MH105 - HVAC PROPOSED FLOOR PLAN.pdf
PDF 2 MB Posted
- Attached to
- Y1NB--Replace Air Handling Unit No. 2 and 3 Federal contract opportunity
- Solicitation number
- Not on record
About this file
This package includes construction drawings and specifications for replacing air handling units at a Department of Veterans Affairs medical center. The drawings show the proposed HVAC system layout and details for the basement, first floor, and roof areas, with notes on demolition scope, protection of existing utilities, fire protection shutdown and reinstallation, and construction of new shaft enclosures. Unit designations, equipment schedules and specifications are provided. The related opportunity notice seeks proposals to replace Air Handling Units 2 and 3 per the specifications, with submissions due on the originally stated date. Relevant agencies are the Department of Veterans Affairs and Veterans Health Administration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MH107 - HVAC PROPOSED FLOOR PLAN.pdf | ||
| MH301 - HVAC SECTIONS.pdf | ||
| SF 30 Amendment 36C24822R0103 0004.pdf | ||
| MH108 - HVAC PROPOSED FLOOR PLAN.pdf | ||
| MH106 - HVAC PROPOSED FLOOR PLAN.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DN
345610
D
E
F
G
A
B
C
B
C
D
E
F
G
A
123456789101112 8. 9. 10. 12. 14. 15. 16. 18. 19.7891112
"X
"X
1-TU-61-BB-4
1-TU-61-BB-1
1-TU-61-BB-9
1-TU-61-BB-3
1-TU-61-BB-10
1-TU-61-BB-17
1-TU-61-BB-19
1-TU-61-BB-7
1-TU-61-BB-14
1-TU-61-BB-12
1-TU-61-BD-2
1-TU-61-BD-1
1-TU-61-BD-3
1-TU-61-BD-5
1-TU-61-BD-13
1-TU-61-BD-4
1-TU-61-BD-6
1-TU-61-BB-5
1-TU-61-BD-7
1-TU-61-BB-6
1-TU-61-BB-22
1-TU-62-BA-10
1-TU-62-BA-11
1-TU-62-BA-2
8"X6"
"ø
1-TU-61-BB-18
1-TU-61-BB-15 1-TU-61-BB-16
C
105 CFM
C
105 CFM
D
240 CFM
D
240 CFM
D
235 CFM
D
235 CFM
E
250 CFM
E
255 CFM
E
255 CFM
E
300 CFM
E
295 CFM
E
300 CFM
E
295 CFM
E
335 CFM
E
335 CFM
E
330 CFM
D
185 CFM
D
165 CFM
C
140 CFM
C
160 CFM C
165 CFM
D
185 CFM
I
50 CFM
E
250 CFM
I
260 CFM
I
260 CFM
I
260 CFM
I
255 CFM
C
110 CFM
I
110 CFM
C
100 CFM I
100 CFM
D
170 CFM
I
170 CFM
I
190 CFM
I
190 CFM
D
180 CFM
C
130 CFM
I
360 CFM I
100 CFM
C
100 CFM
C
130 CFM
I
350 CFM
D
175 CFM
I
250 CFM
I
650 CFM
I
250 CFM
"X
"X
"X
C
135 CFM
C
140 CFM 1
"X
"X
"X
"X
"X
24"X6"
24"X6"
24"X6"24"X6"
24"X6"
24"X6"
18"X6"
18"X6"
18"X6"
"X
"X
"X
"X
8"X6"
24"X6"
20"X8"10"ø
"X
"X
"X
" 6"ø
6"ø
8"X6"
8"X6"
150 CFM
150 CFM
150 CFM
290 CFM
620 CFM
625 CFM
620 CFM 620 CFM
625 CFM
620 CFM
C
100 CFM
8"X6"
C
130 CFM
C
130 CFM
740 CFM
C
110 CFM
I
110 CFM
"X
"X
"X
8"X6"
I
100 CFM
"X
C
130 CFM
C
135 CFM
C
135 CFM
C
130 CFM
I
300 CFM
I
360 CFM
F
570 CFM
F
565 CFM
F
565 CFM
I
950 CFM
I
950 CFM
F
500 CFM
F
500 CFM
I
800 CFM
F
550 CFM
F
550 CFM
F
550 CFM
1150 CFM
1150 CFMF
550 CFM
C
130 CFM
I
130 CFM
D
190 CFM
I
190 CFM
C
100 CFM
I
100 CFM
C
100 CFM I
100 CFM
D
200 CFM
I
100 CFM
F
500 CFM
F
500 CFM
F
500 CFM
F
500 CFM
I
1050 CFM
I
1050 CFM
F
525 CFM
F
525 CFM
F
525 CFM
F
525 CFM
D
200 CFM
I
100 CFM
C
60 CFM
C
60 CFM
C
60 CFM
I
295 CFM
D
195 CFM
I
60 CFM
I
60 CFM
I
60 CFM
D
220 CFM
I
320 CFMI
100 CFM
I
100 CFM
I
100 CFM
I
100 CFM
C
145 CFM
C
145 CFM
I
290 CFM
C
100 CFM
I
100 CFM
C
100 CFM
I
100 CFM
D
195 CFM
D
190 CFM
D
195 CFM
I
580 CFM
C
125 CFM
C
130 CFM
C
125 CFM
E
380 CFM
D
190 CFM
I
190 CFM
E
320 CFM
C
135 CFM
C
130 CFM
E
400 CFM
C
135 CFM
D
250 CFM
D
190 CFM
I
190 CFM
C
120 CFM
I
100 CFM
I
150 CFM
I
250 CFM
C
120 CFM
I
750 CFM
I
350 CFM
I
350 CFM
I
190 CFM
I
190 CFM
I
255 CFM
I
205 CFM
I
205 CFM
I
85 CFM
16"X12"14"X10"14"X8"8"X8" 22"X10"
16"X10"
12"X10" 12"X6"
"X
"X
"X
8"X8"
14"X10"
14"X8" 10"X8"8"X6"
14"X10"
24"X10"
"X
"X
8"X6"
F
500 CFM
I
400 CFM
1-TU-61-BB-2
I
420 CFM
1-TU-61-BB-20
SPS
28"X16"
24"X10"
"X
"X
"X
8"X8"
"X
"X
22"X10"
"X
10"X6"
8"X6"
40"X14"
"X
40"X20"
"X
12"X6"
8"X6"
16"X10"
18"X8"
"X
"X
"X
14"X8"
8"X6"
8"X6"
14"X12" 10"X6"
"X
26"X10"
18"X10"20"X16"
F DPR
F DPR F DPR
F DPR
F DPR
F DPR
F DPR
F DPR
I
100 CFM
I
110 CFM
G
730 CFM
I
740 CFM
G
730 CFM
"X
50"X18"46"X18"
"X
"X
30"X18"
30"X26"
"X
14"X8"
34"X12"
"X
40"X20"42"X20"
"X
"X
"X
"X
"X
32"X10"
"X
"X
"X
"X
"X
24"X10"
"X
14"X10"
"X
46"X22" 44"X22"
34"X22"
"X
"X
8"X6"
"X
16"X6"
12"X8"
8"X6"
8"X6"
"X
"X
"X
8"X6"
"X
"X
"X
8"X6"
12"X8"
"X
"X
14"X6"
20"X8"
8"X6"12"X6"
"X
36"X10"
"X
8"X6"
8"X6"
8"X6"
"X ø8"
8"X6"
10"X8"
16"X12"
"X
"X
28"X12"
"X
"X
12"X6"12"X8"
8"X6"
6"X8"
6"X12"
"X
"X
8"X8"12"X8"
12"X6" 12"X8"
8"X6"
"X
"X
"X
"X
10"X6"
"X
"X
8"X6"
10"X6"
12"X6" 8"X6"
12"X10"
12"X6"
8"X6"
"X
"X
"X
10"X6"
10"X6"
14"X8" 10"X6"
"X
"X
"X
10"X8"
18"X10"
"X
"X
10"X6"
"X
10"X6" 8"X6"
"X
12"X6" 8"X6"
8"X6"12"X6"
"X
8"X6"
"X
"X
12"X6" 8"X6"
"X
8"X6"
8"X6"
"X
8"X6"
16"X8"18"X10"
"X
"X
"X
" 12"X8"
"X
"X
"X
10"X6"
20"X10"
12"X8"
20"X12"
"X
"X
12"X8"
10"X6"
"X
12"X8"
8"X6"
22"X8"
8"X6"
"X
8"X6"
8"X6"
C
100 CFM
I
100 CFM
"X
70"X20"
14"X8"
20"X10" 20"X10"
14"X8"
20"X10"
"X
"ø
10"X14"
8"X6"
8"X6"
"X
18"X6" 12"X8"
"X
10"X6"
8"X6" 14"X8"
"X
12"X8"
14"X8"
"X
12"X8"
"X
10"X8"
"ø
14"X12"
24"X12" 16"X12"
"X
"X
"14"X8"
"X
"X
"X
"X
24"X10"
8"X6"
"X
"X
"ø
"X
"X
8"X6"
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
ENGINEER - OF - RECORD FL. P.E. NO.
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
/9
/2
:1
:4
P M
JHK WRB
WILLIAM RODRIGUEZ 69663
JANUARY 21, 2022
MH105
HVAC PROPOSED FLOOR PLAN
SHEET KEYNOTES
SHEET NOTES
1. SEE CONSTRUCTION PHASING PLAN FOR SEQUENCE
OF WORK.
2. CONTRACTOR SHALL TEST AND BALANCE NEW HVAC
SYSTEM AFTER COMPLETION OF WORK WITHIN EACH
SMOKE COMPARTMENT ZONE.
3. SEE ARCHITECTURAL PLANS FOR SCOPE OF WORK IN
REGARDS TO CONSTRUCTION OF NEW DUCT RISER
SHAFTS. CONTRACTOR SHALL COMPLY WITH VA'S LIFE
SAFETY CODE THROUGHOUT CONSTRUCTION.
4. SEE ELECTRICAL PLANS FOR SCOPE OF WORK
RELATED TO RELOCATION OF EXISTING CONDUITS AND
IT/DATA CABLE TRAYS.
5. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL
PROTECT EXISTING ELECTRICAL CONDUITS, IT/DATA
CABLE TRAYS, FIRE ALARM CONDUITS, PLUMBING PIPES,
MEDICAL GAS PIPES, SPRINKLER PIPES DURING
CONSTRUCTION. ANY CEILING DEVICES IN CONFLICT
WITH NEW HVAC SYSTEM SHALL BE TEMPORARILY
RELOCATED. NOTIFY THE OWNER AND ENGINEER OF
RECORD PRIOR TO SHUTDOWN OF ANY UTILITY
SERVICES.
6. CONTRACTOR SHALL TEMPORARILY SHUT DOWN FIRE
PROTECTION SYSTEM DURING CONSTRUCTION. DRAIN
DOWN THE FIRE SPRINKLER PIPES. ALL SPRINKLER
HEAD AND PIPES TO RADIANT CEILING PANEL SHALL BE
REPLACED WITH NEW FLEXIBLE METAL TUBING AND
SPRINKLER HEAD. REFER TO ARCHITECTURAL PLANS
FOR NEW CEILING HEIGHTS. CONTRACTOR SHALL
COMPLY WITH ILSM REQUIREMENT (INTERIM LIFE
SAFETY MEASURES).
7. NEW 2-HOUR RATED SHAFT ENCLOSURE AND PIPE
CHASE SHALL BE COORDINATED WITH STRUCTURAL
AND ARCHITECTURAL CONTRACTOR.
1/8" = 1'-0"
HVAC BASEMENT FLOOR PLAN - Callout 1
1. CONNECT TO EXISTING FUME HOOD EXHAUST DUCT.
SEE SHEET NOTE 4 ON MD101.
2. CONNECT TO EXISITNG GRILLE.
11 T-4
T-6
T -7
T -1
A
NEW BED TOWER
T-2
T-5
E-WING
ROOF TOP
1st FLOOR
T -1
B
T-11
T -8
T-3
MECH. BLDG.
MAIN
HOSPITAL
T-9
T-10
AMBULATORY
CARE
2 2
Revisions: Date:
1 Bulletin No. 2 09-09-2022
| Sheets |
| MH105 - HVAC PROPOSED FLOOR PLAN |
| MH106 - HVAC PROPOSED FLOOR PLAN |
| MH107 - HVAC PROPOSED FLOOR PLAN |
| MH108 - HVAC PROPOSED FLOOR PLAN |
| MH301 - HVAC SECTIONS |
| 2022-09-09T14:24:05-0400 | |
| William Rodriguez, P.E. |
| 2022-09-09T14:30:11-0400 | |
| William Rodriguez, P.E. |
File details come from the government source that posted it. Updated .