MHAFB AF3065 CONTRACT PROGRESS REPORT.pdf
PDF 1 MB Posted
- Attached to
- Repair Storm Drain Bldg 1788 Federal contract opportunity
- Solicitation number
- FA489725B0005
About this file
The document is a blank Contract Progress Report template designed to track contract work progress for a federal contract. The form includes sections for company details, contract information, and a detailed breakdown of work elements with percentage completion metrics. Key sections include:
- Columns for Line No., Work Element, % of Total Project, % Completed This Period, % Completed Cumulative, and % Scheduled Cumulative
- A section for General Description of Work Completed
- A Progress or Completion Certificate where the Contractor Representative certifies work quality
- Areas for Government Remarks, verification by Government Representative, and approval by Contracting Officer
- A note that the form will be used for computing progress payments
- A checkbox indicating if retainage applies
The template is specifically associated with the Air Force contract FA489725B0005 for Repair Storm Drain Bldg 1788 at Mountain Home Air Force Base, which involves storm drain and courtyard improvements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW-Bldg 1788- Storm Drain System Repairs (5 June 2025).pdf | ||
| B1788 Storm Drain Design Analysis.pdf | ||
| B1788 Storm Drain Design Dwgs 2024-05-08.pdf | ||
| RFTP-FA489725B0005- Storm Drain Repair.pdf | ||
| B1788 Storm Drain Specification.pdf | ||
| Provisions and Clauses - FA489725B0005.pdf | ||
| Contractor Yard Request Form-2.pdf | ||
| AF IMT 3000 Material Approval Submittal.pdf | ||
| REA Information.pdf | ||
| WD-ID20250001_01032025 (Res).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT PROGRESS REPORT
Company Name Company Address
Report No. Period From Period To Contract/Order No. Contract Completion
Line No.
Work Element
% Of Total Project
% Completed This Period
% Completed Cumulative
% Scheduled Cumulative
Total
General Description of Work Completed
Progress or Completion Certificate I hereby certify that the work accomplished meets the standards of quality established under the contract.
Certified By Contractor Representative
Signature Date
In accordance with the schedule and payment clauses the information on this form will be used for computing progress payments.
Government Remarks
Verified By Government Representative
Signature Date
Approved By Contracting Officer
Signature Date
Retainage applies.
Line No.
Work Element % Of Total Project
% Completed This Period
% Completed Cumulative
% Scheduled Cumulative
Total
| Company NameRow1: |
| Company AddressRow1: |
| Report NoRow1: |
| Period ToRow1: |
| ContractOrder NoRow1: |
| Contract CompletionRow1: |
| Line NoRow1: |
| Work ElementRow1: |
| Of Total ProjectRow1: |
| Completed This PeriodRow1: |
| Completed CumulativeRow1: |
| Scheduled CumulativeRow1: |
| Line NoRow2: |
| Work ElementRow2: |
| Of Total ProjectRow2: |
| Completed This PeriodRow2: |
| Completed CumulativeRow2: |
| Scheduled CumulativeRow2: |
| Line NoRow3: |
| Work ElementRow3: |
| Of Total ProjectRow3: |
| Completed This PeriodRow3: |
| Completed CumulativeRow3: |
| Scheduled CumulativeRow3: |
| Line NoRow4: |
| Work ElementRow4: |
| Of Total ProjectRow4: |
| Completed This PeriodRow4: |
| Completed CumulativeRow4: |
| Scheduled CumulativeRow4: |
| Line NoRow5: |
| Work ElementRow5: |
| Of Total ProjectRow5: |
| Completed This PeriodRow5: |
| Completed CumulativeRow5: |
| Scheduled CumulativeRow5: |
| Line NoRow6: |
| Work ElementRow6: |
| Of Total ProjectRow6: |
| Completed This PeriodRow6: |
| Completed CumulativeRow6: |
| Scheduled CumulativeRow6: |
| Line NoRow7: |
| Work ElementRow7: |
| Of Total ProjectRow7: |
| Completed This PeriodRow7: |
| Completed CumulativeRow7: |
| Scheduled CumulativeRow7: |
| Line NoRow8: |
| Work ElementRow8: |
| Of Total ProjectRow8: |
| Completed This PeriodRow8: |
| Completed CumulativeRow8: |
| Scheduled CumulativeRow8: |
| Line NoRow9: |
| Work ElementRow9: |
| Of Total ProjectRow9: |
| Completed This PeriodRow9: |
| Completed CumulativeRow9: |
| Scheduled CumulativeRow9: |
| Line NoRow10: |
| Work ElementRow10: |
| Of Total ProjectRow10: |
| Completed This PeriodRow10: |
| Completed CumulativeRow10: |
| Scheduled CumulativeRow10: |
| Line NoRow11: |
| Work ElementRow11: |
| Of Total ProjectRow11: |
| Completed This PeriodRow11: |
| Completed CumulativeRow11: |
| Scheduled CumulativeRow11: |
| Line NoRow12: |
| Work ElementRow12: |
| Of Total ProjectRow12: |
| Completed This PeriodRow12: |
| Completed CumulativeRow12: |
| Scheduled CumulativeRow12: |
| Line NoRow13: |
| Work ElementRow13: |
| Of Total ProjectRow13: |
| Completed This PeriodRow13: |
| Completed CumulativeRow13: |
| Scheduled CumulativeRow13: |
| Line NoRow14: |
| Work ElementRow14: |
| Of Total ProjectRow14: |
| Completed This PeriodRow14: |
| Completed CumulativeRow14: |
| Scheduled CumulativeRow14: |
| Line NoRow15: |
| Work ElementRow15: |
| Of Total ProjectRow15: |
| Completed This PeriodRow15: |
| Completed CumulativeRow15: |
| Scheduled CumulativeRow15: |
| Line NoRow16: |
| Work ElementRow16: |
| Of Total ProjectRow16: |
| Completed This PeriodRow16: |
| Completed CumulativeRow16: |
| Scheduled CumulativeRow16: |
| Line NoRow17: |
| Work ElementRow17: |
| Of Total ProjectRow17: |
| Completed This PeriodRow17: |
| Completed CumulativeRow17: |
| Scheduled CumulativeRow17: |
| Line NoRow18: |
| Work ElementRow18: |
| Of Total ProjectRow18: |
| Completed This PeriodRow18: |
| Completed CumulativeRow18: |
| Scheduled CumulativeRow18: |
| Of Total ProjectTotal: |
| Completed This PeriodTotal: |
| Completed CumulativeTotal: |
| General Description of Work Completed: |
| fill_121: |
| DateSignature: |
| Government Remarks: |
| fill_123: |
| DateSignature_2: |
| fill_125: |
| DateSignature_3: |
| Line NoRow1_2: |
| Work ElementRow1_2: |
| Of Total ProjectRow1_2: |
| Completed This PeriodRow1_2: |
| Completed CumulativeRow1_2: |
| Scheduled CumulativeRow1_2: |
| Line NoRow2_2: |
| Work ElementRow2_2: |
| Of Total ProjectRow2_2: |
| Completed This PeriodRow2_2: |
| Completed CumulativeRow2_2: |
| Scheduled CumulativeRow2_2: |
| Line NoRow3_2: |
| Work ElementRow3_2: |
| Of Total ProjectRow3_2: |
| Completed This PeriodRow3_2: |
| Completed CumulativeRow3_2: |
| Scheduled CumulativeRow3_2: |
| Line NoRow4_2: |
| Work ElementRow4_2: |
| Of Total ProjectRow4_2: |
| Completed This PeriodRow4_2: |
| Completed CumulativeRow4_2: |
| Scheduled CumulativeRow4_2: |
| Line NoRow5_2: |
| Work ElementRow5_2: |
| Of Total ProjectRow5_2: |
| Completed This PeriodRow5_2: |
| Completed CumulativeRow5_2: |
| Scheduled CumulativeRow5_2: |
| Line NoRow6_2: |
| Work ElementRow6_2: |
| Of Total ProjectRow6_2: |
| Completed This PeriodRow6_2: |
| Completed CumulativeRow6_2: |
| Scheduled CumulativeRow6_2: |
| Line NoRow7_2: |
| Work ElementRow7_2: |
| Of Total ProjectRow7_2: |
| Completed This PeriodRow7_2: |
| Completed CumulativeRow7_2: |
| Scheduled CumulativeRow7_2: |
| Line NoRow8_2: |
| Work ElementRow8_2: |
| Of Total ProjectRow8_2: |
| Completed This PeriodRow8_2: |
| Completed CumulativeRow8_2: |
| Scheduled CumulativeRow8_2: |
| Line NoRow9_2: |
| Work ElementRow9_2: |
| Of Total ProjectRow9_2: |
| Completed This PeriodRow9_2: |
| Completed CumulativeRow9_2: |
| Scheduled CumulativeRow9_2: |
| Line NoRow10_2: |
| Work ElementRow10_2: |
| Of Total ProjectRow10_2: |
| Completed This PeriodRow10_2: |
| Completed CumulativeRow10_2: |
| Scheduled CumulativeRow10_2: |
| Line NoRow11_2: |
| Work ElementRow11_2: |
| Of Total ProjectRow11_2: |
| Completed This PeriodRow11_2: |
| Completed CumulativeRow11_2: |
| Scheduled CumulativeRow11_2: |
| Line NoRow12_2: |
| Work ElementRow12_2: |
| Of Total ProjectRow12_2: |
| Completed This PeriodRow12_2: |
| Completed CumulativeRow12_2: |
| Scheduled CumulativeRow12_2: |
| Line NoRow13_2: |
| Work ElementRow13_2: |
| Of Total ProjectRow13_2: |
| Completed This PeriodRow13_2: |
| Completed CumulativeRow13_2: |
| Scheduled CumulativeRow13_2: |
| Line NoRow14_2: |
| Work ElementRow14_2: |
| Of Total ProjectRow14_2: |
| Completed This PeriodRow14_2: |
| Completed CumulativeRow14_2: |
| Scheduled CumulativeRow14_2: |
| Line NoRow15_2: |
| Work ElementRow15_2: |
| Of Total ProjectRow15_2: |
| Completed This PeriodRow15_2: |
| Completed CumulativeRow15_2: |
| Scheduled CumulativeRow15_2: |
| Line NoRow16_2: |
| Work ElementRow16_2: |
| Of Total ProjectRow16_2: |
| Completed This PeriodRow16_2: |
| Completed CumulativeRow16_2: |
| Scheduled CumulativeRow16_2: |
| Line NoRow17_2: |
| Work ElementRow17_2: |
| Of Total ProjectRow17_2: |
| Completed This PeriodRow17_2: |
| Completed CumulativeRow17_2: |
| Scheduled CumulativeRow17_2: |
| Line NoRow18_2: |
| Work ElementRow18_2: |
| Of Total ProjectRow18_2: |
| Completed This PeriodRow18_2: |
| Completed CumulativeRow18_2: |
| Scheduled CumulativeRow18_2: |
| Line NoRow19_2: |
| Work ElementRow19: |
| Of Total ProjectRow19: |
| Completed This PeriodRow19: |
| Completed CumulativeRow19: |
| Scheduled CumulativeRow19: |
| Line NoRow20: |
| Work ElementRow20: |
| Of Total ProjectRow20: |
| Completed This PeriodRow20: |
| Completed CumulativeRow20: |
| Scheduled CumulativeRow20: |
| Line NoRow21: |
| Work ElementRow21: |
| Of Total ProjectRow21: |
| Completed This PeriodRow21: |
| Completed CumulativeRow21: |
| Scheduled CumulativeRow21: |
| Line NoRow22: |
| Work ElementRow22: |
| Of Total ProjectRow22: |
| Completed This PeriodRow22: |
| Completed CumulativeRow22: |
| Scheduled CumulativeRow22: |
| Line NoRow23: |
| Work ElementRow23: |
| Of Total ProjectRow23: |
| Completed This PeriodRow23: |
| Completed CumulativeRow23: |
| Scheduled CumulativeRow23: |
| Line NoRow24: |
| Work ElementRow24: |
| Of Total ProjectRow24: |
| Completed This PeriodRow24: |
| Completed CumulativeRow24: |
| Scheduled CumulativeRow24: |
| Line NoRow25: |
| Work ElementRow25: |
| Of Total ProjectRow25: |
| Completed This PeriodRow25: |
| Completed CumulativeRow25: |
| Scheduled CumulativeRow25: |
| Line NoRow26: |
| Work ElementRow26: |
| Of Total ProjectRow26: |
| Completed This PeriodRow26: |
| Completed CumulativeRow26: |
| Scheduled CumulativeRow26: |
| Line NoRow27: |
| Work ElementRow27: |
| Of Total ProjectRow27: |
| Completed This PeriodRow27: |
| Completed CumulativeRow27: |
| Scheduled CumulativeRow27: |
| Line NoRow28: |
| Work ElementRow28: |
| Of Total ProjectRow28: |
| Completed This PeriodRow28: |
| Completed CumulativeRow28: |
| Scheduled CumulativeRow28: |
| Line NoRow29: |
| Work ElementRow29: |
| Of Total ProjectRow29: |
| Completed This PeriodRow29: |
| Completed CumulativeRow29: |
| Scheduled CumulativeRow29: |
| Line NoRow30: |
| Work ElementRow30: |
| Of Total ProjectRow30: |
| Completed This PeriodRow30: |
| Completed CumulativeRow30: |
| Scheduled CumulativeRow30: |
| Line NoRow31: |
| Work ElementRow31: |
| Of Total ProjectRow31: |
| Completed This PeriodRow31: |
| Completed CumulativeRow31: |
| Scheduled CumulativeRow31: |
| Line NoRow32: |
| Work ElementRow32: |
| Of Total ProjectRow32: |
| Completed This PeriodRow32: |
| Completed CumulativeRow32: |
| Scheduled CumulativeRow32: |
| Line NoRow33: |
| Work ElementRow33: |
| Of Total ProjectRow33: |
| Completed This PeriodRow33: |
| Completed CumulativeRow33: |
| Scheduled CumulativeRow33: |
| Line NoRow34: |
| Work ElementRow34: |
| Of Total ProjectRow34: |
| Completed This PeriodRow34: |
| Completed CumulativeRow34: |
| Scheduled CumulativeRow34: |
| Line NoRow35: |
| Work ElementRow35: |
| Of Total ProjectRow35: |
| Completed This PeriodRow35: |
| Completed CumulativeRow35: |
| Scheduled CumulativeRow35: |
| Line NoRow36: |
| Work ElementRow36: |
| Of Total ProjectRow36: |
| Completed This PeriodRow36: |
| Completed CumulativeRow36: |
| Scheduled CumulativeRow36: |
| Line NoRow37: |
| Work ElementRow37: |
| Of Total ProjectRow37: |
| Completed This PeriodRow37: |
| Completed CumulativeRow37: |
| Scheduled CumulativeRow37: |
| Line NoRow38: |
| Work ElementRow38: |
| Of Total ProjectRow38: |
| Completed This PeriodRow38: |
| Completed CumulativeRow38: |
| Scheduled CumulativeRow38: |
| Line NoRow39: |
| Work ElementRow39: |
| Of Total ProjectRow39: |
| Completed This PeriodRow39: |
| Completed CumulativeRow39: |
| Scheduled CumulativeRow39: |
| Line NoRow40: |
| Work ElementRow40: |
| Of Total ProjectRow40: |
| Completed This PeriodRow40: |
| Completed CumulativeRow40: |
| Scheduled CumulativeRow40: |
| Line NoRow41: |
| Work ElementRow41: |
| Of Total ProjectRow41: |
| Completed This PeriodRow41: |
| Completed CumulativeRow41: |
| Scheduled CumulativeRow41: |
| Line NoRow42: |
| Work ElementRow42: |
| Of Total ProjectRow42: |
| Completed This PeriodRow42: |
| Completed CumulativeRow42: |
| Scheduled CumulativeRow42: |
| Line NoRow43: |
| Work ElementRow43: |
| Of Total ProjectRow43: |
| Completed This PeriodRow43: |
| Completed CumulativeRow43: |
| Scheduled CumulativeRow43: |
| Line NoRow44: |
| Work ElementRow44: |
| Of Total ProjectRow44: |
| Completed This PeriodRow44: |
| Completed CumulativeRow44: |
| Scheduled CumulativeRow44: |
| Line NoRow45: |
| Work ElementRow45: |
| Of Total ProjectRow45: |
| Completed This PeriodRow45: |
| Completed CumulativeRow45: |
| Scheduled CumulativeRow45: |
| Line NoRow46: |
| Work ElementRow46: |
| Of Total ProjectRow46: |
| Completed This PeriodRow46: |
| Completed CumulativeRow46: |
| Scheduled CumulativeRow46: |
| Line NoRow47: |
| Work ElementRow47: |
| Of Total ProjectRow47: |
| Completed This PeriodRow47: |
| Completed CumulativeRow47: |
| Scheduled CumulativeRow47: |
| Line NoRow48: |
| Work ElementRow48: |
| Of Total ProjectRow48: |
| Completed This PeriodRow48: |
| Completed CumulativeRow48: |
| Scheduled CumulativeRow48: |
| Line NoRow49: |
| Work ElementRow49: |
| Of Total ProjectRow49: |
| Completed This PeriodRow49: |
| Completed CumulativeRow49: |
| Scheduled CumulativeRow49: |
| Line NoRow50: |
| Work ElementRow50: |
| Of Total ProjectRow50: |
| Completed This PeriodRow50: |
| Completed CumulativeRow50: |
| Scheduled CumulativeRow50: |
| Line NoRow51: |
| Work ElementRow51: |
| Of Total ProjectRow51: |
| Completed This PeriodRow51: |
| Completed CumulativeRow51: |
| Scheduled CumulativeRow51: |
| Line NoRow52: |
| Work ElementRow52: |
| Of Total ProjectRow52: |
| Completed This PeriodRow52: |
| Completed CumulativeRow52: |
| Scheduled CumulativeRow52: |
| Of Total ProjectTotal_2: |
| Completed This PeriodTotal_2: |
| Completed CumulativeTotal_2: |
| Scheduled CumulativeTotal_2: |
| Check Box13: Off |
| Period FromRow1: |
| Scheduled CumulativeTotal: |
File details come from the government source that posted it. Updated .