Mid-Valley Sanitary Landfill - LFG Flare Station - Technical Specifications - 10-15-2025.pdf

PDF 2 MB Posted

Attached to
Landfill Gas Flare Station at the Mid Valley Landfill
Solicitation number
PWG126-SOLID-6143
Issued by
San Bernardino County, San Bernardino City, California

About this file

This is a technical specifications document for the Landfill Gas Flare Station project at the Mid-Valley Sanitary Landfill (MVSL), issued by the San Bernardino County Department of Public Works Solid Waste Management Division. The project consists of construction of a new flare station with two enclosed low NOx ground flares, two combustion air blowers, two gas handling skids, two compressor systems, related instrumentation, piping, and ancillary items. The contractor must complete all work within 180 working days from issuance of the Notice to Proceed, with liquidated damages of $3,000 per calendar day for delays beyond the contract period. The specifications cover 87 distinct bid line items encompassing site clearing, earthwork, piping installation (HDPE, stainless steel, PVC, black iron, and galvanized carbon steel in various diameters), concrete work including foundations and slabs, structural steel fabrication, metal fabrications, electrical installation, equipment installation, system startup and testing, and demolition of the existing flare station. Work is limited to 8:00 a.m. to 4:30 p.m. PST, Monday through Friday, with no operations beyond these periods unless approved in writing by SWMD.

The contractor shall bid all 87 items separately and provide a total sum for work, with payment on a unit price, lump sum, lineal foot, cubic yard, or square foot basis only after completion of each work portion. All materials must be new and of specified quality, subject to inspection and approval by SWMD. The contractor is responsible for furnishing all labor, materials, equipment, and incidentals required for project completion and must provide a site-specific Health and Safety Plan meeting all Federal and State regulations, HAZWOPER training certifications for all employees, and an OSHA 200 log for the past three years. The contractor shall maintain continuous site access for engineering inspections and must coordinate with a yet-to-be-determined Construction Manager and Construction Quality Assurance firm. Additional requirements include establishment of permanent benchmarks, as-built drawings, completion of all submittals within specified timeframes, and assumption of all responsibility for damage to existing site features caused by contractor operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS

FOR THE

LANDFILL GAS FLARE STATION

AT THE MID-VALLEY SANITARY LANDFILL

SAN BERNARDINO COUNTY

DEPARTMENT OF PUBLIC WORKS

SOLID WASTE MANAGEMENT DIVISION

ISSUED JUNE 18, 2025

Prepared under the Supervision of: Recommended/Approved by:

Tetra Tech BAS, Inc.

21700 Copley Drive, Suite 200 Diamond Bar, California 91765

Chief Engineer – Johnny Gayman, P.E.

Sami H. Ayass, P.E. Deputy Director – Marc Rodabaugh, P.E.

PRO S I O

TE

R

GE

I S

C84806

CIVIL

RED

ER

N

NE

G

I

L

NA

E

ESF

AMAS

I H AY

SS

STATE OF CA L I FORN IA

LANDFILL GAS FLARE STATION AT THE

MID-VALLEY SANITARY LANDFILL

TABLE OF CONTENTS

Mid-Valley Sanitary Landfill Table of Contents Landfill Gas Flare Station i

SECTION C1 - GENERAL REQUIREMENTS

C01010 General Terms and Conditions C01029 Basis of Payment C01050 Field Engineering C01052 Layout of Work and Surveys C01100 Special Project Procedures C01340 Shop Drawings, Product Data, Samples, and As-Builts C01400 Control of Work C01500 Temporary Facilities and Controls C01640 Product Handling and Protection C01650 Quality Control / Quality Assurance C01710 Final Cleaning

SECTION C2 - SITE WORK

C02110 Site Clearing and Grubbing C02120 Desert Native Plant Protection C02200 Excavating, Backfilling, and Compaction C02700 Landfill Gas Flare Station Improvements C02800 Foundation and Miscellaneous Civil Work

SECTION C3 - CONCRETE

C03100 Concrete Forming and Accessories C03200 Concrete Reinforcing C03300 Cast-In-Place Concrete C03600 Grouting ii

SECTION C4 - MASONRY

C04100 Mortar and Masonry Grout C04220 Concrete Masonry Units

SECTION C5 - METALS

C05120 Structural Steel C05500 Metal Fabrications and Castings

SECTION C7 - THERMAL AND MOISTURE PROTECTION

C07182 Waterproofing C07190 Water Repellent C07900 Joint Sealer

SECTION C9 - PAINT

C09900 Painting

SECTION C13 - SPECIAL CONSTRUCTION

C13122 Prefabricated Metal Canopies

SECTION C15 - MECHANICAL AND PLUMBING

C15010 General Piping Specifications C15050 Flexible Connections C15066 Stainless Steel (SS) Pipe, Tube, and Fittings C15100 High Density Polyethylene (HDPE) Piping C15200 Plastic Piping (PVC) C15370 Miscellaneous Process Piping and Appurtenances C15800 Valves C15900 Pressure Testing of Pipe iii

SECTION C16 - ELECTRICAL

C16101 Electrical Work – General C16111 Conduit C16123 Building Wire and Cable C16140 Wiring Devices C16160 Cabinets and Enclosures C16170 Grounding and Bonding C16190 Supporting Devices C16195 Electrical Identification

Mid-Valley Sanitary Landfill Subsection C01010 General Terms and Conditions

Page C01010-1

SECTION C1 – GENERAL REQUIREMENTS

SUBSECTION C01010

GENERAL TERMS AND CONDITIONS

PART 1 – GENERAL

1.01 INTRODUCTION

A. The project is located at the Mid-Valley Sanitary Landfill (MVSL). The Contractor shall become thoroughly familiar with the Health and Safety Provisions of this Contract for precautionary measures to be followed during construction.

Definition of Terms

Division: ................................. San Bernardino County, Public Works, Solid Waste Management Division (SWMD).

Contract Operator: .................. SWMD Contract Operator.

Engineer: ................................. All references to Engineer shall mean SWMD acting either directly or through properly authorized representatives acting within the scope of the particular duties delegated to them. For this project, Engineering/Design support will be performed by Tetra Tech BAS, 21700 Copley Drive, Suite 200, Diamond Bar, CA 91765, telephone (909) 860- 7777.

Contractor: .............................. The person, persons, firm, partnership, corporation or combination thereof, who have entered into a contract with SWMD to perform work pursuant to the Contract requirements.

Construction Manager (CM): ... The firm under contract to perform Construction Management for the project. The CM firm is yet to be determined.

Construction Quality Assurance (CQA) Firm: ............................ The firm under contract to perform CQA monitoring and reporting for the project. The CQA firm is yet to be determined.

These Technical Specifications include the General Terms and Conditions, Construction Support Tasks, and the Special Conditions for the Landfill Gas Flare Station at the Mid- Valley Sanitary Landfill.

Page C01010-2

1.02 DESCRIPTION OF WORK

In general, the project consists of construction of improvements to the new flare station and all other appurtenant equipment as shown in the Construction Drawings and as specified herein.

1.03 CONTRACT DOCUMENTS

The contract documents consist of the Advertisement for Bids, Bidder’s Proposal, Bid Documents, Technical Specifications and Plans or Drawings as defined below.

A. ADVERTISEMENT FOR BIDS

The Advertisement for Bids first publication date is included in the specifications cover.

B. BIDDER’S PROPOSAL

Bid submittal requirements and specifics are included in the specifications cover.

C. BID DOCUMENTS

Bid Documents entitled “Landfill Gas Flare Station at the Mid-Valley Sanitary Landfill”.

D. TECHNICAL SPECIFICATIONS

Technical Specifications shall include the General Terms and Conditions, Construction Support Tasks, Special Conditions, and referenced Specifications as listed in Section 1.04.

E. PLANS OR DRAWINGS

The Plans for this project are the “Landfill Gas Flare Station at the Mid-Valley Sanitary Landfill”, dated 06/2025 prepared by Tetra Tech, and specifically prepared for this project and referenced Standard Plans.

1.04 REFERENCE SPECIFICATIONS

A. STANDARD SPECIFICATIONS

The standard specifications shall be considered as the 2018 edition of the “Standard Specifications for Public Works Construction” (SSPWC) of the American Public Works Association, and all subsequent amendments, supplements, and additions.

B. GENERAL SPECIFICATIONS

The general specifications shall be considered as the latest revised specifications or tentative specifications drafted by others such as societies (ASTM, ASME, ASCE, etc.), Page C01010-3 associations (AASHTO, etc.), institutes (AISC, ANSI, etc.), and others as specified in either the Special Conditions, General Provisions, or Standard Specifications.

C. STANDARD DRAWINGS

Unless otherwise noted on the project plans, the Standard Drawings shall be the most recent standard drawings referenced.

1.05 RESERVED

1.06 ABBREVIATIONS AND REFERENCES

AASHTO American Association of State Highway and Transportation Officials AC Asphalt Pavement ACI American Concrete Institute AFBMA Anti-Friction Bearings Manufacturer’s Association AGA American Gas Association AISC American Institute of Steel Constructors ANSI American National Standards Institute ASHRAE American Society of Heating, Refrigeration, and Air Conditioning Engineers ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials AWG American Wire Gauge AWS American Welding Society AWWA American Water Works Association BMP Best Management Practice BTU British Thermal Unit ° C degrees Celsius CASMP Construction Activities Storm Water Management Plan CASQA California Stormwater Quality Association CBC California Building Code CDFW California Department of Fish and Wildlife CEC California Electric Code CEQA California Environmental Quality Act CGA Compressed Gas Association CI Cast Iron CMB Crushed Miscellaneous Base CPM Critical Path Method CQA Construction Quality Assurance CQC Construction Quality Control CSA Canadian Standards Association CSP Corrugated Steel Pipe DOTSS Dept. of Transportation (Cal Trans) Standard Specifications, 1999 Edition ° F degrees Fahrenheit FMRC Factory Mutual Research Corporation FRP Fiberglass Reinforced Plastic

Page C01010-4

HDPE High Density Polyethylene ICBO International Conference of Building Officials IEEE Institute of Electrical and Electronics Engineers IPS Iron Pipe Size LFG Landfill Gas MSS Manufacturers Standardization Society of the Valve and Fittings Industry NBS National Bureau of Standards NEC National Electrical Code NECA National Electrical and Communications Association NEMA National Electrical Manufacturers’ Association NFPA National Fire Protection Association NLGI National Lubricating Grease Institute NPDES National Pollutant Discharge Elimination System NONA Notice of Non-Applicability O&M Operations and Maintenance OSHA Occupational Safety and Health Administration P&ID Piping and Instrumentation Diagram PDF Portable Document Format PLC Programmable Logic Standard PSI, PSIG Pounds Per Square Inch (gauge) PST Pacific Standard Time PVC Polyvinyl Chloride ROW Right of Way SAE Society of Automotive Engineers SCAQMD South Coast Air Quality Management District SCE Southern California Edison SS, SST Stainless Steel SSPWC Standard Specifications for Public Works Construction, 2003 Edition SWMD San Bernardino County, Public Works, Solid Waste Management Division UBC Uniform Building Code UA Underwriters Accepted UL Underwriters Laboratories, Inc.

USASI USA Standards Institute VFD Variable Frequency Drive

1.07 WORK BY OTHERS

A. The Contractor is advised that work by others may be in progress adjacent to, or at the site, during the Contract time. Cooperation during mobilization, storage, access, and other construction activities between the parties, and access by the SWMD, is required.

B. The Contractor shall coordinate and interface his work with all other work on or adjacent to the site. No other compensation is due for coordination.

Page C01010-5

C. The Contractor shall give the work the necessary constant attention to facilitate the progress thereof and shall cooperate with the disposal site Owner, and other Contractors.

1.08 WORK HOURS

A. Unless otherwise approved by the Owner, construction activities and material deliveries to the disposal site shall be limited to the hours of 8:00 a.m. Pacific Standard Time (PST) to 4:30 p.m. PST Monday through Friday.

1.09 WORKING DAYS

A. The Contractor may perform work Monday through Friday. No working operations will be conducted beyond those periods unless otherwise approved in writing by the SWMD.

1.10 JOB PROGRESS SCHEDULE

A. Within 10 days of the issuance of a Notice to Proceed by SWMD, the Contractor shall submit a proposed Project Schedule to SWMD. The schedule shall indicate the critical path of operations and milestones established by SWMD. The schedule shall also reflect anticipated submittal dates for shop drawings, and procurement, fabrication, and delivery schedules of major components or materials required for the project. The Schedule shall be in Microsoft Project format, or as approved by the CM, and shall be submitted via electronic mail (email), online shared cloud storage, or on a USB disk, as well as six hard copies.

B. If the Contractor elects to submit an early completion schedule for the project, it does so at its risk and such a submission does not change the Contract completion date reflected in the Notice to Proceed. SWMD will not accept any responsibility for, nor be held liable for, any damages allegedly caused by the Contractor's failure to complete the Project within its proposed early completion schedule.

C. No changes shall be made to the critical path logic of the schedule unless such changes have been approved, in writing, by the CM. The Project Schedule shall be updated monthly. The updated schedules shall indicate any deviations from the original schedule and provide a narrative description of problem areas, current and anticipated delaying factors and their impact, and an explanation of corrective actions taken or proposed.

D. In addition to the Project Schedule, the Contractor shall submit, on a bi-weekly basis, a two-week “look-ahead” schedule. The “look-ahead” schedule will include only those activities that will be in progress, started, or completed during the next two-week period.

Page C01010-6

1.11 TIME OF COMPLETION/LIQUIDATED DAMAGES; EXTENSION OF TIME

A. The Contractor agrees to complete all work within 180 working days, commencing upon issuance of a NOTICE TO PROCEED by the SWMD. In accordance with Government Code Section 53069.85, Contractor agrees to forfeit and pay to the SWMD the sum of Three Thousand Dollars ($3,000) per day for each calendar day that completion of the project is delayed beyond the specified 180 working days. SWMD issues notice to proceed (NTP), contractor has ten (10) days to start work, working days start when contractor(s) commence or 10 days after NTP (whichever is fewer).

B. Such sums shall be deducted from any payments due to or to become due to the Contractor. If delays are caused by unforeseen events beyond the control of both the Contractor and SWMD, or by delays within the control of the SWMD, such delays will entitle the Contractor to an extension of time, but Contractor shall not be entitled to damages or additional payment due to such delays.

C. If Contractor believes that the progress of the work has been adversely affected by abnormal inclement weather, Contractor shall submit a written request for extension of time to the CM. Any shutdowns caused by the wind and/or any other inclement weather will be considered a weather day and will not count as a working day.

Contractor will not charge for shutdowns caused by inclement weather and/or weather days.

D. It is understood that requests for time extensions related to delays for inclement weather will only be considered when the days in question impact a critical path element of the project. Further, a time extension will only be granted when the Contractor is prevented from working on a critical path item during the first five (5) hours of the day with at least sixty (60) percent of the normal work force for that item.

E. Additionally, Contractor agrees to forfeit and pay to the SWMD any penalties and/or fines assessed by the various regulatory agencies having jurisdiction over the landfill for violations associated with a failure to complete the project within the specified 180 working days.

F. Such sum shall be deducted from any payments due to or to become due to Contractor. If delays are caused by unforeseen events beyond the control of both Contractor and SWMD, or by delays within the control of SWMD, such delays will entitle Contractor to an extension of time, but Contractor shall not be entitled to damages or additional payment due to such delays.

1.12 RESPONSIBLE REPRESENTATIVE

A. The Contractor shall furnish to SWMD, in writing, the name of the representative who shall have complete authority to act for this project, including, but not limited to, implementation and enforcement of the site safety plan, the maintenance of barricades, signs, lights, fencing, erosion and dust control. The Contractor shall also furnish to SWMD, a telephone number where the Contractor or his representative may be

Page C01010-7 contacted 24 hours a day. The representative shall be present at the job site during all working hours.

1.13 CONTROL OF WORK

A. SWMD has provided control point information for Contractor’s use. All other construction layout and staking shall be the responsibility of the Contractor.

1.14 DESIGNATED CONTRACTOR ENTRANCE

A. SWMD will determine entrance location(s) for use by the Contractor during the construction kick-off meeting. The Contractor will be limited to using only designated entrance location(s).

1.15 CONTRACTOR KEY AND LOCKS

A. The Contractor shall be responsible for securing and locking all construction entrances and the Treatment Facility during non-working hours. The Contractor shall also ensure that entry to the site is controlled during working hours. The Contractor shall provide locks that will be added to the chain/lock loop at the construction entrances for the duration of the project. The Contractor shall remove their locks at the completion of the project.

1.16 PARKING

A. Contractor’s and subcontractor’s personnel will only be allowed to park in areas as designated by the SWMD. The parking area/areas will be designated by the SWMD prior to the start of the project. Any area disturbed by the Contractor will be restored to its original conditions as approved by the SWMD. The Contractor is responsible for any costs required to repair and/or restore the designated parking area/areas and shall be included in the bid schedule unit costs. The SWMD will not authorize a separate unit cost.

1.17 SMOKING POLICY

A. Smoking is not allowed at the MVSL. The smoking prohibition will be strictly enforced on this project due to the explosive nature of landfill gas.

1.18 SPECIAL CLEAN-UP

A. Any trash generated on the project site by the Contractor, or his employees, will be cleaned up daily by the Contractor for disposal. It shall be the Contractors responsibility to make the arrangements necessary to provide trash disposal containers and service as required. Mud and dirt tracked off-site by the Contractor, his equipment, or his employees will be cleaned up daily and properly disposed of by the Contractor.

Page C01010-8

1.19 LIMITING PUBLIC ACCESS

A. All necessary safety precautions including barricades and/or traffic cones will be used to prevent the public from entering the working area and the landfill. This is an operating disposal site and access by the public is not authorized. The Contractor is reminded that the disposal site contains explosive and potentially hazardous gases.

1.20 BIOHAZARDS

A. The Contractor will encounter waste during construction of the System.

Waste may contain biohazards such as medical waste or dead animals. The Contractor’s Health and Safety Plan, as required in Subsection C01100, shall address the potential for contact with biohazards and the specific measures to be taken to protect the Contractor’s workers, facility staff, and the public.

1.21 SUPERINTENDENT AND FORMEAN PAGERS/CELLULAR PHONES

A. The Contractor’s superintendent and Foreman shall be equipped with a cellular telephone through which the SWMD, Engineer or CQA representative can reach the Superintendent and Foreman 24 hours a day.

1.22 MATERIALS DELIVERY

A. The Contractor is to have all materials delivered to the work site and/or staging area. The SWMD, Engineer or CQA representative will not accept delivery of materials.

1.23 TIMELINESS OR CORRECTION OF ITEMS AFFECTING THE OPERATION OF THE

MVSL SITE

A. The Contractor will not interfere with the continued proper operation of the MVSL. The Contractor shall correct any interference with site operation immediately upon notification from the Engineer or SWMD.

1.24 EMERGENCIES

A. The Contractor will provide the Engineer and the SWMD with the phone numbers of at least two individuals who may be contacted in an emergency on a 24-hour, 7-day per week basis, including holidays. To prepare for emergencies, the Contractor will ensure that his employees know the location of appropriate fire and first aid equipment and emergency phone numbers. In the event of an emergency, such as damage or rupture of an existing gas pipeline, the Contractor shall immediately notify the SWMD and the Engineer. Should such an emergency occur after hours, the Contractor shall notify the SWMD. This is in addition to the Contractor taking any appropriate immediate emergency response to correct the problem.

Page C01010-9

1.25 GENERAL SAFETY AND HAZWOPER CERTIFICATION

A. The Contractor shall be responsible for maintaining safety on the project site in accordance with the provisions of the contract and including OSHA and NFPA regulations. In addition, the Contractor shall supply all necessary safety equipment for his employees and any site visitors. Tailgate safety meetings shall be performed a minimum of once per week for all site personnel. The Contractor shall provide the CM with a summary of the items discussed at the weekly tailgate meetings and a sign-in sheet of those attending the weekly meetings.

B. All employees of the Contractor or Subcontractor working on the site shall be HAZWOPER trained and certified. The Contractor shall provide copies of each employee’s initial and recurrent training certificates prior to mobilization to the site.

1.26 ENVIRONMENTAL MITIGATION MEASURES

A. Cultural Resources

In the event cultural or palaeontologic resources are uncovered during the course of the project, ground-disturbing activities in the vicinity of the find shall be redirected until the nature and extent of the find can be evaluated by a qualified archaeologist or paleontologist as determined by the SWMD. Any such resource uncovered during the course of the project related to grading or construction shall be recorded and/or removed per applicable SWMD and/or State regulations.

1.27 SANITARY FACILITIES

A. The Contractor shall provide adequate chemical toilet facilities for personnel.

The number of facilities shall be as required by Federal and State Safety and Occupational Standards. Chemical toilets shall be kept in a sanitary condition. The Contractor shall remove chemical toilets upon completion of the work and disinfect the premises.

1.28 STORM DAMAGE

A. The Contractor shall be responsible for the repair of any storm damage to the work prior to the Final Inspection by the Engineer and SWMD. Storm damage of stockpiled materials is also the responsibility of the Contractor. Prompt repair of any storm damage shall be the responsibility of the Contractor, at no cost to the SWMD.

1.29 EQUIPMENT FUELING AND MAINTENANCE

A. The Contractor shall fuel and maintain equipment in designated areas of the site as directed by the SWMD. Any fuel spills will be immediately cleaned up and the contaminated soil removed from the site by the Contractor at the Contractor’s expense.

Any temporary fuel storage tank necessary to fuel the Contractor’s equipment will be placed within a secondary containment berm, structure, or secondary containment tank.

The bermed area shall be lined with a material suitable to prevent contamination of the site

Page C01010-10 and underlying soil. The Contractor shall be responsible to obtain any required permits for fuel storage/dispensing facilities that may be required.

1.30 PROJECT DOCUMENT CHANGE CONTROL

A. A structured process for controlling project Plan and Specification changes will be implemented by the Engineer. “Controlled” copies of the Plans and Specifications will be issued to the Contractor and SWMD. These “controlled” copies will be updated with any project changes, revisions, or addenda. The Engineer will not be responsible for providing changes, revisions, or addendums to the Plans and Specifications, other than these “controlled” copies.

1.31 SITE HEALTH AND SAFETY PLAN

A. The Contractor shall provide a site-specific Health and Safety Plan with the signed Contract documents for review and approval by the SWMD that meets the minimum of all the requirements of Federal and State regulations through the construction activities. The Contractor shall allow a period of two weeks for the Engineer’s review time.

The Site Health and Safety Plan shall be reviewed and signed by a Certified Industrial Hygienist. The Contractor shall include the elements of the Health and Safety provisions described in Appendix A of these Specifications.

B. The Contractor shall determine the extent to which these requirements are applicable to his or her work and subcontractors work for this project. It is the responsibility of the Contractor to ensure compliance with all relevant health and safety regulations. The Contractor shall determine the level of protection to be utilized for his workers and for subcontractors during the project.

C. The Contractor shall be responsible for providing all items necessary for health and safety, including dust control, and personal protective equipment, in accordance with applicable Federal and State requirements. The SWMD reserves the right to instruct removal of any of the Contractor’s employees or subcontractors that are not meeting the requirements of the law or the Site Health and Safety Plan. During the entire project, the Contractor shall maintain at least one copy of the Health & Safety Plan at the site.

1.32 SAFETY RECORD

A. The Contractor shall provide a Safety Record with the Contract documents.

The Safety Record shall be the OSHA 200 log for the past three calendar years (2022, 2023, and 2024) and for any incidents in 2025.

1.33 SUBMITTALS REQUIRED

A. The Contractor shall thoroughly review the Specifications and identify all required project submittals. The submittals listed below are intended as a general summary of the submittal items contained in this section. The submittal list does not release the Contractor from the responsibility of identifying and providing all information requested.

Page C01010-11

1. Phone/pager numbers of Contractor’s Superintendent

2. Emergency Contact List

3. Site Health and Safety Plan

4. HAZWOPER Certificates

5. OSHA 200 Log

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

PART 4 – PAYMENT (NOT USED)

END OF SUBSECTION C01010

Mid-Valley Sanitary Landfill Subsection C01029 Basis of Payment

Page C01029-1

SUBSECTION C01029

BASIS OF PAYMENT

1.01 INTRODUCTION

This section includes the items of work and the basis of payment for these tasks. The Contractor shall bid Items 1 through 87 below separately and provide a total sum for all work line items, including optional item 87. The Contractor is responsible for supplying all materials, equipment, and labor necessary for the complete construction and installation of all work as described in these specifications and as shown on the Construction Drawings. Payment for each work item will be on either a unit price (EA), lump sum (LS), lineal foot (LF), cubic yard (CY), or square foot (SF) basis, and only after that portion of the project has been completed.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

PART 4 – PAYMENT

4.1 MOBILIZATION/DEMOBILIZATION

This task includes any and all temporary facilities and utilities, safety plans, and construction equipment required for this project. Payment for this work will be made on a LS basis. Twenty-five (25) percent of the LS price bid will be paid with the first payment request following satisfactory evidence of mobilization of sufficient labor, equipment and material to adequately progress the work of this contract. Twenty-five (25) percent of the LS price bid will be paid with the payment request subsequent to the payment request in which the initial payment for this item is made. Fifty (50) percent of the LS price bid will be paid with the Final Payment request. The price bid in the proposal for this item shall not exceed ten (10) percent of the total project amount.

4.2 CLEARING AND GRUBBING

Supply all material, equipment, and labor necessary to clear and grub the pipe path and flare station area to allow suitable working area, as shown on the Construction drawings.

Included is the removal of all refuse, debris and green waste as required. This item shall include all resources necessary to prepare access roads and the removal and disposal of refuse generated. Refuse shall be disposed of at the active working face at Mid-Valley Landfill. Transportation costs to and from the landfill active face shall be included in this

Page C01029-2 item. No tipping fees are required for the trucks; however, all trucks must be weighed.

Payment for this item will be on a LS basis.

4.3 SURVEY (PRE- AND POST-CONSTRUCTION)

Supply all material, equipment, and labor necessary to perform surveying tasks, including initial layout survey for piping, treatment facility grading and earthwork, and as-built survey of piping and wells. Payment for this item will be on a LS basis.

4.4 GENERAL EARTHWORK AND GRADING

Supply all materials, equipment, and labor for the earthwork and grading of the flare station area. Excavation includes removal, relocation, or disposal of any rocks, and boulders in the approximate area as shown on the Construction Drawings, Sheet C-103.

Payment for this item will be on a LS basis.

4.5 STORM DRAIN DEMOLITION

Supply all materials, equipment, and labor for partial removal and modification (grout/plug) of the existing storm drain, as well as partial removal of existing headwall, as shown on the Construction Drawings, Sheet C-102. Payment for this item will be on a LS basis.

4.6 FENCE REMOVAL

Supply all materials, equipment, and labor for the removal of existing fencing as shown on the Construction Drawings, Sheet C-102. Payment for this work will be on a unit price LS basis.

4.7 RELOCATION OF EXISTING STORAGE AND CARGO CONTAINERS

Supply all materials, equipment, and labor for the relocation of the existing storage and cargo containers as shown on the Construction Drawings, Sheets C-101, C-102, and M-

101. Payment for this item will be on a unit price EA basis.

4.8 RELOCATION OF EXISTING FLARE STATION MOBILE O&M OFFICE TRAILER

Supply all materials, equipment, and labor for the relocation of existing flare station O&M mobile office trailer. This includes associated portable staircases and general utility connections as shown on the Construction Drawings, Sheets C-101, C-102, and M-101.

Page C01029-3

4.9 SAWCUT AND REMOVAL OF AC BERM AND PAVEMENT

Supply all material, equipment, and labor for the sawcut and removal of the asphalt concrete (AC) berm and pavement as shown on Construction Drawings, Sheet C-102.

Payment for this item will be on a unit price LS basis.

4.10 DEMOLITION AND REMOVAL OF EXISTING CONCRETE SLABS, FOOTINGS,

CONDUITS AND APPURTENANCES

Supply all materials, equipment, and labor for the demolition and removal of existing concrete slabs in the flare station area. Excavation includes removal, relocation, or disposal of slabs, footings, and conduits in the approximate area as shown on the Construction Drawings, Sheet C-102. Payment for this item will be on a LS basis.

4.11 SALVAGE EXISTING CONDENSATE SUMP ASSEMBLY

Supply all materials, equipment, and labor to salvage an existing condensate sump assembly and appurtenances. Work includes excavation of condensate sump assembly, backfill, and compaction of excavated area as shown on the Construction Drawings, Sheets C-102 and C-502. Payment for this item will be on a LS basis.

4.12 DEMOLITION AND DISPOSAL OF EXISTING FLARE STATION

Contractor will be responsible for the removal of the existing LFG flare station, excluding infrastructure related to the connection of the new flare station, within 60 days of startup and successful source testing of the new flare. Contractor will be responsible for demolition and/or disposal of equipment, including but not limited to blower(s), flare(s), tank(s), interconnection piping, pump(s), surrounding fencing, concrete pads and foundations, and electrical infrastructure. Salvage blower(s) and/or any other items at the discretion of the County. Demolished materials will be scrapped and removed from the site. Contractor will be responsible for disposal on-site (no disposal fees for dumping of non-hazardous materials on-site). All materials must go through scales for weight.

Contractor will be required to perform asbestos testing and share results prior to decommissioning the existing flare station. The Contractor will bear the cost of decommissioning the LFG flare station. Payment for this item will be made on a LS basis.

4.13 INSTALL CONDENSATE SUMP ASSEMBLY “A” AND APPURTENANCES

Supply all materials, equipment, and labor to install condensate sump assembly “A” and appurtenances. Sump assembly includes a slurry component (mixture of liquid and solid materials) used to facilitate the collection and transport of various substances within the system. Work includes excavation of area for condensate sump assembly, backfill, and compaction as shown on the Construction Drawings, Sheets C-103, C-301, and C-502.

Page C01029-4

4.14 INSTALL CONDENSATE SUMP ASSEMBLY “B” AND APPURTENANCES

Supply all materials, equipment, and labor to install condensate sump assembly “B” and appurtenances. Sump assembly includes a slurry component (mixture of liquid and solid materials) used to facilitate the collection and transport of various substances within the system. Work includes excavation of area for condensate sump assembly, backfill, and compaction as shown on the Construction Drawings, Sheets C-103, C-302, and C-502.

Payment for this item will be on a LS basis.

4.15 INSTALL 30-INCH SDR-17 HDPE PIPE (FIELD PIPING)

Supply all materials, equipment, and labor for the installation of 30-inch diameter SDR- 17 HDPE pipe as shown on the Construction Drawings, Sheet C-103, C-301, and C-502.

Piping, fittings, reducers, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.16 INSTALL 24-INCH SDR-17 HDPE PIPE (FIELD PIPING)

Supply all materials, equipment, and labor for the installation of 24-inch diameter SDR- 17 HDPE pipe as shown on the Construction Drawings, Sheet C-103. Piping, fittings, reducers, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.17 INSTALL 24-INCH BUTTERFLY VALVE

Supply all materials, equipment, and labor for the installation of 24-inch Butterfly Valve as shown on the Construction Drawings, Sheet C-103. Valve extension, gear operator, fittings, and hardware will be provided by the Contractor. Payment for this item will be on a unit price EA basis.

4.18 INSTALL 18-INCH SDR-17 HDPE PIPE (FIELD PIPING)

Supply all materials, equipment, and labor for the installation of 18-inch diameter SDR- 17 HDPE pipe as shown on the Construction Drawings, Sheets C-103, C-301, C-302, and C-501. Piping, fittings, reducers, and appurtenances will be provided by the Contractor.

Payment for this item will be on a unit price LS basis.

4.19 INSTALL 12-INCH SDR-17 HDPE PIPE (FIELD PIPING)

Supply all materials, equipment, and labor for the installation of 12-inch diameter SDR- 17 HDPE pipe as shown on the Construction Drawings, Sheets C-103, C-301, C-302, and C-502. Piping, fittings, and reducers will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

Page C01029-5

4.20 INSTALL SALVAGED 12-INCH BUTTERFLY VALVE

Supply all equipment and labor for the installation of salvaged 12-inch Butterfly Valve as shown on the Construction Drawings, Sheet C-502. Valve to be salvaged is located at the existing condensate sump to be removed, north of the existing flare station shown on Sheet C-102. Payment for this item will be on a unit price EA basis.

4.21 INSTALL 4-INCH SDR-11 HDPE x 8-INCH SDR-17 HDPE DUAL CONTAINED

PIPING

Supply all materials, equipment, and labor for the installation of 4-inch SDR-11 HDPE x 8-inch SDR- 17 HDPE Dual Contained Piping as shown on the Construction Drawings, Sheets C-103 and C-502. Piping, fittings, reducers, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.22 INSTALL 4-INCH HDPE BALL VALVE

Supply all materials, equipment, and labor for the installation of a 4-inch diameter HDPE Ball Valve as shown on the Construction Drawings, Sheets C-302 and C-502. Payment for this item will be on a unit price EA basis.

4.23 INSTALL 2-INCH SDR-9 HDPE PIPE (FIELD PIPING)

Supply all materials, equipment, and labor for the installation of 2-inch diameter SDR-9 HDPE pipe as shown on the Construction Drawings, Sheets C-103, C-301, C-302, and C-

502. Piping, fittings, reducers, and appurtenances will be provided by the Contractor.

Payment for this item will be on a unit price LF basis.

4.24 INSTALL 2-INCH SDR-11 HDPE PIPE (FIELD PIPING)

Supply all materials, equipment, and labor for the installation of 2-inch diameter SDR-11 HDPE pipe as shown on the Construction Drawings, Sheets C-301, C-302, and C-502.

Piping, fittings, reducers, insulation, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.25 INSTALL 2-INCH SDR-11 HDPE x 4-INCH SDR-17 HDPE DUAL CONTAINED

PIPING

Supply all materials, equipment, and labor for the installation of 2-inch SDR-11 HDPE x 4-inch SDR-17 HDPE Dual Contained Piping as shown on the Construction Drawings, C- 103, C-301, C-302, and C-502. Piping, fittings, reducers, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

Page C01029-6

4.26 INSTALL 1-INCH SDR-11 HDPE PIPE (FIELD PIPING)

Supply all materials, equipment, and labor for the installation of 1-inch diameter SDR-11 HDPE pipe as shown on the Construction Drawings, Sheets C-301, C-302, and C-502.

Piping, fittings, reducers, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.27 INSTALL 6-INCH AC PAVEMENT OVER 12-INCH CLASS 2 BASE

Supply all materials, equipment, and labor for the installation of 6-inch AC Pavement over 12-inch Class 2 Base as shown on the Construction Drawings, Sheets C-103, C-301, and C-302. Payment for this item will be on a unit price LS basis.

4.28 SAWCUT AND REMOVAL OF EXISTING AC PAVEMENT

Supply all materials, equipment, and labor for the sawcut and removal of existing AC pavement as shown on the Construction Drawings, Sheets C-103, C-105, C-301, and C-

302. Assume 6-inches of AC Pavement over 12-inches of Class 2 Base as seen on Sheets C-301 and C-302. Payment for this item will be on a unit price LS basis.

4.29 INSTALL 6-INCH AC PAVEMENT BERM

Supply all materials, equipment, and labor for the installation of a 6-inch high AC Pavement Berm as shown on the Construction Drawings, Sheets C-103 and C-105.

Payment for this item will be on a unit price LF basis.

4.30 INSTALL 1.5-INCH CLASS 150 PVC WATER LINE

Supply all materials, equipment, and labor for the installation of a 1.5-inch diameter Class 150 PVC Water Line. Check Valve Assembly, thrust blocks, ball valve, hose bib, trenching, backfill, compaction, and appurtenances will be provided by the Contractor as shown on the Construction Drawings, Sheet C-105 and C-503. Payment for this item will be on a unit price LF basis.

4.31 INSTALL 6-INCH HDPE DRAIN LINE

Supply all materials, equipment, and labor for the installation of a 6-inch diameter drain line shown on the Construction Drawings, Sheet C-103 and C-104. Atrium inlet grate, mitered drainage gate outlet, trenching, backfill, compaction, concrete, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

Page C01029-7

4.32 INSTALL 6-INCH BOLLARD

Supply all materials, equipment, and labor for the installation of a 6-inch Bollard as shown on the Construction Drawings, Sheet C-103 and Detail 8/C-501. Payment for this item will be on a unit price EA basis.

4.33 INSTALLATION AND ANCHORING OF TWO FLARE STACKS, TWO

COMBUSTION AIR BLOWERS, TWO GAS HANDLING SKIDS (GHS-1/GHS-2),

TWO COMPRESSOR SYSTEMS, RELATED INSTRUMENTATION, PIPING,

FITTINGS, EQUIPMENT, AND ANCILLARY ITEMS

Supply all materials, equipment, and labor for the construction and installation of two (2) Enclosed Low NOX Ground Flares (FLR-1 and FLR-2), two (2) Combustion Air Blowers (BLR-401 and BLR-402), two (2) Gas Handling Skids (GHS-1 and GHS-2), two (2) air compressors/dryers, and ancillary items. Supply the labor for the assembly of the source test platform for both flare systems. The flare systems and associated hardware, combustion air blowers, gas handling skids, compressors/dryers, oil/water separator, and ancillary items will be supplied by Perennial Energy, Inc (PEI). The Contractor will be responsible for the procurement, installation, and assembly of piping/equipment to interconnect piping, shimming and grouting of skids, and anchoring of equipment. This includes all fittings, instrumentation, and appurtenances as shown on the Construction Drawings, Sheet M-101 and S-DWGS. Payment for this item will be on a LS basis.

4.34 PIPE AND EQUIPMENT LABELING

Supply all material, equipment, and labor necessary for the installation of labels on piping and equipment per Detail 4/M-502. Payment for this item will be on a LS basis.

4.35 INSTALL ½-INCH GALVANIZED CARBON STEEL PIPING AND FITTINGS

Supply materials, equipment, and labor for the installation of ½-inch diameter galvanized carbon steel pipe as shown on the Construction Drawings, Sheet M-101. Piping, fittings, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.36 INSTALL ½-INCH SCHEDULE 40 BLACK IRON PIPE AND FITINGS

Supply materials, equipment, and labor for the installation of above grade ½-inch diameter SCH 40 black iron pipe as shown on the Construction Drawings, Sheet M-101.

Piping, fittings, and appurtenances will be provided by the Contractor. Payment for this

Page C01029-8

4.37 INSTALL ½-INCH SCHEDULE 40 STAINLESS STEEL PIPE

Supply all materials, equipment, and labor for the installation of ½-inch diameter SCH 40 stainless steel pipe as shown on the Construction Drawings, Sheet M-101. Piping, fittings, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.38 INSTALL 1-INCH SCHEDULE 80 PVC PIPING, VALVE, AND FITTINGS

Supply materials, equipment, and labor for the installation of 1-inch diameter SCH 80 PVC pipe as shown on the Construction Drawings, Sheet M-101. Piping, valve, fittings, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.39 INSTALL 1-INCH SCHEDULE 40 GALVANIZED CARBON STEEL PIPING AND

FITTINGS

Supply materials, equipment, and labor for the installation of 1-inch diameter SCH 40 galvanized carbon steel pipe as shown on the Construction Drawings, Sheet M-101.

Piping, fittings, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.40 INSTALL 2-INCH SDR-9 HDPE PIPE (FLARE STATION)

Supply all materials, equipment, and labor for the installation of 2-inch diameter SDR-9 HDPE pipe as shown on the Construction Drawings, Sheet M-101. Piping, fittings, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.41 INSTALL 2-INCH SDR-11 HDPE PIPE (FLARE STATION)

Supply all materials, equipment, and labor for the installation of above grade 2-inch diameter SDR-11 HDPE pipe as shown on the Construction Drawings, Sheet M-101.

Piping, fittings, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.42 INSTALL 2-INCH SCHEDULE 80 PVC PIPING AND FITTINGS

Supply all equipment and labor for the installation of 2-inch diameter SCH 80 PVC pipe and fittings as shown on the Construction Drawings, Sheet M-101 and Detail 1/M-501.

Piping, fittings, and appurtenances will be provided by the Contractor. Payment for this

Page C01029-9

4.43 INSTALL 8-INCH SQUARE METAL SIGN

Supply all materials, equipment, and labor for the assembly and installation of 8-inch square metal sign. This includes all fittings, associated hardware, and appurtenances as shown on the Construction Drawings, Details 5 and 6/M-501. Payment for this item will be on a unit price EA basis.

4.44 INSTALL 12-INCH SDR-17 HDPE PIPE (FLARE STATION)

Supply all materials, equipment, and labor for the installation of 12-inch diameter SDR- 17 HDPE pipe as shown on the Construction Drawings, Sheet M-101. Piping, fittings, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.45 INSTALL 12-INCH SCHEDULE 10 STAINLESS STEEL PIPE

Supply all materials, equipment, and labor for the installation of 12-inch diameter SCH 10 stainless steel pipe and fittings as shown on the Construction Drawings, Sheet M-101.

Piping, fittings, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.46 INSTALL 18-INCH x 12-INCH HDPE REDUCER

Supply all materials, equipment, and labor for the assembly and installation of 18-inch x 12-inch HDPE Reducer as shown on the Construction Drawings, Sheet M-101. Payment for this item will be on a unit price EA basis.

4.47 INSTALL 24-INCH SDR-17 HDPE PIPE (FLARE STATION)

Supply all materials, equipment, and labor for the installation of 24-inch diameter SDR- 17 HDPE pipe as shown on the Construction Drawings, Sheet M-101. Piping, fittings, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price LF basis.

4.48 INSTALL SMALL PIPE SUPPORT STAND AND CONCRETE FOOTING

Supply all materials, equipment, and labor for the installation of pipe support stand and concrete footing as shown on the Construction Drawings, Sheet M-101 and Detail 2/M-

501. Fittings, strut channel, clamps, bolts, nuts, washers, and appurtenances will be provided by the Contractor. Payment for this item will be on a LS basis.

4.49 INSTALL SMALL CONDUIT/PIPE ANCHOR

Supply all materials, equipment, and labor for the installation of small conduit/pipe anchor as shown on the Construction Drawings, Sheet M-101 and Detail 3/M-501.

Page C01029-10

Fittings, strut channel, clamps, bolts, nuts, washers, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price EA basis.

4.50 INSTALL SMALL PIPE H SUPPORT

Supply all materials, equipment, and labor for the installation of small pipe H support as shown on the Construction Drawings, Sheet M-101 and Detail 4/M-501. Fittings, strut channel, clamps, bolts, nuts, washers, and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price EA basis.

4.51 INSTALL 7-INCH x 10-INCH DANGER SIGN

Supply all materials, equipment, and labor for the installation of 7-inch x 10-inch Danger Sign as shown on the Construction Drawings, Sheet M-101 and Detail 1/M-502. Wall fasteners and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price EA basis.

4.52 INSTALL CABLE RAMP

Supply all materials, equipment, and labor for the assembly and installation of cable ramps as shown on the Construction Drawings, Sheet M-101. Payment for this item will be on a unit price EA basis.

4.53 INSTALL PORTABLE EYEWASH STATION

Supply all materials, equipment, and labor for the installation of a portable eyewash station as shown on the Construction Drawings, Sheet M-101. Wall fasteners and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price EA basis.

4.54 INSTALL FIRE EXTINGUISHER

Supply all materials, equipment, and labor for the installation of a fire extinguisher as shown on the Construction Drawings, Sheet M-101. Mounting bracket, wall fasteners and appurtenances will be provided by the Contractor. Payment for this item will be on a unit price EA basis.

4.55 INSTALL CONDENSATE STORAGE TANK AND APPURTENANCES

Supply all material, equipment, and labor for the construction and installation of one (1) 8,700-gallon condensate holding tank with secondary containment and seismic restraint system, 55 gallon GAC drum, pipe rack, 2-inch stainless steel flame check, sample ports, and appurtenances as shown on the Construction Drawings, Detail 1/M-501 and Sheet M-101 (piping and electrical are separate line items). Payment for this item will be made on a LS basis.

Page C01029-11

4.56 INSTALL 2-INCH PVC TRUE-UNION BALL VALVE

Supply all materials, equipment and labor for the assembly and installation of 2-inch PVC true-union ball valves as shown on the Construction Drawings, Sheet M-101. Payment for this item will be made on a unit price EA basis.

4.57 INSTALL 2-INCH HDPE BALL VALVE

Supply all materials, equipment and labor for the assembly and installation of 2-inch HDPE ball valves as shown on the Construction Drawings, Sheet M-101 and Detail 5/M-

501. Payment for this item will be made on a unit price EA basis.

4.58 INSTALL PROPANE BOTTLES

Supply all material, equipment, and labor for the installation of 5-gallon propane bottles as shown on the Construction Drawings, Sheet M-101. This item includes procurement, and installation of propane bottles. Payment for this item will be on a unit price EA basis.

4.59 INSTALL 8-INCH HDPE FLANGE CONNECTION

Supply all materials, equipment and labor for the assembly and installation of 8-inch flange connection. Flange adapter, ductile iron back-up ring, gasket, and bolt kit will be provided by the Contractor as shown on the Construction Drawings, M-101. Payment for this item will be on a unit price EA basis.

4.60 INSTALL 12-INCH BUTTERFLY VALVE

Supply all equipment and labor for the installation of 12-inch Butterfly Valve with gear operator as shown on the Construction Drawings, Sheet M-101. Payment for this item will be on a unit price EA basis.

4.61 INSTALL PIPE SUPPORT TYPE “A”

Supply all equipment and labor for the installation of pipe support Type “A”. Base plate, square tubing, strut channel, pipe clamp, metal cap, neoprene pad, welding, anchor bolts, and appurtenances will be provided by the Contractor as shown on the Construction Drawings, Sheets S-506, M-101, and Detail 1/S-502. Payment for this item will be on a unit price EA basis.

4.62 INSTALL PIPE SUPPORT TYPE “B”

Supply all equipment and labor for the installation of pipe support Type “B”. Base plate, square tubing, strut channel, pipe clamp, metal cap, neoprene pad, welding, anchor bolts, and appurtenances will be provided by the Contractor as shown on the Construction

Page C01029-12

Drawings, Sheet S-506, M-101, and Detail 1/S-502. Payment for this item will be on a unit price EA basis.

4.63 INSTALL PIPE SUPPORT TYPE “C”

Supply all equipment and labor for the installation of pipe support Type “C”. Base plate, square tubing, strut channel, pipe clamp, metal cap, neoprene pad, welding, anchor bolts, and appurtenances will be provided by the Contractor as shown on the Construction Drawings, Sheets S-506, M-101, and Detail 1/S-502. Payment for this item will be on a unit price EA basis.

4.64 INSTALL PIPE SUPPORT TYPE “D”

Supply all equipment and labor for the installation of pipe support Type “D”. Base plate, square tubing, strut channel, pipe clamp, metal cap, neoprene pad, welding, anchor bolts, and appurtenances will be provided by the Contractor as shown on the Construction Drawings, Sheets S-502, M-101, and Detail 1/S-502. Payment for this item will be on a unit price EA basis.

4.65 INSTALL PIPE SUPPORT TYPE “E”

Supply all equipment and labor for the installation of pipe support Type “E”. Base plate, square tubing, strut channel, pipe clamp, metal cap, neoprene pad, welding, anchor bolts, and appurtenances will be…