Summary
This is a Special Provision for Maintaining Traffic issued by the Michigan Department of Transportation (MDOT) for a construction project on Interstate 69 in Eaton County, Michigan, spanning Eaton, Carmel, Walton, and Bellevue Townships. The provision establishes comprehensive traffic control requirements for maintaining traffic throughout the project from approximately South of Island Highway to the Calhoun County line, with the Construction Influence Area extending to intersecting roads and ramps including E Lansing Road, E Shepherd Street (M-50), E Clinton Trail (M-50), S Cochran Road, Ainger Road, and Butterfield Highway (M-78). The contractor is required to implement traffic control utilizing specified maintaining traffic typicals (M0020a, M0060a, M0100a, M0900a, and M1040a), maintain a minimum of one lane of traffic at all times in each direction, and provide advance notification of at least five business days prior to implementing lane closures and major traffic shifts. The provision specifies detailed traffic restrictions for both northbound and southbound I-69, including shoulder closures allowed 24 hours daily and single lane closures limited to 7:00 a.m. to 6:00 p.m. weekdays, with prohibitions on work during defined holiday periods (Fourth of July and Labor Day) and special events (Olivet move-in weekend, Eaton Rapids Air Festival, Charlotte Frontier Days, and Calhoun County Fair). The contractor must develop and submit an Internal Traffic Control Plan at the preconstruction meeting, coordinate operations with adjacent contractors, and comply with local government permits.
Payment for maintaining traffic will be based on the maximum number of units required by the engineer at any one time for the entire project, with quantities estimated for two concurrent single-lane closures of three miles each. Traffic switch operations are exempt from lane rental assessments or liquidated damage assessments for eight hours per switch. The contractor bears all costs associated with traffic control devices, coordination with emergency services and transit agencies, maintaining devices during storm events, removal and redeployment of devices except for approved extensions, and compliance with the approved Internal Traffic Control Plan. The provision includes detailed specifications for traffic control devices including channelizing devices, temporary signs, Portable Changeable Message Signs (PCMS), temporary barriers, and impact attenuators, with all devices required to meet MMUTCD standards and ATSSA quality guidelines. A separate special provision addresses NTCIP-compliant PCMS requirements, including furnishing and operating solar-powered LED display units capable of three-line messaging with 18-inch characters legible at 200 to 1,000 feet, GPS equipment, cellular connectivity with minimum 20 MB/month data plan, remote control software, security requirements, and operator training.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| itn_vendor_question_worksheetâ¿¿.docx | DOCX document | |
| invitation_to_negotiate_Coversheet _Amended (2).docx | DOCX document | |
| I-69 Joint Repairs Schedule_B.docx | DOCX document | |
| I-69 Joint Repairs Schedule A.docx | DOCX document | |
| Standard Terms.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MICHIGAN
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
MAINTAINING TRAFFIC
LAN AMC 1 of 8 APPR:UNIV:T&S TJF:
a. Description. This work consists of all labor, materials, and equipment required to maintain traffic as specified herein, on I-69 in Eaton, Carmel, Walton and Bellevue Townships, Eaton County.
b. General. Maintain traffic throughout the project in accordance with the latest standard specifications, any typicals or supplemental specifications in the contract and as described on the plans for this project.
1. Notify the Project Engineer a minimum of 5 business days prior to the implementation of any lane closures and major traffic shifts.
2. Coordinate operations with Contractors performing work on other projects adjacent to the Construction Influence Area (CIA) to avoid conflicts in maintaining traffic, construction signing, and to provide for the orderly progress of contract work.
3. MDOT maintenance crews and/or contract maintenance agencies may perform maintenance work within or adjacent to the Construction Influence Area (CIA). The Maintenance Division of MDOT and/or contract maintenance agency will coordinate their operations with the Engineer to minimize the interference to the Contractor. All additional costs for joint use of traffic control items will be borne by the Contractor.
c. Construction Influence Area (CIA). The CIA includes the right-of-way of the following roadways, within the approximate limits described below:
1. On I-69 from approximately South of Island Highway to Calhoun County line.
2. In addition, the CIA includes the right-of-way of any alternate route, intersecting roads and ramps adjacent to the work zone for a distance of approximately 1/4 mile in advance of the work zone or as far as the construction signing extends. The roads include but are not limited to E Lansing Rd, E Shepherd St (M-50), E Clinton Trl (M-50)., S Cochran Rd, Ainger Rd and Butterfield Hwy (M-78).
d. Traffic Restrictions. Maintain traffic in accordance with the maintaining traffic typicals contained herein, except as noted below. Changes or adjustments to the maintaining traffic typicals may be necessary to fit field conditions, subject to approval of the Engineer or as determined by the Engineer.
1. Utilize the following Maintaining Traffic Typicals:
A. M0020a L, D, and B Values
UNIV:AMC 2 of 8 07-30-2019
B. M0060a for an advanced signing treatment for long, Intermediate and stationary work zone operations of more than 2 miles where traffic control devices may remain at end of work day on a divided roadway.
C. M0100a for supplemental speed limit treatment at interchange ramps.
D. M0900a for a freeway shoulder closure using a reduced speed limit where workers present.
D. M1040a for extended temporary traffic control for a one-lane closure on a freeway using a reduced speed limit where workers present.
2. Do not work, deliver material, or close lanes (other than approved stage closures) during the holiday periods as defined in Table 1.
Table 1: 2019 Holiday Periods
Holiday Start Date and time End Date and time
Fourth of July 3:00 p.m. Wednesday July 3rd 6:00 a.m. Monday July 8th
Labor Day 3:00 p.m. Friday August 30th 6:00 a.m. Tuesday September 3rd
3. Do not work, deliver material, or close lanes (other than approved stage closures) during the Special Events as defined in Table 2.
Table 2: 2019 Special Events
Local Event Start Date End Date
Olivet move in weekend Friday, August 16th Sunday, August 18th
Eaton Rapids Air Festival Thursday, September 12th Sunday, September 15th
Charlotte Frontier Days Thursday, September 5th Sunday September 8th
Calhoun County Fair Sunday, August 11th Sunday, August 17th
4. Perform work and lane closures within the allowable time frames as shown in Table 3, unless otherwise approved by the Engineer. Traffic switch operations on freeways may take place within the allowable times listed below in the traffic restriction tables and/ or as otherwise approved by the Engineer. Additional lane, ramp, and/or roadway closures and shifts may be implemented during maintaining traffic stage and traffic switch operations with prior Engineer approval.
5. Traffic switch operations are exempt from lane rental assessments or liquidated damage assessments for 8 hours for each traffic switch. Perform traffic switch operations within the allowable “traffic restriction tables” as shown below.
A. A traffic switch will be defined as a change in the existing (original or staged) traffic configuration which requires multiple (more than one) lane lines and/or edge lines to be relocated in a new location and the old lines to be removed either between construction stages, or maintenance of traffic stages.
UNIV:AMC 3 of 8 07-30-2019
Table 3: I-69 Northbound Traffic Restrictions
Closure Type Start Time
End Time
M Tu W Th F Sa Su
Shoulder Closures 00:00 23:59 ∞ ∞ ∞ ∞ ∞ ∞ ∞
Single Lane Closures 07:00 18:00 ∞ ∞ ∞ ∞ ∞ ∞ ∞
∞ = Closure is allowed, and the frequency is not limited during the project timeframe
Table 3: I-69 Southbound Traffic Restrictions
Closure Type Start Time
End Time
M Tu W Th F Sa Su
Shoulder Closures 00:00 23:59 ∞ ∞ ∞ ∞ ∞ ∞ ∞
Single Lane Closures 07:00 18:00 ∞ ∞ ∞ ∞ ∞ ∞ ∞
∞ = Closure is allowed, and the frequency is not limited during the project timeframe
6. Maintain a minimum of one lane of traffic at all times on NB and SB I-69.
7. No more than one closure is allowed in each direction of travel at the same time.
8. Close any dedicated lanes (exit, ramp, turn, etc.) prior to the location under construction.
9. The following ramps can be closed for duration shown below at a time frame that does not conflict with holidays or special events.
A. The following ramps can be closed for a short duration during the work shift when mainline work is in the outside lane of I-69 within the acceleration/deceleration area of the ramps and a safe ramp acceleration/deceleration lane cannot be maintained, as determined by the Engineer.
(1) SB I-69 to Shepherd Street (M-50) Exit Ramp
(2) Shepherd Street (M-50) to SB I-69 Entrance Ramp
(3) E Clinton Trail (M-50) to NB I-69 Entrance Ramp
(4) NB I-69 to E. Clinton Trail (M-50) Exit Ramp
(5) SB I-69 to S Cochran Road Exit Ramp
(6) S Cochran Road to SB I-69 Entrance Ramp
(7) S Cochran Road to NB I-69 Entrance Ramp
(8) NB I-69 to S Cochran Road Exit Ramp
(9) SB I-69 to Ainger Road Exit Ramp
(10) Ainger Road to SB I-69 Entrance Ramp
UNIV:AMC 4 of 8 07-30-2019
(11) Ainger Road to NB I-69 Entrance Ramp
(12) NB I-69 to Ainger Road Exit Ramp
(13) SB I-69 to Butterfield Highway (M-78) Exit Ramp
(14) Butterfield Highway (M-78) to SB I-69 Entrance Ramp
(15) Butterfield Highway (M-78) to NB I-69 Entrance Ramp
(16) NB I-69 to Butterfield Highway (M-78) Exit Ramp
10. Coordinate work such that no two adjacent interchange ramps that operate in the same direction are closed simultaneously unless otherwise approved by the Engineer.
11. Obtain all necessary permits from local governments within areas of local jurisdiction, including noise/dust ordinance waivers when required, prior to placing construction signing on local roads. The Department will reimburse permit costs in accordance with subsection 107.02.A of the Standard Specification for Construction. Adhere to all requirements made by local maintaining agencies regarding placement of traffic control devices prior to closing lanes on roadways not under MDOT jurisdiction.
e. Traffic General.
1. For any lane open to traffic, provide a minimum lane width of 11 feet with 2 feet of shy distance on both sides unless identified otherwise on plans.
2. Do not close lanes where work can be accomplished with a shoulder closure. Do not occupy any part of the active traffic lane with personnel or equipment when utilizing a shoulder closure. Place lane closures only in areas as show on the plans unless otherwise directed by the Engineer.
3. A speed reduction will be used. The work zone speed limit on I-69 will be 60 miles per hour (mph), 45 mph where workers present.
4. Repair, at no expense to the Department, any damage done to staging area, signs, or any road surface due to the Contractor’s operations.
5. Develop and submit to the Engineer an Internal Traffic Control Plan (ITCP) per subsection 104.11.B of the Standard Specifications for Construction. Submit the ITCP at the preconstruction meeting. The Engineer will have 7 calendar days to review the ITCP for approval or provide comments for revisions required to obtain approval. At a minimum, the ITCP must include the proposed ingress/egress locations for construction equipment and vehicles, traffic control devices that will be utilized to warn the motoring public of ingress/egress locations, and measures that will be taken to ensure compliance with the ITCP.
Access for construction vehicles between the travel lanes and work areas will be restricted to specific locations (this includes the workmen’s private vehicles). The number of access points and their locations will require the prior approval of the Engineer. Ensure that the ITCP minimizes conflicts between construction vehicles and motorists and maintains overall safety and mobility within the work zone. No work may begin prior to approval of the ITCP. Additional time required to obtain an approved ITCP will not be cause for delay or impact claims. All
UNIV:AMC 5 of 8 07-30-2019 costs associated with obtaining an approved ITCP, providing and executing all parts of the approved ITCP including required traffic control devices, or resolving an incomplete or unacceptable ITCP will be borne by the Contractor. No full or partial payments will be made for minor traffic devices until the Contractor’s ITCP is approved.
6. The Engineer will be responsible for notifying emergency services, transit agencies, law enforcement and schools prior to any lane closures, detours or major traffic shifts. In addition, the Contractor will be responsible for working with and complying with any coordination that is necessary with the Department and emergency services, transit agencies, law enforcement and schools. All costs associated with these coordination efforts will be considered included in the pay item “Minor Traf Devices”.
7. All costs associated with maintaining devices during/post a storm event are considered included in the “Operated” item for the traffic control devices.
8. Remove all temporary traffic control devices from MDOT right-of-way during any shut down periods unless needed for directly maintaining or channelizing traffic. No additional payment will be made for removal and/or redeployment of these devices except for in the case of an approved extension of time.
9. Cover or remove construction signing that refers to work zone speed when work at a location is planned to be inactive for a period greater than 2 days, unless otherwise specified on the plans or as directed by the Engineer.
10. Once work is initiated that includes any lane restrictions, that work must be continued daily until completed. A lack of work activity for more than 3 days will require the removal of lane closures at no expense to the Department.
f. Unique Project Traffic Control Requirements.
1. Work is permitted on both northbound and southbound concurrently. However, no concurrent work which would cause conflicting ramp closures and detours will be permitted.
2. Close and detour entrance and exit ramps when mainline work is in the outside lane within the limits of the ramp.
3. Stage ramp work such that allowable closure period of the ramp for ramp patching occurs while the ramp requires closure for mainline work, as described above. More than one ramp closure period will not be permitted.
g. Traffic Control Devices. Ensure all traffic control devices are in accordance with the
MMUTCD and must meet the “acceptable” criteria as defined in the ATSSA publication entitled “Quality Guidelines for Temporary Traffic Control Devices and Features” at the time of initial deployment and after each major stage change.
1. General.
A. During non-working periods, any work site with uncompleted work must have applicable advance signs and channelizing devices at specific locations, as directed by the Engineer, at no additional cost to the Department.
UNIV:AMC 6 of 8 07-30-2019
B. Notify the Engineer 24 hours in advance of when traffic control devices are being delivered to the project site, to allow for initial inspection of devices to take place.
C. Remove from the project site all traffic control devices (including detour signing) no longer needed for a particular operation and equipment for construction within 14 calendar days of reopening the shoulder/lane/roadway.
2. Channelizing Devices.
A. Channelizing devices required for this project are as shown in the contract unless otherwise directed by the Engineer.
B. Ensure all devices have sufficient ballast to prevent moving or tipping. If moving or tipping occurs, place additional ballast, as directed by the Engineer, at no additional cost to the Department. No more than two ballasts are allowed on each channelizing device.
C. Do not use caution tape on this project.
3. Temporary Signs.
A. W8-26 (RUMBLE STRIPS) signs are included in the quantities to place on roads in advance of areas where traffic is shifted on a shoulder containing rumble strips.
B. Fabricate, install, and remove temporary sign overlays on existing signs with the pay item for Sign, Type B, Temp, Prismatic, Furn. Attach the overlay in accordance with subsection 812.03.D.2 of the Standard Specifications for Construction.
C. Use typical M0950a MOD for an exit ramp treatment with a freeway lane closure.
D. Include (8) W20-1 (ROAD WORK AHEAD) signs in the quantities, to place on ramps in advance of construction areas as the Engineer directs.
E. Place (4) W20-15b (WATCH FOR TRAFFIC BACKUPS/BE PREPARED TO
STOP) signs at locations designated by the Engineer.
4. Portable Changeable Message Signs (PCMS’s). Use PCMS’s to warn traffic of upcoming and changing traffic control during the life of the project. Obtain approval from the Engineer for all sign locations.
A. Install PCMS’s and make them operational a minimum of 7 calendar days prior to the start of work, unless otherwise directed by the Engineer. Messages displayed on the PCMS’s must conform to MDOT’s policy on PCMS’s. Notify the Engineer if displaying a different message then those listed below for the project.
B. Do not leave PCMS’s with a blank screen within the clear zone of any roadway at any time. Remove the PCMS or display flashing dots in each corner of the screen when there is no message to display. Update the PCMS messages at the end of each work period to reflect current traffic lane restrictions.
UNIV:AMC 7 of 8 07-30-2019
C. Display the following two messages (prior to work on I-69)
Display the following two messages (prior to ramp closures)
Display the following two messages (during work on I-69)
Display the following two messages (during ramp closure)
5. Temporary Barrier (TB) and Impact Attenuators.
A. Mobile attenuators (MA’s) have been included in this project. If the Contractor elects to work at more locations than this number allows, additional MA’s must be supplied at the Contractor’s expense.
3. Temporary Pavement Marking.
A. Remove conflicting pavement markings, pavement markings in taper/transition areas and other markings as directed by the Engineer, for operations occupying a location longer than 3 days. Durable markings in these areas should be covered rather than be removed.
B. Quantities for temporary tape to be placed during paving operations are based on
4-inch strips, 4 feet long, spaced at 50 feet center to center for lane lines.
C. When Type R or NR tape is used, ensure that all temporary pavement markings adhere to the pavement surface until permanent markings are installed.
STARTING
DAY/DATE
DAILY
LANE
CLOSURES
RAMP
TO
CLOSE
DAY/DATE
TIME
XXXXX
LANE
CLOSED
XX MILES
AHEAD
EXIT XXX
CLOSED
AHEAD
DAY
TIME
UNIV:AMC 8 of 8 07-30-2019
D. Complete temporary pavement markings in each stage prior to shifting traffic as directed by the Engineer.
E. Replace all existing pavement markings that are removed for traffic control or obliterated during construction.
h. Measurement and Payment. The estimate of quantities for maintaining traffic is based on signing and related traffic control devices required utilizing the attached typicals. Payment for traffic control devices will conform to Subsection 812.04 of the Standard Specifications for Construction as well as FUSP 12S812N, unless otherwise specified.
1. Payment for quantities used to maintain traffic will be based on the maximum number of units required by the Engineer at any one time for the entire project and have been estimated based on the restrictions in this provision. The quantities have been set up so that 2 single lane closures, each 3 miles in length, may be under construction simultaneously.
2. Payment for temporary signs will be made based on the maximum square foot of dissimilar sign legends in use at any one time during the project.
3. MDOT will not pay for additional traffic control devices required for the Contractor’s convenience.
4. The Contractor will not be compensated for any unused quantities of traffic control devices.
5. Quantities for traffic control devices are included for the safe movement of traffic throughout the project site and shall be as originally specified in the contract, or as directed by the Engineer. Additionally, the Contractor’s attention is directed to responsibilities for safety of the public and project personnel as required in Subsection 104.11 of the Standard Specifications for Construction.
S H
O U
L D
E R
S H
O U
L D
E R
D
D
BOTH DIRECTIONS
IS THE SAME FOR
SIGN PLACEMENT
SIGN = 156 ft2 - TYPE B
15 YEARS
$7500 +
WORKER
KILL A
INJURE /
15 YEARS
$7500 +
WORKER
KILL A
INJURE /
D
TO PROTECT
FINES DOUBLED IN
WORK ZONES
HIGHWAY WORKERS
R5-18a
D
M I N
I M
U M
V
A R
I A
B L
E
TO PROTECT
FINES DOUBLED IN
WORK ZONES
HIGHWAY WORKERS
R5-18a
END OF WORK DAY ON A DIVIDED ROADWAY
TRAFFIC CONTROL DEVICES MAY REMAIN AT
OF MORE THAN TWO MILES IN LENGTH WHERE
STATIONARY WORK ZONE OPERATIONS
LONG, INTERMEDIATE AND SHORT TERM
TYPICAL ADVANCE SIGNING TREATMENT FOR
CON:AE:djf
10/13/2011
NEXT MILES
ROAD WORK
ROAD WORK
END
G20-1
G20-2
FURTHEST ADVANCE
SIGNING SEQUENCE
FOR PROJECT
PROJECT LIMITS
PROJECT LIMITS
WORK ZONE
NEXT MILES
ROAD WORK
ROAD WORK
END
G20-1
G20-2
R5-18b R5-18b
1 2 BMM:CRB M0060a
OCTOBER 2011
FOR ONE DIRECTION OF TRAFFIC
PW RD/TS/Typicals/Signs/MT NON FWY/M0060a.dgn
MAINTAINING TRAFFIC
TYPICAL
SHEET
Michigan Department of Transportation
FILE:
OF
TRAFFIC AND SAFETY
PLAN DATE:
DRAWN BY:
CHECKED BY:
REV. NOT TO SCALE
NOTES
SIGN SIZES
33.
1 0F 2. THESE SIGNS ARE NOT TO BE INTERMINGLED WITH ANY TEMPORARY SEQUENCE SIGNING.
THESE SIGNS ARE INTENDED TO BE USED OUTSIDE THE LIMITS OF ALL TEMPORARY SEQUENCE SIGNING AS IS SHOWN ON
32. THESE SIGNS SHALL BE LEFT IN PLACE AT THEIR PRESCRIBED LOCATIONS FOR THE DURATION OF THE PROJECT AND
UNTIL ALL TEMPORARY TRAFFIC CONTROL HAS BEEN REMOVED.
R5-18b - 48" x 60"
R5-18a - 96" x 60"
G20-2 - 48" x 24"
G20-1 - 60" x 24"
END OF WORK DAY ON A DIVIDED ROADWAY
TRAFFIC CONTROL DEVICES MAY REMAIN AT
OF MORE THAN TWO MILES IN LENGTH WHERE
STATIONARY WORK ZONE OPERATIONS
LONG, INTERMEDIATE AND SHORT TERM
TYPICAL ADVANCE SIGNING TREATMENT FOR
CON:AE:djf
10/13/2011
2 2 BMM:CRB M0060a
OCTOBER 2011
30. THE APPROPRIATE ADVANCE SIGNING SEQUENCE(S), (M0030a THROUGH M0080a) SHALL BE USED ON ALL PROJECTS.
PW RD/TS/Typicals/Signs/MT NON FWY/M0060a.dgn
MAINTAINING TRAFFIC
OF
TRAFFIC AND SAFETY
PLAN DATE:
KEY
BMM:CRB 1 2
CHANNELIZING DEVICES
TRAFFIC FLOW
D D
D D
D D D
D
M0100a OCTOBER 2011 CON:AE:djf
SPEED
LIMIT
R2-1
X X
SPEED
LIMIT
R2-1
X X
PRESENT
WORKERS
WHERE
4 5
R2-1a
PRESENT
WORKERS
WHERE
4 5
R2-1a
SPEED
LIMIT
R2-1
X X
PRESENT
WORKERS
WHERE
4 5
R2-1a
PRESENT
WORKERS
WHERE
4 5
R2-1a
SPEED
LIMIT
R2-1
X X
D D D
D
PRESENT
WORKERS
WHERE
4 5
R2-1a SPEED
LIMIT
R2-1
X X
CROSSROAD
S H
O U
L D
E R
S H
O U
L D
E R
SHOULDER
S H O U L D E R
CROSSROAD
S H
O U
L D
E R
S H
O U
L D
E R
RAMP
ENTRANCE
RAMP
ENTRANCE
P L
A C
E D
M O
R E
T H
A N
M
I L
E S
A P
A R
T
S U
C H
T H
A T
N O
S E
T O
F T
H E
S E
S P
E E
D L
I M
I T
S I G
N S
A R
E E
V E
R
W H
E N
E N
T R
A N
C E
R A
M P
S A
R E
M O
R E
T H
A N
M
I L
E S
A P
A R
T
S
U P
P L
E M
E N
T A
L S
E T
O F
S P
E E
D L
I M
I T
S I G
N S
A R
E R
E Q
U I R
E D
ENTRANCE RAMPS
REQUIRED AFTER ALL
WHERE WORKERS PRESENT
LIMITED ACCESS ROADWAYS
LIMIT TREATMENT ON
CONTROL FOR SUPPLEMENTAL SPEED
TYPICAL TEMPORARY TRAFFIC
10/04/2011 PW RD/TS/Typicals/Signs/MT NON FWY/M0100a.dgn
MAINTAINING TRAFFIC
OF
TRAFFIC AND SAFETY
PLAN DATE:
CON:AE:djf OCTOBER 2011
M0100a
2 2BMM:CRB
NOTES
2. ALL NON-APPLICABLE SIGNING WITHIN THE CIA SHALL BE MODIFIED TO FIT CONDITIONS, COVERED OR REMOVED.
DISTANCES BETWEEN SIGNS, THE VALUES FOR WHICH ARE SHOWN IN TABLE D, ARE APPROXIMATE AND MAY NEED
ADJUSTING AS DIRECTED BY THE ENGINEER.
3.
8.
CONDUCTED IN THE BUFFER AREA.
WHEN BUFFER AREAS ARE ESTABLISHED, THERE SHALL BE NO EQUIPMENT OR MATERIALS STORED OR WORK
WHERE WORKERS PRESENT
LIMITED ACCESS ROADWAYS
LIMIT TREATMENT ON
CONTROL FOR SUPPLEMENTAL SPEED
TYPICAL TEMPORARY TRAFFIC
1N. D = DISTANCE BETWEEN TRAFFIC CONTROL DEVICES
M0020aSEE FOR "D" VALUES
1N. D = DISTANCE BETWEEN TRAFFIC CONTROL DEVICES
M0020aSEE FOR "D" VALUES
10/04/2011 PW RD/TS/Typicals/Signs/MT NON FWY/M0100a.dgn
7.
ONLY DESIGNS AND MATERIALS APPROVED BY MDOT WILL BE ALLOWED.
SPECIFICATIONS FOR CONSTRUCTION, THE STANDARD PLANS AND APPLICABLE SPECIAL PROVISIONS.
MICHIGAN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, THE CURRENT EDITION OF THE STANDARD
SHALL MEET NCHRP 350 CRASHWORTHLY REQUIREMENTS STIPULATED IN THE CURRENT EDITION OF THE
ALL TEMPORARY SIGNS, TYPE III BARRICADES, THEIR SUPPORT SYSTEMS AND LIGHTING REQUIREMENTS
MAINTAINING TRAFFIC
OF
TRAFFIC AND SAFETY
PLAN DATE:
D
W O
R K
A R
E A
V A
R I E
S
W20-1
ROAD
WORK
AHEAD
S H
O U
L D
E R
KEY
NEXT
W20-1a
MILESS
H
O U
L D
E R
BEGINS
ZONE
WORK
R5-18c
ROAD WORK
ENDROAD WORK
END
SPEED
LIMIT
R2-1
X X
D D
D D
D
W20-1
ROAD
WORK
AHEAD
BEGINS
ZONE
WORK
R5-18c
SPEED
LIMIT
R2-1
X X
W21-5b
AHEAD
CLOSED
SHOULDER
RIGHT
CLOSED
RIGHT
SHOULDER
REDUCED
AHEAD
W3-5b
SPEED ZONE
REDUCED
AHEAD
W3-5b
SPEED ZONE
CHANNELIZING DEVICES
LIGHTED ARROW PANEL
(CAUTION MODE)
TRAFFIC FLOW
1 2 BMM:CRB
CON:AE:djf
W21-5a
M0910a
OCTOBER 2011
TYPICAL M0030a-M0080a.
DEPICTED ON THE APPROPRIATE
ADVANCE WORK ZONE SIGNING AS
PLACE THIS SIGN ALONG WITH THE
TYPICAL M0030a-M0080a.
DEPICTED ON THE APPROPRIATE
ADVANCE WORK ZONE SIGNING AS
PLACE THIS SIGN ALONG WITH THE
D D
PRESENT
WORKERS
WHERE
4 5
R2-1a B
U F
F E
R B
U F
F E
R
PRESENT
WORKERS
WHERE
4 5
R2-1a
SIGNING THROUGHOUT WORK AREA
PLUS ADDITIONAL SPEED LIMIT
SIGN = 260 ft2 - TYPE B
EXCEEDS 1 MILE IN LENGTH
SIGN WHEN SHOULDER CLOSURE
USE THE "NEXT MILES"
TTCO REQUIRED
DEPICTED ON TYPICAL M0100a.
THROUGHOUT THE WORK AREA AS
SETS OF SPEED LIMIT SIGNS
PLACE ADDITIONAL SUPPLEMENTAL
PRESENT
WORKERS
WHERE
4 5
R2-1a
SPEED
LIMIT
R2-1
X X
DEPICTED ON TYPICAL M0100a.
THROUGHOUT THE WORK AREA AS
SETS OF SPEED LIMIT SIGNS
PLACE ADDITIONAL SUPPLEMENTAL
PRESENT
WORKERS
WHERE
4 5
R2-1a
SPEED
LIMIT
R2-1
X X
SPEED LIMIT WHERE WORKERS PRESENT
FREEWAY, USING A REDUCED
FOR A SHOULDER CLOSURE ON A
TYPICAL TEMPORARY TRAFFIC CONTROL
D
SPEED
LIMIT
R2-1
X X
SPEED
LIMIT
R2-1
X X
LIMIT BEYOND WORK AREA
LEGEND REFLECTS SPEED
10/27/2011PW RD/TS/Typicals/Signs/MT FWY/M0910a.dgn
MAINTAINING TRAFFIC
OF
TRAFFIC AND SAFETY
PLAN DATE:
NOTES
2. ALL NON-APPLICABLE SIGNING WITHIN THE CIA SHALL BE MODIFIED TO FIT CONDITIONS, COVERED OR REMOVED.
DISTANCES BETWEEN SIGNS, THE VALUES FOR WHICH ARE SHOWN IN TABLE D, ARE APPROXIMATE AND MAY NEED
ADJUSTING AS DIRECTED BY THE ENGINEER.
3.
8.
CONDUCTED IN THE BUFFER AREA.
WHEN BUFFER AREAS ARE ESTABLISHED, THERE SHALL BE NO EQUIPMENT OR MATERIALS STORED OR WORK
SIGN SIZES
3A. THE "WORK ZONE BEGINS" (R5-18c) SIGN SHALL BE USED ONLY IN THE INITIAL SIGNING SEQUENCE IN THE WORK
ZONE. SUBSEQUENT SEQUENCES IN THE SAME WORK ZONE SHALL OMIT THIS SIGN AND THE QUANTITIES SHALL BE
ADJUSTED APPROPRIATELY.
2 2 BMM:CRB
CON:AE:djf OCTOBER 2011
4D. THE SPACING OF CHANNELIZING DEVICES SHOULD NOT EXCEED 45 FEET WHEN USED FOR TAPER CHANNELIZATION, AND SHOULD NOT EXCEED 90 FEET WHEN USED FOR TANGENT CHANNELIZATION.
W20-1a PLAQUE - 48 "x 36"
DIAMOND WARNING - 48" x 48"
R2-1 REGULATORY - 48" x 60"
R5-18c REGULATORY - 48" x 48"
D = DISTANCE BETWEEN TRAFFIC CONTROL DEVICES
M0020a
1G.
1/3 L = MINIMUM LENGTH OF TAPER
AND LENGTH OF LONGITUDINAL BUFFERS
SEE FOR "D" AND "L" VALUES
29C. THE TYPE OF REFLECTIVE SHEETING USED FOR THE W20-1a PLAQUE AND THE "WHERE WORKERS PRESENT"
PLAQUE SHALL BE THE SAME AS THE TYPE USED FOR THE PARENT SIGN.
16B. WHEN REDUCED SPEED LIMITS ARE UTILIZED IN THE WORK AREA, ADDITIONAL SPEED LIMIT SIGNS RETURNING
TRAFFIC TO ITS NORMAL SPEED SHALL BE PLACED BEYOND THE LIMITS OF THE REDUCED SPEED AS INDICATED.
SPEED LIMIT WHERE WORKERS PRESENT
FREEWAY, USING A REDUCED
FOR A SHOULDER CLOSURE ON A
TYPICAL TEMPORARY TRAFFIC CONTROL
M0910a
10/27/2011
6.
FLASHER, SHOWN ON THE WARNING SIGNS, SHALL BE POSITIONED ON THE SIDE OF THE SIGN NEAREST THE ROADWAY.
WHEN CALLED FOR IN THE FHWA ACCEPTANCE LETTER FOR THE SIGN SYSTEM SELECTED, THE TYPE A WARNING
PW RD/TS/Typicals/Signs/MT FWY/M0910a.dgn
7.
ONLY DESIGNS AND MATERIALS APPROVED BY MDOT WILL BE ALLOWED.
SPECIFICATIONS FOR CONSTRUCTION, THE STANDARD PLANS AND APPLICABLE SPECIAL PROVISIONS.
MICHIGAN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, THE CURRENT EDITION OF THE STANDARD
SHALL MEET NCHRP 350 CRASHWORTHLY REQUIREMENTS STIPULATED IN THE CURRENT EDITION OF THE
ALL TEMPORARY SIGNS, TYPE III BARRICADES, THEIR SUPPORT SYSTEMS AND LIGHTING REQUIREMENTS
FOR OVERNIGHT CLOSURES, TYPE III BARRICADES SHALL BE LIGHTED.5.
MAINTAINING TRAFFIC
OF
TRAFFIC AND SAFETY
PLAN DATE:
W
O R
K A
R E
A V
A R
I E
S
S H
O U
L D
E R
D D
D D
KEY
LIMIT BEYOND WORK AREA
LEGEND REFLECTS SPEED
D
S H
O U
L D
E R
2 MILES
CLOSED
RIGHT LANE
1 MILE
CLOSED
RIGHT LANE
2 MILES
CLOSED
RIGHT LANE
(MODIFIED)
W20-5
(MODIFIED)
W20-5
(MODIFIED)
W20-5 f t
W20-5
AHEAD
CLOSED
RIGHT LANE
BEGINS
ZONE
WORK
R5-18c
BEGINS
ZONE
WORK
R5-18c
D D
ROAD WORK
END
SPEED
LIMIT
R2-1
X X
SPEED
LIMIT
R2-1
X X
SPEED
LIMIT
R2-1
X X
SPEED
LIMIT
R2-1
X X
W20-5
AHEAD
CLOSED
RIGHT LANE
1 MILE
CLOSED
RIGHT LANE
(MODIFIED)
W20-5 f t
ROAD WORK
END
REDUCED
AHEAD
SPEED ZONE
REDUCED
AHEAD
W3-5b
SPEED ZONE
W4-2 W4-2
TRAFFIC FLOW
CHANNELIZING DEVICES
LIGHTED ARROW PANEL
W3-5b
WHERE WORKERS PRESENT
FREEWAY USING A REDUCED SPEED LIMIT
CONTROL FOR A ONE-LANE CLOSURE ON A
TYPICAL EXTENDED TEMPORARY TRAFFIC
W20-1
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
TYPICAL M0030a-M0080a.
AS DEPICTED ON THE APPROPRIATE
THE ADVANCE WORK ZONE SIGNING
PLACE THESE SIGNS ALONG WITH
D D
SPEED
LIMIT
R2-1
X X
SPEED
LIMIT
R2-1
X X
DEPICTED ON TYPICAL M0100a.
THROUGHOUT THE WORK AREA AS
SETS OF SPEED LIMIT SIGNS
PLACE ADDITIONAL SUPPLEMENTALSPEED
LIMIT
R2-1
X X
PRESENT
WORKERS
WHERE
4 5
R2-1a
DEPICTED ON TYPICAL M0100a.
THROUGHOUT THE WORK AREA AS
SETS OF SPEED LIMIT SIGNS
PLACE ADDITIONAL SUPPLEMENTAL
SPEED
LIMIT
R2-1
X X
PRESENT
WORKERS
WHERE
4 5
R2-1a
B U
F F
E R
B U
F F
E R
WORK AREA
LIMIT SIGNING THROUGHOUT
PLUS ADDITIONAL SPEED
SIGN = 344 ft2 - TYPE B
CON:AE:djf
BMM:CRB
PW RD/TS/Typicals/Signs/MT FWY/M1040a.dgn
OCTOBER 2011
M1040a 1 2
10/26/2011
MAINTAINING TRAFFIC
OF
TRAFFIC AND SAFETY
PLAN DATE:
8.
CONDUCTED IN THE BUFFER AREA.
WHEN BUFFER AREAS ARE ESTABLISHED, THERE SHALL BE NO EQUIPMENT OR MATERIALS STORED OR WORK
NOTES
2. ALL NON-APPLICABLE SIGNING WITHIN THE CIA SHALL BE MODIFIED TO FIT CONDITIONS, COVERED OR REMOVED.
DISTANCES BETWEEN SIGNS, THE VALUES FOR WHICH ARE SHOWN IN TABLE D, ARE APPROXIMATE AND MAY NEED
ADJUSTING AS DIRECTED BY THE ENGINEER.
3.
16B. WHEN REDUCED SPEED LIMITS ARE UTILIZED IN THE WORK AREA, ADDITIONAL SPEED LIMIT SIGNS RETURNING
TRAFFIC TO ITS NORMAL SPEED SHALL BE PLACED BEYOND THE LIMITS OF THE REDUCED SPEED AS INDICATED.
21. ALL EXISTING PAVEMENT MARKINGS WHICH ARE IN CONFLICT WITH EITHER PROPOSED CHANGES IN TRAFFIC PATTERNS
OR PROPOSED TEMPORARY TRAFFIC MARKINGS, SHALL BE REMOVED BEFORE ANY CHANGE IS MADE IN THE TRAFFIC
PATTERN. EXCEPTION WILL BE MADE FOR DAYTIME-ONLY TRAFFIC PATTERNS THAT ARE ADEQUATELY DELINEATED BY
OTHER TRAFFIC CONTROL DEVICES.
26.
OF THE TAPER AS POSSIBLE.
LIMITATIONS RESTRICT ITS PLACEMENT AS INDICATED, THEN IT SHALL BE PLACED AS CLOSE TO THE BEGINNING
THE LIGHTED ARROW PANEL SHALL BE LOCATED AT THE BEGINNING OF THE TAPER AS SHOWN. WHEN PHYSICAL
SIGN SIZES
3A. THE "WORK ZONE BEGINS" (R5-18c) SIGN SHALL BE USED ONLY IN THE INITIAL SIGNING SEQUENCE IN THE WORK
ZONE. SUBSEQUENT SEQUENCES IN THE SAME WORK ZONE SHALL OMIT THIS SIGN AND THE QUANTITIES SHALL BE
ADJUSTED APPROPRIATELY.
WHERE WORKERS PRESENT
FREEWAY USING A REDUCED SPEED LIMIT
CONTROL FOR A ONE-LANE CLOSURE ON A
TYPICAL EXTENDED TEMPORARY TRAFFIC
1I. D = DISTANCE BETWEEN TRAFFIC CONTROL DEVICES
L = MINIMUM LENGTH OF TAPER
M0020a
AND LENGTH OF LONGITUDINAL BUFFERS
SEE FOR "D" AND "L" VALUES
4D. THE SPACING OF CHANNELIZING DEVICES SHOULD NOT EXCEED 45 FEET WHEN USED FOR TAPER CHANNELIZATION, AND SHOULD NOT EXCEED 90 FEET WHEN USED FOR TANGENT CHANNELIZATION.
CON:AE:djf
BMM:CRB
PW RD/TS/Typicals/Signs/MT FWY/M1040a.dgn
OCTOBER 2011
M1040a 2 2
10/26/2011
6.
FLASHER, SHOWN ON THE WARNING SIGNS, SHALL BE POSITIONED ON THE SIDE OF THE SIGN NEAREST THE ROADWAY.
WHEN CALLED FOR IN THE FHWA ACCEPTANCE LETTER FOR THE SIGN SYSTEM SELECTED, THE TYPE A WARNING
FOR OVERNIGHT CLOSURES, TYPE III BARRICADES SHALL BE LIGHTED5.
R5-18c REGULATORY - 48 " x 48 "
RECTANGULAR REGULATORY - 48 " x 60 "
DIAMOND WARNING - 48 " x 48 "
7.
ONLY DESIGNS AND MATERIALS APPROVED BY MDOT WILL BE ALLOWED.
SPECIFICATIONS FOR CONSTRUCTION, THE STANDARD PLANS AND APPLICABLE SPECIAL PROVISIONS.
MICHIGAN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, THE CURRENT EDITION OF THE STANDARD
SHALL MEET NCHRP 350 CRASHWORTHLY REQUIREMENTS STIPULATED IN THE CURRENT EDITION OF THE
ALL TEMPORARY SIGNS, TYPE III BARRICADES, THEIR SUPPORT SYSTEMS AND LIGHTING REQUIREMENTS
MAINTAINING TRAFFIC
OF
TRAFFIC AND SAFETY
PLAN DATE:
(ft )
SIGN AREA
9_<
9 _ 20<
N/A1 - 3 lb/ft
2 - 3 lb/ft 1 - 4" X 6"
2 - 4" X 6"
2 - 6" X 8"N/A
N/A
SIGNS 4 FEET AND GREATER IN WIDTH REQUIRE 2 POSTS.
36" X 36"
> X
X
X X
1 - 2" 12 or 14 GA
2 - 2" 12 or 14 GA
X
X> 144" WIDE
ROUNDING OF CORNERS IS NOT REQUIRED FOR TYPE I OR II SIGNS.
VERTICAL JOINTS ARE NOT PERMITTED.
HORIZONTIAL JOINTS THROUGH SIGN LEGEND OR SYMBOLS ARE NOT PERMITTED.
A MAXIMUM OF 2 POSTS WITHIN A 7' PATH IS PERMITTED.
<> N/A 3 - 6" X 8"
SIGNS GREATER THAN 8 FEET IN WIDTH REQUIRE 2 OR 3 WOOD
POSTS DEPENDING ON AREA OF SIGN.
36" X 36" _ 96" TO WIDE
POST TYPE
2 WOODSQUARE TUBULAR STEELU-CHANNEL STEEL
20 _ 30
N/A
N/A
POST SIZE REQUIREMENTS TABLE
SIGN MATERIAL SELECTION TABLE
SIGN SIZE TYPE I TYPE II TYPE III
SIGN MATERIAL TYPE
TYPE I ALUMINUM EXTRUSION
30 _ 60
60 _ 84 N/A
96" WIDE TO 144" WIDE
SUPPORTS FOR TEMP SIGNS
GROUND DRIVEN SIGN
WZD-100-AAUG
CON/ECH
1 11 11/2/2017
DEPARTMENT DIRECTOR MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVALCHECKED BY:
DRAWN BY:
Michigan Department of Transportation
APPROVED BY:
APPROVED BY:
Kirk T. Steudle
BY
PREPARED
DESIGN DIVISION
DIRECTOR, BUREAU OF FIELD SERVICES
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
DIRECTOR, BUREAU OF DEVELOPMENT
DISTANCE BETWEEN OUTSIDE POSTS.
SPREAD POSTS SO AS TO HAVE A 8' MIN. TO 9' MAX.
FOR ALL 11' AND 12' LONG SIGNS ON 3 WOOD SUPPORTS,
SIGN
L
2 POST SIGN SUPPORT SPACING
1/6L 1/6L2/3L
SIGN
L
1/6L 1/6L
3 POST SIGN SUPPORT SPACING
1/3L 1/3L
2 11
11/2/2017 WZD-100-A
NOT TO SCALE
MICHIGAN DEPARTMENT OF TRANSPORTATION
PLAN DATEF.H.W.A. APPROVAL
SHEET
OF
NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION.
BUREAU OF DEVELOPMENT STANDARD PLAN
AHEAD
CLOSED
ROAD
ROAD
WORK
AHEAD
DETOUR
AHEAD
AHEAD
CLOSED
RIGHT LANE
M.P.H.
BOTTOM HEIGHT AND OFFSET
6'-12' 6'-12'
6'
RURAL
URBAN
5' MIN.
2'
7' MIN.
2'
7'MIN.
4'MIN.
URBAN
4" MAX.4" MAX.
WZD-100-A
3 11
PAVED SHOULDER
SPEED PLATE
RURAL WITH ADVISORY
WALKWAY WALKWAY
WALKWAYS ARE PRESENT)
(CURBED AREAS OR WHERE
WALKWAYS ARE PRESENT)
(CURBED AREAS OR WHERE
11/2/2017
SHEET
OF
C
X X
P O
T
N G
R I
E S
3 3/4" MAX.
I
O
L
N
N
X
3" MIN.
X X
TRAFFIC FLOW
WEIGHT = 3 lbs/ft
1" MIN.
1†" MAX.
L
SECT. MOD. X.-X. = 0.31 CUBIC INCHES MIN.
WZD-100-A 4 11
U - CHANNEL STEEL POST
MOUNT SIGN ON OPEN FACE OF
(NO SPLICE)
3 lb. U - CHANNEL STEEL POST
SHEET
OF
A A
N
N
U P
P
R
P
S T
N
P
UPPER SPLICE LOWER SPLICE
A A
N
P
TRAFFIC FLOW
U P
P
S T
D R I
V
U B
D R I
V
U B
5 11
UPPER U - CHANNEL STEEL POST
MOUNT SIGN ON OPEN FACE OF
2 REQUIRED
5/16" BOLTS
2 REQUIRED
5/16" BOLTS
2 REQUIRED
5/16" BOLTS
2 REQUIRED
5/16" BOLTS
(WITH SPLICE)
3 lb. U - CHANNEL STEEL POST
SHEET
OF
7/16"
NOTES:
UPPER POSTDRIVEN POST
TRAFFIC FLOW
5/16" BOLT
SPACER DETAIL
3/4" O.D.
3/8" I.D.
SPACER THICKNESS
SECTION A-A
1. THE SPACER THICKNESS SHALL BE 1/16" LESS THAN THE GAP BETWEEN THE POST
WHEN POSITIONED IN THE UNBOLTED CONFIGURATION.
2. THE EXTERIOR BOLT (CLOSEST TO LAP), SPACER, WASHER, AND NUT SHALL BE
INSTALLED IN A PREPUNCHED HOLE 1" to 2" FROM THE END OF THE LAP.
3. THE INTERIOR BOLT (FARTHEST FROM LAP), SPACER, WASHER, AND NUT SHALL BE
INSTALLED IN THE NEXT PREPUNCHED HOLE.
4. THE DRIVEN POST SHALL ALWAYS BE MOUNTED IN FRONT OF THE UPPER POST
WITH RESPECT TO THE ADJACENT ONCOMING TRAFFIC, REGARDLESS OF THE
DIRECTION THE SIGN IS FACING.
5. THE SPLICE LAP SHALL BE FASTENED BY FOUR-5/16" DIA. GALVANIZED A449 BOLTS
(SAE J429 GRADE 5) OR GALVANIZED A325 BOLTS.
6 11
(WITH SPLICE)
3 lb. U - CHANNEL STEEL POST
O.D. 3/4" MIN., I.D. 3/8" MAX.
REQUIRED FOR ALL BOLTS
7/16" SPACER
SHEET
OF
3# POST
VARIES VARIES VARIES
A
A
SECTION A-A
FRONT
1. MATERIAL: 12 GAUGE CARBON STEEL.
3. FINISH-AFTER STAMPING AND PUNCHING,
GALVANIZE ACCORDING TO CURRENT
3 1/2"
1 3/4" 1 3/4"
7/16" DRILL
EQUAL TO POST THROAT
OPENING DIMENSION
2. TOLERANCE ON ALL DIMENSIONS 0.0625"
SPECIFICATIONS FOR ZINC (HOT
GALVANIZE) COATINGS ON PRODUCTS
FABRICATED FROM PLATES OR STRIPS
NOTES: (FOR STEEL SIGN REINF' PLATE)
0.19" R
PLYWOOD (TYPE II) OR ALUMINUM SHEET (III) SIGN
STEEL SIGN REINFORCING PLATE
SIGN TO 3 lb. POST CONNECTION
3 lb. U - CHANNEL STEEL POST SIGN CONNECTION
REQUIRED FOR TYPE III SIGNS ONLY
5/16" DIAMETER GALVANIZED BOLT
AND NUT
FLAT WASHER
WZD-100-A 7 11
(TYP. ALUMINUM SHEET [TYPE III] SIGN ONLY)
REINFORCING PLATE
SELF-ALIGNING STEEL
SHEET
OF
(4" X 6" (NOMINAL) POST) 1 1/2" DIA. 2 HOLES
(6" X 8" (NOMINAL) POST) 3 1/2" DIA. 2 HOLES
N
8" DIA. AUGERED HOLE FOR 4" X 6" POST
10" DIA. AUGERED HOLE FOR 6" X 8" POST
5•" OR 7•" (ACTUAL)
SAW CUT DETAIL
5 1/2 " OR 7 1/2" ACTUAL
TRAFFIC FLOW
WOOD POST DETAILS
(MULTIPLE POST INSTALLATIONS)
TRAFFIC FLOW
SIGN PANEL
CONSTRUCTION.
THE STANDARD SPECIFICATIONS FOR
SECTION 912 OF THE CURRENT EDITION OF
WOOD POST SHALL BE IN CONFORMANCE TO
WZD-100-A 8 11
LAYERS, TAMPING EACH LAYER.
EXISTING MATERIAL IN FIVE EQUAL
AUGERED HOLE. IF AUGERED, BACKFILL WITH
THE POST MAY BE DRIVEN OR PLACED IN AN
S I
N G
S E
M B
L I
E S
T
E X
C E
P T
I
N
(FOR 6" X 8" NOMINAL POST) 1 1/2"
(FOR 4" X 6" NOMINAL POST) 1"
CENTERED ON POSTS.
HOLES ARE TO BE
DRILLED BREAKAWAY
DIRECT EMBEDMENT DETAILS
WOOD POST BREAKAWAY HOLES/
SHEET
OF
POST ASSEMBLIES
EXCLUDE SAW CUT ON SINGLE
SAME AS BOLT ABOVE
TYPE II AND TYPE III SIGNS
END VIEW REAR VIEW
C OF POST
1 1/2"
(TYP.)
P A
N E
L
W I
D T
H
TOP VIEW
LENGTH ALL EXTRUSIONS.
L
1/2"
O
T Y
P
12"
T Y
P
4" X 6" (NOMINAL) OR 6" X 8" (NOMINAL) WOOD POST
ON APPROX. 24" CENTERS FULL
TYPE I SIGN
WOOD POST CONNECTIONS
TYPE I SIGN - ERECTION DETAILS
L
1/6 SIGN LENGTH
(TYP.)
3/8" DIA. GALVANIZED BOLTS
WZD-100-A
(TYP.)
1 1/2"
(TYP.)
STIFFENER ANGLE
SPACING
HOLE
TYPICAL
ALIGNMENT OF PANELS.
USED TO FACILITATE
E
X
N
X
N
TYP.
2"
BOLT HOLES MAY BE
1/2" X 3/4" ELONGATED
M A
X
M A
X
CORNER RADIUS (TYP.)
0.040" EXTERIOR
(ALUM.) x SIGN HEIGHT
L 2" X 2" X 1/4"
STIFFENER ANGLE-
FOR CONSTRUCTION
SPECIFICATIONS
PER MDOT STANDARD
ALUMINUM EXTRUSION
SIGNS
ALUMINUM SHEET (TYPE III)
PLYWOOD (TYPE II) OR
(TYPE I) SIGN
ALUMINUM EXTRUSION
SAW CUT
FLAT WASHER
GALVANIZED
HEX. HD. BOLT
3/8" DIA. GALVANIZED
NYLON INSERT LOCKNUT
GALVANIZED
FLAT WASHER
GALVANIZED
NYLON INSERT LOCKNUT (TYP.).
WASHERS & GALVANIZED
2 GALVANIZED FLAT
3/8" DIA. GALVANIZED BOLT,
BE INSTALLED ON EITHER SIDE OF EACH POST.
ALUMINUM L 4" X 3" X 3/8" ANGLES MAY
GALVANIZED BOLTS.
C OF HOLES FOR 3/8" DIA.
ALIGNMENT OF ALUMINUM ANGLES.
HOLES MAY BE USED TO FACILITATE
1/2" X 3/4" ELONGATED BOLT
EACH PANEL.
BOLT STIFFENER ANGLE TO
NYLON INSERT LOCKNUTS.
& GALVANIZED
GALVANIZED FLAT WASHERS
RECTANGULAR FLAT BOLTS,
GALVANIZED 3/8" DIA.
9 11
SHEET
OF
N G
R I
E S
ANCHOR SLEEVE
GRADE
SQUARE TUBULAR STEEL POST
M I
N
N
L
TUBE SIZE = 2•" X 2•"
WALL THICKNESS = 12 GA
P O
S I
F
D E
S
SIGN POST
TUBE SIZE = 2" x 2"
WALL THICKNESS =12 OR 14 GA
X
INSERT CONNECTION HARDWARE
(PER MANUFACTURER'S
SPECIFICATIONS)
WZD-100-A
SIGN CONNECTION LOCATIONS.
ANCHOR/POST CONNECTION AND
HOLES OPTIONAL EXCEPT FOR
10 11
SHEET
OF
1. A MAXIMUM OF TWO POSTS WITHIN A 7 FOOT PATH IS PERMITTED.
GENERAL NOTES:
3. ALL POSTS SHALL BE EMBEDDED A MINIMUM OF 42".
2. ALL SIGN POSTS SHALL COMPLY WITH NCHRP 350.
13. POSTS SHALL NOT EXTEND MORE THAN 4" ABOVE TOP OF SIGN.
10. REMOVE SIGN POSTS AND/OR POST STUBS IN THEIR ENTIRETY WHEN NO LONGER
REQUIRED.
11. ALL LABOR, MATERIALS, AND EQUIPMENT, INCLUDING TEMPORARY SUPPORTS
12. SAW CUTS IN WOOD POSTS ARE TO BE PARALLEL TO THE BOTTOM OF THE SIGN.
4. BRACING OF POST IS NOT PERMITTED.
5. SIGN SHALL BE LEVEL, AND UPRIGHT FOR THE DURATION OF INSTALLATION.
6. ERECT POSTS SO THE SIGN FACE AND SUPPORTS DO NOT VARY FROM PLUMB
BY MORE THAN 3/16" IN 3'. PROVIDE A CENTER-TO-CENTER DISTANCE
BETWEEN POSTS WITHIN 2 PERCENT OF PLAN DISTANCE.
7. NO MORE THAN ONE SPLICE PER POST, AS SHOWN, WILL BE PERMITTED.
8. POST TYPES SHALL NOT BE MIXED WITHIN A SIGN SUPPORT INSTALLATION.
WZD-100-A
THROUGH SIGN LEGEND OR SYMBOLS ARE PERMITTED IN SIGN
9. NO VERTICAL JOINTS ARE PERMITTED IN SIGN. NO HORIZONTIAL JOINTS
11 11 11/2/2017
REQUIRED TO INSTALL, MAINTAIN, RELOCATE, AND/OR REMOVE THE TEMPORARY
SIGN, INCLUDING SUPPORTS, ARE CONSIDERED TO BE INCLUDED IN THE COST
OF THE TEMPORARY SIGN.
14. TEMPORARY WOOD SUPPORTS DO NOT REQUIRE PRESERVATIVE TREATMENT.
SHEET
OF
ECH
MWB
ENGINEER OF DEVELOPMENT
Traffic Control Devices
Temporary
WZD-125-E 1 3
6" MIN.
12" MAX.1
8'-0" o
(12 REQUIRED)
1" MIN. O.D. STEEL FLAT LOCK WASHER
…" - 16 STEEL HEX NUT
…" - 16 STEEL HEX BOLT
6" MIN.
12" MAX.1
8'-0" o
(12 REQUIRED)
1" MIN. O.D. STEEL FLAT LOCK WASHER
…" - 16 STEEL HEX NUT
…" - 16 STEEL HEX BOLT
FRONT ELEVATION SIDE VIEW
FRONT ELEVATION SIDE VIEW
PERFORATED SQUARE STEEL TUBE OPTION
BI-DIRECTIONAL RIGHT DIRECTIONALLEFT DIRECTIONAL
T Y
P
T Y
P
ANGLE IRON OPTION
(12 GAGE)
SQUARE STEEL TUBE
1ƒ" PERFORATED
(10 GAGE)
1•" x 1•" ANGLE
C
C C
C C
C C
C ƒ" HOLLOW EXTRUDED RIGID POLYOLEFIN ƒ" HIGH DENSITY POLYETHYLENE OR ƒ" ACX PLYWOOD OR
BARRICADE RAIL MAY BE
ƒ" HOLLOW EXTRUDED RIGID POLYOLEFIN ƒ" HIGH DENSITY POLYETHYLENE OR ƒ" ACX PLYWOOD OR
BARRICADE RAIL MAY BE
CLOSURES
(TYPICAL)
ORANGE
REFLECTORIZED
(TYPICAL)
SILVER (WHITE)
REFLECTORIZED
(TYPICAL)
SILVER (WHITE)
REFLECTORIZED
(TYPICAL)
ORANGE
REFLECTORIZED
BARRICADE RAIL SHEETING OPTIONS
TYPE III BARRICADES
(12 GAGE)
2" SQUARE STEEL TUBE
4'-0" - 6'-0"
4'-0" - 6'-0"
(12 GAGE)
2" SQUARE STEEL TUBE8
O R
2" x 2" x ‰" ANGLE
2" x 2" x ‚" ANGLE OR OF BASE
WELD TO CENTER
OF BASE
WELD TO CENTER
" 1•" x 1•" ANGLE (10 GAGE)
2" x 2" x ‰" ANGLE OR
2" x 2" x ‚" ANGLE OR http://safety.fhwa.dot.gov/roadway_dept/road_hardware/wzd.htm
Other Type III Barricades meeting current NCHRP crash worthy criteria can be found on the FHWA Safety website at
(SPECIAL DETAIL) 1/18/11
THROUGH UPRIGHT AND RAIL
WITH VANDAL RESISTANT HARDWARE
LIGHTWEIGHT WARNING LIGHT ATTACHED
THROUGH UPRIGHT
WITH VANDAL RESISTANT HARDWARE
LIGHTWEIGHT WARNING LIGHT ATTACHED
DEPARTMENT DIRECTOR MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVALCHECKED BY:
DRAWN BY:
Michigan Department of Transportation
APPROVED BY:
APPROVED BY:
Kirk T. Steudle
BY
PREPARED
DESIGN DIVISION
DIRECTOR, BUREAU OF FIELD SERVICES
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
DIRECTOR, BUREAU OF DEVELOPMENT
6'-0"
(4 REQUIRED)
STEEL HEX BOLT WITH Œ" NUT
…" x 2•" - 16 ZINC COATED
1" ON CENTER, ALL FOUR SIDES
PSST STEEL TUBING WITH …" HOLES
12 OR 14 GAGE GALVANIZED UPRIGHT
1ƒ" x 1ƒ" x 9'-0"
REFLECTIVE SHEETING
3'-4"
PLACED 6" FROM BOTTOM OF UPRIGHT
1" ON CENTER, ALL FOUR SIDES
PSST STEEL TUBING WITH …" HOLES
12 GAGE GALVANIZED SLEEVE
2" x 2" x 3'-0"
ON THREE SIDES
IRON BY ‚" x 2" WELDS
ATTACH STUB TO ANGLE
FOR INSERTING UPRIGHT
6" HIGH (12 GAGE)
2" SQUARE STEEL TUBE
FRONT ELEVATIONSIDE VIEW
TEMPORARY SIGN SUPPORT
(WARNING LIGHT PLACED ON SIDE CLOSEST TO TRAFFIC)
T
Y P
Z-BRACKET DETAIL
1‚"
1ƒ"
14 GAGE STEEL
3"
1•"1•"
Œ" DIA. HOLE
ƒ
PLACED IN OUTERMOST SLOT
AND BATTERY MUST BE
OF SIGN A MINIMUM OF 1"
MUST PROTRUDE FROM EDGE
WARNING LIGHT HOUSING
FROM THE EDGE LINE OF THE PANEL
WITH BOLT PROTECTION CUP. LOCATE BOLT 2" IN
Z-BRACKET ATTACHED WITH •" x 4" HALF MOON BOLT
WITH 6 VOLT SINGLE LANTERN TYPE BATTERY HELD BY
LIGHTWEIGHT (3.3 LBS. MAX.) WARNING LIGHT TYPE A
2" x 2" x ‰" ANGLE *
2" x 2" x ‚" ANGLE OR
* SIGN STAND IS BALLASTED WITH FOUR OR MORE 35 LB SANDBAGS. A MINIMUM OF ONE ON EACH END.
UPRIGHTS SHALL NOT EXTEND ABOVE THE SIGN PANEL.
(OPTIONAL)
INSERTED IN THE HOLE OF PANEL
NYLON WASHER (SEE DETAIL BELOW)
TIGHTENED TO CUP WASHER
AND 1•" FLAT WASHER ˆ" THICK
STEEL HEX BOLT WITH Œ" NUT
…" x 3" - 16 ZINC COATED
1‚" DIA. HOLE IN PANEL FOR
OPTIONAL NYLON WASHER
…" DIA. HOLE
„"1„"
(MEDIUM DENSITY OVERLAY PLYWOOD)
48" x 48" x •" PANEL http://safety.fhwa.dot.gov/roadway_dept/road_hardware/wzd.htm
Other temporary sign supports meeting current NCHRP crash worthy criteria can be found on the FHWA Safety website at
R U
R A
U R
B A
N
1/18/11SPECIAL DETAIL WZD-125-E 2 3
SHEET
OF
WZD-125-E
NOTES:
PLASTIC DRUM
A P
P R
O X
REMAINDER OF DRUM
2" MAX.
NON REFLECTORIZED ORANGE
REFLECTORIZED WHITE
REFLECTORIZED ORANGE
X
S
T E
18" MIN.
SYMBOLS TO BE USED ON PLANS
EXISTING TYPE III BARRICADE
PROPOSED TYPE III BARRICADE
PLASTIC DRUM
TRAFFIC CONTROL DEVICE.
SO THEY WILL NOT COVER OR OBSTRUCT ANY REFLECTIVE PORTION OF THE
ACHIEVE STABILITY OF THE BARRICADE. THE SANDBAGS SHALL BE PLACED
SANDBAGS SHALL BE USED WHEN SUPPLEMENTAL WEIGHTS ARE REQUIRED TO
SPECIFICATIONS FOR CONSTRUCTION.
SENSITIVE REFLECTIVE SHEETING ACCORDING TO THE CURRENT STANDARD
SIGNS, BARRICADES, AND PLASTIC DRUMS SHALL BE FACED WITH PRESSURE-
SHALL BE ORANGE IN COLOR AND EQUAL IN WIDTH.
THE HORIZONTAL REFLECTORIZED ORANGE AND WHITE STRIPES
STRIPE BEING ORANGE. NON REFLECTORIZED SPACES BETWEEN
ALTERNATING IN COLOR WITH THE TOPMOST REFLECTORIZED
STRIPES (2 ORANGE AND 2 WHITE) OF 6" UNIFORM WIDTH,
DRUMS SHALL HAVE AT LEAST 4 HORIZONTAL REFLECTORIZED
NOTE:
3 3 1/18/11
OF PLASTIC DRUMS FOR PLACEMENT OF TEMORARY CONCRETE BARRIER.
DIVIDED ROADWAY, AND R-126-SERIES FOR TYPICAL LOCATION AND SPACING
SEE ROAD STANDARD PLANS R-113-SERIES FOR TEMPORARY CROSSOVERS FOR
CONTRACT ON TYPE III BARRICADES.
SPECIFICATIONS FOR CONSTRUCTION AND ALL OTHER PROVISIONS IN THE
WARNING LIGHTS SHALL BE PLACED ACCORDING TO THE CURRENT STANDARD
HORIZONTAL BASE OF THE TYPE III BARICADE.
2" PERFORATED SQUARE STEEL TUBES MAY BE USED TO FABRICATE THE
(SPECIAL DETAIL)
SHEET
OF
Traffic Passing on Left
Traffic Passing on Both Sides
Traffic Passing on Right
SCT
1 1
CT
IMPACT ATTENUATOR
OBJECT MARKER
USE APPROPRIATE SIGN ACCORDING TO CONDITIONS
24"
24"
24"
NOTES:
3" (TYP.)
3" (TYP.)
OM-3La OM-3Ca OM-3Ra
PW:DOC/RD/TS/TYP/SIGNS/WORK ZONE/WZD-150-A.dgn
WZD-150-A
10/21/2008 JT
1. ALTERNATE BLACK 3-INCH AND YELLOW 3-INCH STRIPES AT A
45-DEGREE ANGLE.
2. THE YELLOW STRIPES SHALL MEET ASTM D4956 SPECIFICATIONS
FOR TYPE IX RETROREFLECTIVE SHEETING.
3. THE OBJECT MARKER SHALL BE MADE OF 0.040-INCH THICK
ALUMINUM.
4. ATTACH OBJECT MARKER TO ATTENUATOR NOSE WITH TWO
5/16-INCH DIAMETER HEX BOLTS, NUTS AND WASHERS (PREFERRED
METHOD) OR OTHER METHOD APPROVED BY THE ATTENUATOR
MANUFACTURER.
09/21/08(SPECIAL DETAIL)
Michigan Department of Transportation
DRAWN BY:
CHECKED BY: PLAN DATE
BUREAU OF HIGHWAYS DELIVERY STANDARD PLAN FOR
FHWA APPROVAL DATE
ENGINEER OF DEVELOPMENT
ENGINEER OF DELIVERY
PREPARED BY
TRAFFIC AND SAFETY
File: Rev.NOT TO SCALE of
12RC812(A680)
MICHIGAN
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
NATIONAL TRANSPORTATION COMMUNICATIONS FOR INTELLIGENT
TRANSPORTATION SYSTEM PROTOCOL COMPLIANT PORTABLE CHANGEABLE
MESSAGE SIGN
OFS:CRB 1 of 6 APPR:CB:JVG:03-30-18
a. Description. This work consists of furnishing, installing, maintaining, operating and removal of a National Transportation Communications for Intelligent Transportation System Protocol (NTCIP) compliant Portable Changeable Message Sign (PCMS) and control software for the PCMS. The PCMS must be capable of communication via a cellular network with software installed on a State-owned computer and must provide automated PCMS Global Positioning System (GPS) coordinate/location information as noted within this special provision. The PCMS must meet all requirements of sections 812 and 922 of the Standard Specifications for Construction and the MMUTCD and MDOT Portable Changeable Message Sign Guidelines - BOH IM 2011-02, except as modified herein.
1. General.
A. Provide a PCMS that meets all requirements as stated in this special provision;
place the PCMS at the location(s) depicted within the plan set, or as directed by the Engineer; provide software capable of controlling the PCMS; commission the PCMS into the provided software; relocate and/or temporary remove the PCMS for construction phasing; and decommission and remove the PCMS upon completion of the project.
B. Comply with working clearances and dedicated spaces per NEC Articles 110, 384 and 800-5, as well as all current NEC articles, and Federal, State and Local regulations.
C. All equipment and equipment service and any appurtenances to the PCMS are the full responsibility of the Contractor.
D. Provide at minimum, one classroom style training session up to 2 hours, on PCMS operator interface software and field equipment, including but not limited to, posting and removal of messages, diagnosing field equipment malfunctions including messaging and communications errors. Supply all training schedules, syllabus and receive approval by the Engineer prior to delivery of training.
E. MDOT reserves the right to take full messaging control of any PCMS at any time throughout the duration of the project. This includes posting any message determined to be appropriate by MDOT, utilizing the Contractor supplied software and/or the Statewide Advanced Traffic Management System (ATMS) software.
2. Requirements of Regulatory Agencies. Comply with the following codes or standards:
A. Institute of Electrical and Electronic Engineers (IEEE);
OFS:CRB 2 of 6 03-30-18
B. American Association of State Highway and Transportation Officials (AASHTO);
C. American Society of Testing and Materials (ASTM);
D. American Society of Civil Engineers (ASCE);
E. Institute of Electrical and Electronics Engineers (IEEE) 802.3;
F. National Electrical Manufacturers Association (NEMA);
G. National Fire Protection Association (NFPA) 780 - Lightning Protection Code;
H. Lightning Protection Institute (LPI) Standards 175;
I. Underwriters’ Laboratories Standards (UL) 96 and 96A;
J. American National Standards Institute (ANSI) Standard C2;
K. National Transportation Communications for ITS Protocol (NTCIP).
3. Portable Changeable Message Sign (PCMS) Submittals and Documentation. Submit the following:
A. Product data for the PCMS and control software. Within 30 days of contract award or 14 days prior to deployment of PCMS, provide to the Engineer or their representative a list of PCMS that will be utilized on the project, including information necessary to integrate with the MDOT ATMS software. Information required includes, but is not limited to; PCMS and GPS equipment make, model number, communication settings, Internet Protocol (IP) addresses, etc. The Engineer will provide an electronic version of the format and information required for integration. Upon deployment of said devices at anytime prior to final acceptance of the project, inform the Engineer in writing of the specific PCMS device that has been placed in the field in active service or pending active service.
B. An electronic version and at least one printed version of the user manuals for the
PCMS, GPS equipment and control software.
C. Training materials for the PCMS, GPS equipment and control software to be distributed during training.
4. National Transportation Communications for Intelligent Transportation System
Protocol (NTCIP).
A. The PCMS will communicate using the latest accepted NTCIP standards at the time of bidding, including all accepted amendments.
B. The PCMS will conform to NTCIP Standard 2101 for direct communication and
NTCIP Standard 2104 for Ethernet communication.
C. All mandatory objects that are required by NTCIP 1203, whether or not they are specifically noted within this special provision, are required.
OFS:CRB 3 of 6 03-30-18
b. Materials.
1. Portable Changeable Message Sign (PCMS).
A. Provide a PCMS consisting of a Light Emitting Diode (LED) display, controller, solar/battery equipment and power supply, GPS equipment, and cellular service with a minimum data plan of 20 megabytes per month (MB/mo.), all mounted on a heavy duty towable trailer in accordance with subsections 922.07.C.5 and 922.07.C.6 of the Standard Specifications for Construction.
B. Portable Changeable Message Sign (PCMS) Display.
(1) The display must be capable of displaying at least 3 lines of text, with at least
8 characters on each line. The display may be a full-matrix, line-matrix, or character-matrix design.
(2) When displaying 18 inch characters, the display will be legible between distances of 200 to 1,000 feet, with a 20 degree LED viewing angle for both day and night operations. All 20 degree LEDs will have a nominal viewing cone angle of 20 degrees with a half-power angle of 10 degrees measured from the longitudinal axis of the LED.
(3) The display will be rainproof and use materials that resist degradation due to exposure to ultraviolet (UV) light.
(4) Fonts.
(a) The PCMS must be pre-loaded with at least the following fonts:
(i) 18 inch standard.
(b) The PCMS must display:
(i) All upper case letters;
(ii) Up to three lines of text per sign;
(iii) All numerals 0 to 9.
(c) The message must not scroll or move across the display.
(5) Display Brightness. The PCMS must automatically adjust the display brightness based on lighting conditions to maintain legibility to motorists at all times.
(6) In the event of a malfunction, the PCMS will default to a blank message.
C. Power.
(1) The PCMS must utilize a power source in accordance with subsection
922.07.C.5 of the Standard Specifications for Construction and that is pre-approved by the Engineer.
OFS:CRB 4 of 6 03-30-18
(2) The power source must be able to continuously display a message of at least
24 characters, 24 hours per day, 7 days per week, for the duration that the PCMS is deployed in the field.
2. Software.
A. Provide the Engineer with computer software that will allow control of the PCMS from a remote location. The control software must, at a minimum, allow a trained user to display a message on the PCMS, clear a message, schedule messages for a specific date and time, observe the current message and PCMS status, and alert the user of any detected errors.