MHCC parking lots R-U tree trenches v2 for bid docs.pdf

PDF 424 KB Posted

Attached to
Parking Lots Tree Trenches State and local contract opportunity
Solicitation number
S-P00400-00006484
Issued by
Multnomah County, Gladstone City, Oregon

About this file

This document is a set of construction plans and specifications for a parking lot tree trench retrofit project in Multnomah County, Oregon. The project involves removing existing asphalt, excavating underlying soil, and installing new soil and mulch to treat stormwater runoff from four parking lots near the Yoshida Sports Complex. Key details include the creation of tree trenches with 3-way soil blend, 5-foot walkways, concrete curb and gutters, and evenly-spaced storm drain inlets. The construction plans provide dimensions, quantities, and specifications for the various project elements.

The project will be procured through a formal Invitation to Bid (ITB) process, with the construction documents and specifications included as part of the bid package. No other details are provided regarding bidding requirements, deadlines, award dates, or contract term. Pricing terms, funding sources, and other commercial details are not included in the provided materials.

View the file

Other files for this state and local contract opportunity

Other files attached to Parking Lots Tree Trenches, newest first.
File Type Posted
Bid tabulation~1.pdf PDF
Walkthrough~2.pdf PDF
Q-V_M1.pdf PDF
1.pdf PDF
2.pdf PDF
Posted ITB 2023.pdf PDF
Q-V_E1.pdf PDF
Pre-proposal attendees.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

312’ 293’ ’292

32 parking spaces /side (9’W spaces)

31 parking spaces /side (10’W spaces)

29 parking spaces /side (10’W spaces)

23 parking spaces /side (10’W spaces)

Lights 8’ x 8’

Create 5’ walkways

Create 5’ walkways

Figure 1: R, S, T and U Tree Trench Project overview

Existing asphalt Existing asphalt

3-way soil blend

4’ - 0”

New asphalt

New asphalt

4” AC

3” Base rock

9’ - 0” saw cut and asphalt removal

Mulch 3”

Figure 2: Tree Trench (cross sectional view)

Concrete curb and gutter (see GS-103)

NOTES:

1. Concrete curb and gutter shall follow GS-103 (figure 5), and inlets shall follow GS-104 (figure 6) and be spaced a maximum of every 25 feet

2. Fracture and loosen the native soil following initial excavation and before installing structural soil or 3-way soil blend

3. 3-way soil shall follow specifications in Appendix F of Gresham’s Stormwater Management Manual

6” bench, if needed for curb construction

Figure 3: Tree Trench (plan view)

Concrete base for existing light poles

(8’ x 8’)

3-way soil 4’ - 0”

Saw cut line

Create 5’ wide new walkway on west side of center light

Tree

Tree spacing Evenly spaced, but approx. 25’ O.C. from lights and other trees

New asphalt

Overflow notches (see note 2)

NOTES:

1. Inlets shall follow GS-104 (figure 6) and be spaced a maximum of every 25 feet. Space evenly and ensure that an inlet is located at the downstream (east end) of each reach of tree trench prior to any interruption (e.g. concrete bases for light poles)

2. Overflow notches shall be 4” wide and 6” deep (so that water can overflow to north side of tree trench). Space every 10 feet

3. 3-way blend soil shall follow specifications in Appendix F of Gresham’s Stormwater Management Manual

4. 5’ wide walkway to west of center light post. All other trenches shall end at the 8’ x 8’ light post bases

5. Replace electrical conduit and wire between light posts

Inlet spacing Evenly space. Maximum of 25’

Concrete curb inlet (see note 1)

Concrete curb and gutter

Overflow spacing 10’

312’ 293’ 232’292’

Notes:

1. Light poles are spaced about 100 feet apart

2. Inlets shall be evenly spaced; max of 25’ apart.

Figure 4: Curb inlet spacing

Walkways

Curb Inlets

Figure 5: Concrete Curb and Gutter (GS-103)

12”

NOTES:

1. Concrete shall be 3,300 PSI strength at 28 days.

2. Contraction joints shall be placed every 15’.

3. Finish all exposed concrete surfaces

4. Structural soil shall be compacted to at least 95% Proctor Density from a standard compaction curve AASHTO T 99 (ASTM D 698) prior to placement of base rock/asphalt and pouring concrete curb

Figure 6: Concrete Curb Inlet (GS-104)

12”

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6