Mildenhall.pdf
PDF 106 KB Posted
- Attached to
- AVIATOR’S BREATHING OXYGEN (ABO) AND NITROGEN, TECHNICAL (LN2) MULTIPLE OCONUS EUROPE LOCATIONS
- Solicitation number
- SPE601-20-R-0324
- Issued by
-
Defense Logistics Agency Energy
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Lakenheath.pdf | ||
| NSA Souda Bay Navy.pdf | ||
| Aviano.pdf | ||
| Rota Naval Station.pdf | ||
| Moron AB.pdf | ||
| QAPs.pdf | ||
| ENERGY QAP E6 CERTIFICATE OF CONFORMANCE (AUG 2015).pdf | ||
| NSA Souda Bay AF.pdf | ||
| Ramstein.pdf | ||
| TRANS CERT.pdf | ||
| Spangdahlem.pdf | ||
| Incirlik.pdf | ||
| SPE60120R0324 ABO LN_14 Jan 21.pdf | ||
| Aerospace Text APG_SPE60120R0324 ABO LN.pdf | ||
| Fairford.pdf | ||
| NAS Sigonella.pdf | ||
| MIL-PRF-27210J.pdf | ||
| Lajes Field.pdf | ||
| Contractor Performance Data Sheet.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TSW – CDSMILDENH DODAAC – FP8071
STATEMENT OF OBJECTIVES, 8 Jan 20
Scope: The Defense Logistics Agency (DLA) Aerospace Energy Business Unit, as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen to RAF Mildenhall, UK into Government-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to RAF Mildenhall.
Product: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210.
One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.
Product Delivery: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.
Method of Measurement: Method of measurement shall be by truck mounted calibrated flow meter.
Inspection and Acceptance: Inspection for quality shall be performed at origin.
Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.
Tank Over-Pressure Protection: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).
Tank Hot Fill: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.
Security Requirements: Contractor personnel shall provide a valid passport, driver’s license, insurance, vehicle paperwork, and shall be escorted at all times at each destination. All delivery vehicles are subject to search by security personnel prior to accessing delivery location and while on each facility.
File details come from the government source that posted it. Updated .