About this file
This is a Request for Proposal (RFP) issued by the Missouri Department of Transportation (MoDOT) under the Missouri Highways and Transportation Commission (MHTC) for exterior structural repair and interior architectural rehabilitation of a 5,000 square foot single-level office building located in SE Poplar Bluff, Missouri. The scope of work includes installation of steel underpinning piles around the building perimeter (minimum bearing capacity of 20,000 pounds per pile), polyjacking of the entire floor slab, and repair or replacement of interior elements such as drywall, ceiling tiles, windows, doors, and flooring. Offerors must conduct a mandatory site visit scheduled for June 26, 2025, between 10:30 a.m. and 12:30 p.m., with advance registration required by June 24, 2025. The proposal submission deadline is July 29, 2025, at 2:00 p.m. Central Time, with anticipated award notification on August 15, 2025. The contract period extends from the date of full execution through May 15, 2026, with no renewal options available. The successful contractor must also provide a post-lift settlement monitoring plan to be implemented every six months for a three-year period.
Pricing is submitted as a lump sum firm fixed price with payment terms of Net 45 days. A 5 percent proposal bond is required, along with a contract bond equal to the full contract price. The contractor must comply with Missouri prevailing wage requirements as outlined in the Annual Wage Order #31 for Butler County, with penalties of $500 per day per worker for non-compliance. All contractors and subcontractors must provide proof of OSHA 10-hour construction safety training and maintain insurance including General Liability (minimum $600,000 per person/$4,000,000 aggregate), Business Automobile Liability (minimum $600,000 per person/$4,000,000 aggregate), and Missouri Workers' Compensation coverage with $1,000,000 employer's liability. Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) participation is encouraged (10 percent MBE and 5 percent WBE targets). Contractors must comply with federal work authorization requirements, including E-Verify enrollment, and must meet Missouri requirements for registration with the Secretary of State and transient employer certification if applicable. Evaluation of proposals will be conducted using a multiattribute scoring method with maximum points allocated as follows: Experience, Expertise and Reliability (15 points), Proposed Method of Performance (25 points), Schedule and Timeline (10 points), Proposed Fee (40 points), and Post-Lift Settlement Monitoring and Service Agreement (10 points).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (RFP) MODOT-FY25-0175-SL,3
If you have any questions, please contact:
Procurement Entity State of Missouri
Buyer MICHAEL YODER Location
Phone Fax
E-mail MICHAEL.YODER@MODOT.MO.GOV
State of Missouri
Missouri Department of Transportation
Responses are preferred to be submitted electronically via MissouriBUYS, powered by MOVERS.
ATTENTION:
1. After reviewing the solicitation, the vendor must complete and return all necessary exhibits.
2. Due to lead times for obtaining the information needed to complete the various Business Compliance
Exhibits herein as explained in the solicitation's Supplier Response Exhibits, suppliers are encouraged to IMMEDIATELY begin securing these verifications.
3. The supplier must be registered in MissouriBUYS (Powered by MOVERS) to be considered for contract award.
INSTRUCTIONS:
1. From the Table of Contents on the left-hand side of this screen, navigate to the Contract Terms section and click the Download Contract button to review the solicitation terms in its entirety.
2. Navigate to the Lines and Requirements sections to review and download any available attachments.
3. Click Create Response to enter your response.
Table of Contents
1 Overview
1.1 General Information
1.2 Schedule
1.3 Additional Information
1.4 Solicitation Controls
1.5 Terms
1.6 Attachments
2 Lines
2.1 Line Information
2.2 Line Details
2.2.1 Line 1
3 Appendix: Alternate Lines
3.1 Instructions for Alternate Lines
3.2 Alternate Lines Template
4 Contract Terms
1 Overview
1.1 General Information
Title SE Poplar Bluff Building Rehabilitation
Synopsis This Request for Proposal (RFP) seeks proposals from qualified Offerors for the exterior structural repair of a 5,000 square foot single-level office building.
Additionally, interior architectural elements such as, but not limited to drywall ceiling tiles, windows, doors, flooring, etc. are to be repaired and or replaced within this project package. MoDOT will receive proposals electronically through MissouriBUYS or via mail, UPS, or FEDEX. It is required the Offerors contact the buyer of record, Michael.Yoder@modot.mo.gov five (5) business days before the proposal closes, if the Offerors intend to submit a hard copy proposal. Proposals will not be accepted by email.
Amendment Date 07/16/2025 8:34 AM Amendment Description Questions and Answers, Extending proposal closing date to 7/29/2025
Buyer MICHAEL YODER Outcome Blanket Purchase Agreement
E-Mail MICHAEL.
YODER@MODOT.MO.
GOV
1.2 Schedule
Close Date 07/29/2025 3:00 PM Open Date 06/13/2025 10:00 AM Time Zone Central Time
1.3 Additional Information
Pre-Bid/Pre-Proposal Conference Date and Time 00+00:00
Pre-Bid/Pre-Proposal Conference Location Tour Date and Time 00+00:00
Tour Location Tour Contact Name
Tour Contact Phone # Tour Contact Email
1.4 Solicitation Controls
Response Visibility Sealed
Lines Settings Rank Indicator No indicator displayed
Ranking Method Multiattribute scoring
1.5 Terms
Agreement Start Date Agreement End Date Agreement Amount
(USD)
Minimum Release
Amount (USD) Payment Terms Net 45 Freight Terms
Shipping Method FOB Solicitation Currency USD (US Dollar)
Price Precision 2
1.6 Attachments
File Name or URL Type Description Exhibit 4 - Proposal Bond.pdf File Exhibit 3 - Anti-Descriminatio File Exhibit 2 - AffidavitofLawfulP File Exhibit 1 - AnnualWorkerEligib File Attachment D - AWO31.pdf File Attachment C - MoDot Architect File Attachment B - MoDOT Poplar Bl File Attachment A - SE Poplar Bluff File Exhibit 4 - Proposal Bond Upda File
2 Lines
2.1 Line Information
Line Estimated Quantity
UOM Response Price
Line Amount
Response Minimum
Release Amount
1-SE Poplar Bluff Building Rehabilitation
LUM
P
SUM
2.2 Line Details
2.2.1 Line 1 SE Poplar Bluff Building Rehabilitation
To provide an alternate line, see appendix.
Category Name 72152710 -
FOUNDATION AND
FOOTING
CONSTRUCTION
SERVICE
Item Revision Allow Alternate Lines Yes Alternate Line Provided Yes No
Target Minimum Release Amount (USD)
Start Price (USD)
3 Appendix: Alternate Lines
3.1 Instructions for Alternate Lines
Alternate lines are allowed for some solicitation lines. For these lines, you can propose one or more alternatives by entering information for each alternate line in the format given below. Print and insert multiple copies as per your requirement.
3.2 Alternate Lines Template
Solicitation Line (Number and description of the solicitation line for which you have an alternative)
Example:1-xxxxxx where xxxxxx is the line description of first solicitation line.
Alternate Line Number (Enter only numbers in sequence starting with 1 for every alternate line)
Alternate Line Description
Response Price (For a solicitation line with cost factors, enter your line price in the cost factors table)
Response Minimum Release Amount
Note to Buyer
4 Contract Terms
MODOT-FY25-0175-SL,3
Contract Terms and Conditions
1. MODOT RFP STANDARD PROPOSAL PROVISIONS
1.1. Solicitation Authority
1.2. Proposals to be Submitted by Officer or Employee
1.3. MHTC Rights Reserved
1.4. Personal Privacy Protection Act Notification
2. MODOT RFP PROPOSAL CERTIFICATION
2.1. Fee Proposal
2.2. Offeror's Certifications
3. MODOT RFP GENERAL DESCRIPTION AND BACKGROUND
3.1. General Description
3.2. Background
3.3. Contract Period
3.4. Renewal Period
3.5. Schedule of Events
3.6. Mandatory Site Visit
3.7. Written Questions
3.8. Liquidated Damages
3.9. Construction Safety Program
4. MODOT RFP SCOPE OF WORK AND SPECIFIC SERVICES
4.1. Scope of Work
4.2. Specific Services
4.3. Prevailing Wage
5. MODOT RFP REQUIRED ELEMENTS OF PROPOSAL AND SUBMISSION
5.1. Required Elements of Proposal
Required Elements of Proposal
5.1.1. Experience, Expertise and Reliability
5.1.2. Proposed Method of Performance
5.1.3. Schedule and Timeline
5.1.4. Proposed Fee
5.1.5. Post-Lift Settlement Monitoring and Service Agreement
5.1.6. References
5.1.7. Proposal Evaluation
5.2. Submission of Proposals
5.2.1. Electronic Proposal Format
5.2.2. Hard Copy Proposal Format
5.2.3. Signatures
5.2.4. Pricing
5.2.5. Proposal Life
5.2.6. Submission of All Information Required
5.2.7. Public Inspection
5.2.8. Clarification of Requirements
5.2.9. Initial Screening
5.2.10. Official Position of MHTC
6. MODOT RFP EVALUATION FACTORS AND PROCESS
6.1. Evaluation Factors
6.1.1. Evaluation Criteria
6.1.2. Historic Information
6.1.3. Responsibility to Submit Information
6.1.4. Proposal Review Evaluation
7. MODOT RFP TERMS AND CONDITIONS
7.1. Agreement Components
7.2. RFP Contact
7.3. Assignment
7.4. Amendments
7.5. Disputes
7.6. Successors and Assigns
7.7. Sole Beneficiary
7.8. Cancellation of Resulting Agreement
7.9. Bankruptcy
7.10. Status of Independent Contractor
7.11. Subcontractor
7.12. MBE/WBE Participation Encouraged
7.12.1. Offeror's Responsibility Unconditional
7.12.2. Affirmative Action Program
7.13. Nondiscrimination
7.14. Executive Order
7.14.1. Incorporation of Provisions
7.14.2. Failure to Comply
7.14.3. Offeror's Certification
7.15. Non-employment of Unauthorized Aliens
7.15.1. Enrollment in Federal Work Authorization Program
7.15.2. Annual Worker Eligibility Affidavit
7.16. Proof of Lawful Presence for Sole Proprietorships and Partnerships
7.17. Requirements to do Business in Missouri
7.17.1. Registration with Secretary of State
7.17.2. Transient Employer Certificate
7.18. Law of Missouri to Govern
7.19. Venue
7.20. Ownership of Records
7.21. Release to Public/Confidentiality
7.22. Prohibition Against Kickbacks and Gratuities/Non-solicitation
7.23. Conflict of Interest
7.24. Audit of Records
7.25. Indemnification
7.26. Insurance
7.27. Section Headings
7.28. Severability
7.29. No Adverse Inference
7.30. Anti-Discrimination Against Israel Act Certification
7.31. Drug Free Workplace
7.32. Bonding
8. ADDENDUMS
8.1. Addendum 001
8.2. Addendum 002
8.3. Addendum 003
VENDOR RESPONSIBILITY
The vendor is solely responsible for ensuring timely submission of their solicitation response. Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.
The State of Missouri's Privacy Policy can be accessed here.
VENDOR'S INSTRUCTIONS
Submission of Proposals
Vendors should complete and attach all applicable exhibits.
MODOT SECTION NUMBERING
Section Numbering
All section numbering contained in this solicitation is for the convenience of reference only and is not intended to define or limit the scope of any provision of this solicitation and may not be sequential.
SOLICITATION REQUIREMENTS
Instructions for Submitting a Response
The Missouri Department of Transportation advertises all bid solicitation documents on the MissouriBUYS Bid Board (https://www.missouribuys.mo.gov). MissouriBUYS is the State of Missouri's web-based statewide eProcurement system. To respond electronically to a solicitation, the vendor must first register with MissouriBUYS by going to the MissouriBUYS Home Page (https://missouribuys.mo.gov), clicking the "Supplier Register" button at the top of the page, and completing the Vendor Registration.
IMPORTANT NOTICE TO ALL VENDORS:
The Missouri Department of Transportation prefers receipt of all bid responses as electronic submissions. Hard copy submissions may be permitted based on the circumstances and content of the relevant solicitation with the approval of the buyer five (5) business days prior to the solicitation close date.
The solicitation as it appears digitally on the MissouriBUYS website is the official document of record. It is incumbent on the Vendor to inspect and ensure any downloaded or printed version of https://www.mo.gov/privacy-policy/ the solicitation contains all information, terms and conditions contained in the solicitation as it appears digitally on the MissouriBUYS website. In the event of any dispute regarding the contents of the solicitation, the solicitation as it appears digitally on the MissouriBUYS website shall take precedence and priority over any other downloaded or printed version of the solicitation.
The vendor is solely responsible for ensuring timely submission of their solicitation response.
Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.
1. MODOT RFP STANDARD PROPOSAL PROVISIONS
1.1. Solicitation Authority
The solicitation for the procurement of services referenced therein, is being issued under, and governed by, the provisions of Title 7 Missouri Department of Transportation, Division 10 Missouri Highways and Transportation Commission, Chapter 11 Procurement of Supplies, of the Code of State Regulations. The Missouri Highways and Transportation Commission (MHTC/Commission), acting by and through its operating arm, the Missouri Department of Transportation (MoDOT), draws the Offeror's attention to said 7 CSR 10-11 for all the provisions governing solicitation and receipt of proposals and the award of the contract pursuant to this solicitation.
1.2. Proposals to be Submitted by Officer or Employee
All proposals must be submitted by a responsible officer or employee of the firm. Obligations assumed by such submission must be fulfilled.
1.3. MHTC Rights Reserved
MHTC reserves the right to reject any and all proposals for any reason whatsoever. Time is of the essence for responding to the RFP within the submission deadlines.
1.4. Personal Privacy Protection Act Notification
MHTC and MoDOT comply with all provisions in the Personal Privacy Protection Act found in section 105.1500, RSMo, and follow practices to keep confidential and sensitive information secure. Bidders acknowledge that submission of information is voluntary and that MHTC is not asking or requiring the submission of "personal information" as defined in the act. By submitting a bid, Bidders and Contractors agree to not to bring a suit against MHTC, or any employees, under section 105.1500, RSMo.
2. MODOT RFP PROPOSAL CERTIFICATION
2.1. Fee Proposal
The Offeror shall provide a fee proposal to MHTC in accordance with the terms of this Request for Proposal (RFP). All services shall be performed at the fees offered and in accordance with the terms of this RFP.
2.2. Offeror's Certifications
By submission of the proposal, each Offeror, and in the case of a joint proposal, each party thereto as to its own organization, under penalty of perjury, certifies to the best of its knowledge and belief:
1. The prices in this proposal have been arrived at independently without collusion, consultation, communication or agreement for the purpose of restricting competition, as to any matter relating to such prices with any other Offeror or any competitor.
2. Unless otherwise required by law, the proposed prices have not been knowingly disclosed by the Offeror prior to the opening, directly or indirectly, to any other Offeror or to any competitor.
3. No attempt has been made or will be made by the Offeror to induce any other person, partnership or corporation to submit or not to submit a proposal for the purpose of restricting competition.
4. The Offeror certifies this proposal is made without any connection with any other person, firm, organization or business entity making a proposal for the same purpose, and is in all respects fair and without collusion or fraud, and that no elected official or other member, officer or employee or person whose salary is payable in whole or in part from the MHTC/MoDOT is directly or indirectly interested therein, or in any portion of the profits thereof.
3. MODOT RFP GENERAL DESCRIPTION AND BACKGROUND
3.1. General Description
This document constitutes a RFP from prospective qualified Offerors to provide SE Poplar Bluff Building Rehabilitation to the MHTC, as set forth in this RFP. It is the intent of this RFP to have the successful Offeror enter into an Agreement with MHTC (hereinafter Resulting Agreement), to supply said services as outlined herein.
3.2. Background
MoDOT operates as a customer focused and results driven, state agency under a decentralized organization structure with headquarters in Jefferson City, Missouri and is governed by the MHTC, a six (6) member Commission appointed by the Governor. The Central Office provides oversight and support to seven
(7) geographical districts primarily responsible for delivery of MoDOT's mission and tangible results. Each district contains approximately fifteen percent (15%) of the total road mileage in the state highway system.
MoDOT employs approximately five thousand one hundred (5,100) full-time employees. About eighty percent (80%) of those employees work in the seven (7) districts with the remainder working in the various divisions within the Central Office facility.
3.3. Contract Period
The Contract Period for the performance of the services described in this RFP is from the date of the fully executed Resulting Agreement through May 15, 2026. The successful Offeror shall perform any and all the services listed herein as often as requested by MHTC for the entire duration of the Contract Period as defined herein at the Guaranteed-Not-To-Exceed Prices submitted by the successful Offeror in response to this RFP.
3.4. Renewal Period
There are no renewal options for this RFP.
3.5. Schedule of Events
Below is the schedule that will be followed. Unless otherwise specified, the time of day will be 7:30 a.m.
to 4:00 p.m. Central Time. MHTC reserves the right at its sole discretion to expand this schedule, as deemed necessary, without any notification except for the deadline date for submitting a proposal.
1. June 13, 2025 - Issuance of RFP.
2. June 26, 2025 - Site visit for Offerors.
3. July 3, 2025 - Deadline for Offerors to submit written questions and requests for clarification to the RFP Buyer of Record.
4. July 10, 2025 - Issuance of Amendment with resolution to any questions submitted.
5. July 22, 2025 - Deadline for submission of proposals and scheduled public reading of firm names of proposals received.
6. August 15, 2025 - Anticipated Notification of Award.
3.6. Mandatory Site Visit
Site visit is mandatory for any Offeror to submit a proposal in response to this RFP. Site visits will be held June 26, 2025, between the hours of 10:30 a.m. and 12:30 p.m. Offerors interested in this project must schedule a site visit by appointment only by contacting Tammy Young at tammy.young@modot.mo.gov prior to close of business Tuesday June 24, 2025.
3.7. Written Questions
Any and all questions regarding specifications, requirements, competitive procurement process, or other questions must be directed to the buyer of record, Michael Yoder, at (573) 526-7929 (phone) or Michael.
Yoder@modot.mo.gov (email). All written questions must be addressed to Michael Yoder no later than 3:
00 p.m. Central Time, July 3, 2025. MoDOT will issue an addendum to all questions for Offerors to retrieve at the MissouriBUYS website, https://missouribuys.mo.gov/. It is the Offerors sole responsibility to check the website for any and all addenda throughout the procurement process.
3.8. Liquidated Damages
In the event the successful Contractor fails to complete the scope of work in the time specified, and in accordance with plans, specifications, and addenda, the Department and the public will sustain damages because of such delay in delivery, the exact extent of which would be difficult to ascertain, and in order to liquidate such damage in advance it is agreed that the sum of $700 per day, for each assessable calendar day on which the delivery has not been completed, is reasonable and the best estimate which the parties can arrive at as liquidated damages, and it is therefore agreed that said amount will be withheld from payments due the Contractor or otherwise collected from the Contractor as liquidated damages. Saturdays, Sundays, holidays and days whereas the Department has suspended work shall not be assessable days.
3.9. Construction Safety Program
Missouri law, 292.675 RSMo, requires the awarded Contractor and its subcontractor(s) to provide a ten-hour occupational safety and health administration (OSHA) construction safety program (or a similar program approved by the Missouri Department of Labor and Industrial Relations as a qualified substitute) mailto:tammy.young@modot.mo.gov https://missouribuys.mo.gov/.
for their onsite employees (laborers, workmen, drivers, equipment operators, and craftsmen) who have not previously completed such a program and are directly engaged in actual construction of the improvement (or working at a nearby or adjacent facility used for construction of the improvement). The Contractor and its subcontractor(s) shall require all such employees to complete this ten-hour program, pursuant to 292.675 RSMo, unless they hold documentation on their prior completion of said program. Penalties for noncompliance include Contractor forfeiture to the Commission in the amount of $2,500, plus $100 per contractor and subcontractor employee for each calendar day such employee is employed beyond the elapsed time period for required program completion under 292.675 RSMo.
1. The Contractor shall provide proof of OSHA 10 for all employees of the Contractor or subcontractor, along with a current State or Federally approved photo ID to the MoDOT Facility Representative for each employee before any work can be conducted on MoDOT property.
2. The Contractor shall provide the name and phone number of the Contractor's employee or agent who is in charge onsite to the MoDOT Facility Representative; this individual must be able to be contacted in case of emergency. The Contractor must be able to furnish names and address of all employees upon request.
3. The Contractor shall establish regular working hours with the MoDOT Facility Representative prior to any work being performed on site. The Contractor must report changes in working hours or overtime to the MoDOT Facility Representative and obtain approval twenty-four (24) hours ahead of time. The Contractor shall report emergency overtime to MoDOT Facility Representative as soon as it is evident that overtime is needed. The Contractor must obtain approval from MoDOT Facility Representative for all work performed after dark.
4. MODOT RFP SCOPE OF WORK AND SPECIFIC SERVICES
4.1. Scope of Work
The Missouri Department of Transportation is seeking a Request for Proposal (RFP) for the exterior structural repair of a 5000 square foot single-level office building. Additionally, interior architectural elements such as, but not limited to drywall ceiling tiles, windows, doors, flooring, etc. are to be repaired and or replaced within this project package. The exterior work must consist of installing steel underpinning piles around the perimeter of the building, as shown on the attached plans. The piles must achieve a minimum bearing capacity of 20,000 pounds per pile. The awarded contractor must provide drill logs and samples of deleterious material to confirm the soil/aggregate type at each numbered pile location. The contractor must also provide samples to confirm the depth to bedrock that is attained at each numbered location.
The contractor must polyjack the entire floor slab. The polyjacking of the floor must be coordinated with leveling of the building. This is necessary to avoid more damage to the floor. Once the building has been stabilized and brought to level condition, the contractor can commence on repair/replacement of interior architectural finishes in the building. The awarded contractor shall provide detailed photographs during the entire scope of the project.
The awarded contractor shall provide a proposal for a post-lift settlement monitoring plan that will be implemented at least every six (6) months for a three-year period.
All improvements and modifications shall be made in accordance with the Project Documents See attachments MoDOT Poplar Bluff Geotech, MoDOT Architectural Report 241104, SE Poplar Bluff Project Office Final Plans.
4.2. Specific Services
The Offerors agree to perform specific services within the above stated scope of work to include, but not be limited to the following:
1. The Offeror shall provide all personnel, supervision, administrative and technical support and reporting, labor, subcontractors, tools, transportation, materials, supplies and equipment; and shall plan, schedule, coordinate, perform and assure effective completion of all services and needs described in this RFP.
2. It is the Offerors' responsibility to inspect the site prior to submission of proposal.
4.3. Prevailing Wage
The work to be performed under this solicitation is governed by the provisions of Chapter 290 RSMo, as amended, related to prevailing wages to be paid on public works, as applicable, depending on the type of work being performed.
1. If the proposal is accepted, the Offeror will be required to comply with the prevailing wages as fixed by the Missouri Department of Labor and Industrial Relations, in effect as of the date of the issuance of the solicitation, for each affected craft and type of workmen in the following county (ies): Butler. The Annual Wage Order #31, for each affected county, is attached to the RFP as Attachment D - AWO31. Pursuant to the requirements of Chapter 290 RSMo., not less than the prevailing hourly rate of wages, as set out in the wage order attached to and made part of the specification for work under the contract, must be paid to all workers performing work under the contract.
2. The Offeror shall provide all information, reports and other documentation as required by MHTC to ensure compliance with Chapter 290 RSMo., as amended, relating to prevailing wages to be paid on public works.
3. The Offeror shall forfeit a penalty to the contracting public body of $500 per day (or portion of a day) for each worker that is paid less than the prevailing rate for any work done under the contract by the Offeror or by any subcontractor subject to prevailing wages.
5. MODOT RFP REQUIRED ELEMENTS OF PROPOSAL AND SUBMISSION
5.1. Required Elements of Proposal
Required Elements of Proposal
Each Offeror shall provide a cover letter signed by an authorized firm representative stating he/she has read and understands all of the terms and conditions of doing business with MHTC in response to this request for proposal. The proposal must be divided into sections corresponding to the list of elements described below.
5.1.1. Experience, Expertise and Reliability
With regard to documenting its experience, expertise, and reliability in performing the requested services, the Offeror must provide information related to previous and current contractual relationships considered identical or similar in scope to the one anticipated to result between
MHTC and the successful Offeror pursuant to this RFP. At a minimum, the following information must be provided:
1. Name, address, telephone number of contracting agency/entity, and a contact person who can verify all data submitted.
2. Contract dates.
3. A brief, written description of the specific services provided, methods used, and the results associated with the specific services provided.
4. List of any pending legal action(s) involving your firm that could directly or indirectly impact the services provided to MHTC.
5. Relevant credentials of personnel responsible for monitoring, sampling, analysis, and reporting.
5.1.2. Proposed Method of Performance
Each Offeror must present a written narrative demonstrating the method and/or manner in which it proposes to satisfy the requirements of this RFP. The language of the narrative shall be straightforward and limited to facts, solutions to the problems, and plans of proposed action as well as the timeline for completion of proposed action. Offerors must provide technical approach and construction methodology for all aspects of scope of work. Offeror must provide detail of monitoring methodology including frequency, duration, sensor types, sampling and data collection process of lifting process. Offerors must identify any portion of the scope of work to be completed by a subcontractor.
1. By reading the proposal, MHTC must be able to gain a comfortable grasp of the services to be provided, and the methods proposed by the Offeror to provide them. A detailed explanation should be included to understand how the services comply with the requirements of this RFP.
2. In order to show feasibility, a timetable setting forth appropriate milestones shall be included in Offerors proposal, with sufficient detail explaining how the Offeror will meet those timelines/milestones.
5.1.3. Schedule and Timeline
Each Offeror must provide detailed information documenting the proposed schedule and timeline.
Offeror must outline expected duration of the project in calendar days. The Offeror must outline proposed phasing, coordination, and mitigation strategies to minimize disruption and ensure optimal business continuity.
5.1.4. Proposed Fee
The Offerors must complete the pricing information to this RFP as specifically directed therein.
5.1.5. Post-Lift Settlement Monitoring and Service Agreement
The Offerors shall include any warranty terms and conditions. If the Offeror includes any type of service agreement service agreement should include service rate, response time and time length.
5.1.6. References
Provide all references for which the Offeror firm provided services which are similar in nature to the services requested in this proposal over the past three (3) calendar years. MHTC reserves the right to determine which references to call and whether or not to call all references for all Offerors. The reference list should include:
1. The reference firm name, address, telephone number, and fax number.
2. List of reference firm owners names and addresses.
3. A brief description of services provided and location of work performed.
4. Dates of contract and/or performance of service.
5. A contact person familiar with the services provided including their name, address, email address and telephone number.
5.1.7. Proposal Evaluation
The proposals will be evaluated based on the adequacy of the Offeror's response in addressing each of the Required Elements of the Proposal listed above as well as any other evaluation methods referenced in this RFP.
5.2. Submission of Proposals
5.2.1. Electronic Proposal Format
If an Offeror (referred to here as registered vendor or vendor) is responding electronically through the MissouriBUYS System website, in addition to completing the on-line pricing, the registered vendor should submit completed exhibits, forms, and other information concerning the proposal as an attachment to the electronic proposal. The registered vendor is instructed to review the RFP submission provisions carefully to ensure they are providing all required pricing, including applicable renewal pricing. Instructions on how a registered vendor responds to a bid on-line are available on the MissouriBUYS System website at: https://missouribuys.mo.gov/bidboard.html.
In the event that the vendor is an agency of state government or other such political subdivision which is prohibited by law or court decision from complying with certain provisions of an RFP, such vendor may submit a proposal which contains a list of statutory limitations and identification of those prohibitive clauses. The vendor should include a complete list of statutory references and citations for each provision of the RFP, which is affected by this paragraph. The statutory limitations and prohibitive clauses may (1) be requested to be clarified in writing or (2) be accepted without further clarification if the statutory limitations and prohibitive clauses are deemed acceptable. If MHTC determines clarification of the statutory limitations and prohibitive clauses is necessary, the clarification will be conducted in order to agree to language that reflects the intent and compliance of such law and/or court order and the RFP.
1. The exhibits, forms, and Pricing Page(s) provided herein can be saved into a word processing document, completed by a registered vendor, and then sent as an attachment to the electronic submission. Other information requested or required may be sent as an attachment. Additional instructions for submitting electronic attachments are on the MissouriBUYS System website. Be sure to include the solicitation/opportunity (OPP) number, company name, and a contact name on any electronic attachments. Electronic copies of the proposal and electronic attachments should be searchable.
2. In addition, a registered vendor may submit the exhibits, forms, Pricing Page(s), etc., through mail or courier service. However, any such submission must be received prior to the specified end date and time.
3. If a registered vendor submits an electronic and hard copy proposal response and if such responses are not identical, the vendor should explain which response is valid. MHTC will consider the response with the terms most favorable to MHTC.
5.2.2. Hard Copy Proposal Format
If the vendor is submitting a proposal via the mail or a courier service or is hand delivering the proposal, the vendor should include completed exhibits, forms, and other information concerning the proposal (including completed Pricing Page(s) with the proposal. The vendor is instructed to review the RFP submission provisions carefully to ensure they are providing all required pricing, including applicable renewal pricing.
1. The proposal should be page numbered and the signed page one from the original RFP and all signed addendums should be placed at the beginning of the proposal.
2. The vendor should include one (1) original proposal. The front cover of the original proposal should be labeled original.
5.2.3. Signatures
Any form containing a signature line in this RFP and any amendments, pricing pages, etc., must be manually signed and returned as part of the proposal.
5.2.4. Pricing
The Offeror is required to specify the pricing associated with this RFP as a firm fixed price. The successful Offeror will be responsible for performing all services listed in this RFP at the prices submitted. MHTC will not be liable for any charges beyond those detailed in the proposal.
1. MHTC shall not make any payment to the successful Offeror in advance of the services rendered by the successful Offeror.
2. Each Offeror is responsible for its own expense in preparing, delivering or presenting a proposal, and for subsequent interviews or negotiations with MHTC, if any, as provided for in this RFP.
5.2.5. Proposal Life
The Offeror must include a statement in the proposal that indicates the length of time during which MHTC may rely on all proposal commitments. All proposals made in response to this RFP and quoted pricing must remain in effect for a period of not less than 90 days after the date for proposal submission. Any proposal accepted by MHTC for the purpose of contract negotiations shall remain valid until superseded by a contract or until rejected by MHTC.
5.2.6. Submission of All Information Required
The Offerors must respond to this RFP by submitting all the information required herein for its proposal to be evaluated and considered for award. Failure to submit all the required information shall be deemed sufficient cause for disqualification of a proposal from consideration.
5.2.7. Public Inspection
The Offerors are hereby advised that all proposals and the information contained in or related thereto are subject to Missouri Open Records Act and after contract award and execution of the Resulting Agreement shall be open to public inspection and may be viewed and copied by any member of the public; therefore, MHTC does not assume any responsibility whatsoever in the event that such information is used or copied by individual persons or organizations.
1. Offerors claiming a statutory exception to the Missouri Open Records Act must clearly identify any confidential documents. The Offeror must also specify which statutory exception provision applies. MHTC reserves the right to make determinations of confidentiality. If MHTC does not agree that the information designated is confidential under one of the disclosure exceptions to the Missouri Open Records Act, it may either reject the proposal or discuss its interpretation of the allowable exceptions with the Offeror. If agreement can be reached, the proposal will be considered. If agreement cannot be reached, MHTC will remove the proposal from consideration for award and return the proposal to the Offeror.
2. MHTC will not consider prices to be confidential information.
3. The Offeror must submit its proposal based on the conditions contained in this paragraph without reservations.
5.2.8. Clarification of Requirements
It shall be the Offerors responsibility to ask questions, request changes or clarification, or otherwise advise MHTC/MoDOT if any language, specifications or requirements of the RFP appear to be ambiguous, contradictory, and/or arbitrary, or appear to inadvertently restrict or limit the requirements stated in the RFP to a single source.
1. Any and all communication from Offerors regarding specifications, requirements, competitive proposal, etc., must be directed to the RFP Contact listed herein, unless the RFP specifically refers the Offerors to another contact. Such communication shall be received by the date noted in the Schedule of Events.
2. Every attempt will be made to ensure that the Offeror receives an adequate and prompt response. However, in order to maintain a fair and equitable proposal process, all Offerors will be advised, via the issuance of an addendum to the RFP, of any relevant or pertinent information related to the procurement. Therefore, Offerors are advised that unless specified elsewhere in the RFP, any questions received after the listed date may not be answered.
5.2.9. Initial Screening
After an initial screening of the written proposals, any, or all of the Offerors submitting a proposal in response to this RFP may be required to give an oral presentation of their proposal. Additional technical information may be requested for clarification purposes, but in no way to change the original written proposal submitted. MHTC reserves the right, in its sole discretion, to decide to conduct interviews with any or all of the Offerors. MHTC reserves the right, in its sole discretion, to determine the interview method, format and location. If an interview is conducted, it is preferred that the interviewed Offeror's personnel to be assigned to the work, as well as key representatives, be present at and participate in the interview.
5.2.10. Official Position of MHTC
Offerors are cautioned that the only official position of the MHTC and MoDOT is that which is issued by MHTC in the RFP or an amendment thereto. No other means of communication, whether oral or written, shall be construed as a formal or official response or statement.
6. MODOT RFP EVALUATION FACTORS AND PROCESS
6.1. Evaluation Factors
The following factors shall be considered in the evaluation of the proposals:
6.1.1. Evaluation Criteria
Any agreement for services resulting from this RFP shall be awarded to the Offeror providing the best proposal to MHTC. After determining responsiveness, proposals will be evaluated in accordance with the following criteria and maximum points per each criterion:
1. Experience, Expertise and Reliability - 15 Maximum Points
2. Proposed Method of Performance - 25 Maximum Points
3. Schedule and Timeline - 10 Maximum Points
4. Proposed Fee - 40 Maximum Points
1. The evaluation of cost will be conducted using a scale of forty (40) possible points and the following formula:
Lowest Offeror's Price/Compared Offeror's Price x 40 points = Cost Points
5. Post-Lift Settlement Monitoring and Service Agreement - 10 Maximum Points
6.1.2. Historic Information
MHTC reserves the right to consider historic information and facts, whether gained from the Offeror's proposal, presentations or interviews as applicable, references, or other sources, including but not limited to the listed subcontractors, in the evaluation process.
6.1.3. Responsibility to Submit Information
Each Offeror is cautioned that it is the Offeror's sole responsibility to submit information related to the evaluation criteria and MHTC is under no obligation to solicit such information if it is not included with the Offeror's proposal. Failure of the Offeror to submit such information may cause an adverse impact on the evaluation of the Offeror's proposal.
6.1.4. Proposal Review Evaluation
MHTC will select a group of individuals to comprise the proposal review team. MHTC may, in its sole discretion, form a subgroup of the proposal review team, consisting of one or more team members, to comprise a separate proposal evaluation team that would be responsible for evaluating proposals with regard to compliance with RFP requirements. All evaluation team members will use the evaluation criteria stated in this RFP and present the evaluations to the review team for further action in the proposal evaluation and contract award process. If MHTC opts to not create a separate subgroup proposal evaluation team, the proposal review team shall also act as the proposal evaluation team.
7. MODOT RFP TERMS AND CONDITIONS
7.1. Agreement Components
The Resulting Agreement between MHTC and the successful Offeror shall incorporate by reference as its components the following: the RFP and any written amendments thereto and the proposal submitted by the successful Offeror in response to the RFP. In case of a conflict between or inconsistency in the terms contained in the RFP and the proposal submitted by the Offeror in response to the RFP, the terms of the RFP shall govern. In the event of a conflict between or inconsistency in the terms of the RFP and the Resulting Agreement, the terms of the Resulting Agreement shall govern. MHTC reserves the right, in its sole discretion, to clarify any relationship in writing and such written clarification shall govern in case of any conflict with or inconsistency in the applicable requirements stated in the RFP and the successful Offeror's proposal.
7.2. RFP Contact
The General Services Facility Supervisor is designated as MHTC's representative with authority to act on behalf of MHTC for the purpose of administering the Resulting Agreement. MHTC's representative may designate by written notice other persons having the authority to act on behalf of MHTC in furtherance of the performance of the Resulting Agreement. Each Offeror shall fully coordinate its activities with the designated representative and shall consult the MHTC representative regarding any problem arising out of the provision of the services to the MHTC pursuant to this RFP and the Resulting Agreement. As the work of the successful Offeror progresses, advice and information on matters covered by the Resulting Agreement shall be made available by the successful Offeror to the designated representative throughout the effective period of the Agreement. MHTC reserves the right to limit the authority of MHTC's representative provided herein as it deems necessary in its sole discretion at any time and from time to time throughout the duration of the RFP process and the Contract Period.
7.3. Assignment
The successful Offeror shall not assign, transfer, or delegate any interest in the services to be provided under this RFP and the Resulting Agreement without the prior written consent of the MHTC representative.
The successful Offeror may at its own expense employ clerical or technical assistance in the performance of the services under this RFP and the Resulting Agreement, such clerical and technical assistance provider being as fully bound as the Offeror to all confidentiality and work product provisions of this RFP and the Resulting Agreement.
7.4. Amendments
Any change in the Resulting Agreement, whether by modification or supplementation, must be accomplished by a formal contract amendment approved and signed by representatives of the successful Offeror and Commission, respectively, each of whom being duly authorized to execute the contract amendment on behalf of the successful Offeror and Commission, respectively.
7.5. Disputes
Disputes Under the RFP and Resulting Agreement: The MHTC representative, as applicable, will decide all questions which may arise as to the quality, quantity, and acceptability of any Offeror's proposals submitted in response to this RFP, and of the services under this RFP and the Resulting Agreement performed by the successful Offeror and as to the rate of progress of the services; all questions which may arise as to the interpretation of the services to be performed under this RFP and the Resulting Agreement; all questions as to the acceptable fulfillment of the Resulting Agreement on the part of the successful Offeror; the proper compensation for performance or breach of the Resulting Agreement; and all claims of any character whatsoever in connection with or growing out of the services to be performed or performed by the successful Offeror, whether claims under this RFP and the Resulting Agreement or otherwise. The decision of the MHTC representative, as applicable, shall be conclusive, binding, and incontestable.
7.6. Successors and Assigns
The Commission and the Offerors agree that this RFP and, as applicable, the Resulting Agreement as well as all agreements entered into under the provisions of this RFP, shall be binding upon the parties thereto and their successors and assigns.
7.7. Sole Beneficiary
The Resulting Agreement will be made for the sole benefit of the parties thereto and nothing in this RFP or the Resulting Agreement shall be construed to give any rights or benefits to anyone other than the Commission and the successful Offeror.
7.8. Cancellation of Resulting Agreement
MHTC may cancel the Resulting Agreement at any time by providing the successful Offeror with a written notice of cancellation. Should the Commission exercise its right to cancel the Resulting Agreement, cancellation will become effective upon the date specified in the notice of cancellation.
7.9. Bankruptcy
Upon filing for any bankruptcy or insolvency proceeding by or against any Offeror or assignee, whether voluntarily, or upon the appointment of a receiver for the benefit of creditors, the Commission reserves the right and sole discretion to reject the Offeror's proposal, or, as applicable, either cancel the Resulting Agreement or affirm the Resulting Agreement and hold the successful Offeror responsible for damages.
7.10. Status of Independent Contractor
The successful Offeror represents itself to be an independent contractor offering such services to the general public and shall not represent itself or its employees to be an employee of MHTC or MoDOT.
Therefore, the successful Offeror shall assume all legal and financial responsibility for taxes, FICA, employee fringe benefits, workers compensation, employee insurance, minimum wage requirements, overtime, or other such benefits or obligations.
7.11. Subcontractor
Any Offeror's proposal must identify all subcontractors, if any, and outline the contractual relationship between the Offeror and each subcontractor. Either a copy of the executed subcontract or a letter of agreement over the official signature of the firms involved must accompany each proposal. MHTC must approve the successful Offeror's subcontracting any portion of the services to be provided under the Resulting Agreement. The successful Offeror is responsible for the performance of any obligations that may result from this RFP and the Agreement and shall not be relieved by the non-performance of any subcontractor.
7.12. MBE/WBE Participation Encouraged
Minority Participation Encouraged: Offerors are encouraged to obtain minority business enterprise (MBE) and women business enterprise (WBE) participation in this work through the use of subcontractors, suppliers, joint ventures, or other arrangements that afford meaningful participation for M/WBEs (i.e. 10% MBE and 5% WBE participation).
7.12.1. Offeror's Responsibility Unconditional
Regardless of which persons or firms, if any, that the successful Offeror may use as subcontractors or suppliers of goods or services for the services to be provided, the successful Offeror ultimately remains responsible and liable to MHTC for the complete, accurate, and professional quality/performance of these services.
7.12.2. Affirmative Action Program
Offerors are encouraged to submit copies of their existing affirmative action programs, if any. Offerors are also encouraged to directly hire minorities and women as direct employees of the Offerors.
7.13. Nondiscrimination
The Contractor shall comply with all state and federal statutes applicable to the Contractor relating to nondiscrimination, including, but not limited to, Chapter 213, RSMo; Title VI and Title VII of Civil Rights Act of 1964 as amended (42 U.S.C. Sections 2000d and 2000e, et seq.); and with any provision of the Americans with Disabilities Act (42 U.S.C. Section 12101, et seq)..
1. Sanctions for Noncompliance: In the event of the Contractor's noncompliance with these nondiscrimination provisions of the Contract, MHTC shall impose such contract sanctions as it or the Federal Highway Administration may determine to be appropriate, including, but not limited to:
a. withholding of payments to the Contractor under the Contract until the Contractor complies, and/or,
b. cancellation, termination or suspension of the Contract, in whole or in part.
7.14. Executive Order
The Contractor shall comply with all the provisions of Executive Order 07-13, issued by the Honorable Matt Blunt, Governor of Missouri, on the sixth (6th) day of March, 2007. This Executive Order, which promulgates the State of Missouri's position to not tolerate persons who contract with the state engaging in or supporting illegal activities of employing individuals who are not eligible to work in the United States, shall be incorporated herein by reference and made a part of the Contract.
1. The Contractor hereby certifies that any employee of the Contractor assigned to perform services under the Contract is eligible and authorized to work in the United States in compliance with federal law.
2. In the event the Contractor fails to comply with the provisions of the Executive Order 07- 13, or in the event the Commission has reasonable cause to believe that the Contractor has knowingly employed individuals who are not eligible to work in the United States in violation of federal law, the Commission reserves the right to impose such contract sanctions as it may determine to be appropriate, including but not limited to cancellation, termination or suspension in whole or in part or both.
3. The Contractor shall include the provisions of this paragraph in every subcontract. The Contractor shall take such action with respect to any subcontract as the Commission may direct as a means of enforcing such provisions, including sanctions for noncompliance.
7.14.1. Incorporation of Provisions
The successful Offeror shall include the provisions of this paragraph in every subcontract. The successful Offeror shall take such action with respect to any subcontract as the Commission may direct as a means of enforcing such provisions, including sanctions for noncompliance.
7.14.2. Failure to Comply
In the event the Offeror fails to comply with the provisions of the Executive Order 07-13, or in the event the Commission has reasonable cause to believe that the Offeror has knowingly employed individuals who are not eligible to work in the United States in violation of federal law, the Commission reserves the right to reject the Offeror's proposal or, as applicable, impose such contract sanctions as it may determine to be appropriate, including but not limited to contract cancellation, termination or suspension in whole or in part or both.
7.14.3. Offeror's Certification
By signing the proposal to this RFP, the Offeror hereby certifies that any employee of the Offeror assigned to perform services herein is eligible and authorized to work in the United States in compliance with federal law.
7.15.