Attachment D - AWO31.pdf
PDF 211 KB Posted
- Attached to
- SE Poplar Bluff Building Rehabilitation
- Solicitation number
- 300000170707393
- Issued by
- Missouri
About this file
This is an Annual Wage Order (No. 31) issued by the Missouri Department of Labor and Industrial Relations, Division of Labor Standards, establishing prevailing wage rates for construction work in Butler County, Section 012, effective March 8, 2024. The document applies to all public works construction projects within the county and establishes minimum hourly wage requirements for various occupational classifications in building construction and heavy construction categories. Building construction rates range from $25.51 per hour for numerous trades (including Asbestos Workers, Bricklayers, Communication Technicians, and Electricians) to $74.88 per hour for Sheet Metal Workers and $69.33 per hour for Ironworkers. Heavy construction rates include Laborers at $47.97 per hour and Operating Engineers at $67.64 per hour. The wage order includes specific provisions for overtime compensation at 1.5 times the prevailing rate for work exceeding 10 hours in a day or 40 hours in a week, and double-time pay for Sunday and holiday work.
The prevailing hourly rates listed include applicable fringe benefit amounts as defined under RSMo Section 290.210. Rates marked with an asterisk indicate classifications for which the Division of Labor Standards received fewer than 1,000 reportable hours, with wages established using data from the Missouri Economic Research and Information Center. The wage order specifies that a 30-minute unpaid lunch period applies daily to all public works workers. Designated holidays include January 1, Memorial Day, July 4, Labor Day, Veterans Day, Thanksgiving, and Christmas, with Monday substituted when holidays fall on Sunday. Any person affected by this wage order had until April 8, 2024, to file objections with the Labor and Industrial Relations Commission, with copies required to be furnished to the Division of Labor Standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division of Labor Standards
WAGE AND HOUR SECTION
MICHAEL L. PARSON, Governor
Annual Wage Order No. 31 Section 012
BUTLER COUNTY
In accordance with Section 290.262 RSMo 2000, within thirty (30) days after a certified copy of this Annual Wage Order has been filed with the Secretary of State as indicated below, any person who may be affected by this Annual Wage Order may object by filing an objection in triplicate with the Labor and Industrial Relations Commission, P.O. Box 599, Jefferson City, MO 65102- 0599. Such objections must set forth in writing the specific grounds of objection. Each objection shall certify that a copy has been furnished to the Division of Labor Standards, P.O. Box 449, Jefferson City, MO 65102-0449 pursuant to 8 CSR 20-5.010(1). A certified copy of the Annual Wage Order has been filed with the Secretary of State of Missouri.
Original Signed by Todd Smith, Director Division of Labor Standards
Filed With Secretary of State: March 8, 2024
Last Date Objections May Be Filed: April 8, 2024
Prepared by Missouri Department of Labor and Industrial Relations
Missouri
Building Construction Rates for BUTLER County
Section 012
**Prevailing OCCUPATIONAL TITLE Hourly
Rate Asbestos Worker $25.51* Boilermaker $25.51* Bricklayer-Stone Mason $25.51* Carpenter $52.52 Lather Linoleum Layer Millwright Pile Driver Cement Mason $50.66 Plasterer Communication Technician $25.51* Electrician (Inside Wireman) $25.51* Electrician Outside Lineman $25.51* Lineman Operator Lineman - Tree Trimmer Groundman Groundman - Tree Trimmer Elevator Constructor $25.51* Glazier $25.51* Ironworker $69.33 Laborer $42.63 General Laborer First Semi-Skilled Second Semi-Skilled Mason $25.51* Marble Mason Marble Finisher Terrazzo Worker Terrazzo Finisher Tile Setter Tile Finisher Operating Engineer $25.51* Group I Group II Group III Group III-A Group IV Group V Painter $25.51* Plumber $70.96 Pipe Fitter Roofer $46.21 Sheet Metal Worker $74.88 Sprinkler Fitter $25.51* Truck Driver $25.51* Truck Control Service Driver Group I Group II Group III Group IV
*The Division of Labor Standards received fewer than 1,000 reportable hours for this occupational title. The public works contracting minimum wage is established for this occupational title using data provided by Missouri Economic Research and Information Center.
**The Prevailing Hourly Rate includes any applicable fringe benefit amounts for each occupational title as defined in RSMo Section 290.210.
ANNUAL WAGE ORDER NO. 31 3/24
Heavy Construction Rates for BUTLER County
Section 012
**Prevailing OCCUPATIONAL TITLE Hourly
Rate Carpenter $25.51* Millwright Pile Driver Electrician (Outside Lineman) $25.51* Lineman Operator Lineman - Tree Trimmer Groundman Groundman - Tree Trimmer Laborer $47.97 General Laborer Skilled Laborer Operating Engineer $67.64 Group I Group II Group III Group IV Truck Driver $25.51* Truck Control Service Driver Group I Group II Group III Group IV
Use Heavy Construction Rates on Highway and Heavy construction in accordance with the classifications of construction work established in 8 CSR 30-3.040(3).
Use Building Construction Rates on Building construction in accordance with the classifications of construction work established in 8 CSR 30-3.040(2).
If a worker is performing work on a heavy construction project within an occupational title that is not listed on the Heavy Construction Rate Sheet, use the rate for that occupational title as shown on the Building Construction Rate Sheet.
*The Division of Labor Standards received fewer than 1,000 reportable hours for this occupational title.
Public works contracting minimum wage is established for this occupational title using data provided by Missouri Economic Research and Information Center.
**The Prevailing Hourly Rate includes any applicable fringe benefit amounts for each occupational title.
ANNUAL WAGE ORDER NO. 31 3/24
OVERTIME
and
HOLIDAYS
ANNUAL WAGE ORDER NO. 31 3/24
OVERTIME
For all work performed on a Sunday or a holiday, not less than twice (2x) the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed or the public works contracting minimum wage, whichever is applicable, shall be paid to all workers employed by or on behalf of any public body engaged in the construction of public works, exclusive of maintenance work.
For all overtime work performed, not less than one and one-half (1½) the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed or the public works contracting minimum wage, whichever is applicable, shall be paid to all workers employed by or on behalf of any public body engaged in the construction of public works, exclusive of maintenance work or contractual obligation.
For purposes of this subdivision, "overtime work" shall include work that exceeds ten hours in one day and work in excess of forty hours in one calendar week; and
A thirty-minute lunch period on each calendar day shall be allowed for each worker on a public works project, provided that such time shall not be considered as time worked.
HOLIDAYS
January first;
The last Monday in May;
July fourth;
The first Monday in September;
November eleventh;
The fourth Thursday in November; and December twenty-fifth;
If any holiday falls on a Sunday, the following Monday shall be considered a holiday.
| Cover |
| BC Rates |
| HC Rates |
| Overtime and Holidays |
File details come from the government source that posted it. Updated .