MH107 - HVAC PROPOSED FLOOR PLAN.pdf
PDF 3 MB Posted
- Attached to
- Y1NB--Replace Air Handling Unit No. 2 and 3 Federal contract opportunity
- Solicitation number
- Not on record
About this file
This package includes an HVAC floor plan drawing and related federal contract opportunity notice. The floor plan drawing depicts the proposed layout for replacing air handling units 2 and 3 at a Department of Veterans Affairs medical facility. The scope of work involves installing new ductwork and air distribution devices to match existing airflows and rebalancing air devices. Contractors must support existing structural members and coordinate with other construction work. The federal contract opportunity is to replace the specified air handling units in accordance with the revised drawings, with the proposal due date and other terms remaining unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MH108 - HVAC PROPOSED FLOOR PLAN.pdf | ||
| MH106 - HVAC PROPOSED FLOOR PLAN.pdf | ||
| MH105 - HVAC PROPOSED FLOOR PLAN.pdf | ||
| MH301 - HVAC SECTIONS.pdf | ||
| SF 30 Amendment 36C24822R0103 0004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12"∅ x
48x1440x12 x
RECEPTION /
SCHEDULING
PREP/RECOVERY #1
CORRIDOR
PREP/RECOVERY #2
READING RM.
PREP/RECOVERY #3
ADA TOILET
SOILED
STAFF TLT.
CLEAN STORAGE
110 CORRIDOR
P-5 P-6
LOBBY CORRIDOR
345610
D
E
F
G
A
B
C
B
C
D
E
F
G
A
123456789101112 8. 9. 10. 12. 14. 15. 16. 18. 19.7891112
1-TU-61-1C-41-TU-61-1C-7
1-TU-61-1C-6
1-TU-61-1C-5
1-TU-61-1C-15
1-TU-61-1C-201-TU-61-1C-22
1-TU-61-1C-23
1-TU-61-1C-24
1-TU-61-1C-18
1-TU-61-1C-12
1-TU-61-1B-8
1-TU-61-1B-2
1-TU-61-1B-11
1-TU-61-1B-5
1-TU-61-1B-9
1-TU-61-1B-6
1-TU-61-1E-1
1-TU-61-1E-3
1-TU-61-1E-7
1-TU-61-1E-5
1-TU-61-1E-4
1-TU-61-1E-11
1-TU-61-1E-8
1-TU-61-1E-12
1-TU-61-1D-7
1-TU-61-1D-12
1-TU-61-1D-13
1-TU-61-1D-11
1-TU-61-1D-1
1-TU-61-1D-20
1-TU-61-1D-21
1-TU-61-1E-10
1-TU-61-1D-16
1-TU-61-1D-41-TU-61-1D-9
1-TU-61-1D-8
1-TU-61-1B-3
1-TU-61-1D-14
1-TU-61-1D-17
1-TU-61-1D-3
1-TU-61-1D-6
1-TU-61-1D-2
1-TU-61-1D-5
1-TU-61-1D-22
1-TU-61-1D-10
1-TU-61-1D-15
1-TU-61-1D-18
1-TU-61-1D-19
1-TU-61-1B-7
1-TU-61-1E-9
1-TU-61-1C-19 1-TU-61-1C-17
1-TU-61-1C-9
1-TU-61-1C-11
1-TU-61-1C-14
1-TU-61-1C-21
1-TU-61-1C-25
1-TU-61-1C-10
1-TU-61-1B-10
MH301
MH301
MH301
1-TU-61-1C-8
1-TU-61-1C-1
1-TU-61-1B-1
1-TU-61-1C-26
1-TU-61-1B-4
MH301
1-TU-61-1E-6
1-TU-61-1E-2
1-TU-61-1C-3
1-TU-61-1B-12
1-TU-61-1C-2
1-TU-61-1C-16
1-TU-61-1C-13
1-TU-61-1E-14
1-TU-61-1E-13
D
175 CFM
D
180 CFM
D
175 CFM
I
530 CFM
I
110 CFM
I
140 CFM
C
110 CFM
C
140 CFM
C
100 CFM
I
100 CFM
I
100 CFM
C
100 CFM
C
100 CFM
I
100 CFM
C
100 CFM
I
100 CFM
D
235 CFM
G
700 CFM
D
235 CFM
D
235 CFM
D
230 CFM
D
235 CFM
D
230 CFM
C
150 CFM
I
150 CFM
I
120 CFM
D
120 CFM
D
120 CFM
I
120 CFM
D
120 CFM
D
130 CFM
I
120 CFM
I
130 CFM I
120 CFM
I
240 CFM
C
120 CFM
I
120 CFM
I
100 CFM
I
100 CFM
C
100 CFM I
100 CFM
D
170 CFM
D
170 CFM
C
110 CFM
I
110 CFM
C
100 CFM
C
100 CFM
I
320 CFM
I
360 CFM
C
130 CFM
C
130 CFM
D
220 CFM
D
100 CFM
D
110 CFM
C
100 CFM
E
260 CFM
I
260 CFM
C
100 CFM
I
100 CFM
I
210 CFMC
100 CFM
I
100 CFM
I
100 CFM
D
100 CFM
D
210 CFM
I
150 CFM
D
150 CFM
C
110 CFM
I
280 CFM
I
110 CFM
I
100 CFM
E
280 CFM
I
140 CFM
D
140 CFM
I
320 CFM
D
160 CFM
D
110 CFM
I
110 CFM
I
150 CFM
D
150 CFM
D
130 CFM
C
100 CFM
I
100 CFM
D
100 CFM
I
100 CFM
I
130 CFM
D
160 CFM
I
160 CFM
E
300 CFM
D
215 CFM
D
215 CFM
D
215 CFM
D
215 CFM
I
570 CFM
D
215 CFM
D
215 CFM
I
570 CFM
D
215 CFM
D
215 CFM
I
100 CFM
I
100 CFM
I
100 CFM
I
100 CFM
C
100 CFM
C
100 CFM
I
160 CFM D
160 CFM
I
260 CFM
I
100 CFM
I
100 CFM
C
100 CFM
D
220 CFM
I
260 CFM
D
220 CFM
H
100 CFM
H
100 CFM
I
140 CFM
C
100 CFM
C
100 CFM
I
100 CFM
D
130 CFM
I
130 CFM
D
110 CFM
I
110 CFM
I
140 CFM
I
225 CFM
I
215 CFM
I
130 CFM
I
160 CFM
I
100 CFM
I
180 CFM
I
260 CFM
D
220 CFM
C
100 CFM
C
150 CFM
F
500 CFM
F
500 CFM
I
500 CFM
F
500 CFM
I
500 CFM
F
500 CFM
F
500 CFM
F
500 CFM
I
1000 CFM
I
1000 CFM
I
1000 CFM
I
1000 CFM
F
500 CFM
C
95 CFM
I
190 CFM
C
145 CFM
C
95 CFM
C
100 CFM
C
150 CFM
I
150 CFM
I
100 CFM
C
140 CFM
I
130 CFM C
145 CFM
I
160 CFM
D
210 CFM
C
100 CFM
I
100 CFM
D
110 CFM
I
110 CFM
I
160 CFM
D
200 CFM
I
140 CFM
C
140 CFM
C
100 CFM
C
100 CFM
I
100 CFM
I
150 CFM
I
150 CFM
C
140 CFM
C
140 CFM
I
180 CFM
I
190 CFM
C
120 CFM
I
120 CFM
C
95 CFM
I
100 CFM
C
100 CFM
E
260 CFM
I
260 CFM
I
110 CFM
C
110 CFM
I
190 CFM
D
190 CFM
C
100 CFM
I
100 CFM
D
195 CFM
C
100 CFM
I
100 CFM
I
160 CFM
C
100 CFM
I
100 CFMI
100 CFM
C
100 CFM
I
100 CFM
C
100 CFM
I
100 CFM
C
100 CFM
I
160 CFM
D
195 CFM
D
195 CFM
I
160 CFM
D
195 CFM
E
360 CFM
E
300 CFM
C
130 CFM
I
130 CFM
I
100 CFM
C
100 CFM
C
130 CFM
I
460 CFM I
400 CFM
I
620 CFM
E
260 CFM
E
260 CFM
E
355 CFM
E
355 CFM
I
405 CFM
C
100 CFM
I
100 CFM
C
105 CFM
C
95 CFM
I
190 CFM
C
95 CFM
C
110 CFM
C
105 CFM
I
320 CFM
C
100 CFM
I
100 CFM
C
150 CFM
I
200 CFM
D
200 CFM
I
100 CFM
C
100 CFM
D
200 CFM
I
300 CFM
C
100 CFM
I
100 CFM
I
100 CFM
I
100 CFM
D
210 CFM
C
100 CFM
I
100 CFM
C
100 CFM
C
100 CFM
I
100 CFM
A.D.
"X
"X
72"X20"
40"X24"
44"X20"
22"X22"44"X12"
"X
40"X26"
"X
"48"X14"
"X
48"X14"
38"X12" 40"X8" 36"X8"
"X
F DPR
F DPR
"X
8"X6"
"X
10"X6"
"X
10"X6"
10"X8"8"X6"
46"X14" 46"X14"
"X
"X
"X
"X
"X
"X
28"X12"
"X
14"X8"
"X
"X
12"X8"
16"X8"
"X
"X
" 4
"X
"X
"X
"X
32"X12"
"X
16"X6"
"X
16"X8"
"X
8"X6"
"X
"X
"X
"X
16"X8"
8"X6"
14"X8"
10"X8"8"X6"
"X
"X
8"X6" 14"X6"
"X
"X
24"X10" 36"X10" 38"X10"
"X
36"X12"40"X10"36"X10"
36"X10"
I
130 CFM
32"X14" 34"X14"
38"X14" 46"X20"
14"X6"
12"X6"
"X
"X
"X
"X
8"X6"
"X
"X
12"X8"
30"X14"
"X
"X
"X
28"X10" 16"X28"
18"X28"
28"X16"
"X
"X
"X
18"X10"
"X
14"X8"
16"X8"
"X
26"X10" 28"X10"16"X8"
"X
40"X14"
"X
16"X10"
"X
38"X12"
22"X8"18"X6" 18"X6"18"X8"
38"X18"
"X
16"X8"
"X
12"X6"
24"X6"
"X
"X
D
120 CFM
8"X6" 10"X6"
I
100 CFM
"X
"X
"X
12"X6"
"X
12"X8"
"X
" 10"X6"8"X6"
"X
"X
"X
18"X12"16"X12"
"X
"X
"X
18"X10"
30"X10"
"X
16"X12"14"X10"
"X
" 32"X12"
34"X12"
"X
50"X16"
"X
"X
12"X6"
10"X6"
10"X8" 12"X8"
"X
"X
18"X6"
12"X6"
10"X6"
"X
"X
"X
22"X8" I
120 CFM
D
110 CFM
I
100 CFM
I
700 CFM
C
95 CFM
I
160 CFM
D
160 CFM
C
100 CFM
I
150 CFM
F
500 CFM
H
100 CFM
H
50 CFM
I
300 CFM
D
200 CFM
F
500 CFM
F
500 CFM
"X
8"X6"
"X
"X
10"X8"
8"X6"
10"X8"
"X
"X
"X
18"X10"
"X
14"X8"
18"X10"
"X
"X
"X
16"X10"
14"X8"
"X
"X
14"X8"
"X
"X
" 1
"X
I
580 CFM
D
160 CFM
F DPR
(5835 RA) (7715 SA)
(1880 EA)
(115 SA)
(65 EA)
(100 SA)
(50 EA)
(120 SA)
(70 EA)
(100 EA)
(100 EA)
(75 EA)
(460 EA TOTAL)
(200 SA) (200 SA)
(105 SA)
(100 SA)
(100 SA)
(150 SA)
(180 SA)
(200 RA)
(165 SA, TYP OF 4)
(220 EA)
I
400 CFM
H
155 CFM
(TOTAL 995 SA)
(TOTAL 835 EA)
"X
"X
I
405 CFM
I
200 CFM
D
220 CFM
C
100 CFM
"X
"X
"X
18"X12"
14"X8" 16"X6"
"X
"X
"X
"X
"X
26"X12"
16"X10"
"X
"X
"X
10"X6" 12"X8"
12"X8" 16"X10"
"X
"X
8"X6"
"X
10"X6"10"X6"
8"X6"
10"X6"
8"X6"
"X
"X
8"X6" 8"X6"
10"X6" 10"X6"
10"X6" 10"X6"
8"X6"
"X
10"X6"
8"X6"
"X
8"X6"
8"X6"
"X
"X
"X
"X
8"X6"
"X
"X
12"X6"
"ø
26"X8"
"X
10"X6" 10"X6"
8"X6"
6"ø
"X
8"X6"
20"X6"
8"X6"
"X
"X
8"X6"
"X
"X
8"X6"
12"X8"1 "X
"ø
8"X6"
10"X6"
"X
"X
8"X6"
"X
8"X6"
12"X8"
"X
8"X6"12"X6"
"X
8"X6"
24"X6"
6"ø
8"X6"
8"X6"
"X
8"X6" 10"X6"
"X
"X
"X
10"X6"
8"X6"
8"X6"
"X
"X
6"ø 8"X6"
"ø
10"X6" 8"X6"
"X
"X
18"X6"
"X
10"X6" 8"X6"
8"X6"
8"X6"
8"X6"
8"X6"
8"X6"
10"X6"
"X
8"X6"
8"X6" 8"X6"
8"X6"
"X
8"X6"10"X6"
12"X8"
8"X6" 8"X6"
"X
8"X6" 6"ø
"X
"X
"X
"X
8"X6"
"X
"X
10"X6" 8"X6"
8"X6"
10"X6"
"X
"X
6"
12"X6"
14"X6"10"X6"
8"X6"
"X
"X
24"X10"12"ø
"X
8"X6"
8"X6"
"X
14"X6"
12"X6"
"X
"X
"X
"X
"X
"X
"X
"X
8"X6"
8"X6"
"X
8"X6" 1 "X
8"X6"
8"X6"
10"X6"
"X
"X
"ø
"X
"X
"X
"X
"X
"X
12"X6"
10"X6" 6"ø
"X
10"X6"
12"X8"
6"ø8"X6"6"ø
14"X8"
"X
"14"X8"
"X
18"X10"
"X
"ø
"ø
"X
"X
8"X6"
6"ø
8"X6"
"X
12"X8"
10"X8"
"ø
"X
"X
"X
8"X6"
16"X16"
8"X6"
8"X6"
10"X6" 8"X6"
"X
"X
"X
"X
14"X10"
10"X6"
"X
14"X8"
"X
8"X6"
8"X6"
8"X6"
"X
"X
10"X6"
"X
"X
"X
"X
8"X6"
"X
"X
"X
"X
"X
"X
8" X6"
8"X6"
"X
"X
8"X6"
8"X6"
"X
"8"X6"
12"X6"8"ø8"X6"
10"X8"
"X
8"X6"
8"X6"
"ø
"X
8"X6"
8"X6"
6"ø
8"ø 10"X8"
"X
10"X8"
8"X6"
8"X6"
8"X6"
10"X6"6"ø
6"ø 10"X6"
12"X6"
8"ø
"X
12"X8" 12"X6"
12"X12"
10"X8"
12"X6"
"X
"X
10"ø 14"X12"
"X
"X
12"X6"14"X8"14"X10"14"X10"
12"X6"
"X
"X
8"X6"
20"X8"
"X
"X
"X
8"X6"
10"X6" 8"X6"
"X
"X
"X
12"X6"10"X6"
8"X6"
8"X6"
6"X8"
"X
10"X6"
8"X6"
"X
"X
14"X8"
6"ø
10"X6"
30"X10"
"X
8"X6"
6"ø
6"ø ø6"
"X
"X
18"X8"
18"X8"
"X
"X
8"X6"
8"X6"
"X
8"X6"
8"X6"
"ø
8"X6"6"ø
6"ø
"X
"16"X10"
8"ø
10"X6"
"X
"X
10"X8"
8"X6"
"X
8"X6"
10"X6"
8"X6"
10"X6"
10"X6"8"X6"
"X
"X
14"X8" "X
"X
"ø
10"X6"
8"X6"
8"X6"
8"X6"
"X
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
ENGINEER - OF - RECORD FL. P.E. NO.
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
/9
/2
:1
:5
P M
JHK WRB
WILLIAM RODRIGUEZ 69663
JANUARY 21, 2022
MH107
HVAC PROPOSED FLOOR PLAN
1/8" = 1'-0"
HVAC 1ST FLOOR PLAN - PHASE 3
11 T-4
T-6
T -7
T -1
A
NEW BED TOWER
T-2
T-5
E-WING
ROOF TOP
1st FLOOR
T -1
B
T-11
T -8
T-3
MECH. BLDG.
MAIN
HOSPITAL
T-9
T-10
AMBULATORY
CARE
11 T-4
T-6
T -7
T -1
A
NEW BED TOWER
T-2
T-5
E-WING
ROOF TOP
1st FLOOR
T -1
B
T-11
T -8
T-3
MECH. BLDG.
MAIN
HOSPITAL
T-9
T-10
AMBULATORY
CARE
1. CONTRACTOR SHALL SUPPORT EXISTING
STRUCTURAL MEMBERS AT LEVEL 1 CEILING AS
REQUIRED. CONTRACTOR SHALL DESIGN THE SUPPORT
AND SUBMIT FOR REVIEW BY THE GOVERNMENT.
2. MATCH EXISTING AIRFLOW AND CONNECT TO
EXISTING DUCT AS SHOWN AND REBALANCE EXISTING
AIR DEVICES. SEE MD-103 KEYNOTE #4.
3. MATCH EXISTING AIRFLOW AND CONNECT TO
EXISTING DUCT AS SHOWN AND REBALANCE EXISTING
AIR DEVICES. COODINATE WITH CSI 104 RENOVATE
RADIOLOGY PROJECT.
4. CONNECT EXISTING EXHAUST DUCT THAT FEED
TOILET D351 AND D352, AND OFFICE D330 TO EXHAUST
FAN E-1 MAIN DUCT. SEE MD-104.
SHEET KEYNOTES
SHEET NOTES
1. SEE CONSTRUCTION PHASING PLAN FOR SEQUENCE
OF WORK.
2. CONTRACTOR SHALL TEST AND BALANCE NEW HVAC
SYSTEM AFTER COMPLETION OF WORK WITHIN EACH
SMOKE COMPARTMENT ZONE.
3. SEE ARCHITECTURAL PLANS FOR SCOPE OF WORK IN
REGARDS TO CONSTRUCTION OF NEW DUCT RISER
SHAFTS. CONTRACTOR SHALL COMPLY WITH VA'S LIFE
SAFETY CODE THROUGHOUT CONSTRUCTION.
4. SEE ELECTRICAL PLANS FOR SCOPE OF WORK
RELATED TO RELOCATION OF EXISTING CONDUITS AND
IT/DATA CABLE TRAYS.
5. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL
PROTECT EXISTING ELECTRICAL CONDUITS, IT/DATA
CABLE TRAYS, FIRE ALARM CONDUITS, PLUMBING PIPES,
MEDICAL GAS PIPES, SPRINKLER PIPES DURING
CONSTRUCTION. ANY CEILING DEVICES IN CONFLICT
WITH NEW HVAC SYSTEM SHALL BE TEMPORARILY
RELOCATED. NOTIFY THE OWNER AND ENGINEER OF
RECORD PRIOR TO SHUTDOWN OF ANY UTILITY
SERVICES.
6. CONTRACTOR SHALL TEMPORARILY SHUT DOWN FIRE
PROTECTION SYSTEM DURING CONSTRUCTION. DRAIN
DOWN THE FIRE SPRINKLER PIPES. ALL SPRINKLER
HEAD AND PIPES TO RADIANT CEILING PANEL SHALL BE
REPLACED WITH NEW FLEXIBLE METAL TUBING AND
SPRINKLER HEAD. REFER TO ARCHITECTURAL PLANS
FOR NEW CEILING HEIGHTS. CONTRACTOR SHALL
COMPLY WITH ILSM REQUIREMENT (INTERIM LIFE
SAFETY MEASURES).
7. NEW 2-HOUR RATED SHAFT ENCLOSURE AND PIPE
CHASE SHALL BE COORDINATED WITH STRUCTURAL
AND ARCHITECTURAL CONTRACTOR.
F DPR
Revisions: Date:
1 Bulletin No. 2 09-09-2022
| Sheets |
| MH105 - HVAC PROPOSED FLOOR PLAN |
| MH106 - HVAC PROPOSED FLOOR PLAN |
| MH107 - HVAC PROPOSED FLOOR PLAN |
| MH108 - HVAC PROPOSED FLOOR PLAN |
| MH301 - HVAC SECTIONS |
| 2022-09-09T14:26:52-0400 | |
| William Rodriguez, P.E. |
| 2022-09-09T14:32:01-0400 | |
| William Rodriguez, P.E. |
File details come from the government source that posted it. Updated .