This is a Request for Bid (RFB) issued by Monroe Public School District (MPS) in Monroe, Michigan, for the replacement of the district's intrusion alarm system with integration into its existing Monitor Cast Security access control platform. The district seeks bids for both wired and wireless fire and intrusion alarm systems, with options for lease or purchase arrangements, 24/7 monitoring services, and ancillary sensors for boiler temperature, water detection, chiller/cooler monitoring, and server room temperature across 19 school buildings. The RFB was released on May 15, 2026, with a mandatory pre-bid meeting and site walkthrough scheduled for May 19, 2026, and a question deadline of May 22, 2026. Sealed physical bids (two copies) must be submitted to the Monroe Public Schools Administration Building by 5:00 p.m. on May 26, 2026, with bid opening at 2:00 p.m. the same day. Vendors are encouraged to attend the public bid opening. The district requires a DMP XR150 Network system or comparable equipment with integration capabilities, backup battery systems providing 12 hours of runtime, network connectivity via dual-SIM cellular communicator and LAN, and installation completion before August 31, 2026, without interference to summer school operations at Waterloo and Monroe High School's upper A Wing (8:00 a.m. to 3:00 p.m.).
Bids should include detailed itemized costs covering all labor, materials, cabling, equipment, permits, licenses, and inspections, with a minimum one-year warranty covering firmware and software updates. The district will evaluate proposals based on cost (40 points), features and integration (30 points), vendor capability (10 points), site visit and design (10 points), and implementation timeline (10 points). Vendors must provide a minimum of two references for similar projects and certifications regarding Iran Economic Sanctions Act compliance and familial relationships with school board members. All work must comply with Michigan's Prevailing Wage Act (MCL 408.1101 et seq.), with bidders required to submit state project registration and certified payroll records. Bids are binding for 90 days, with final contract award pending approval from the MPS Board of Education. The RFB specifies compliance with all applicable codes, plenum-grade cabling standards, network UPS integration where possible, and provision of basic training and troubleshooting for MPS technology staff.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MPS - Intrusion Alarm System RFP copy.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Monroe | Public | School | District |
| 1275 | N. | Macomb | St. |
| Monroe, | MI | 48162 |
REQUEST FOR BID
for Fire and Intrusion Alarm System
Summer 2026
| Monroe | Public | School | District | is | seeking | bids | for | a | new | fire | and | intrusion | alarm | system |
| with | integration | into | our | existing | access | control | system. |
Bids will be received according to the following instructions:
GENERAL CONDITIONS
1. Vendors must submit sealed physical bids (2 copies) at the Monroe Public Schools
| Administration | Building, | 1275 | N. | Macomb | St., | Monroe, | MI | 48162 | on | or | before | |
| 5/26/2026 | by | 1:00pm. | NO | LATE | BIDS | WILL | BE | ACCEPTED. | BIDS | WILL | BE | |
| OPENED | AT | 2:00 | P.M. | on | bid | due | date. |
2. All bids must be in a sealed envelope and clearly marked “2026 Monroe Public
| School | District | Intrusion | Alarm | System | Bid” | on | the | face | of | the | envelope |
| carrying | said | bid, | and | are | to | be | addressed | to: |
| Jacklyne | Ford | ||
| 1275 | N. | Macomb | St. |
| Monroe, | MI. | 48162 |
| Any | questions | concerning | the | bid | should | be | directed | to | Jacklyne | Ford | via |
| at | fordjb@monroe.k12.mi.us |
3. Bids submitted should comply with all aspects of the specifications. Any deviation
| from | what | is | listed | must | be | noted | on | your | bid | response | form, | or | the | bid | may | be |
| considered | rejected. |
4. MPS reserves the right to reject any or all proposals and bids, including that of
| the | lowest | bidder; | or | to | accept | bids | either | in | whole | or | in | part; | to | award | contracts | ||
| by | individual | items | or | by | lump | sum | total; | or | to | waive | any | informalities, | defects | ||||
| or | omissions | in | any | bid, | should | it | be | deemed | to | be | in | the | best | interest | of | MPS | to |
| do | so. |
5. Bids shall be binding for ninety (90) days from bid opening and prices will be binding for the length of the contract.
6. Awarding of the bid is pending final approval of purchase from the MPS Board of
Education.
7. Vendor shall include estimated delivery dates of equipment quoted at the time of your bid submission.
8. RFP Schedule
| RFP | Released | 5/15/2026 | ||||
| Pre-Bid | Meeting/Site | Walkthrough | 5/19/2026 | |||
| Deadline | for | Questions | 5/22/2026 | |||
| Proposals | Due | and | Bid | Opening | 5/26/2026 |
Bid opening is a public meeting at 1275 N. Macomb St., Monroe, MI that vendors are welcome to attend
9. Vendors are strongly encouraged to attend the pre-bid meeting / site
| walkthrough | on | that | date | and | time | above. | If | you | are | not | able | to | attend, | please | |
| contact | Jacklyne | Ford | with | adequate | time | to | schedule | a | site | walkthrough |
10. The vendor is responsible for checking our website for any Addenda’s that
| would | be | posted | for | this | RFP | no | later | than | 3 | days | after | the | deadline | for |
| questions | at | 5/22/2026 |
11. Provide detailed itemized project cost (quantity, part numbers, item cost, labor,
| total | cost). | This | is | helpful | to | verify | your | bid | includes | all | components | and | allows | |
| us | to | verify | the | components | that | meet | the | required | specifications |
12. A minimum of 2 references for similar projects should be included
13. Any required permits, licenses, inspections, approvals, and fees for the work
| shall | be | secured | and | paid | for | by | the | Contractor. | All | work | shall | conform | to | all | |
| applicable | codes, | rules, | and | regulations. | Perform | all | tests | required | by | state, | city, | ||||
| county | and/or | other | agencies | having | jurisdiction. | Provide | all | materials, | |||||||
| equipment, | etc., | and | labor | required | for | tests. |
14. All installation, removal of old wiring, labor, parts, cabling, and necessary equipment must be included in the total cost on your bid.
15. Provide add on options for itemized lists for boiler temperatures, cooler and
| chiller | temperatures, | fire, | water | sensors | for | boilers | rooms | and | sum | pumps, | and |
| server | room | temperature. |
PROJECT OVERVIEW
| MPS | is | seeking | bids | to | replace | our | existing | intrusion | alarm | system. | Vendors | should | ||||
| assume | that | no | components | or | wiring | from | the | current | intrusion | alarm | system | are | ||||
| available | to | use | on | the | new | system. | MPS | will | be | accepting | bids | for | both | wired | and | |
| wireless | systems, | bids | for | lease | or | purchase | options | of | the | equipment, | monitoring | for | ||||
| fire, | water | sensors, | chillers | and | coolers, | boiler | temperature, | and | vendors | are | ||||||
| encouraged | to | submit | all | options | in | their | bid, | as | we | are | considering | all | options. | We | are | |
| seeking | bids | for | the | 24/7 | monitoring | service | as | well | and | this | needs | to | be | included. |
| In | our | district, | we | have | 19 | physical | buildings, | each | with | multiple | zones. | We | use | the | |
| Monitor | Cast | Security | platform | for | our | door | access | control | system, | which | we | want | the | ||
| intrusion | alarm | system | to | integrate | with | for | monitoring | and | to | arm/disarm | the | system, | |||
| and | possibly | manage | users. |
| MPS | is | seeking | bids | for | a | DMP | XR150 | Network | intrusion | alarm | system | or | comparable, | ||
| as | they | will | be | providing | us | with | ongoing | support | for | the | system. | Must | allow | access | to |
to
| We | may | consider | other | systems | with | comparable | features | that | can | be | integrated | with |
| Monitor | Cast | Security | System | version | 4.8.4.50 | or | later. | We | recommend | vendors | include | |
| any | ongoing | support | costs | and | a | description | of | what | it | includes. |
We would like warranty options and a detailed list of what is covered.
MPS Campus Map and Zone Overview
| Vendors | can | request | a | detailed | map | of | our | facilities | and | sensor | placements | by |
| contacting | fordjb@monroe.k12.mi.us |
Below is a list of buildings we have in our district, with a count of door sensors we are Requesting.
Buildings Doors Bay Doors
| Admin | Building | 7 2 | |
| Admin | warehouse 3 2 | ||
| Cantrick | 15 0 | ||
| Custer | 1 19 0 | ||
| Custer | 2 | 4 0 | |
| Custer | Center | Building | 9 0 |
Fenmoor 7 3
| Hollywood | 8 0 | |||
| Knabusch | 7 2 | |||
| Manor | 15 0 | |||
| Monroe | High | School | 47 4 | |
| CTE | Storage | 1 3 | ||
| MHS | I | Wing | 3 6 | |
| MHS | Boiler | Building | 2 0 | |
| Monroe | Middle | School | 17 0 | |
| Orchard | Center | High | School | 6 0 |
| Raisinville | 11 0 | |||
| Riverside | 6 0 | |||
| Waterloo | 7 0 |
MONROE PUBLIC SCHOOLS
DATA CABLING STANDARDS
Brand Part # Description Purpose
ICC IC1078F6BL BLUE CAT6 KEYSTONE KEYSTONE FOR DATA PORT DEVICES
ICC IC1078F6RD YELLOW CAT KEYSTONE KEYSTONE FOR MISC. DATA PORT
ICC IC1078F6YL RED CAT KEYSTONE KEYSTONE FOR AI PHONE SERVICES
ICC IC1078F6ABL BLUE CATA KEYSTONE KEYSTONE FOR DATA PORT DEVICES
ICC CLASSIC CONFIGURABLE FACEPLATES
WITH STATION ID (IVORY) WALL PLATES FOR DATA PORTS
ICC ICMPP48C61 48 PORT HIGH-DENSITY PATCH PANEL,
FEED THROUGH COUPLERS
PATCH BAY FOR DATA PORTS IN
DATA CABIENTS
YELLOW CABLING CAT6 DATA CABLING (NETWORK)
BLUE CABLING CATSe DATA CABLING (TELCO
USAGE)
LIGHT BLUE CABLING FIBER OPTIC MULTIMODE
DARK GRAY CABLING 16-GAUGE CABLING FOR SECURITY
RED CABLING CABLING FOR FIRE ALARM
WHITE CABLING CABLING FOR ACCESS CONTROL
BEIGE CABLING CABLING FOR HVAC / BOILER
SERVICES
CAT 6 550 MHZ PLENUM YELLOW DATA CABLE FOR ALL CAT PORTS
CATSE 350 MHZ PLENUM BLUE DATA CABLE FOR ALL PORTS TELCO
DEVICES
CAT 6A 23 AWG. 4 PAIR SOLID RISER
WHITE
CATA PATCH CABLE - 1FT (RED, BLUE,
YELLOW)
PATCH CABLE FOR PORTS WITH
DATA CABINET
** ALL CABLING INSTALLED MUST BE OF PLENUM GRADE. THIS IS TO KEEP WITH
STANDARDS IN PLACE WITH DISTRICT-WIDE CBLING
** ALL CABLING INSTALLED MUST BE HUNG IN J-HOOKS OR SIMILAR CABLING
SUSPENTION.
INTRUSTION ALARM SYSTEM SPECIFICATIONS
| We | are | considering | bids | for | both | wired | and | wireless | intrusion | alarm | systems. | Vendors | |
| are | encouraged | to | submit | bids | for | both | options | that | meet | the | following | specifications |
below:
• DMP XR150 Network system or comparable intrusion alarm system with a network interface
• Intrusion alarm system must be integrated with VI Monitor and MonitorCast and all
| necessary | licenses | from | the | manufacturer | included. | ||||||
| • Ability | to | create | multiple | zones | within | a | building | and | support | multiple | keypads |
| • Supports | a | variety | of | sensors | that | can | include | motion, | doors | contacts, | roof |
| doors/latches, | temperature, | and | others | ||||||||||||
| • Each | panel | must | include | a | backup | battery | of | sufficient | size | to | run | the | system | for | 12 |
| hours | in | the | event | of | a | power | failure | |||||||
| • All | panels | and | necessary | expander | panels | must | be | installed | in | a | network | IDF | or | MDF |
| closet | that | are | identified | on | maps. | MPS | will | choose | all | network | placing. | If | possible, |
| we | would | like | alarm | system | plugged | into | our | Network | UPS’s |
| • Panels | must | be | able | to | be | monitored | by | any | national | monitoring | service. | A | DualSIM |
| Cellular | DMP | 263 | LTE | or | comparable | cellular | communicator | device | and | a | |||
| network/LAN | for | communication | on | each | panel/building | needs | to | be | included | in | |||
| bid | response. |
| • With | wireless | systems, | vendors | shall | include | enough | receivers | for | adequate | ||||
| wireless | coverage | in | our | buildings, | and | the | wires | must | be | the | MPS | approved | color |
| (see | data | cabling | standards) | throughout | the | district. |
• Provide documentation that includes device locations, routes of cables, and device names
• 1 year or greater warranty on all labor and materials. Must include firmware and
| software | updates | as | part | of | this | warranty | ||||||
| • On | a | separate | page, | include | any | required | or | optional | costs | for | ongoing | maintenance |
| or | support | on | the | intrusion | alarm | system | for | software/firmware | updates. | This | |||||
| should | not | be | included | in | your | total | cost | beyond | 1 | year | on | your | bid | response | form. |
OPTIONAL: ALTERNATIVE BID
| We | will | consider | alternative | bids, | but | the | base | bid | of | a | wired | and/or | wireless | systems | is |
| required | to | be | included. | Please | include | a | description | on | the | bid | sheet | of | why | you | |
| included | an | alternative | bid | and | what | benefits | it | has | for | the | district | to | consider. |
INSTALLATION SCHEDULE
| MPS | would | like | to | get | this | system | deployed | as | soon | as | possible | and | before | school | starts | back |
| on | August | 31st, | 2026. | Installation | of | the | system | should | not | interfere | with | our | school | day | in | |
| our | summer | school | buildings, | which | students | are | in | Waterloo | and | Monroe | High | upper | A | |||
| Wing | from | 8:00am-3:00pm. | Work | in | those | buildings/areas | must | happen | outside | of | school | |||||
| hours, | which | is | after | 3:30pm | or | on | Fridays | without | students, | as | noted | below: |
o June 11th –Starts Summer Break*
| * | We | do | have | some | programs | that | run | all | year | that | is | limited | to | certain | spots | in | the |
| building. | We | would | have | to | coordinate | around | those | areas | when | students | are | present. | |||||
| That | program | typically | has | a | few | weeks | off | during | the | summer | months, | but | we | do | not | ||
| have | the | dates | confirmed | yet | for | the | weeks | they | will | be | out | of | session | until | later | this |
year.
| On | the | bid | response | form, | vendors | will | be | asked | to | describe | how | they | plan | to | schedule | and |
| complete | this | work | as | this | will | be | considered | in | our | bid | evaluation. |
INSTALLATION SPECIFICATIONS
Below is the specification for installation:
| • Existing | building | intrusion | system | and | components | must | remain | operational | |||||||
| • MPS | and | Vendor | will | work | on | an | agreed | upon | work | schedule | |||||
| • Install | and | test | all | components | to | ensure | they | are | working | properly | |||||
| • Identify | and | label | physical | cables | and | logically | in | the | software | of | the | control | with | a | list |
| the | district | would | provide | for | each | sensor | |||||||
| • Run | a | network | cable | to | connect | any | necessary | components | to | the | network. | MCISD | tech |
department will help network and any firewall requirements or information needed for communication
| • All | firmware | on | products | shall | be | running | the | latest | and | most | up | to | date | stable |
| release | provided | by | the | manufacturer | at | the | time | of | installation |
| • Cabling | Requirements | |||||||||
| o Plenum | cable | must | be | used | and | meet | all | the | manufacturer | specifications |
| o Cable | shall | use | existing | cable | management | hooks | or | trays | and | paths | and | areas | that | |||
| do | not | have | any, | the | vendor | shall | supply | them | to | keep | cables | off | of | the | drop | ceiling |
| tiles | and | meet | code. |
o All exposed/visible wire below the ceiling must be placed in plastic mold or wire mold
| • Any | holes | drilled | or | existing | conduit | used | for | cabling | shall | be | sealed | or | resealed | to | meet |
| fire | code |
| • All | cabling | and | power | should | comply | with | NFPA | 70 | |||||
| • Username/Passwords | to | the | systems | shall | be | provided | to | MPS | and | MPS | will | provide | the |
| password | for | the | system. | No | factory/default | passwords | should | be | used | on | the | system | |
| • Basic | training | and | troubleshooting | should | be | provided | for | the | MPS | technology | staff | on |
the system
EVALUATION
| The | district’s | objective | is | to | get | the | best | overall | value | and | features. | Below | is | all | evaluation |
| rubric | we | will | be | using | to | award | this | bid. |
| Criteria | Points | ||||||||
| Cost | 40 | ||||||||
| Features | and | Integration | 30 | ||||||
| Vendor | Capability | (Experience, | qualifications, | references, | team) | 10 | |||
| Site | Visit | and | Design | 10 | |||||
| Implementation | Timeline | 10 |
PREVAILING WAGES
| Consistent | with | Michigan’s | Prevailing | Wages | on | State | Projects | Act | (Act), | MCL | 408.1101, | ||||||
| et | seq., | any | bidder | who | submits | a | bid | in | response | to | this | RFP | expressly | represents | that | ||
| the | wages | and | fringe | benefits | paid | to | “construction | mechanics” | (excluding | those | under | ||||||
| the | State | Civil | Service | Commission), | as | the | phrase | is | defined | under | MCL | 408.1101(b), | by | ||||
| the | bidder/contractor | and | all | subcontractors | will | not | be | less | than | the | prevailing | rates | in | ||||
| the | locality | where | the | work | is | performed. | The | current | rate | sheets | as | of | the | date | of | this | |
| RFP | for | Monroe | County, | Michigan | can | be | found | here.1 |
| Bidders | further | warrant | they | will | assume | the | responsibility | of | ensuring | any | |||||
| subcontractors | pay | the | prevailing | rates | under | the | rate | sheets | identified | above. | The | ||||
| chosen | bidder | as | well | as | any | subcontractor(s) | must | post | on | the | construction | site, | in | a | |
| conspicuous | place, | a | copy | of | all | prevailing | wage | and | fringe | benefit | rate | sheets | as | well | as |
| keep | an | accurate | record | showing | the | name | and | occupation | of | and | the | actual | wages | and | |
| benefits | paid | to | each | construction | mechanic | employed | by | it | who | is | performing | services | |||
| under | this | RFP. |
| MPS | expressly | states | that | construction | mechanics | are | intended | beneficiaries | of | the | ||||
| prevailing | wage, | fringe | benefit, | and | nondiscrimination | nonretaliation | requirements | |||||||
| contained | under | the | Act. | The | wages | and | fringe | benefits | paid | to | construction | mechanics | ||
| (excluding | those | under | the | State | Civil | Service | Commission) | by | the | contractor | and | all | ||
| subcontractors | must | not | be | less | than | the | prevailing | rates | in | the | locality | where | the | work |
| is | performed. | Any | construction | mechanic | aggrieved | by | the | failure | of | a | contractor | or | ||
| subcontractor | to | pay | prevailing | wages | or | benefits | as | specified | under | a | rate | sheet | ||
| identified | above | or | MCL | 408.1107, | in | addition | to | any | other | remedies | provided | in | the | Act |
| or | by | law, | may | bring | an | action | in | a | court | of | competent | jurisdiction | against | the |
| bidder/contractor | or | subcontractor | for | damages | or | injunctive | relief | and | may | be | awarded | |||
| reinstatement | or | other | appropriate | relief, | and | all | damages | sustained, | together | with | ||||
| actual | costs | and | attorney | fees | at | trial | and | on | appeal. |
| In | addition, | all | bidders/contractors | and | subcontractors | must | hold | a | state | project | |||||||
| registration | as | required | by | MCL | 408.1102. | Bidders | must | submit | a | copy | of | their | state | ||||
| project | registration | along | with | their | bid | for | both | themself | and | each | subcontractor | that | |||||
| has | been | selected | at | the | time | the | bid | is | submitted. | By | bidding | on | this | RFP, | bidders | agree | |
| they | will | submit | certified | payroll | records | to | the | online | certified | payroll | submission | ||||||
| system | identified | by | the | Michigan | Department | of | Labor | & | Economic | Opportunity | within | ||||||
| the | timeframes | identified | under | the | Act | and | will | indemnify, | defend, | and | hold | MPS | |||||
| harmless | from | any | and | all | claims | resulting | from | a | bidder’s | failure | to | fulfill | its | obligations | |||
| under | the | ActMPS | expects | – | and | bidders/contractors | agree | - | that | all | bidders/contractors | ||||||
| will | follow | all | other | requirements | of | the | Act. |
[1] https://www.michigan.gov/leo/-/media/Project/Websites/leo/Documents/PWRS-By- County/Monroe.pdf?rev=e86218 b96c8548f797f38b9d98b517cc&hash=5221D74C36F25E83C1529D4D7682D7A4
2026 MPS Intrusion Alarm Bid Form
Manufacturer: _________________________________________________________________
Model: _________________________________________________________________
Bid Summary: Price should include shipping and all other costs involved as defined in RFP.
Wired Option: _________________________
Wireless Option: _________________________
Alternative Bid: _________________________
| Note: | vendors | must | submit | a | base | wired | or | wireless | bid | if | they | include | an |
| alternative | bid. |
| If | you | submitted | an | Alternative | Bid, | please | describe | it | below | and | why | the | district |
| should | consider | it? |
Does the intrusion alarm solution meet all specifications and requirements in RFP?
Yes ______ No ______
If no, list specs or requirements not met:
| Please | specify | the | type | of | warranty/support/subscription | that | is | included | on | the |
| components | below. | Please | list | any | ongoing | support/maintenance | options | the | ||
| MPS | may | want | to | consider. |
| Does | this | system | have | integrations | with | MonitorCast | and | VI | Monitor | and | did | you |
| include | the | required | licenses | from | the | manufacturer | of | the | intrusion | alarm |
system?
Yes ______ No ______
| Do | you | have | any | experience | supporting | MonitorCast | and | VI | Monitor | and | integrating |
| the | Intrusion | Alarm | System | in | your | bid? |
| Please | describe | your | timeline | for | completing | this | project | that | would | not | interfere | with | |
| students | and | our | school | day. | This | is | part | of | our | bid | evaluation | criteria |
Other Comments or Notes for Consideration:
Quote Prepared By:
Name of Company:
Address:
Phone:
Signature:
Printed Name:
| Monroe | Public | Schools | |||
| 2026 | INTRUSION | ALARM | SYSTEM | BID | FORM |
Acknowledgment of Authority to Bid
| My | signature | certifies | that | the | proposal | submitted | complies | with | all | Terms | and | Conditions | |||
| set | forth | in | this | RFP. | My | signature | also | certifies | that | the | accompanying | proposal | is | not | the |
| result | of, | or | affected | by, | any | unlawful | act | of | collusion | with | another | person | or | company | |
| engaged | in | the | same | line | of | business | or | commerce | or | any | act | of | fraud. | Furthermore, | I |
| understand | that | fraud | and | unlawful | collusion | are | crimes | under | Federal | Law | and | can | result | in | |
| fines, | prison | sentences | and | civil | damages | awards. |
I hereby certify that I am authorized to sign as a representative for the following firm:
Firm Name:
Firm Address:
Signature:
Printed Name:
Business Phone: Cellular Phone:
THE AFFIDAVIT SET FORTH BELOW MUST BE EXECUTED ON BEHALF OF
THE VENDOR AND FURNISHED WITH EVERY BID
The Board of Education will not accept this bid without this completed, signed and notarized form
AFFIDAVIT FAMILIAL RELATIONSHIP
STATE OF: ___________________
COUNTY OF: ________________
________________________________ , being sworn, says (Affiant’s printed name)
1. I am the __________________of ________________________________ (title) (vendor bidder) which has been submitted to MONROE PUBLIC SCHOOL DISTRICT, a proposal for the furniture and equipment.
2. I state that there is NO familial relationship between the owner or any employee of above Vendor-Bidder and any member of the Board of Education or the Superintendent of
Monroe Public Schools, said exceptions being as follows:
Signed: ___________________________________ Printed:
SWORN TO and subscribed before me, a Notary Public, in and for the above-named state and county this _________________ day of _______________, 2020. My commission expires on
Signature: ______________________________________________, Notary Public
CERTIFICATION OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner, or authorized officer of the below-named company (the “Company”) hereby certifies, represents, and warrants that the Company (which includes its officers, directors and employees) is not an “Iran Linked Business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event the Company is awarded a contract by Monroe Public Schools as a result of an RFP, the Company is not and will not become an “Iran Linked Business” at any time during the course of performing any services under the contract.
The Company further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or two (2) times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of Monroe Public Schools investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date that it is determined that the person has submitted the false certification.
Name of Company
Name and Title of Authorized Representative
Signature
Date
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Total
Total
Building Total
Monroe Public Schools Security System Bid Response Form
Administration Building | 1275 N.Macomb St, Mornoe MI 48162
Total
Total
Building Total
Administration Warehouse Building | 1275 N.Macomb St, Mornoe MI 48162
Custer 1 Elementary School 5003 W Albain Rd, Mornoe MI 48161
Total
Total
Building Total
Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Custer 2 Elementary School 5001 W Albain Rd, Mornoe MI 48161
Total
Total
Building Total
Custer Center Building 5003 W Albain Rd, Mornoe MI 48161
Total
Total
Building Total
Cantrick 5/6 Building 1008 Riverview Avenue, Monroe Mi. 48162
Total
Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Fenmoor Operations Building 4920 West Albain Rd,Raisinville TWP,Mi 48161
Total
Total
Building Total
Hollywood Elementary School 1135 Riverview Avenue, Monroe Mi. 48162
Total
Total
Building Total
Knabusch Math and Science Center 6670 Watersedge Dr, Monroe Mi. 48161
Total
Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Manor Elementary School 1731 W. Lorain St, Monroe Mi. 48162
Total
Total
Building Total
Monroe High School 901 Herr Road, Monroe Mi. 48161
Total
Total
Building Total
Monroe High School I-Wing Building 901 Herr Road, Monroe Mi. 48161
Total
Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Monroe High School CTE Storage Building 901 Herr Road, Monroe Mi. 48161
Total
Total
Building Total
Monroe High School Boiler Building 901 Herr Road, Monroe Mi. 48161
Total
Total
Building Total
Monroe Middle School 503 Washington St, Monroe Mi. 48161
Total
Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Connection / Hardware Description Item Cost Qty Purchase Total Lease Total Motion Sensors -$ -$ Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Orchard Center High School 1750 Oak St, Monroe Mi. 48161
Total
Total
Building Total
Raisinville Elementary School 2300 N Raisinville Rd, Monroe Mi. 48162
Total
Total
Building Total
Riverside Early Learning Center 77 N Roessler St, Monroe Mi 48162
Total
Door Sensors -$ -$ Alarm Panels -$ -$ Boiler Sensors -$ -$ Water Sensors -$ -$ Misc Parts and cabling -$ -$
Alarm Services Purchase Total Lease Total Burgle Alarm Services -$ -$ Fire Alarm Services -$ -$ Labor -$ -$
Total
Total
Waterloo Elementary School 1933 S Custer Rd, Monroe Mi 48161