Missouri+river+Intake+RFP+Amendment+1.pdf
PDF 42 KB Posted
- Solicitation number
- 770.4200-24-001
- Issued by
- Mclean County, North Dakota
About this file
This document is a solicitation amendment from the North Dakota Department of Water Resources for an investigation into potential locations for industrial water intakes along the Missouri River Corridor. The original solicitation was issued on February 13, 2024, with a deadline for receipt of proposals on March 5, 3024 at 5:00 PM CT. The amendment includes additional appendices to the original "Missouri River Hydrogeologic Investigation and Intake Conceptual Design Study" dated May 2015. Specifically, Appendices A through H are included as Attachment 4, Appendix I is included as Attachment 5, and Appendices J through L are included as Attachment 6, with the exception of Appendix K which is not available.
The contract opportunity is for the investigation of optimal locations for industrial water intakes throughout the Missouri River Corridor from the Montana border to Washburn, ND. The jurisdiction for this solicitation is Mclean County in the state of North Dakota. No additional details are provided regarding pricing terms, set asides, incumbents, funding requirements, or award information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment+5.pdf | ||
| Attachment+1+Technical+Proposal.pdf | ||
| Attachment+3+Relevant+Studies.pdf | ||
| RFP.pdf | ||
| Attachment+4.pdf | ||
| Attachment+2+Sample+Contract.pdf | ||
| Attachment+6.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF NORTH DAKOTA
North Dakota Department of Water Resources
1200 Memorial Highway Bismarck, ND 58504
SOLICITATION AMENDMENT 1
February 23, 2024
Solicita4on Number: 770.4200-24-001 Solicita4on Title: Missouri River Poten4al Intake Loca4ons Inves4ga4on Deadline for Receipt of Proposals: March, 5, 3024, 5:00 PM CT Solicita4on Issued: February 13, 2024
Appendices to the “Missouri River Hydrogeologic Inves4ga4on and Intake Conceptual Design Study” dated May 2015 were not included in the original pos4ng.
Appendices A through H are now included as ASachment 4
Appendix I is included as ASachment 5
Appendices J through L are included as ASachment 6. Please note Appendix K is not available.