.
12-5-22
Department Fire Rescue
Murfreesboro
Fire Stations Reroofing of
OUTLINE OF BUILDING
WALL BELOW
8:12
8:12
8:12
8:128:128:12
6:12 6:12
6:12
6:12
6:12
EXISTING
PIPE VENT
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING GUTTERS
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING SHINGLE
ROOFING TO
REMAIN
EXISTING
PIPE VENT
TO REMAIN
OUTLINE OF BUILDING
WALL BELOW
8:12
8:12
8:12
8:128:128:12
6:12 6:12
6:12
6:12
6:12
EXISTING
PIPE VENT
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXIST. STEP
FLASHING
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING GUTTERS
TO REMAIN
EXISTING DOWNSPOUTS
TO REMAIN
EXISTING SHINGLE
ROOFING TO
REMAIN
EXISTING
PIPE VENT
TO REMAIN
NEW PREFINISHED
METAL FLASHING
WHERE EPDM
CONNECTS TO
EXISTING
SHINGLES
NEW VENT PIPE
FLASHING - SEE
DETAIL 5/A2.1
NEW CURB
FLASHING - SEE
DETAIL 4/A2.1
REMOVE
EXISTING
STEEL PLATE REMOVE
EXISTING
ADHERED EPDM
ROOFING &
INSULATION
NEW POWER
ROOF VENTILATOR
WHERE EXISTING
WAS REMOVED
NEW POWER
ROOF VENTILATOR
WHERE EXISTING
WAS REMOVED
REMOVE EXISTING
POWER ROOF
VENTILATOR
NEW POWER
ROOF VENTILATOR
WHERE EXISTING
WAS REMOVED
REMOVE EXISTING
POWER ROOF
VENTILATOR
REMOVE
EXISTING
POWER ROOF
VENTILATOR
REMOVE TOP 2
ROWS OF SHINGLES
ADJACENT TO
METAL FLASHING
REMOVE TOP 2
ROWS OF SHINGLES
ADJACENT TO
METAL FLASHING
INSTALL NEW
SHINGLES AT
TOP 2 ROWS
ADJACENT TO
METAL FLASHING
INSTALL NEW
SHINGLES AT
TOP 2 ROWS
ADJACENT TO
METAL FLASHING
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
NEW EPDM ROOFING
& 1/2" COVER
BOARD
NEW 8" X 16' ALUM.
SOFFIT VENTS INSTALLED
ON EXISTING EIFS
(4 REQD.@ LOW ROOF)
NEW 8" X 16' ALUM.
SOFFIT VENTS INSTALLED
ON EXISTING SOFFIT
(4 REQD.@ HIGH ROOF)
4"
4"
5"
4"
5"
5"
A2.11DETAIL
A2.1 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
DEMOLITION NEW CONSTRUCTION
2DETAIL
A2.1 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
DEMOLITION NEW CONSTRUCTION
3DETAIL
A2.1 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
DEMOLITION NEW CONSTRUCTION
4DETAIL
A2.1 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
5DETAIL
A2.1 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
6DETAIL
A2.1 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
THIS DRAWING SHALL NOT BE
REPRODUCED, PUBLISHED, OR USED
IN ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THE ARCHITECT.
PROJECT N0.
DATEREVISION
CHECKED BY
DRAWN BY
DATE
NOTES:
J.R.P.
R.L.L.
12-5-22
Department Fire Rescue
Murfreesboro
Fire Stations Reroofing of
EXISTING ROOF TRUSS
TO REMAIN
EXISTING PLYWOOD
ROOF DECK TO
REMAIN
EXISTING WOOD
BLOCKING TO
REMAIN
EXISTING ROOF TRUSS
TO REMAIN
EXISTING PLYWOOD
ROOF DECK TO
REMAIN
EXISTING WOOD
BLOCKING TO
REMAIN
REMOVE EXISTING
ADHERED EPDM ROOF
REMOVE EXISTING
EPDM FLASHING
REMOVE EXISTING
METAL FLASHING
EXISTING RIGID ROOF
INSULATION SLOPED 1/4"
PER FOOT TO ROOF EDGE
TO REMAIN
EXISTING RIGID ROOF
INSULATION SLOPED 1/4"
PER FOOT TO ROOF EDGE
TO REMAINEXISTING
SHINGLES
ON UNDERLAYMENT
TO REMAIN
EXISTING
SHINGLES
ON UNDERLAYMENT
TO REMAIN
NEW EPDM
FLASHING
EXISTING ROOF TRUSS
TO REMAIN
EXISTING PLYWOOD
ROOF DECK TO
REMAIN
EXISTING WOOD
BLOCKING TO
REMAIN
EXISTING ROOF TRUSS
TO REMAIN
EXISTING PLYWOOD
ROOF DECK TO
REMAIN
EXISTING WOOD
BLOCKING TO
REMAIN
REMOVE EXISTING
ADHERED EPDM ROOF
REMOVE EXISTING
EPDM FLASHING
REMOVE EXISTING
METAL FLASHING
EXISTING
SHINGLES
ON UNDERLAYMENT
TO REMAIN
EXISTING
SHINGLES
ON UNDERLAYMENT
TO REMAIN
NEW PREFINISHED METAL
FLASHING LAPED OVER
EXISTING SHINGLES
NEW EPDM
FLASHING
EXISTING ROOF TRUSS
TO REMAIN
EXISTING PLYWOOD
ROOF DECK TO
REMAIN
EXISTING WOOD
BLOCKING TO
REMAIN
EXISTING ROOF TRUSS
TO REMAIN
EXISTING PLYWOOD
ROOF DECK TO
REMAIN
EXISTING WOOD
BLOCKING TO
REMAIN
REMOVE EXISTING
ADHERED EPDM ROOF
REMOVE EXISTING
EPDM FLASHING
REMOVE EXISTING
METAL FLASHING
EXISTING RIGID ROOF
INSULATION SLOPED 1/4"
PER FOOT TO ROOF EDGE
TO REMAIN
EXISTING RIGID ROOF
INSULATION SLOPED 1/4"
PER FOOT TO ROOF EDGE
TO REMAINEXISTING
SHINGLES
ON UNDERLAYMENT
TO REMAIN
EXISTING
SHINGLES
ON UNDERLAYMENT
TO REMAIN
REMOVE TOP TWO ROWS
OF EXISTIG SHINGLES
NEW PREFINISHED METAL
FLASHING LAPED OVER
SHINGLES
TWO ROWS NEW SHINGLES
TO MATCH EXISTING
REMOVE EXISTING RIGID
ROOF INSULATION AND
FASTENERS TO EXPOSE
EXISTING PLYWOOD ROOF
DECK
NEW PREFINISHED METAL
FLASHING LAPED OVER
EXISTING SHINGLES
NEW EPDM
FLASHING
NEW ADHERED EPDM ROOFING
OVER NEW PRETAPERED
RIGID ROOF INSULATION
NEW PRETAPERED RIGID ROOF
INSULATION SLOPED 1/4" PER
FOOT TO ROOF EDGE-
THICKNESS TO BE 3/4" AT
ROOF EDGE
NEW ADHERED EPDM ROOFING
OVER NEW 1/2" COVER
BOARD MECHANICALY ATTACHED
TO EXISTING ROOF
NEW ADHERED EPDM ROOFING
OVER NEW 1/2" COVER
BOARD MECHANICALY ATTACHED
TO EXISTING ROOF
NEW 1/2"
EXT. PLYWOOD
SPACER
NEW 1/2"
EXT. PLYWOOD
SPACER
EXISTING ROOF
STRUCTURE
NEW ADHERED
EPDM ROOFING
NEW SPLICING CEMENT
NEW LAP SEALANT
NEW EPDM
FLASHING
EXISTING
MECH. UNIT
FLASHING
EXISTING
ROOF CURB
EXISTING ROOF
STRUCTURE
EXISTING
VENT PIPE
NEW PRE-MOLDED
PIPE SILL
NEW ADHERED
EPDM ROOFING
NEW WATER CUT-OFF
MASTIC
NEW S.S. CLAMPING
RING
NEW SPLICING CEMENT
NEW LAP SEALANT
1•" - 6•" DIA.
EXISTING RIGID ROOF
INSULATION SLOPED 1/4"
PER FOOT TO ROOF EDGE
TO REMAIN
EXISTING ROOF
STRUCTURE
EXISTING EIFS
NEW TERM BAR
EXISTING MASONRY
WALL TO REMAIN
NEW ADHERED
EPDM ROOFING
| 2211_zCover |
| 2211_zA11 |
| 2211_zA12 |
| 2211_zA13 |
| 2211_zA21 |
File details come from the government source that posted it. Updated .