MH108 - HVAC PROPOSED FLOOR PLAN.pdf
PDF 3 MB Posted
- Attached to
- Y1NB--Replace Air Handling Unit No. 2 and 3 Federal contract opportunity
- Solicitation number
- Not on record
About this file
This package includes proposed floor plans and sections for replacing air handling units at a Department of Veterans Affairs medical facility. The plans show the layout of new and existing HVAC equipment in multiple areas of the first floor, with notes specifying construction phasing, testing and balancing of the new system, protection of existing utilities, and coordination requirements. Dimensions and specifications are provided for new ductwork, air handlers, and other mechanical system elements to support replacement of Air Handling Units 2 and 3. The related opportunity on the VA's procurement system seeks proposals to complete this work without modifying the established due date. Relevant details such as pricing, small business preferences, and award timing are not included.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MH106 - HVAC PROPOSED FLOOR PLAN.pdf | ||
| MH107 - HVAC PROPOSED FLOOR PLAN.pdf | ||
| MH105 - HVAC PROPOSED FLOOR PLAN.pdf | ||
| MH301 - HVAC SECTIONS.pdf | ||
| SF 30 Amendment 36C24822R0103 0004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-3
ANGIO RM. #2
EQUIP.
107 ANGIO RM. #1
P-4
DUCT CHASE
EQUIP.
S-2
SHARED
CONTROL
EQUIP.
S-1
345610
H
J
K
L
M
N
P
R
J
M
N
H
K
L
P
R
123456789101112 7891112
1-TU-62-1B-8
1-TU-62-1B-6
1-TU-62-1B-3
1-TU-62-1B-11
1-TU-62-1A-2
1-TU-62-1A-1
1-TU-62-1A-3
1-TU-62-1A-5
1-TU-62-1A-7
1-TU-62-1A-8
1-TU-62-1A-12
1-TU-62-1A-10
1-TU-62-1A-16
1-TU-62-1A-17
1-TU-62-1A-14
1-TU-62-1A-18
1-TU-62-1A-13
1-TU-62-1B-5
1-TU-62-1B-4 1-TU-62-1B-2
MH301
I
120 CFM
I
110 CFM
I
110 CFM
I
270 CFM
I
120 CFM
I
100 CFM
I
110 CFM
I
120 CFM
D
220 CFM
C
150 CFM
I
150 CFM
D
225 CFM
D
220 CFM
D
225 CFM
I
445 CFM
I
445 CFM
D
235 CFM
D
235 CFM
I
470 CFM
C
110 CFM
I
110 CFM
C
100 CFM
I
100 CFM
C
100 CFM
I
100 CFM
C
100 CFM
I
100 CFM
C
120 CFM
C
100 CFM
D
110 CFM
C
130 CFM
I
130 CFM
D
160 CFM
I
160 CFM
D
110 CFM
I
110 CFM
I
110 CFM
C
110 CFM
C
120 CFM
C
120 CFM
I
240 CFM
I
100 CFM
C
100 CFM
I
390 CFM
I
390 CFM
D
170 CFM
I
170 CFM
D
170 CFM
I
170 CFM
D
180 CFM
D
180 CFM
D
180 CFM
D
180 CFM
I
150 CFM
I
150 CFM
C
100 CFM
I
100 CFM
C
100 CFM I
100 CFM
C
100 CFM
I
100 CFM
C
100 CFM
I
100 CFM
C
100 CFM
I
100 CFM
D
210 CFM
D
210 CFM
I
425 CFM
D
215 CFM
I
425 CFM
D
215 CFM
I
160 CFM
C
120 CFM
I
120 CFM
C
110 CFM
I
110 CFM
C
100 CFM
I
100 CFM
C
100 CFM
I
100 CFM
C
150 CFM
I
150 CFM
H
50 CFM
C
50 CFM
D
190 CFM
D
190 CFM
D
185 CFM
D
185 CFM
I
350 CFM
I
350 CFM
D
140 CFM
I
140 CFM
C
110 CFM
I
110 CFM
C
120 CFM
C
150 CFM
C
150 CFM
I
300 CFM
C
100 CFM
I
100 CFM
C
135 CFM
D
135 CFM
D
110 CFM
C
100 CFM
I
100 CFM
D
120 CFM
D
110 CFM
C
100 CFM C
100 CFM
I
100 CFM
I
100 CFM
K
630 CFM
K
630 CFM
J
310 CFM
C
120 CFM
C
100 CFM
I
100 CFM
I
160 CFM
I
160 CFM
I
160 CFM
I
160 CFM
D
170 CFM
I
260 CFM D
170 CFM
C
110 CFM
ø6" ø8" ø6" ø8" ø6" ø6" ø6" ø8"
1-TU-62-1B-12
ø6" ø8" ø10" ø10" ø8" ø8" ø8"
H
50 CFM
A.D.
1-TU-62-1B-1
1-TU-62-1A-4
1-TU-62-1A-6
1-TU-62-1A-11
1-TU-62-1A-15
F DPR
F DPR F DPR
D
170 CFM
C
140 CFM
I
140 CFM
D
160 CFM
I
395 CFM
I
395 CFM
I
260 CFM
40"X16"
"X
46"X16"
"X
44"X16"
"X
40"X16"
"X
72"X44"
74"X20"
"X
18"X8"12"X8"
"X
"X
"X
8"X6"
"X
22"X8"
36"X10"
"X
"X
12"X8"
10"X6" 8"X6"
8"X6"
48"X14"
46"X14"
"X
"X
"X
12"X8"
"X
"X
"X
20"X8"16"X8"
"X
"X
"X
"X
"X
"X
32"X8" 26"X8"
"X
"X
14"X8" 8"X6"
"X
16"X6"
8"X6"
"X
"X
20"X8"16"X8"
"X
20"X8" 16"X8"
"X
30"X8"28"X8"22"X8"18"X6"
"X
"X
"X
12"X8"
"X
8"X6"
"X
12"X8"
"X
"X
10"X6"
"X
"X
16"X10"
"X
"X
"X
"X
"X
"X
"X
"X
"X
F DPR
"X
12"X8"
"X
10"X6"
10"X6"
10"ø
16"X10"
"X
38"X14"
12"X8"
12"X8" 10"X6"
"X
8"X6"
"X
"X
8"X6"
8"X6"
"X
10"ø
"X
"X
10"X6"
8"X6"
"X
18"X8"
"X
"X
14"X10"
18"X10"
12"X6"8"X6"
8"X6"
"X
"X
"X
"ø
"X
8"X6"
"X
12"X8"
20"X8"
"X
8"X6"
"X
"X
10"X20"
14"X10"
10"X6"
14"X6" 14"X8"
"ø
"X
8"X6"
"X
10"X6"
8"X6"
10"X6" 8"X6"8 "X
8"X6"
"X
"X
14"X6"
"X
"X
10"X6"
14"X8"
"X
10"X6"
8"X6"
"X
8"X6"
"X
"X
"X
8"X6"
"X
"ø
"ø
"X
8"X6"
10"X6"
10"X6"
8"X6"
8"X6"
6"ø
"X
"X
"X
8"X6"
12"X6"
16"X8"
18"X6"
"X
8"ø 14"X6"8"X6"
8"X6" 8"X6"
"X
"X
8"X6"
8"X6"10"X6"
8"X6"
"X
10"X8"
"X
8"X6"
40"X10"
10"X6"10"X8"
"X
"X
"ø
"ø
10"X6"
6"ø 8"X6"
10"X6"
8"X6"
8"X6" 6"X8"
"X
8"X6"
8"X6"
"X
10"X6"
8"X6"
"X
"X
8"ø
8"X6"
8"X6"
8"X6"
"X
12"X6"
8"X6"
"X
"X
"X
"8"X6"
8"X6"
8"X6" 14"X6"
"X
"X
"X
8"ø11"X10"
8"X6"
"X
8"X6"
"ø
"X
"X
12"X8"
"X
8"X6"
"X
"X
"X
8"X6"
6"ø
"X
8"X6"
"X
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
ENGINEER - OF - RECORD FL. P.E. NO.
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
/9
/2
:1
:5
P M
JHK WRB
WILLIAM RODRIGUEZ 69663
JANUARY 21, 2022
MH108
HVAC PROPOSED FLOOR PLAN
1/8" = 1'-0"
HVAC 1ST FLOOR PLAN - PHASE 4
11 T-4
T-6
T -7
T -1
A
NEW BED TOWER
T-2
T-5
E-WING
ROOF TOP
1st FLOOR
T -1
B
T-11
T -8
T-3
MECH. BLDG.
MAIN
HOSPITAL
T-9
T-10
AMBULATORY
CARE
SHEET KEYNOTES
SHEET NOTES
1. SEE CONSTRUCTION PHASING PLAN FOR SEQUENCE
OF WORK.
2. CONTRACTOR SHALL TEST AND BALANCE NEW HVAC
SYSTEM AFTER COMPLETION OF WORK WITHIN EACH
SMOKE COMPARTMENT ZONE.
3. SEE ARCHITECTURAL PLANS FOR SCOPE OF WORK IN
REGARDS TO CONSTRUCTION OF NEW DUCT RISER
SHAFTS. CONTRACTOR SHALL COMPLY WITH VA'S LIFE
SAFETY CODE THROUGHOUT CONSTRUCTION.
4. SEE ELECTRICAL PLANS FOR SCOPE OF WORK
RELATED TO RELOCATION OF EXISTING CONDUITS AND
IT/DATA CABLE TRAYS.
5. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL
PROTECT EXISTING ELECTRICAL CONDUITS, IT/DATA
CABLE TRAYS, FIRE ALARM CONDUITS, PLUMBING PIPES,
MEDICAL GAS PIPES, SPRINKLER PIPES DURING
CONSTRUCTION. ANY CEILING DEVICES IN CONFLICT
WITH NEW HVAC SYSTEM SHALL BE TEMPORARILY
RELOCATED. NOTIFY THE OWNER AND ENGINEER OF
RECORD PRIOR TO SHUTDOWN OF ANY UTILITY
SERVICES.
6. CONTRACTOR SHALL TEMPORARILY SHUT DOWN FIRE
PROTECTION SYSTEM DURING CONSTRUCTION. DRAIN
DOWN THE FIRE SPRINKLER PIPES. ALL SPRINKLER
HEAD AND PIPES TO RADIANT CEILING PANEL SHALL BE
REPLACED WITH NEW FLEXIBLE METAL TUBING AND
SPRINKLER HEAD. REFER TO ARCHITECTURAL PLANS
FOR NEW CEILING HEIGHTS. CONTRACTOR SHALL
COMPLY WITH ILSM REQUIREMENT (INTERIM LIFE
SAFETY MEASURES).
7. NEW 2-HOUR RATED SHAFT ENCLOSURE AND PIPE
CHASE SHALL BE COORDINATED WITH STRUCTURAL
AND ARCHITECTURAL CONTRACTOR.
Revisions: Date:
1 Bulletin No. 2 09-09-2022
| Sheets |
| MH105 - HVAC PROPOSED FLOOR PLAN |
| MH106 - HVAC PROPOSED FLOOR PLAN |
| MH107 - HVAC PROPOSED FLOOR PLAN |
| MH108 - HVAC PROPOSED FLOOR PLAN |
| MH301 - HVAC SECTIONS |
| 2022-09-09T14:27:47-0400 | |
| William Rodriguez, P.E. |
| 2022-09-09T14:32:47-0400 | |
| William Rodriguez, P.E. |
File details come from the government source that posted it. Updated .