This is a Bid Form and Proposal Bond document issued by the Missouri Department of Transportation (MoDOT) General Services Division for contract opportunity MODOT-FY25-0175-SL, which concerns the Southeast Poplar Bluff Building Rehabilitation project. The document serves as the formal bidding instrument through which contractors submit their proposals to provide all labor, materials, equipment, and services necessary for the rehabilitation work to the satisfaction of MoDOT's General Services-Facility Operations Supervisor and the Missouri Highway and Transportation Commission. Bidders are required to have examined the complete contract documents, including drawings, instructions to bidders, general conditions, supplementary conditions, and technical specifications, as well as to have visited the project site and reviewed all conditions affecting the work. The form requires acknowledgment of receipt of all applicable addenda and includes sections for bidders to itemize costs across multiple categories including labor, materials, general requirements, demolition/removal, structural improvements, ceilings, flooring, drywall, doors/windows, and other general construction work.
Bidders must submit bid security equal to not less than 5 percent of their proposed contract sum with their proposals. The Bid Form requires complete identification information based on the bidder's structure—whether an individual, partnership, or corporation—and must be signed by an authorized representative. For work portions equaling or exceeding 10 percent of the total proposed contract sum, bidders must list proposed subcontractors. The accompanying Proposal Bond obligates the principal bidder and a corporate surety authorized to conduct business in Missouri to comply with all contract requirements; failure to comply entitles the State of Missouri to recover the full penal sum of the bond plus court costs, attorney's fees, and recovery expenses. All bonds must be executed by both the principal and a corporate surety entity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID FORM
To: MAILING ADDRESS: PHYSICAL ADDRESS:
Missouri Department of Transportation
P. O. Box 270 Jefferson City, MO 65102 Attn: Michael Yoder
Missouri Department of Transportation General Services Division 830 MoDOT Drive Jefferson City, MO 65109
1. The undersigned, having examined the proposed Contract Documents titled MODOT-FY25-0175-SL -
SE Poplar Bluff Building Rehabilitation RFP having visited the site and examined the conditions affecting the work, hereby proposes and agrees to furnish all labor, materials, equipment and everything which may be necessary or incidental thereto, as proposed by said Contract Documents, all to the satisfaction of the General Services-Facility Operations Supervisor or designated representative of the Missouri Department of Transportation and the Missouri Highway and Transportation Commission, for the stipulated sum of:
DOLLARS
2. The undersigned, acknowledges having examined and being familiar with the contract documents including the drawings, the Instructions to Bidders, General Conditions, Supplementary Conditions, and the body of technical specifications.
3. The undersigned acknowledges receipt of Addenda number through inclusive.
4. Enclosed with this bid is bid security in the amount of not less than 5% of the bidder's proposed Contract
Sum, the amount being DOLLARS
BREAKDOWN OF BASE BID
The cost of work totals below must equal the total, base bid amount above.
Labor Material General Requirements $ $
Removal/Demo $ $
Structural Improvements $ $
Ceiling $ $
Flooring $ $
Drywall $ $
Doors/Windows $ $
General Construction(not included above)
Subtotal Labor $ Subtotal Material $
IF AN INDIVIDUAL
Name of individual Residence address
Social Security Number Telephone Number
Firm Name, If Any
Address for communications Signature
IF A PARTNERSHIP
(State Name and Residence Address of All Partners)
Name of Partnership
Partner Residence Address
Partner Residence Address
Federal Tax I.D. Number
Address for Communications Signature of Either Partner
Telephone Number
IF A CORPORATION
Incorporated under the laws of the
Name of Corporation State of
Corporate License No.
Name and Title of Officer (If a corporation organized in a state other than
Missouri, attach Certificate of Authority to do business in the State of Missouri.)
Signature of officer
Federal Tax I.D. Number
(ATTEST)
Address for Communications
Telephone Number (SEAL) Secretary
(Each bidder must complete the Bid Form by signing in the proper signature line above and by supplying the required information called for in connection with the signature. The information called for is necessary in the proper preparation of the contract and performance bond.)
00430
SUBCONTRACTOR LISTING
1. For portions of Work equaling or exceeding 10% of the total proposed Contract Sum, the undersigned proposes to use the following subcontractors. Except as otherwise approved by the Owner, the undersigned proposes to perform all other portions of the Work with his own forces.
2. Portion of the Work: Subcontractor name and address:
USE ADDITIONAL SHEETS
BIDDER
: IF REQUIRED
PROVIDE SIGNATURE
IDENTICAL TO THAT
SHOWN ON THE BID FORM by
PROPOSAL BOND
KNOW ALL MEN BY THESE PRESENTS, that we , as Principal, and , as Surety, are held firmly bound unto the State of Missouri (acting by and through the Missouri Highway and
Transportation Commission) in the penal sum of
Dollars
($ ), to be paid to the State of Missouri, or the Missouri Highway and Transportation
Commission, to be credited to the State Road Fund and Principal and Surety binding themselves, their heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
Sealed with our seals and dated this day of , 20
THE CONDITION OF THIS OBLIGATION is such that:
WHEREAS, the Principal is submitting herewith a bid to the Missouri Highways and Transportation Commission for furnishing the MODOT-FY25-0175-SL - SE Poplar Bluff Building Rehabilitation RFP as set out in the proposal to which this bond is attached.
NOW THEREFORE, if the Missouri Highways and Transportation Commission shall accept the bid of the Principal and if said Principal shall properly execute and deliver to the Missouri Highways and Transportation Commission the contract and contract bond in compliance with the requirements of the proposal, the specifications and the provisions of law, to the satisfaction of the Highways and Transportation Commission, then this obligation shall be void and of no effect, otherwise to remain in full force and effect.
In the event the said Principal shall, in the judgment of the Missouri Highways and Transportation Commission, fail to comply with any requirement as set forth in the preceding paragraph, then the State of Missouri acting through the Missouri Highways and Transportation Commission shall immediately and forthwith be entitled to recover the full penal sum above set out, together with court costs, attorney’s fees and any other expense of recovery.
Principal Surety
By Attorney in Fact (SEAL)
Attest: (CORPORATE SEAL)
Corporate Secretary
Note: This bond must be executed by the Principal and by a Corporate Surety authorized to conduct surety business in the State of Missouri.
| Subtotal Labor $ Subtotal Material $ |
| IF AN INDIVIDUAL |
| IF A PARTNERSHIP |
| IF A CORPORATION |
| 00430 |
| PROPOSAL BOND |
File details come from the government source that posted it. Updated .