Addendum 4 - Final QUESTIONS Final.pdf
PDF 11 MB Posted
- Solicitation number
- PWG126-SOLID-6143
- Issued by
- San Bernardino County, San Bernardino City, California
About this file
Addendum 4 to Landfill Gas Flare Station Construction Project
This is an addendum to the Request for Bid issued by the San Bernardino County Solid Waste Management Division for the Landfill Gas Flare Station at the Mid-Valley Sanitary Landfill in Rialto, California. The project involves the design, fabrication, installation, and commissioning of a complete landfill gas flare station including two enclosed low NOx ground flares, two gas handling skids, two combustion air blowers, two compressor systems, condensate management systems, structural work, piping, electrical systems, and control systems. The original bid due date of December 9, 2025, has been extended to December 16, 2025, at 10:00 a.m. The bid schedule includes 88 line items covering demolition, site preparation, equipment installation, structural construction, mechanical and electrical work, with pricing on a lump sum or unit price basis. The project requires the contractor to supply all materials, equipment, and labor for complete construction and installation as detailed in the specifications and drawings.
Pricing, Scope, and Project Requirements
Bidders are required to acknowledge receipt of Addendum 4 and submit revised bid schedules numbered 22-1R1 through 22-4R1, with bids not submitted on the revised schedule deemed non-responsive. Electronic bid bonds are not accepted; hard copy bid bonds are required per Instructions to Bidders. The project specifications reference extensive technical requirements including independent testing and special inspections compliant with California Building Code and California Electrical Code, with the contractor responsible for all quality control services. Key project clarifications address equipment delivery coordination through Vu Nguyen at 840-587-2582, clarification that all existing flare station equipment must be disposed of except concrete pads, confirmation that the existing flare station must remain operational until the new system is commissioned, and provision of unloading and assembly instructions for all vendor-supplied equipment. The contractor must complete demolition and removal of the existing flare station within 60 days of new flare startup and successful source testing, with the county retaining discretion to salvage certain equipment. A detailed bid schedule outlines estimated quantities for items including mobilization, clearing and grubbing, site improvements, piping installations of various materials and sizes, equipment installation and anchoring, structural work, electrical systems, permits, and system startup and testing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAN BERNARDINO COUNTY
SOLID WASTE MANAGEMENT DIVISION
222 West Hospitality Lane, 2nd Floor San Bernardino, CA 92415-0017
Fax: 909-386-8900
ADDENDUM NO. 4
TO THE PLANS AND BID DOCUMENTS FOR
THE LANDFILL GAS FLARE STATION at the MID VALLEY SANITARY LANDFILL in Rialto, California
December 04, 2025
BID DUE DATE: 10:00AM DECEMBER 9, 2025
BID DUE DATE: 10:00AM DECEMBER 16, 2025
The following changes and/or additions shall be made to the Plans and Bid Documents for the Landfill Gas Flare Station at the Mid Valley Sanitary Landfill. All other requirements of the Plans and Bid Documents shall remain the same.
The following changes are to be made part of the Contract Documents. Bidders are required to acknowledge receipt of these changes on the Bid Proposal.
I. REVISED BID DATE:
Bid Opening Date has been modified, Special Provisions Page 1, as follows:
“Notice is herby given that the San Bernardino County, Department of Public Works – Solid Waste Management Division on behalf of the Board of the San Bernardino County, California will receive sealed bis no later than 10:00 a.m. on December 16, 2025, in the Department of Public Works, Solid Waste Management Division offices, locate at 222 W.
Hospitality Lane, 2nd Floor, San Bernardino, California, 92415-0017, at which time the bids will be publicly opened and declared for the Landfill Gas Flare Station at the Mid Valley Sanitary Landfill in Rialto, California. Bid received after this time will not be considered.”
II. PROJECT PLANS AND SPECIFICATIONS
1. Delete and Replace Section C1 in its entirety of the Technical Specifications with Section C1 contained within Attachment 3.
2. Delete and replace in its entirety Bid Schedule supplied in the bid documents with the Revised Bid Schedule (numbered 22-1R1 thru 22-4R1) in Attachment 4. Bids not submitted on Revised Bid Schedule will be deemed Non-Responsive.
III. PROJECT QUESTIONS AND ANSWERS
1. Will the County accept an electronic bid bond instead of a hard copy?
No, refer to Section IV. Bid Deposit (Bid Bond) of Instructions to Bidders (Yellow Pages).
2. Who would be our contact for scheduling equipment delivery?
Please contact Vu Nguyen, SWMD Project Engineer @ 840-587-2582 or vu.nguyen@dpw.sbcounty.gov
3. For Bid Line Item 12, would the County clarify what will and won’t be salvaged so we can provide an accurate estimate?
Contractor is to assume all equipment and materials in the existing flare station will need to be disposed of, except for the concrete pads/slabs. Please note that the County may elect to keep certain equipment and remove from the existing Flare Station prior to Contractor completing this demolition and disposal work per Line Item 12.
4. The bid proposal checklist and assembly sheets, item 3 on page 3, indicates if we are submitting our bid thru ePro, we should include in our submission the fully executed bid proposal on Yellow Page 6. Does the County mean we should submit the entire Yellow section, which starts on Yellow page 6?
Bidders must submit the pink sheets and yellow sheets, page 3 through page 37, in addition to any additional required documents.
5. Bid line item 77, please clarify what is expected to be completed by the contractor?
Supply all material, equipment, and labor to assist with permitting and provide any special inspections as required by the County (including any Special Inspections for Concrete curing and testing).
6. Field Piping:
a. Bid Line Item 15 has (1) LF in qty. is this accurate?
Quantity should be “LS” or Lump Sum. However, please note that Line Item 15 does include the approximate quantity of piping required (80 LF) in the “Description of Work” column. See revised Bid Schedule, Attachment 4.
b. Bid Line items 16 & 18 have LS unit rates, is this accurate?
Yes, line Items are lump sum packages that includes all the piping, fittings, reducers, and appurtenances required. Each of the line items lists the approximate length of pipe required in LF for estimating purposes in the “Description of Work” column.
7. The flow diagram, d-601, indicate that the existing flare station needs to remain in service until the new flare is fully commissioned. However, the piping drawings do not provide previsions to allow for both the new and existing piping to be in service simultaneously, as the Flow Diagram does.
The existing flare will need to remain in service until the new flare is fully commissioned. A flow diagram is attached Drawing G-003, C-502 and D-601 (Revisions are clouded) Attachment 2. In addition see attached revised Technical Specification Section C01029, Attachment 3.
8. We request installation manuals for all the Owner supplied equipment.
Please find attached the unloading and assembly instructions provided by PEI.
9. Based on the job walk I get the impression that the Owner??s Vendor would be responsible for commissioning their equipment. The specs indicate that we are responsible for commissioning, but if the Owner commissions their supplied equipment our involvement would be limited. Please Clarify.
The County, Design Engineer, CQA, and Flare Equipment Supplier (PEI) will be present during system start-up and testing. During this period, if any components require replacement, repair, adjustment, or similar work, the general contractor and its subcontractors (mechanical/electrical) shall be available to provide assistance, including equipment and labor.
10. What are the weights for the GHS-1 & 2 skids Are Flares #1 & @2 being shipped in one piece, what are the weights? For CAB 401 &402 what are the weights being shipped?
Please find attached the top assemblies of the skids and flares along with the overall layout provided by PEI which includes the weights.
11. Where will the dirt from the pad excavation be taken?
The excavated material will be transported to the bottom of Unit 4, where landfill operations are currently occurring. Contractor shall coordinate with Construction Manager and Landfill Operator.
12. Please confirm the SOV units for bid items 15, 44, 45, and 47.
Quantity is “LS” or “Lump Sum” since each line items contains piping, fittings, reducers, and appurtenances. Please note each line item has the approximate length of piping required in the “Description of Work” column for estimating purposes. No additional compensation, outside of this budgeted line item, will be provided for the referenced piping, fittings, reducers and appurtenances.
13. Are there more ground wells to be installed than the two called out on the plans on sheet E-101 Per Detail 4/E-501?
No, only these two ground wells are required.
14. Please confirm that the contractor is required to provide independent inspection and testing services as specified in Section C01650, Part 1.01(F).
Yes, the contractor is responsible for providing independent inspections and testing services in accordance with CBC and CEC provisions, including any Special Inspections required by the County.
15. Could SWMD please provide the top-of-footing elevations for the two steps in the 12" CMU wing wall located north of the East Wall profile?
As seen on Sheet C-202, the lower top-of-footing elevation before the steps is 1589.00 and the upper top-of-footing elevation after the steps is 1591.00. Assuming a standard riser height of approximately 8 inches, the top-of-footing elevations for the two steps should be 1589.66 and 1590.33, respectively.
16. Is there a plan to simultaneously keep the old flare system running while performing start-up and testing on the new flare system?
Please see question 7 above.
17. Page 11, Section XVII in the Instruction to Bidders references a schedule to be submitted by the Contractor. Is this schedule to be submitted at bid or once the job is awarded?
The schedule is to be provided once the Contract is awarded and once the Notice to Proceed is issued.
If you have any questions, please Pete Ligorria at (909) 386-8701 or you may contact me at
(909) 386-9017.
Johnny Gayman, P.E. Date Chief Engineer
E4635 Johnny Gayman 2024
E4635 Text Box 12/04/2025
ATTACHMENT 1
• Unloading and Assembly Instructions provided by PEI.
• Top assemblies of the skids and flares along with the overall layout provided by PEI which includes the weights.
UNLOADING AND ASSEMBLY INSTRUCTIONS
Please carefully review the packing list upon arrival and notify us of any discrepancies. We request that a signed packing list is returned to us within 48 hours of equipment arrival. If no issues are noted within this time frame we deem that all items are satisfactorily received and accounted for.
The Gas Handling System and Flare are shipped separately along with the interconnection piping and other small components. Upon arrival at the jobsite, a crane or other lifting device will be required to unload and place the unit.
Approximate weights for major equipment:
Gas Handling System 1 (GHS1): 40,000 – 45,000 lbs Gas Handling System (GHS2): 17,000 – 20, 000 lbs Enclosed Flare (FLR1): 62,000 – 65,000 lbs Enclosed Flare (FLR2): 26,000 – 30,000 lbs Combustion Air Blower (FLR-BLR-401): 11,200 – 12,000 lbs Combustion Air Blower (FLR-BLR-402): 2500 – 3000 lbs
Gas Handling System (GHS1 and GHS2) Four lifting points are provided on the skid framework to facilitate unloading of the Gas Handling System (GHS). Lifting from any other points on the system may cause damage to the system.
Spreader bars should be used when lifting to keep from damaging any components, piping, or instrumentation on the GHS. The GHS should be slowly lifted and set on the prepared concrete foundation pad. The GHS mounting feet should be anchored with appropriate, site designed anchor bolts and leveled using shims or grouting. The skid should be level to within 1/8” from foot to foot.
Enclosed Flare (FLR1 and FLR2) The Flare is shipped in a horizontal position. The two lifting points on the top of the flare and two of the flare feet are used when lifting the flare off the shipping trailer. REMOVE THE
PLYWOOD COVER FROM THE TOP OF THE FLARE BEFORE LIFTING TO THE VERTICAL
POSITION. Lift the flare to a vertical position using appropriate lifting equipment connected to the same two lifting points on the top of the flare. The flare should be slowly lifted and set on the prepared concrete foundation pad. The flare mounting feet should be anchored with appropriate, site designed anchor bolts and leveled using shims or grouting. The Burner Head will be packaged for shipment. This package will need to be removed as well.
Smaller components that ship loose from the flare and GHS can now be installed. These include, but are not limited to:
Flame arrester, flex, valves UV Scanner Pilot tile Interconnecting piping Control Panel Sun/Rain Shield
Flame arresters, flexes, and valves will need to be connected to flare as shown in PEI drawings.
Valves should be installed with the actuators in a horizontal orientation.
Pilot tiles will need to be placed in the pilot. Also, the igniter plug should be installed after the pilot tile has been placed into the pilot with the igniter opening facing the igniter port.
The landfill gas piping connections and electrical connections can now be made. In addition, the condensate drain must be connected to a proper condensate collection system. The GHS and Flare should also be properly grounded.
This is a simple overview of the installation requirements of our equipment and does not include other requirements of the installer to provide a complete installation as required in the specifications.
PLAN VIEW
SCALE 1:30
FRONT ELEV. VIEW
SCALE 1:30
RIGHT ELEV. VIEW
SCALE 1:30
ISOMETRIC VIEW
©2021 PERENNIAL ENERGY, LLC
MATERIAL: AS NOTED
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
FRACT .XX ANGLES
±1/16 ±.03 ±0°30
DRAWN BY:
A.PARKER
DATE:
8/19/21
DESIGNED BY:
J.WIENHOFF
DATE:
8/19/21
ENGINEERING SIGNATURES
D
SIZE DWG. NO.
TITLE:
PA-001-1132
GAS HANDLING SYSTEM
TOP ASSEMBLY
This Drawing Contains Proprietary Data and May Not Be Duplicated, Copied, Reproduced or Otherwise Used In Any Manner
Not in the Best Interest of Perennial Energy LLC. All Ideas and Concepts Remain the Property of Perennial Energy LLC.
APPLICABLE JOB NO(S).
MID-VALLEY LNEGFS
LTR DESCRIPTION DATE APPROVED
REVISED PER ENGINEERING REVIEW (3/23/22) AP
REVISIONS
SCALE: AS NOTED
FILE NO. PA-001-1132.dwg
SHEET 1 OF 1
www.PerennialEnergy.com
WEST PLAINS, MO 65775
1375 COUNTY ROAD 8690
A M
I
M i d V a l l e y
L N E G F S P A d w g
A P A R K E R
S
I
Z
E
F
R
O
M
R
I
G
I
N
A
L
R
E
D
U
C
E
D
EDP-1
SERVICE
ENTRY
NOTE: CONNECT
TO GROUND GRID
CADWELD HERE
NOTE: CONNECT
TO GROUND GRID
CADWELD HERE
SSR-1
PESD
FLT-301
CLASSIFIED AREA
CLASS 1, DIV 2, GROUP D
3FT CLEARANCE FROM GAS PIPE
E/E-1
BLR-303BLR-302BLR-301
n1
TYP
427 [35'-7"]
16 3/8
O V E R A L L
H E I G H T
E/E-1
FLT-301
CP-1
LFG IN
LFG
IN
NOTE:
1. CLASSIFIED AREAS ARE SPECIFICALLY NOTED. ALL OTHER AREAS ARE UNCLASSIFIED.
2. SKIDS MUST BE LEVEL 1/8" SIDE TO SIDE, 1/4" END TO END.
3. CONTACT PERENNIAL ENERGY FOR INTERIM MAINTENANCE PROCEDURES IF EQUIPMENT IS NOT
RUNNING WITHIN 21 DAYS OF ARRIVAL ON SITE.
4. REMOVE SHIPPING STANDS, BRACES, AND COVERS PRIOR TO INSTALLATION.
5. UNLESS OTHERWISE NOTED, USE ON GAS WITH MORE THAN 1500 PPM, H2S VOIDS WARRANTY.
6. BLOWERS 50HP AND ABOVE MUST HAVE SKID FRAME RAILS UNDER THE BLOWER SOLIDLY
SHIMMED OR GROUTED TO A SUITABLE CONCRETE PAD.
7. TOP ASSEMBLY DIMENSIONS SHOWN ARE NOT ACTUAL SHIPPING DIMENSIONS, CONFIRM FIELD
DIMENSIONS PRIOR TO ORDERING THE PROPER SHIPPING PERMITS.
8. ALL FLANGES ARE 125# GALVANIZED DUCTILE IRON SLIP FLANGES WITH ZINC PLATED FASTENERS.
WEIGHT: 40,000-45,000 ESTIMATED
CP-1
AC-2AC-1
TYP
TYP
SKID MOUNTING
CLAMP PLATE
COG
C O G
COG
COG
J B O X
FOOT PLAN
SCALE 1:20
TYPICAL SECTION
THRU LIFTING LUG
SCALE 1:8
PLAN VIEW
SCALE 1:25
©2021 PERENNIAL ENERGY, LLC
MATERIAL: AS NOTED
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
FRACT .XX ANGLES
±1/16 ±.03 ±0°30
DRAWN BY:
A.PARKER
DATE:
9/8/21
DESIGNED BY:
J.WIENHOFF
DATE:
9/8/21
ENGINEERING SIGNATURES
D
SIZE DWG. NO.
TITLE:
PA-001-1137
FLARE TOP ASSEMBLY
164" OD X 612" TALL
This Drawing Contains Proprietary Data and May Not Be Duplicated, Copied, Reproduced or Otherwise Used In Any Manner
Not in the Best Interest of Perennial Energy LLC. All Ideas and Concepts Remain the Property of Perennial Energy LLC.
APPLICABLE JOB NO(S).
MID-VALLEY LNEGFS
LTR DESCRIPTION DATE APPROVED
REVISED PER ENGINEERING REVIEW (12/9/21) DS
REVISIONS
SCALE: AS NOTED
FILE NO. PA-001-1137.dwg
SHEET 1 OF 2
www.PerennialEnergy.com
WEST PLAINS, MO 65775
1375 COUNTY ROAD 8690
P M
I
M i d V a l l e y
L N E G F S P A d
P A R K E R
S
I
Z
E
F
R
I
G
I
N
A
L
R
E
D
U
C
E
D
179 5/8
87 5/8
45° 45° n2 THRU
TYP(8)
n164 OD
FLARE SHELL
n171 7/8 BHC
FLARE ROLLED RING
LIFT LUG
FLARE RAIN SHIELD
FLARE SHELL
INSULATION
FLARE TRIM RING
GROUND TAB
NOTE:
CONNECT TO
GROUND GRID
CADWELD HERE
AP-2
FCV-403
FCV-402
AP-3
FCV-401
4 3/8
TYP
AP-1
AP-4
FCV-404
TE-501..3
FX-301
WEIGHT: 62,000-65,000 LBS ESTIMATED
B
U
R
N
E
I
N
L
T
ELEVATION VIEWS
SCALE 1:50
AIR BLOWER VIEWS
SCALE 1:40
ISOMETRIC VIEWS
SCALE 1:70
©2021 PERENNIAL ENERGY, LLC
MATERIAL: AS NOTED
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
FRACT .XX ANGLES
±1/16 ±.03 ±0°30
DRAWN BY:
A.PARKER
DATE:
9/8/21
DESIGNED BY:
J.WIENHOFF
DATE:
9/8/21
ENGINEERING SIGNATURES
D
SIZE DWG. NO.
TITLE:
PA-001-1137
FLARE TOP ASSEMBLY
164" OD X 612" TALL
This Drawing Contains Proprietary Data and May Not Be Duplicated, Copied, Reproduced or Otherwise Used In Any Manner
Not in the Best Interest of Perennial Energy LLC. All Ideas and Concepts Remain the Property of Perennial Energy LLC.
APPLICABLE JOB NO(S).
MID-VALLEY LNEGFS
LTR DESCRIPTION DATE APPROVED
REVISED PER ENGINEERING REVIEW (12/9/21) DS
REVISIONS
SCALE: AS NOTED
FILE NO. PA-001-1137.dwg
SHEET 2 OF 2
www.PerennialEnergy.com
WEST PLAINS, MO 65775
1375 COUNTY ROAD 8690
P M
I
M i d V a l l e y
L N E G F S P A d
P A R K E R
S
I
Z
E
F
R
I
G
I
N
A
L
R
E
D
U
C
E
D
BG-506
AP-1
FCV-401
BG-504
164Ø
9 1/2
AP-2
FCV-402
36" MANWAY
BG-508
BG-507
AP-3
FCV-403
BG-505
BG-503
TE-501
TE-502
TE-503
BG-502
BG-501
T Y P
AP-4
FCV-404
188 5/8
94 1/2
10 5/8
COG
SCALE 1:20
FOOT PLAN
SCALE 1:20
TYPICAL SECTION THRU LIFTING LUG
SCALE 1:10
SCALE 1:20
©2021 PERENNIAL ENERGY, LLC
MATERIAL: AS NOTED
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
FRACT .XX ANGLES
±1/16 ±.03 ±0°30
DRAWN BY:
A.PARKER
DATE:
12/9/21
DESIGNED BY:
J.WIENHOFF
DATE:
12/9/21
ENGINEERING SIGNATURES
D
SIZE DWG. NO.
TITLE:
PA-001-1141
FLARE TOP ASSEMBLY
92" OD X 420" TALL
This Drawing Contains Proprietary Data and May Not Be Duplicated, Copied, Reproduced or Otherwise Used In Any Manner
Not in the Best Interest of Perennial Energy LLC. All Ideas and Concepts Remain the Property of Perennial Energy LLC.
APPLICABLE JOB NO(S).
MID-VALLEY LNEGFS
LTR DESCRIPTION DATE APPROVED
REVISED PER ENGINEERING REVIEW (12/10/21) AP
REVISIONS
SCALE: AS NOTED
FILE NO. PA-001-1141.dwg
SHEET 1 OF 2
www.PerennialEnergy.com
WEST PLAINS, MO 65775
1375 COUNTY ROAD 8690
A M
I
M i d V a l l e y
L N E G F S P A d
P A R K E R
S
I
Z
E
F
R
I
G
I
N
A
L
R
E
D
U
C
E
D
WEIGHT: 26,000-30,000 LBS ESTIMATED
LADDER
45°
90° n92
FLARE
SHELL
n101 5/16
BHC
n1 1/2
THRU
FLARE INSULATION
RETAINER BAND
FLARE SHELL
FLARE RAIN SHIELD
INSULATION
FLARE TRIM RING
LIFT LUG
GROUND TAB
NOTE:
CONNECT TO
GROUND GRID
CADWELD HERE
BURNER INLET
FCV-406
TSE-302
FX-302
FV-302
8" 150# FLANGE
CONNECTION
FCV-405
36 1/4
108 3/4
45°
ELEVATION VIEWS
SCALE 1:36
ISO VIEWS
SCALE 1:50
AIR BLOWER VIEWS
SCALE 1:40
©2021 PERENNIAL ENERGY, LLC
MATERIAL: AS NOTED
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
FRACT .XX ANGLES
±1/16 ±.03 ±0°30
DRAWN BY:
A.PARKER
DATE:
12/9/21
DESIGNED BY:
J.WIENHOFF
DATE:
12/9/21
ENGINEERING SIGNATURES
D
SIZE DWG. NO.
TITLE:
PA-001-1141
FLARE TOP ASSEMBLY
92" OD X 420" TALL
This Drawing Contains Proprietary Data and May Not Be Duplicated, Copied, Reproduced or Otherwise Used In Any Manner
Not in the Best Interest of Perennial Energy LLC. All Ideas and Concepts Remain the Property of Perennial Energy LLC.
APPLICABLE JOB NO(S).
MID-VALLEY LNEGFS
LTR DESCRIPTION DATE APPROVED
REVISED PER ENGINEERING REVIEW (12/10/21) AP
REVISIONS
SCALE: AS NOTED
FILE NO. PA-001-1141.dwg
SHEET 2 OF 2
www.PerennialEnergy.com
WEST PLAINS, MO 65775
1375 COUNTY ROAD 8690
A M
I
M i d V a l l e y
L N E G F S P A d
P A R K E R
S
I
Z
E
F
R
I
G
I
N
A
L
R
E
D
U
C
E
D n92
FCV-401
FCV-402
47 1/2
79 1/8
T Y P
7 1/4
36" MANWAY
30" MANWAY
BG-515
BG-516
BG-512
TE-504
TE-505
TE-506
BG-511
BG-514
AP-6
AP-7
AP-8
AP-5
C.O.G.
BG-513
BG-509
BG-510
FRONT ELEVATION VIEW
SCALE 1:24
PLAN VIEW
SCALE 1:24
RIGHT ELEVATION VIEW
SCALE 1:24
ISOMETRIC VIEW
SCALE 1:20
©2021 PERENNIAL ENERGY, LLC
MATERIAL: AS NOTED
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
FRACT .XX ANGLES
±1/16 ±.03 ±0°30
DRAWN BY:
A.PARKER
DATE:
10/27/21
DESIGNED BY:
J.WIENHOFF
DATE:
10/27/21
ENGINEERING SIGNATURES
D
SIZE DWG. NO.
TITLE:
PA-001-1153
COMBUSTION AIR BLOWER
401 TOP ASSEMBLY
This Drawing Contains Proprietary Data and May Not Be Duplicated, Copied, Reproduced or Otherwise Used In Any Manner
Not in the Best Interest of Perennial Energy LLC. All Ideas and Concepts Remain the Property of Perennial Energy LLC.
APPLICABLE JOB NO(S).
MID-VALLEY LNEGFS
LTR DESCRIPTION DATE APPROVED
REVISED PER ENGINEERING REVIEW (12/9/21) DS
REVISIONS
SCALE: AS NOTED
FILE NO. PA-001-1153.dwg
SHEET 1 OF 1
www.PerennialEnergy.com
WEST PLAINS, MO 65775
1375 COUNTY ROAD 8690
A M
I A C A D F
M i d V a l l e y
L N E G F S P A d
P A R K E R
P
E
R
E
N
N
I
L
E
R
G
Y
C
O
N
L
Y
F
V
I
E
W
I
N
F
O
P
R
E
L
I
M
I
N
A
R
Y
S
I
Z
E
F
R
I
G
I
N
A
L
R
E
D
U
C
E
D
NOTE:
1. CLASSIFIED AREAS ARE SPECIFICALLY NOTED. ALL OTHER AREAS ARE UNCLASSIFIED.
2. SKIDS MUST BE LEVEL 1/8" SIDE TO SIDE, 1/4" END TO END.
3. CONTACT PERENNIAL ENERGY FOR INTERIM MAINTENANCE PROCEDURES IF EQUIPMENT IS NOT
RUNNING WITHIN 21 DAYS OF ARRIVAL ON SITE.
4. REMOVE SHIPPING STANDS, BRACES, AND COVERS PRIOR TO INSTALLATION.
5. UNLESS OTHERWISE NOTED, USE ON GAS WITH MORE THAN 1500 PPM, H2S VOIDS WARRANTY.
6. BLOWERS 50HP AND ABOVE MUST HAVE SKID FRAME RAILS UNDER THE BLOWER SOLIDLY
SHIMMED OR GROUTED TO A SUITABLE CONCRETE PAD.
7. TOP ASSEMBLY DIMENSIONS SHOWN ARE NOT ACTUAL SHIPPING DIMENSIONS, CONFIRM FIELD
DIMENSIONS PRIOR TO ORDERING THE PROPER SHIPPING PERMITS.
8. DO NOT USE THIS DRAWING FOR LOCATION OF CAST IN PLACE ANCHORS.
1/2
1/2
94 1/2
6 1/2
REF
14 3/4
REF
196 1/8
193 1/8
96 5/16
1 1/2 n16) TYP
1 1/2
73 1/4
93 5/16
3 13/16
25 11/16
COG
1 1/16
COG
WEIGHT: 11,200-12,000 LBS (ESTIMATED)
SCALE 1:10
RIGHT ELEVATION VIEW
SCALE 1:10
PLAN VIEW
SCALE 1:10
ISOMETRIC VIEW
SCALE 1:10
©2021 PERENNIAL ENERGY, LLC
MATERIAL: AS NOTED
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
FRACT .XX ANGLES
±1/16 ±.03 ±0°30
DRAWN BY:
A.PARKER
DATE:
10/28/21
DESIGNED BY:
J.WIENHOFF
DATE:
10/28/21
ENGINEERING SIGNATURES
D
SIZE DWG. NO.
TITLE:
PA-001-1154
COMBUSTION AIR BLOWER
402 TOP ASSEMBLY
This Drawing Contains Proprietary Data and May Not Be Duplicated, Copied, Reproduced or Otherwise Used In Any Manner
Not in the Best Interest of Perennial Energy LLC. All Ideas and Concepts Remain the Property of Perennial Energy LLC.
APPLICABLE JOB NO(S).
MID-VALLEY LNEGFS
LTR DESCRIPTION DATE APPROVED
REVISED PER ENGINEERING REVIEW (12/10/21) AP
REVISIONS
SCALE: AS NOTED
FILE NO. PA-001-1154.dwg
SHEET 1 OF 1
www.PerennialEnergy.com
WEST PLAINS, MO 65775
1375 COUNTY ROAD 8690
A M
O A C A D F
M i d V a l l e y
L N E G F S P A d
P A R K E R
P
E
R
E
N
N
I
E
R
G
Y
C
O
N
L
Y
F
V
I
E
W
I
N
F
O
P
R
E
L
I
M
I
N
A
R
Y
S
I
Z
E
F
R
I
G
I
N
A
L
R
E
D
U
C
E
D
NOTE:
1. CLASSIFIED AREAS ARE SPECIFICALLY NOTED. ALL OTHER AREAS ARE UNCLASSIFIED.
2. SKIDS MUST BE LEVEL 1/8" SIDE TO SIDE, 1/4" END TO END.
3. CONTACT PERENNIAL ENERGY FOR INTERIM MAINTENANCE PROCEDURES IF EQUIPMENT IS NOT
RUNNING WITHIN 21 DAYS OF ARRIVAL ON SITE.
4. REMOVE SHIPPING STANDS, BRACES, AND COVERS PRIOR TO INSTALLATION.
5. UNLESS OTHERWISE NOTED, USE ON GAS WITH MORE THAN 1500 PPM, H2S VOIDS WARRANTY.
6. BLOWERS 50HP AND ABOVE MUST HAVE SKID FRAME RAILS UNDER THE BLOWER SOLIDLY
SHIMMED OR GROUTED TO A SUITABLE CONCRETE PAD.
7. TOP ASSEMBLY DIMENSIONS SHOWN ARE NOT ACTUAL SHIPPING DIMENSIONS, CONFIRM FIELD
DIMENSIONS PRIOR TO ORDERING THE PROPER SHIPPING PERMITS.
8. DO NOT USE THIS DRAWING FOR LOCATION OF CAST IN PLACE ANCHORS.
47 1/2
3/4 3/4
14 3/4
REF
35 1/4
4 3/8
79 1/8
14 3/4
REF
1 3/16
1 3/16 n5/8 TYP
WEIGHT: 2,500-3,000 LBS ESTIMATED
18 5/8
C.O.G.
6 7/16
26 11/16
5/16
15/16
C.O.G.
FRONT ELEV. VIEW
SCALE 1:30
RIGHT ELEV. VIEW
SCALE 1:30
ISOMETRIC VIEW
SCALE 1:30
©2022 PERENNIAL ENERGY, LLC
MATERIAL: AS NOTED
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
FRACT .XX ANGLES
±1/16 ±.03 ±0°30
DRAWN BY:
A.PARKER
DATE:
1/17/22
DESIGNED BY:
J.WIENHOFF
DATE:
1/17/22
ENGINEERING SIGNATURES
D
SIZE DWG. NO.
TITLE:
PA-001-1169
GAS HANDLING SYSTEM
TOP ASSEMBLY [GHS2]
This Drawing Contains Proprietary Data and May Not Be Duplicated, Copied, Reproduced or Otherwise Used In Any Manner
Not in the Best Interest of Perennial Energy LLC. All Ideas and Concepts Remain the Property of Perennial Energy LLC.
APPLICABLE JOB NO(S).
MID-VALLEY LNEGFS
LTR DESCRIPTION DATE APPROVED
REVISED PER ENGINEERING REVIEW (3/23/22) AP
REVISIONS
SCALE: AS NOTED
FILE NO. PA-001-1169.dwg
SHEET 1 OF 1
www.PerennialEnergy.com
WEST PLAINS, MO 65775
1375 COUNTY ROAD 8690
A M
I
M i d V a l l e y
L N E G F S P A d
P A R K E R
S
I
Z
E
F
R
I
G
I
N
A
L
R
E
D
U
C
E
D
LFG IN
NOTE:
1. CLASSIFIED AREAS ARE SPECIFICALLY NOTED. ALL OTHER AREAS ARE UNCLASSIFIED.
2. SKIDS MUST BE LEVEL 1/8" SIDE TO SIDE, 1/4" END TO END.
3. CONTACT PERENNIAL ENERGY FOR INTERIM MAINTENANCE PROCEDURES IF EQUIPMENT IS NOT
RUNNING WITHIN 21 DAYS OF ARRIVAL ON SITE.
4. REMOVE SHIPPING STANDS, BRACES, AND COVERS PRIOR TO INSTALLATION.
5. UNLESS OTHERWISE NOTED, USE ON GAS WITH MORE THAN 1500 PPM, H2S VOIDS WARRANTY.
6. BLOWERS 50HP AND ABOVE MUST HAVE SKID FRAME RAILS UNDER THE BLOWER SOLIDLY
SHIMMED OR GROUTED TO A SUITABLE CONCRETE PAD.
7. TOP ASSEMBLY DIMENSIONS SHOWN ARE NOT ACTUAL SHIPPING DIMENSIONS, CONFIRM FIELD
DIMENSIONS PRIOR TO ORDERING THE PROPER SHIPPING PERMITS.
8. ALL FLANGES ARE 125# GALVANIZED DUCTILE IRON SLIP FLANGES WITH ZINC PLATED FASTENERS.
CP-2
AC-3
11 13/16
342 [28'-6"]
79 98
BLR-304
R E F
O V E R A L L
PMP-702
PMP-701
NOTE: CONNECT
TO GROUND GRID
CADWELD HERE
NOTE: CONNECT
TO GROUND GRID
CADWELD HERE
LFG IN
CP-2
BLR-305 BLR-306
WEIGHT: 17,000-20,000 ESTIMATED
60 1/2
COG
COG
COG
43 7/8
COG
183 3/8
COG
SCALE 1:80
PLAN VIEW
SCALE 1:80
ISOMETRIC VIEW
SCALE 1:90
©2022 PERENNIAL ENERGY, LLC
MATERIAL: AS NOTED
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
FRACT .XX ANGLES
±1/16 ±.03 ±0°30
DRAWN BY:
A.PARKER
DATE:
1/21/22
DESIGNED BY:
J.WIENHOFF
DATE:
1/21/22
ENGINEERING SIGNATURES
D
SIZE DWG. NO.
TITLE:
OS-009-0277
OVERALL SITE
LAYOUT
This Drawing Contains Proprietary Data and May Not Be Duplicated, Copied, Reproduced or Otherwise Used In Any Manner
Not in the Best Interest of Perennial Energy LLC. All Ideas and Concepts Remain the Property of Perennial Energy LLC.
APPLICABLE JOB NO(S).
MID-VALLEY LNEGFS
LTR DESCRIPTION DATE APPROVED
REVISED PER ENGINEERING REVIEW (10/9/24) DS
REVISIONS
SCALE: AS NOTED
FILE NO. OS-009-0277.dwg
SHEET 1 OF 1
www.PerennialEnergy.com
WEST PLAINS, MO 65775
1375 COUNTY ROAD 8690
A M
O A C A D F
M i d V a l l e y
L N E G F S O S d
P A R K E R
S
I
Z
E
F
R
I
G
I
N
A
L
R
E
D
U
C
E
D
NOTE:
1. CLASSIFIED AREAS ARE SPECIFICALLY NOTED. ALL OTHER AREAS ARE UNCLASSIFIED.
2. SKIDS MUST BE LEVEL 1/8" SIDE TO SIDE, 1/4" END TO END.
3. CONTACT PERENNIAL ENERGY FOR INTERIM MAINTENANCE PROCEDURES IF EQUIPMENT IS NOT
RUNNING WITHIN 21 DAYS OF ARRIVAL ON SITE.
4. REMOVE SHIPPING STANDS, BRACES, AND COVERS PRIOR TO INSTALLATION.
5. UNLESS OTHERWISE NOTED, USE ON GAS WITH MORE THAN 1500 PPM, H2S VOIDS WARRANTY.
6. BLOWERS 50HP AND ABOVE MUST HAVE SKID FRAME RAILS UNDER THE BLOWER SOLIDLY
SHIMMED OR GROUTED TO A SUITABLE CONCRETE PAD.
7. TOP ASSEMBLY DIMENSIONS SHOWN ARE NOT ACTUAL SHIPPING DIMENSIONS, CONFIRM FIELD
DIMENSIONS PRIOR TO ORDERING THE PROPER SHIPPING PERMITS.
8. DO NOT USE THIS DRAWING FOR LOCATION OF CAST IN PLACE ANCHORS.
1275 [106'-3"]
57 3/8
70 1/2
(79)
GHS1
GHS2
FLR2
FLR1
NOTE: SHOWN FOR SIZE REF ONLY
ATTACHMENT 2
Flow Diagram
DEMOLITION/SALVAGE/RELOCATION CONSTRUCTION NOTES (PER SHEET C-101/C-102)
RELOCATE SEWAGE TANK AND DRAIN LINE TO FLARE STATION
RELOCATE PORTABLE STAIR CASES
REMOVE/DEMO 6' HIGH CHAIN LINK FENCE WITH 3-STRAND BARBED WIRE, GATES
RELOCATE CARGO AND STORAGE CONTAINERS, VARIOUS SIZES AND WEIGHTS PER PLAN
REMOVE/DEMO EXISTING CONCRETE SLABS/FOOTINGS (THICKNESS VARIES) AND CONDUITS
RELOCATE STORAGE CONTAINER TO FLARE STATION OR AREA DESIGNATED BY COUNTY
PROTECT EXISTING STRUCTURE/PIPE IN PLACE
DESCRIPTION# QTY (OR APPROVED EQUAL) REFERENCE NOTES
RELOCATE COUNTY OPERATION'S TRAILER (12' X 40') TO FLARE STATION 1 EA EXISTING SEE C-101/M-101 CONNECT ALL UILITIES
1 EA EXISTING SEE C-101/M-101 CONNECT WITH 3" LINE TO TRAILER
3 EA EXISTING SEE C-101/M-101 -
5 EA EXISTING SEE C-101/M-101 -
1 EA EXISTING SEE C-101/M-101 AFTER NEW FLARE STATION IS OPERATIONAL
AS REQ'D EXISTING SEE C-102 PREVIOUS POWER PLANT CONDUITS NOT SHOWN
400 LF EXISTING SEE C-102 -
4 EA EXISTING SEE C-102/M-101 -
AS REQ'D - SEE C-102/C502
AS REQ'D - - -
120 LF - -
IF ENCOUNTERED DURING GRADING/EARTHWORK
AS REQ'D EXISTING
30 LF EXISTING - -
SUPPLIER OR MFR. DETAIL/SHEET
PART NO.
MODEL OR
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
2 EA - -
EXISTING
EXISTING
EXISTING
EXISTING
REMOVE EXISTING 24" STORM DRAIN LINE/BURIED HEADWALL11
PLUG/GROUT END OF EXISTING 24" STORM DRAIN LINE12
SAWCUT AND REMOVE SECTION OF AC BERM14
INSTALL 12" CONCRETE AROUND OUTLET GRATE
- -20 LF ISCO INDUSTRIES - -
4 EA ISCO INDUSTRIES - GHS-1/GHS-2 DRAIN AND SUMP BALANCE LINES
10 EA GRAINGER PER DETAIL 1/C-302 GHS-2 DRAIN LINE CONNECTION
8 EA PER DETAIL 8/C-501 -
SITE IMPROVEMENTS/GRADING/FIELD PIPING CONSTRUCTION NOTES (C-103, C-301, C-302, C-501, C-502, C-503)
CONSTRUCT 6" AC PAVEMENT OVER 12" CLASS 2 BASE
CONSTRUCT 6" THICK CONCRETE V-DITCH, APPROX. 5' WIDE, DEPTH VARIES
INSTALL 6" ATRIUM STYLE INLET GRATE
INSTALL 6" SINGLE WALL DRAIN PIPE, HDPE
SAWCUT AND REMOVE AC PAVEMENT SECTION
9,550 SF CONTRACTOR OR SUB SEE DWG C-103/C-105
11 CY CONTRACTOR OR SUB SEE DETAIL 2/C-501 WITH 6x6 W1.4/1.4 WWM
100 LF ADVANCED DRAINAGE SYS SEE DWG C-103 DRAINAGE SWALE DRAIN PIPE
1 EA LOCAL SUPPLIER SEE DWG C-103 V-DITCH INLET STRUCTURE
2,000 SF CONTRACTOR OR SUB SEE DWG C-103/C-105 SEE DETAILS 6 & 7/C-501
PER PLAN
PER PLAN
INSTALL 1" SDR 11 HDPE PIPE & FITTINGS
INSTALL 2" HDPE SADDLE
INSTALL 2" SS CHECK VALVE, Y SPRING TYPE
INSTALL 6" STEEL BOLLARD AND PLASTIC SLEEVE
6 EA --61 INSTALL 2" X 1" HDPE REDUCER
6 EA --62 INSTALL 1" HDPE TO SS TRANSITION FITTING
6 EA --63 INSTALL 1" SS COUPLING
2 EA --64 INSTALL 1" X 3/4" SS REDUCER BUSHING
4 EA --65 INSTALL 1" X 1/2" SS REDUCER BUSHING
66 INSTALL 3/4" SS PIPE NIPPLE
CUSTOM
ISCO INDUSTRIES
ISCO INDUSTRIES
GRAINGER
GRAINGER
GRAINGER
GRAINGER2 EA
67 INSTALL 1/2" SS PIPE NIPPLE
68 INSTALL 4" X 2" HDPE D/C TERMINATION FITTING
69 INSTALL 8" X 4" HDPE D/C TERMINATION FITTING
GRAINGER4 EA --
ISCO INDUSTRIES6 EA --
ISCO INDUSTRIES6 EA --
ISCO INDUSTRIES6 EA --
ISCO INDUSTRIES6 EA --
72 INSTALL 4" HDPE BALL VALVE, BUTT X BUTT ISCO INDUSTRIES1 EA --
SUMP CONNECTION AND SUMP BALANCE LINES
SUMP CONNECTION
SUMP CONNECTION
SUMP LIQUID DISCHARGE CONNECTION
SUMP AIR & BALANCE LINE CONNECTION
4" CONDENSATE LINE CLEAN-OUT
73 INSTALL 30" SDR 17 HDPE PIPE ISCO INDUSTRIES80 LF SEE DETAIL 6/C-501-
74 INSTALL 30" HDPE FLANGE ADAPTER, D.I. BACK-UP RING, AND HARDWARE ISCO INDUSTRIES3 ASSY --
INSTALL 30" X 24" HDPE REDUCER
ISCO INDUSTRIES
2 EA
INSTALL 24" X 18" HDPE REDUCER
ISCO INDUSTRIES
2 EA
INSTALL 18" X 12" HDPE REDUCER
ISCO INDUSTRIES
4 EA
INSTALL 18" SDR 17 HDPE PIPE
ISCO INDUSTRIES
100 LF
INSTALL 18" HDPE FLANGE ADAPTER, D.I. BACK-UP RING, AND HARDWARE
ISCO INDUSTRIES
4 EA
INSTALL 18" HDPE ELBOW, 90°, SDR 17
ISCO INDUSTRIES
2 EA
SEE DETAIL 7/C-501-
81 ISCO INDUSTRIES --
82 ISCO INDUSTRIES --
INSTALL 30" HDPE TEE, SDR 17
INSTALL 30" HDPE ELBOW, 90°, SDR 17 2 EA
1 EA
INSTALL 2" SDR 11 HDPE x 4" SDR 17 HDPE DUAL CONTAINED PIPE & FITTINGS 140 LF83 ISCO INDUSTRIES -
INSTALL 4" SDR 11 HDPE x 8" SDR 17 HDPE DUAL CONTAINED PIPE & FITTINGS 220 LF84 ISCO INDUSTRIES -
INSTALL SALVAGED 12" BUTTERFLY VALVE 2 EA85 - -
(DELETED) -86 - -
SEE DETAILS 6 & 7/C-501
INSTALL 24" SDR 17 HDPE PIPE
INSTALL 12" SDR 17 HDPE PIPE
INSTALL 2" SDR 9 HDPE PIPE & FITTINGS
INSTALL 2" SDR 11 HDPE PIPE & FITTINGS
INSTALL 1 1/2" DOUBLE CHECK VALVE ASSEMBLY PER SAN BERNARDINO COUNTY STANDARDS
100 LF ISCO INDUSTRIES
20 LF ISCO INDUSTRIES
200 LF ISCO INDUSTRIES
40 LF ISCO INDUSTRIES
1 ASSY
SEE DETAIL 10/C-501 UNIT #4 HEADER
- INLET TO GHS-2
- COMPRESSED AIR LINE
- CONDENSATE FORCEMAIN
INSTALL 24" BUTTERFLY VALVE WITH 3' VALVE EXTENSION AND GEAR OPERATOR 1 ASSY -
INSTALL 24" HDPE TEE, SDR 17 1 EA ISCO INDUSTRIES -
INSTALL 24" HDPE ELBOW, 90°, SDR 17 2 EA ISCO INDUSTRIES -
INSTALL 24" HDPE FLANGE ADAPTER, D.I. BACK-UP RING, GASKET, AND BOLT KIT 5 EA ISCO INDUSTRIES -
INSTALL 24" PVC BLIND FLANGE 1 EA ISCO INDUSTRIES UNIT #4 HEADER
5 EA CUSTOM SEE DETAIL 2/C-502 SUMP OUTLET PIPING
3 EA ISCO INDUSTRIES -
4 EA ISCO INDUSTRIES -
550 LF - WATER LINE FOR SWMD TRAILER
INSTALL 2" HDPE BALL VALVE, BUTT X BUTT 11 EA ISCO INDUSTRIES CONDENSATE FORCEMAIN, 2" CLEAN-OUT
JOIN EXISTING 6" WATER LINE PER SAN BERNARDINO COUNTY STANDARDS 1 EA - SEE DETAIL 2/C-503 -
SEE WALL PROFILES, C-201/C-202
INSTALL 2" HDPE TO STAINLESS STEEL TRANSITION FITTING (BUTT x MPT) 20 EA ISCO INDUSTRIES SEE DETAIL 1/C-301/302 CONDENSATE FORCEMAIN CHECK VALVES
1 ASSY REAL ENV. PRODUCTS SEE DWG C-301/D-601 -
INSTALL CONDENSATE SUMP ASSEMBLY "B", SERIES 7000 SUMP, 18" X 24" DUAL CONTAINED 1 ASSY REAL ENV. PRODUCTS SEE DWG C-302/D-601 -
SITE IMPROVEMENTS/GRADING/FIELD PIPING CONSTRUCTION NOTES (C-103, C-104. C-301, C-302, C-501, C-502)
ISCO INDUSTRIES
INSTALL PIPE SUPPORT, CONCRETE FOOTING AND SIGN
INSTALL 12" HDPE ELBOW, 90°, SDR 17
INSTALL 12" HDPE FLANGE ADAPTER, D.I, BACK-UP RING, GASKET, AND BOLT KIT
INSTALL 1 1/2" CLASS 150 PVC WATER PIPE & FITTINGS
SEE SHEET C-503
PER PLAN
PER PLAN
JOIN EXISTING AS REQ'D -
INSTALL 6" AC BERM
GRADE AREA TO CONTOURS SHOWN (PRIMARILY CUT TO INSTALL FOOTINGS & WALLS)
55 LF CONTRACTOR OR SUB SEE DWG C-103
PER PLAN CONTRACTOR OR SUB SEE DWG C-103
1 EA ISCO INDUSTRIES
- -4 EA
COORDINATE WITH COUNTY/SCE
PER PLAN
AS REQ'D -
INSTALL CONDENSATE SUMP ASSEMBLY "A", SERIES 7000 SUMP, 30" X 36" DUAL CONTAINED
EXISTING HIGH VOLTAGE POWER POLE(S) TO BE REMOVED BY OTHERS
SEE DETAIL 3/C-503
INSTALL 12" BUTTERFLY VALVE, SS DISK & INTERNALS, VITON OR TEFLON SEALS
INSTALL 12" 22 1/2° HDPE ELBOW, SDR 17
SEE SUMP "A" AND GHS-1 INLET PIPING PROFILE
SEE SUMP "B" AND GHS-2 INLET PIPING PROFILE
SEE DETAIL 1/C-301
SEE DETAIL 1/C-302
INSTALL 4" X 2" HDPE REDUCER, SDR 11 5 EA ISCO INDUSTRIES
DESCRIPTION# QTY (OR APPROVED EQUAL) REFERENCE NOTES
SUPPLIER OR MFR. DETAIL/SHEET
PART NO.
MODEL OR
DESCRIPTION# QTY (OR APPROVED EQUAL) REFERENCE NOTES
SUPPLIER OR MFR. DETAIL/SHEET
PART NO.
MODEL OR
CONDENSATE FORCEMAIN
SUMP AIR & BALANCE LINE CONNECTION
SUMP LIQUID DISCHARGE CONNECTION
INSTALL 4" X 2" HDPE D/C 45° WYE FITTING
INSTALL 8" X 4" HDPE D/C 45° WYE FITTING
ESTIMATED
ESTIMATED
INSTALL 1 1/2" CLASS 150 PVC BALL VALVE, NSF/ANSI 61 STANDARD AND HOSE BIB 1 ASSY87 HAYWARD OR EQUAL -
INSTALL WATER LINE THRUST BLOCK88 2 EA - - SEE DETAIL 1/C-503
REMOVE/SALVAGE EXISTING SUMP, VALVES, PIPE, AND FITTINGS AFTER NEW FLARE STATION IS OPERATIONAL
INSTALL 6" MITERED DRAINAGE GRATE (JOIN WITH FERNCO COUPLING) 1 EA DRAINAGE SOLUTIONS 6MD3P
RELOCATE EXISTING FLARE STATION O&M TRAILER TO NEW FLARE STATION COMPOUND
DEMOLITION AND DISPOSAL OF THE EXISTING FLARE STATION: INCLUDES ALL CONCRETE
SLABS, FOOTINGS, WALLS, FENCING, FLARE STACKS, INTERCONNECT GAS SYSTEM PIPING
AND FITTINGS (ABOVE AND BELOW GRADE), PIPE SUPPORTS AND FOOTINGS,
INSTRUMENTATION, COMPRESSORS, COMPRESSED AIR LINES (ABOVE AND BELOW GRADE),
CONDENSATE DRAIN LINES (ABOVE AND BELOW GRADE), CONDENSATE INJECTION SYSTEM
(ABOVE AND BELOW GRADE), FLARE PILOT FUEL SYSTEM (PROPANE, ABOVE AND BELOW
GRADE), CONDENSATE STORAGE TANK, PUMPS, BLOWERS, KNOCK-OUT VESSEL, VALVES,
ELECTRICAL PANELS, CONDUITS (ABOVE AND BELOW GRADE), WIRING, AND SWITCHGEAR
AS DIRECTED BY THE COUNTY. SALVAGE BLOWERS AND ANY OTHER ITEMS AT THE
DISCRETION OF THE COUNTY.
REMOVAL OF EQUIPMENT FROM FLARE STATION
SHALL BE COMPLETED AFTER THE NEW FLARE
STATION IS OPERATIONAL, INCLUDING SOURCE
TESTING. THE COUNTY WILL DETERMINE IF ANY
OF THE EXISTING FLARE STATION EQUIPMENT IS
SALVAGEABLE FOR COUNTY PURPOSES PRIOR
TO DISPOSAL/REMOVAL. THE COUNTY WILL
ASSIGN AN AREA NEAR THE FLARE STATION FOR
EQUIPMENT STORAGE.
SEE SHEET C-102 FOR
EXISTING FLARE
STATION AREA
AS REQ'D EXISTING - --
EXISTING TELEPHONE LINE TO BE REMOVED FROM POWER POLE BY OTHERS15
INSTALL 12" HDPE TEE89 4 EA ISCO INDUSTRIES - -
DEMOLITION/SALVAGE/
SITE IMPROVEMENTS
CONSTRUCTION NOTES
G-003 NONE
A P
P R
R
E V
I S
I O
N S
M A
R K
D A
T E
A P
P R
R
E V
I S
I O
N S
DESIGNED BY
DRAWN BY PROJ. ENGR.
DEPARTMENT OF PUBLIC WORKS
SUBMITTED BY
TOT. SHT'S.
SAN BERNARDINO COUNTY
SHT. NO.
SCALE
DWG NO.DATE
RECOMMENDED / APPROVED BY
M A
R K
D A
T E
DATE
SAMI H AYASS
PREPARED UNDER THE SUPERVISION OF:
DATECHIEF ENGINEER
DEPUTY DIRECTOR DATEPROJECT MANAGER DATE 6/2025 42
MID-VALLEY SANITARY LANDFILL
SNA/SHA SHA
LANDFILL GAS FLARE STATION
21700 Copley Drive, Suite 200 Diamond Bar, CA 91765
TEL 909.860.7777 FAX 909.860.8017
H d w g
S b s w m d
M i d
V a l l e y F l a r e
S t a t i o n
D
W G
S
G
V d s c o t t a n g u s
SNA
P
R
O
S
I
O
T
E
R G
E
I
S
C84806
C
I
VI
L
R
E
D
E R
N
N
E
G
I
L
A
N
E
S
F
E
A
M
A
S
I
H A
Y
S
S
S
T
A
F
CA
I
F
O
R
N
I
A
06/18/2025
06/18/2025SAMI H AYASS
A
D D
D
E M
S
M
P O
R A
R Y
C O
N N
E C
T I O
N
T
O
E
X I S
T I N
G P
R O
P O
S E
D
H
A
NTS
PIPING PLAN1
REFERENCE SHEET: C-103
TOP OF FLANGE=1586.0
24" INV=1579.0 (WEST)
TOP OF FLANGE=1586.0
18" INV=1581.0 (WEST)
18" INV=1575.0 (EAST)
TYP 10 PLACES
EXISTING 2" x 4" HDPE
DUAL CONTAINED
CONDENSATE
FORCEMAIN FROM
TEMPORARY SUMP
AND UNIT #4
EXISTING 2" HDPE
COMPRESSED AIR LINE
EXISTING 2" HDPE COMPRESSED
AIR LINE TO FLARE STATION
COMPRESSOR (CUT & CAP
AFTER NEW FLARE STATION
IS OPERATIONAL)
EXISTING 12" HDPE TO FLARE
STATION KNOCK-OUT (CUT &
CAP AFTER NEW FLARE STATION
IS OPERATIONAL)
EXISTING
PIPING FROM
UNIT #1
EXISTING 2" HDPE
EXISTING 2" HDPE COMPRESSED
H
D P
E
L
G
A
D E
R
P I P
I N
G
F
R O
M
U
N
H
D P
E
C
O N
D E
N S
A T
E
F
M
H
D P
E
C
O M
P R
E S
S E
D
A
I R
S
N
K
S
P
W
A
N
T
C
P
TYP 10 PLACES
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
A
A
A
A
SUMP
SUMP "A"
SUMP "B"
AIR (JOIN WITH NEW AIR LINE)
61 62
63 62 6164
63 64
37 41 37
65 67
56 61 55 62
63 65 67
30" INV=1575.0 (EAST)
G
G
G
47 59
81 56
63 62 616567
25 28
4" CLEAN-OUT6972
2" CLEAN-OUT6839
TYP 5
PLACES
TYP 5
PLACES
G
EXISTING 12" SDR 17
HDPE TO UNIT #4
NTS
PIPE SUPPORT/SIGN DETAIL2
REFERENCE SHEET: DETAIL 1 THIS SHEET
T
G
W
E R
P L
A N
T
1'-0"
CONDENSATE
2' LONG X 1' WIDE X 2' DEEP
CONCRETE FOOTING OR 2'Ø
SONOTUBE
8" SQUARE STEEL SIGN. 3/4"
BLACK LETTERS ON WHITE
BACKGROUND, FASTEN WITH
TWO 1/4" SHEET METAL
SCREWS TO STRUT CHANNEL
PLASTIC STRUT CHANNEL CAPS
2" GALVANIZED STRUT CHANNEL
CLAMPS
U OR L BRACKETS AND
HARDWARE
1 5/8" X 1 5/8" GALVANIZED
STRUT CHANNEL, TYP
TYP 6 PLACES
PLACES
TYP 6
CONDENSATE FM
C O
N N
E C
T
T
O
X
D
N
D E
N S
A T
E
F
M
C O
N N
E C
T
T
O
X
D
N
D E
N S
A T
E
F
M
26 26
C
C
LEGEND
PROPOSED 4" X 8" DUAL CONTAINMENT CONDENSATE FORCEMAIN (TO POWER PLANT)
PROPOSED 2" X 4" DUAL CONTAINMENT CONDENSATE FORCEMAIN (TO TK-701)
EXISTING 2" HDPE COMPRESSED AIR LINE
A PROPOSED 2" HDPE COMPRESSED AIR LINE
A
EXISTING BELOW GRADE PIPING
PROPOSED BELOW GRADE PIPING
PROPOSED PIPING/EQUIPMENT ABOVE GRADE
EXISTING ABOVE GRADE PIPING
F
I E
V
R
I F
Y
H
E A
D E
R
D
E P
T H
12" HDPE
LFG HEADER
G
AFTER NEW FLARE
STATION IS OPERATIONAL
G
NONE 15C-502
DETAILS
INSTALL 1" SDR 11 HDPE PIPE & FITTINGS
INSTALL 2" HDPE SADDLE
INSTALL 2" SS CHECK VALVE, Y SPRING TYPE
61 INSTALL 2" X 1" HDPE REDUCER
62 INSTALL 1" HDPE TO SS TRANSITION FITTING
63 INSTALL 1" SS COUPLING
64 INSTALL 1" X 3/4" SS REDUCER BUSHING
65 INSTALL 1" X 1/2" SS REDUCER BUSHING
66 INSTALL 3/4" SS PIPE NIPPLE
67 INSTALL 1/2" SS PIPE NIPPLE
68 INSTALL 4" X 2" HDPE D/C TERMINATION FITTING
69 INSTALL 8" X 4" HDPE D/C TERMINATION FITTING
73 INSTALL 30" SDR 17 HDPE PIPE
74 INSTALL 30" HDPE FLANGE ADAPTER, D.I. BACK-UP RING, AND HARDWARE
INSTALL 30" X 24" HDPE REDUCER
INSTALL 24" X 18" HDPE REDUCER
INSTALL 18" X 12" HDPE REDUCER
INSTALL 18" SDR 17 HDPE PIPE
INSTALL 18" HDPE FLANGE ADAPTER, D.I. BACK-UP RING, AND HARDWARE
INSTALL 2" SDR 11 HDPE x 4" SDR 17 HDPE DUAL CONTAINED PIPE & FITTINGS 83
INSTALL 4" SDR 11 HDPE x 8" SDR 17 HDPE DUAL CONTAINED PIPE & FITTINGS84
INSTALL SALVAGED 12" BUTTERFLY VALVE85
REMOVE/SALVAGE EXISTING SUMP, VALVES, PIPE, AND FITTINGS9
INSTALL 2" SDR 9 HDPE PIPE & FITTINGS
INSTALL 2" SDR 11 HDPE PIPE & FITTINGS
INSTALL 24" HDPE TEE, SDR 17
INSTALL 24" HDPE FLANGE ADAPTER, D.I. BACK-UP RING, GASKET, AND BOLT KIT
INSTALL 2" HDPE BALL VALVE, BUTT X BUTT
INSTALL 2" HDPE TO STAINLESS STEEL TRANSITION FITTING (BUTT x MPT)
INSTALL CONDENSATE SUMP ASSEMBLY "B", SERIES 7000 SUMP, 18" X 24" DUAL CONTAINED
INSTALL PIPE SUPPORT, CONCRETE FOOTING AND SIGN PER DETAIL 2 THIS SHEET
INSTALL 12" HDPE ELBOW, 90°, SDR 17
INSTALL 12" HDPE FLANGE ADAPTER, D.I, BACK-UP RING, GASKET, AND BOLT KIT
JOIN EXISTING
INSTALL/REPLACE 6" AC BERM
INSTALL CONDENSATE SUMP ASSEMBLY "A", SERIES 7000 SUMP, 30" X 36" DUAL CONTAINED
INSTALL 4" HDPE BALL VALVE, BUTT X BUTT
SEE SUMP "A" AND GHS-1 INLET PIPING PROFILE PER SHEET C-301
SEE SUMP "B" AND GHS-2 INLET PIPING PROFILE PER SHEET C-302
INSTALL 4" X 2" HDPE REDUCER, SDR 11
INSTALL 4" X 2" HDPE D/C 45° WYE FITTING
CONSTRUCTION NOTES
71 INSTALL 8" X 4" HDPE D/C 45° WYE FITTING
A P
P R
R
E V
I S
I O
N S
M A
R K
D A
T E
A P
P R
R
E V
I S
I O
N S
DESIGNED BY
DRAWN BY PROJ. ENGR.
DEPARTMENT OF PUBLIC WORKS
SUBMITTED BY
TOT. SHT'S.
SAN BERNARDINO COUNTY
SHT. NO.
SCALE
DWG NO.DATE
RECOMMENDED / APPROVED BY
M A
R K
D A
T E
DATE
SAMI H AYASS
PREPARED UNDER THE SUPERVISION OF:
DATECHIEF ENGINEER
DEPUTY DIRECTOR DATEPROJECT MANAGER DATE 6/2025 42
MID-VALLEY SANITARY LANDFILL
SNA/SHA SHA
LANDFILL GAS FLARE STATION
21700 Copley Drive, Suite 200 Diamond Bar, CA 91765
TEL 909.860.7777 FAX 909.860.8017
H d w g
S b s w m d
M i d
V a l l e y F l a a t i o n
D
W G
S
C
V d s c o t t a n g u s
SNA
P
R
O
S
I
O
T
E
R G
E
I
S
C84806
C
I
VI
L
R
E
D
E R
N
N
E
G
I
L
A
N
E
S
F
E
A
M
A
S
I
H A
Y
S
S
S
T
A
I
F
O
R
N
I
A
06/18/2025
06/18/2025SAMI H AYASS
M O
D I F
Y
P
I P
I N
G A
L
V E
S
F
O R
T E
M P
O R
A R
Y
O
P E
R A
T I O
N
S H
A
INSTALL 12" BUTTERFLY VALVE41
INSTALL 12" HDPE TEE89
2" PVC80
P
V C
V-3 PMP-701/702
TK-701
TK-701
LG
C
C
V-3
LT
2" PVC80
CONDENSATE HOLDING TANK
MFR: POLY PROCESSING (CORE-ROSION)
SIZE: 11'-11"Ø X 14'-6" HIGH
COLOR: BLACK
CAPACITY: 8,700 GALLONS WITH
SECONDARY CONTAINMENT, SIESMIC
RESTRAINT, FITTINGS
ELECTRIC PUMP
MFR: GRUNDFOS
MODEL:CM3-9 A-S-I-E-AQQE
FLOW: 5 GPM
MOTOR: 3.35 HP (440-480V,
3Ø, 60Hz)
GRANULAR ACTIVATED CARBON
CONNECTION: 2" FNPT
SIZE: 55 GALLON DRUM
LEGEND
PROPOSED PIPING/EQUIPMENT SUPPLIED AND INSTALLED BY CONTRACTOR
PIPING/EQUIPMENT SUPPLIED BY FLARE MANUFACTURER (PURCHASED BY COUNTY)
2" HDPE11
30MM BTU
1/2"
FLR-1
CDN
CDN
CDN
1 GPM MAX.
1/2" SS40
1/2"
FLR-2 CONDENSATE DESTRUCTION
SYSTEM (CDS) BY PEI (SEE SHEET 45 & 46)
CDN
1 GPM/30 MM BTU
HV
1" SS
PMP-701
1" SS
M
PMP-702
1" SS
1" SS
PS
5/8" SST
PI
M
PI
FE
FT
1/2" SST
FE
FT
1/2" SST
5 GPM MAX
PI
1/2" SS40
PI
1/2"
PI
PI
PI
SS40
1/2"
SS40
1/2"
SS40
PI
FLR-1 CONDENSATE DESTRUCTION
SYSTEM (CDS) BY PEI (SEE SHEETS 45 & 46)
CONDENSATE DESTRUCTION
SYSTEM (CDS) BY PEI (SEE SHEET 45)
S
S
1/2" SS40
1/2" SS40
2" HDPE
1/4"
1/4"
TSE-701
FLAME CHECK
MFR: GROTH
MODEL: 7622
CONNECTION: 2" FNPT
MATERIAL: SS ELEMENT
TSE-701
HV
HV
SP
SP
30x36 D/C
P
SUMP "A"
H
D P
E
PI
FT
EXISTING PIPING/EQUIPMENT OR INSTALLED BY OTHERS (ARCHAEA OR COUNTY)
G
CONDENSATE TO
POWER PLANT
EXISTING 4x8 HDPE D/C CONDENSATE LINE
(BY OTHERS)
FROM UNIT #4
CONDENSATE FM
24x12
FLR-2
INJECTION
INJECTION
SUMP
FLARE STATION
EXISTING
CONDENSATE
FLARE STATION
EXISTING
TANK
FROM UNIT #2/#3
4x8 HDPE D/C
12"
LFG FROM
UNIT #1
G
PE17
LFG FROM
UNITS #2 & #3
G
NEW
VALVES
12" HDPE17
LFG FROM UNIT
#4 (UNUSED)
G
TO EXISTING
CONDENSATE FM
KNOCK-OUT
G x
G
FROM UNIT #1
CONDENSATE FM
2"x4" D/C HDPE
H
D P
E
AIR IN
4x2
2" HDPE11
2" HDPE11
EXISTING PIPING/EQUIPMENT TO BE REMOVED AFTER START-UP OF NEW SYSTEM
18x24 D/C
P
SUMP "B"
P
E
PI
FT
x
AIR IN
TO GHS-2
30" PE17
18" PE17
H
D P
E
HV
4x2
H
D P
E
FSV
FSV
HV
AND SHEET D-602
AIR IN
AIR IN
(SEE SHEET D-602)
2" HDPE11
TO EXISTING CONDENSATE INJECTION PUMPS
x
D
P
E
HV
HV
HV
HV
HV
HV
HV
CAP LINE AFTER START-UP
OF NEW FLARE STATION
HV
SUMP-A
CONDENSATE SUMP ASSEMBLY
MFR: REAL ENVIRONMENTAL PRODUCTS OR EQUAL
MODEL: SERIES 7000, IN-LINE
DUAL CONTAINED AUTO SUMP
SIZE: 30"Ø SDR 17 HDPE PRIMARY AND
36"Ø SDR 32.5 HDPE SECONDARY
PUMP MFR: PUMP ONE - #20000454
FLANGE CONNECTIONS: 30" AND 24"
PUMP ISOLATION WELL: 6" HDPE WITH
QUICK-CONNECT ACCESS PORT
ASSESSORIES: PNEUMATIC PULSE COUNTER, 1"
DISCHARGE HOSE, 3/8" AIR HOSE, 1/2" VENT HOSE
(TUBING BUNDLE), PRESSURE REGULATOR, AIR
VALVE, DISCHARGE VALVE, CLAMPS,
QUICK-CONNECT FITTINGS,VAULT
SUMP-B
CONDENSATE SUMP ASSEMBLY
MFR: REAL ENVIRONMENTAL PRODUCTS OR EQUAL
MODEL: SERIES 7000, IN-LINE
DUAL CONTAINED AUTO SUMP
SIZE: 18"Ø SDR 17 HDPE PRIMARY AND
24"Ø SDR 17 HDPE SECONDARY
PUMP MFR: PUMP ONE - #20000454
FLANGE CONNECTIONS: 18"
PUMP ISOLATION WELL: 6" HDPE WITH
QUICK-CONNECT ACCESS PORT
ASSESSORIES: PNEUMATIC PULSE COUNTER, 1"
DISCHARGE HOSE, 3/8" AIR HOSE, 1/2" VENT HOSE
(TUBING BUNDLE), PRESSURE REGULATOR, AIR
VALVE, DISCHARGE VALVE, CLAMPS,
QUICK-CONNECT FITTINGS,VAULT
PROPOSED DUAL CONTAINED HDPE PIPING, SIZE PER PLAN
(SEE SHEET D-602)
(SEE SHEET D-602)
GAC
AND FLARE INJECTION SYSTEM
FSV
HV
FSV
H
D P
E
FSV
HV
FSV
HV
4x2
H
D P
E
4x2
FSV
HV
FSV
HV
HV
HVFSV
FSV
HV
4" CLEAN-OUT
HV
2" CLEAN-OUT
HV
NEW FLARE STATION AREA
EXISTING FLARE STATION AREA
2" HDPE11
x
D
P
E
2" HDPE11
CAP LINES AFTER
START-UP OF NEW
FLARE STATION
4x2
2" PVC80
2x1
2"x4" D/C HDPE
24"
30"
TO GHS-1
(SEE SHEET D-602)
ELECTRICAL BY CONTRACTOR
FLR-1 EQUIPMENT SUPPLIED BY PEI (SEE SHEET 46)
AND SHEET D-602
FLR-2 EQUIPMENT SUPPLIED BY PEI (SEE SHEET 46)
VAULT @ FS
HV-705
HV-706
HV-707
H V
H V
HV-703
HV-704
2" HDPE11
2" PVC80
1" SS
FX
INSTALL 12" TEE
INSTALL 12" TEE
G
HV
HV
NONE 32D-601
CONDENSATE MANAGEMENT SYSTEM
PROCESS FLOW DIAGRAM
A P
P R
R
E V
I S
I O
N S
M A
R K
D A
T E
A P
P R
R
E V
I S
I O
N S
DESIGNED BY
DRAWN BY PROJ. ENGR.
DEPARTMENT OF PUBLIC WORKS
SUBMITTED BY
TOT. SHT'S.
SAN BERNARDINO COUNTY
SHT. NO.
SCALE
DWG NO.DATE
RECOMMENDED / APPROVED BY
M A
R K
D A
T E
DATE
PREPARED UNDER THE SUPERVISION OF:
DATECHIEF ENGINEER
DEPUTY DIRECTOR DATEPROJECT MANAGER DATE 6/2025 42
MID-VALLEY SANITARY LANDFILL
SNA/SHA SHA
FLARE STATION IMPROVEMENTS
21700 Copley Drive, Suite 200 Diamond Bar, CA 91765
TEL 909.860.7777 FAX 909.860.8017
H d w g
S b s w m d
M i d
V a l l e y F l a a t i o n
D
W G
S
D
V d s c o t t a n g u s
SNA
P
R
O
S
I
O
T
E
R G
E
I
S
C84806
C
I
VI
L
R
E
D
E R
N
N
E
G
I
L
A
N
E
S
F
E
A
M
A
S
I
H A
Y
S
S
S
T
A
I
F
O
R
N
I
A
SAMI H AYASS
06/18/2025
06/18/2025
SAMI H AYASS
M O
D I F
Y
P
I P
I N
G A
L
V E
S
F
O R
T E
M P
O R
A R
Y
O
P E
R A
T I O
N
S H
A
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
ATTACHMENT 3
Revised Technical Specifications
Mid-Valley Sanitary Landfill Subsection C01029 Basis of Payment Landfill Gas Flare Station
Page C01029-1
SECTION C1 – GENERAL REQUIREMENTS
SUBSECTION C01029
BASIS OF PAYMENT
PART 1 – GENERAL
1.01 INTRODUCTION
This section includes the items of work and the basis of payment for these tasks. The Contractor shall bid Items 1 through 87 below separately and provide a total sum for all work line items, including optional item 87. The Contractor is responsible for supplying all materials, equipment, and labor necessary for the complete construction and installation of all work as described in these specifications and as shown on the Construction Drawings. Payment for each work item will be on either a unit price (EA), lump sum (LS), lineal foot (LF), cubic yard (CY), or square foot (SF) basis, and only after that portion of the project has been completed.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXECUTION (NOT USED)
PART 4 – PAYMENT
4.1 MOBILIZATION/DEMOBILIZATION
This task includes any and all temporary facilities and utilities, safety plans, and construction equipment required for this project. Payment for this work will be made on a LS basis. Twenty-five (25) percent of the LS price bid will be paid with the first payment request following satisfactory evidence of mobilization of sufficient labor, equipment and material to adequately progress the work of this contract. Twenty-five (25) percent of the LS price bid will be paid with the payment request subsequent to the payment request in which the initial payment for this item is made. Fifty (50) percent of the LS price bid will be paid with the Final Payment request. The price bid in the proposal for this item shall not exceed ten (10) percent of the total project amount.
4.2 CLEARING AND GRUBBING
Supply all material, equipment, and labor necessary to clear and grub the pipe path and flare station area to allow suitable working area, as shown on the Construction drawings.
Included is the removal of all refuse, debris and green waste as required. This item shall include all resources necessary to prepare access roads and the removal and disposal of refuse generated. Refuse shall be disposed of at the active working face at Mid-Valley Landfill. Transportation costs to and from the landfill active face shall be included in this
Page C01029-2 item. No tipping fees are required for the trucks; however, all trucks must be weighed.
Payment for this item will be on a LS basis.
4.3 SURVEY (PRE- AND POST-CONSTRUCTION)
Supply all material, equipment, and labor necessary to perform surveying tasks, including initial layout survey for piping, treatment facility grading and earthwork, and as-built survey of piping and wells. Payment for this item will be on a LS basis.
4.4 GENERAL EARTHWORK AND GRADING
Supply all materials, equipment, and labor for the earthwork and grading of the flare station area. Excavation includes removal, relocation, or disposal of any rocks, and boulders in the approximate area as shown on the Construction Drawings, Sheet C-103.
Payment for this item will be on a LS basis.
4.5 STORM DRAIN DEMOLITION
Supply all materials, equipment, and labor for partial removal and modification (grout/plug) of the existing storm drain, as well as partial removal of existing headwall, as shown on the Construction Drawings, Sheet C-102. Payment for this item will be on a LS basis.
4.6 FENCE REMOVAL
Supply all materials, equipment, and labor for the removal of existing fencing as shown on the Construction Drawings, Sheet C-102. Payment for this work will be on a unit price LS basis.
4.7 RELOCATION OF EXISTING STORAGE AND CARGO CONTAINERS
Supply all materials, equipment, and labor for the relocation of the existing storage and cargo containers as shown on the Construction Drawings, Sheets C-101, C-102, and M-
101. Payment for this item will be on a unit price EA basis.
4.8 RELOCATION OF EXISTING FLARE STATION MOBILE O&M OFFICE TRAILER
Supply all materials, equipment, and labor for the relocation of existing flare station O&M mobile office trailer. This includes associated portable staircases and general utility connections as shown on the Construction Drawings, Sheets C-101, C-102, and M-101.
Page C01029-3
4.9 SAWCUT AND REMOVAL OF AC BERM AND PAVEMENT
Supply all material, equipment, and labor for the sawcut and removal of the asphalt concrete (AC) berm and pavement as shown on Construction Drawings, Sheet C-102.
Payment for this item will be on a unit price LS basis.
4.10 DEMOLITION AND REMOVAL OF EXISTING CONCRETE SLABS, FOOTINGS,
CONDUITS AND APPURTENANCES
Supply all materials, equipment, and labor for the demolition and removal of existing concrete slabs in the flare station area. Excavation includes removal, relocation, or disposal of slabs, footings, and conduits in the approximate area as shown on the Construction Drawings, Sheet C-102. Payment for this item will be on a LS basis.
4.11 SALVAGE EXISTING CONDENSATE SUMP ASSEMBLY
Supply all materials, equipment, and labor to salvage an existing condensate sump assembly and appurtenances. Work includes excavation of condensate sump assembly, backfill, and compaction of excavated area as shown on the Construction Drawings, Sheets C-102 and C-502. Payment for this item will be on a LS basis.
4.12 DEMOLITION AND DISPOSAL OF EXISTING FLARE STATION
Contractor will be responsible for the removal of the existing LFG flare station, excluding infrastructure related to the connection of the new flare station, within 60 days of startup and successful source testing of the new flare. Contractor will be responsible for demolition and/or disposal of equipment, including but not limited to blower(s), flare(s), tank(s), interconnection piping, pump(s), surrounding fencing, concrete pads and foundations, and electrical infrastructure. Salvage blower(s) and/or any other items at the discretion of the County. Demolished materials will be scrapped and removed from the site. Contractor will be responsible for disposal on-site (no disposal fees for dumping of non-hazardous materials on-site). All materials must go through scales for weight.
Contractor will be required to perform asbestos testing and share results prior to decommissioning the existing flare station. The Contractor will bear the cost of decommissioning the LFG flare station. Payment for this item will be made on a LS basis.
4.13 INSTALL CONDENSATE SUMP ASSEMBLY “A” AND APPURTENANCES
Supply all materials, equipment, and labor to install condensate sump assembly “A” and appurtenances. Sump assembly includes a slurry component (mixture of liquid and solid materials) used to facilitate the…
This is the start of the file's text. The full file is on GovTribe.