MH106 - HVAC PROPOSED FLOOR PLAN.pdf

PDF 2 MB Posted

Attached to
Y1NB--Replace Air Handling Unit No. 2 and 3 Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This package includes proposed HVAC floor plans and sections for replacing air handling units at a Department of Veterans Affairs medical facility, as well as a related federal contract opportunity notice. The plans depict the layout of new and existing ductwork, air handlers, fans, diffusers, equipment rooms, and other HVAC components for the basement and first floor. Detailed notes specify requirements for pressure sensors, transfer ducts, sprinkler head replacements, and construction phasing. The contract opportunity is for replacing air handling units numbers two and three, with an unchanged proposal due date. Revisions to the drawings add dimensions and information.

View the file

Other files for this federal contract opportunity

Other files attached to Y1NB--Replace Air Handling Unit No. 2 and 3, newest first.
File Type Posted
MH108 - HVAC PROPOSED FLOOR PLAN.pdf PDF
MH107 - HVAC PROPOSED FLOOR PLAN.pdf PDF
MH105 - HVAC PROPOSED FLOOR PLAN.pdf PDF
MH301 - HVAC SECTIONS.pdf PDF
SF 30 Amendment 36C24822R0103 0004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

345610

H

J

K

L

M

N

P

R

J

M

N

H

K

L

P

R

123456789101112 7891112

1-TU-62-BA-15B

1-TU-62-BA-22

1-TU-62-BA-19

1-TU-62-BA-14A

1-TU-62-BA-14B

1-TU-62-BA-16

1-TU-62-BA-20

1-TU-62-BA-3

1-TU-62-BA-9

1-TU-62-BA-7

1-TU-62-BA-8

1-TU-62-BA-4

1-TU-61-BD-8 1-TU-61-BD-9

1-TU-61-BD-11

1-TU-61-BD-121-TU-61-BD-14

1-TU-61-BD-10

1-TU-62-BA-5

1-TU-62-BA-21

1-TU-62-BA-15A

1-TU-62-BA-13

I

205 CFM

I

110 CFM

D

210 CFM

I

205 CFM

D

130 CFM

I

130 CFM

D

155 CFM

D

155 CFM

I

210 CFM

D

155 CFM

I

100 CFM

I

110 CFM

I

100 CFM

I

110 CFM

C

100 CFM

C

110 CFM

C

100 CFM

C

110 CFM

C

90 CFMD

205 CFM

I

410 CFM

D

205 CFM

C

50 CFM

D

175 CFM

I

415 CFM

E

300 CFM

E

300 CFM

E

300 CFM

E

300 CFM

I

410 CFM

E

300 CFM

I

410 CFM

I

130 CFM

C

100 CFM

I

100 CFM

C

90 CFM

I

280 CFM

1-TU-62-BA-1B

MH301

"X

8"X6"

"X

"X

10"X8"

"ø

"ø

"ø

"ø

1-TU-62-BA-6

1-TU-62-BA-1A

6"ø 8"X6"

"X

"ø

"ø

"X

"X

22"X12" 22"X10"

"ø

32"X10"

"X

"ø

"X

C

120 CFM

"X

"X

E

280 CFM

C

100 CFM

"X

C

150 CFM

8"X6"

C

100 CFM

32"X16"

C

135 CFM

10"X6" 8"X6"

"X

18"X14"

I

100 CFM

I

100 CFM

8"ø8"ø

930 CFM

"X

"X

26"X8"

"X

22"X8"

"X

"X

12"X8"

8"X6"

"X

"X

"X

36"X16"

18"X8"

230 CFM

D

210 CFM

D

210 CFM

D

210 CFM

D

210 CFM

D

210 CFM

D

210 CFM

D

210 CFM

D

210 CFM

D

210 CFM

D

210 CFM

D

200 CFM

F

500 CFMF

500 CFM

F

500 CFM

F

500 CFM

F

500 CFM

I

1025 CFM

I

1025 CFM

I

1025 CFM

I

1025 CFM

F

500 CFM

I

1025 CFM

I

1025 CFM

E

300 CFM

F

500 CFM

F

500 CFM

E

400 CFM

G

760 CFM

G

760 CFM

D

100 CFM

G

760 CFM

G

760 CFM

G

760 CFM

F

500 CFM

F

450 CFM

F

450 CFM D

250 CFMD

250 CFM

D

250 CFM

D

250 CFM

D

250 CFM

D

250 CFM

G

750 CFM

E

275 CFM

I

100 CFM

E

275 CFM

E

275 CFM

E

275 CFM

D

200 CFM

I

200 CFM

D

200 CFM

I

200 CFM

I

120 CFM

E

280 CFM

100 CFM

I

100 CFM

I

150 CFM

D

185 CFMD

180 CFM

D

185 CFM

C

100 CFM

C

100 CFM

I

900 CFM

I

415 CFM

I

150 CFM

G

750 CFM

I

550 CFM

I

550 CFM

1-TU-62-BA-18

1-EF-62-1

I

250 CFM

I

200 CFM

C

50 CFM

14"X8"20"X10"

18"X8"

8" X6"

"X

14"X8" 10"X8" 10"X6" ø8"

10"X6" ø8"10"X6" ø8"

"X

"X

"X

"X

"X

"ø

"X

" 14"ø

58"X24"

72"X20"

32"X30"

"X

36"X24"

"X

16"X8"

"X

" 12"X8" 12"X6"

"X

" 8"X6" 6"ø

"X

"X

"ø

8"X6"

"X

16"X8" 10"X6"

12"X8"

"X

"8

"ø

8"ø

12"X10"12"X8"10"X6"8"X6"

8"X6" ø8"

8"X8"

"X

22"X12" 22"X10"

"X ø10"

16"X10" 12"X6" ø10" ø10" ø6"

8"X6"

8"X6" ø8" ø8" 1 "X

8"X6" ø8"ø8"

"X ø8" ø8"

10"X8"

12"X8" 10"X8" 10"X6" 8"X6"

10"X6"

"X

"X ø6" ø6"

"X ø6"

"X ø6"

"X

"X

"X

F

500 CFM

22"X10"

16"X8"

26"X12" 28"X12" 32"X14"

"X

34"X16"

36"X20"

"X

"X

"X

"X

I

350 CFM

18"X12"

"X

18"X12"

"X

"X

18"X10"

"X

10"X6"

"X

935 CFM 930 CFM 935 CFM

SPS

1-TU-62-BA-12

1-TU-62-BA-17

"X

I

100 CFM

F DPR

F DPR

D

155 CFM

24"X12"

"X

"X

"X

I

400 CFM

22"X10"

"X

"X

34"X16"

2 2 2 2

"X

"X

14"X8"

"X

"X

8"X6" 10"X6" 12"X8"

10"X14"

8"X6"

"X

"X

10"X6"

8"X6"

8"X6"

8"X8"

"X

"X

"X

12"X8"

"X

14"X8"

18"X8"

"X

"X

"X

10"X6"

"X

"ø

"ø

"X

"X

"X

"X

"X

"ø

"X

14"ø

14"X12" 8"X6" 6"ø

18"X12"

14"X8"

14"X10"

12"X8"

1 1

3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437

COA: FL #29758

AKEA Project No. AD182-19

Design, Inc.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT / ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

ENGINEER - OF - RECORD FL. P.E. NO.

REPLACE AIR HANDLING UNIT

(AHU) 2

573-18-602

GAINESVILLE, FLORIDA

FINAL DESIGN SUBMITTAL

APPROVED FOR CONSTRUCTION

This item has been electronically signed and sealed by the individual named at right.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

/9

/2

:1

:4

P M

JHK WRB

WILLIAM RODRIGUEZ 69663

JANUARY 21, 2022

MH106

HVAC PROPOSED FLOOR PLAN

1/8" = 1'-0"

HVAC BASEMENT FLOOR PLAN - Callout 2

11 T-4

T-6

T -7

T -1

A

NEW BED TOWER

T-2

T-5

E-WING

ROOF TOP

1st FLOOR

T -1

B

T-11

T -8

T-3

MECH. BLDG.

MAIN

HOSPITAL

T-9

T-10

AMBULATORY

CARE

1. PROVIDE DUCT STATIC PRESSURE SENSOR.

2. CONNECT TO EXISTNG RETURN GRILLES.

3. PROVIDE 14"x12" TRANSFER DUCT

SHEET KEYNOTES

SHEET NOTES

1. SEE CONSTRUCTION PHASING PLAN FOR SEQUENCE

OF WORK.

2. CONTRACTOR SHALL TEST AND BALANCE NEW HVAC

SYSTEM AFTER COMPLETION OF WORK WITHIN EACH

SMOKE COMPARTMENT ZONE.

3. SEE ARCHITECTURAL PLANS FOR SCOPE OF WORK IN

REGARDS TO CONSTRUCTION OF NEW DUCT RISER

SHAFTS. CONTRACTOR SHALL COMPLY WITH VA'S LIFE

SAFETY CODE THROUGHOUT CONSTRUCTION.

4. SEE ELECTRICAL PLANS FOR SCOPE OF WORK

RELATED TO RELOCATION OF EXISTING CONDUITS AND

IT/DATA CABLE TRAYS.

5. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL

PROTECT EXISTING ELECTRICAL CONDUITS, IT/DATA

CABLE TRAYS, FIRE ALARM CONDUITS, PLUMBING PIPES,

MEDICAL GAS PIPES, SPRINKLER PIPES DURING

CONSTRUCTION. ANY CEILING DEVICES IN CONFLICT

WITH NEW HVAC SYSTEM SHALL BE TEMPORARILY

RELOCATED. NOTIFY THE OWNER AND ENGINEER OF

RECORD PRIOR TO SHUTDOWN OF ANY UTILITY

SERVICES.

6. CONTRACTOR SHALL TEMPORARILY SHUT DOWN FIRE

PROTECTION SYSTEM DURING CONSTRUCTION. DRAIN

DOWN THE FIRE SPRINKLER PIPES. ALL SPRINKLER

HEAD AND PIPES TO RADIANT CEILING PANEL SHALL BE

REPLACED WITH NEW FLEXIBLE METAL TUBING AND

SPRINKLER HEAD. REFER TO ARCHITECTURAL PLANS

FOR NEW CEILING HEIGHTS. CONTRACTOR SHALL

COMPLY WITH ILSM REQUIREMENT (INTERIM LIFE

SAFETY MEASURES).

7. NEW 2-HOUR RATED SHAFT ENCLOSURE AND PIPE

CHASE SHALL BE COORDINATED WITH STRUCTURAL

AND ARCHITECTURAL CONTRACTOR.

Revisions: Date:

1 Bulletin No. 2 09-09-2022

Sheets
MH105 - HVAC PROPOSED FLOOR PLAN
MH106 - HVAC PROPOSED FLOOR PLAN
MH107 - HVAC PROPOSED FLOOR PLAN
MH108 - HVAC PROPOSED FLOOR PLAN
MH301 - HVAC SECTIONS
2022-09-09T14:25:16-0400
William Rodriguez, P.E.
2022-09-09T14:31:03-0400
William Rodriguez, P.E.

File details come from the government source that posted it. Updated .