This document is an Acceptance Criteria List (ACL) form for BENDC (Configuration "C" Dipole Bending Electromagnet) magnets designed for the Advanced Light Source Upgrade (ALS-U) Storage Ring at Lawrence Berkeley National Laboratory. The ACL serves as both a specification document and a filled-out inspection form template for receiving inspection and magnetic measurement of individual BENDC magnets sourced under a build-to-print subcontract.
The ACL defines 75 acceptance criteria organized sequentially across six inspection and testing phases: Arrival Inspection, Visual/Mechanical Inspection, Coordinate Measurement Machine (CMM) Inspection, Electrical Tests, Hydraulic Tests, Power/Temperature Test, and Magnetic Measurement. Criteria include gross damage inspection, component completeness and serialization verification, lifting interface integrity, coil assembly quality, electrical continuity and insulation resistance (minimum 2 gigaohms at specified voltages), main and trim coil circuit resistance specifications, cooling water flow rates, thermal switch and thermocouple installation, magnetic field polarity, steady-state temperature differentials, and multipole field integral measurements across a specified operating range (95-105% of nominal dipole integral). Key dimensional requirements include pole surface profile tolerances (0.156 mm combined, 0.02 mm individual), gap specifications, pole length tolerances, and fiducialization accuracy of ±12 micrometers per axis. The document references multiple supporting specifications and drawings (AL-series documents) and establishes procedures for documenting nonconformances through Nonconformance Reports (NCRs). The form is designated for Level of Care = High and requires approvals from the Chief Engineer, System Managers, Lead Engineer, QA Manager, and Technical Lead. The document was released November 17, 2026, with revision status A.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 9) Rep Cert BENDB and BENDC.docx | DOCX document | |
| 2) Sample SubK Rev. 1- RFP MG-11182026.pdf | ||
| AL-1977-2102A.pdf | ||
| 1) RFP-BVSS BENDB and BENDC Rev. 1.pdf | ||
| 7) Past Performance Reference Form B.docx | DOCX document | |
| 5) GP-Commercial Supplies and Services.pdf | ||
| AL-1925-6317A.pdf | ||
| 8) AL-1208-0209C.pdf | ||
| 3) AL-1977-2101B_SOW.pdf | ||
| 6) GP-Commercial Foreign.pdf | ||
| 4) AL-1977-2097A_TS.pdf | ||
| AL-1477-4120N.pdf | ||
| AL-1479-9548N.pdf | ||
| 10) Price Proposal Schedule A RFP MG-11182026.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat Code LBNL Document # Rev
AL7510 AL-1925-6318 A
ADVANCED LIGHT SOURCE
MAGNETS - GENERAL
REVISION HISTORY
Description Rev By Rev
Initial release DS/SP/DTB A
B
C
D
Lawrence Berkeley National Laboratory
Collaborating Institution
Reviewed By Reviewed Date
SR BENDC Magnets ACL
Author(s)
Daniel Schow, DTanase Broten dtbroten,dsschow Nov 11 2026 2:01:44 PM PST
Nov 17 2026 5:12:03 PM PSTjianiniu,fmatichard,oomolayo,KAMccombs,ejnewman,soprestemon
Approved / Concurred By DCC Release Date
Title
ALS-U - STORAGE RING
Date
11/10/2026
O ffi ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: N ov em be r 1 7t h, D C
C A ut h
K ey
: 1 H
TA
2K
R2 C
S
Downloaded by: Martha Gamarano Grausz at November 18, 2026 12:52:08
Info
INTRODUCTION
SCOPE
Name Part Number
BENDC AL-1479-9548
ACL FORM USAGE INSTRUCTIONS
Procedure ID: AL-number of test procedure document per which inspection was carried out.
Verifying Entity: Org chart group of staff that carried out inspection.
NCR ID (if any): Leave blank if no NCR, or enter NCR ID in "xxxxxx-NCR-Magnet" format.
For qualitative criteria, this is pre-populated as "n/a", unless otherwise indicated .
Choose PASS, FAIL or WAIVE from dropdown list.
"Shall" criteria that are not met can only be accepted as PASS through an NCR.
"Should" criteria outlier results may be rejected by subsystem Tech Lead.
ABBREVIATIONS AND ACRONYMS
ACL Acceptance Criteria List
ALS Advanced Light Source
ALS-U Advanced Light Source Upgrade
BENDC Configuration “C” Dipole Bending Electromagnet
CMM Coordinate Measurement Machine
ESD Engineering Specification Document
NCR Nonconformance Report
QA Quality Assurance
REQ Requirement σ standard deviation
SOW Statement of Work
AUTHORIZING DOCUMENT
LBNL QA Plan PUB 3111
LBNL ALS-U Quality Assurance Plan, AL-1024-3173
REFERENCE for acceptance criteria No.
AL-1153-8747 ALS-U ACL Template
AL-1479-9548 BENDC, DIPOLE MAGNET-SR 5, 13, 14, 18, 19, 23
AL-1477-5374 BASEPLATE-BENDB/BENDC 26
AL-1577-1591 MAIN COIL ASSY-UPPER YOKE 10, 11, 12, 15, 34
AL-1479-7004 MAIN COIL ASSY-LOWER YOKE 10, 11, 12, 15, 34
AL-1582-0975 UPPER YOKE ASSY-BENDC 9
AL-1581-9170 LOWER YOKE ASSY-BENDC 9
AL-1499-7260 ENCLOSURE-UPPER YOKE 7
AL-1499-7142 ENCLOSURE-LOWER YOKE 7
AL-1581-9170 LOWER YOKE ASSY-BENDC 9
AL-1477-4038 LOWER YOKE WELDMENT/MACHINING 24
AL-1572-2207 LCW MANIFOLD/HOSES KIT-BENDB/BENDC 20
AL-1620-9205 NAMEPLATE-BENDC 2
AL-1633-6817 NAMEPLATE UPPER YOKE MAIN COIL 6
AL-1633-6789 NAMEPLATE LOWER MAIN COIL 6
AL-1633-7106 NAMEPLATE-TRIM COIL 6
AL-1509-5740 QUADRUPOLE POLE PIECE-BENDC 6, 22, 29, 32
AL-1987-3804 SR BENDC CMM INSPECTION PLAN 27, 33
AL-1624-9285 SR DIPOLE MAGNET LIFTING FIXTURES-BENDC 3
AL-1477-4117 UPPER YOKE INSERT INSTL AND WELDMENT 3, 24
AL-1582-0975 UPPER YOKE WELDMENT/MACHINING 9
LEVEL OF CARE
Footnotes
a) Required approvers per AL-1220-9276 for the ACL form document, not for each resulting ACL Record.
-0001
-0002
-0003
-0004
-0005
-0006
-0007
-0008
-0009
-0010
-0011
-0012
-0013
-0014
-0015
-0016
-0017
-0018
-0019
-0020
-0021
-0022
-0023
-0024
-0025
-0026
-0027
-0028
-0029
-0030
-0031
-0032
-0033
-0034
-0035
-0036
-0037
-0038
-0039
-0040
-0041
-0042
-0043
-0044
-0045
-0046
-0047
-0048
-0049
-0050
-0051
-0052
-0053
-0054
-0055
-0056
Required document approversa: Chief Engineer; Level 3 System Manager; Level 5 System Manager;
Lead Engineer; QA manager; Mech Tech Lead, Lead Systems Engineer
For quantitative criteria, enter actual value as indicated . For "Shall" criteria, color code red if criterion is not met.
AL-number(s) of source data/report. If source does not explicitly indicate compliance with criteria, add AL-number of separate evaluation document. In some cases a specific required report type is indicated .
This document defines acceptance criteria for receiving inspection and magnetic measurement of
BENDC type dipole magnets for the ALS-U Storage Ring, and serves as a form to be filled out for each individual BENDC magnet, to signify that the magnet is ready to be handed off for subsequent integration and installation. The acceptance criteria list is grouped according to an assumed test & inspection sequence, illustrated below.
This ACL applies to the BENDC magnet variants identified below. These magnets are sourced under a build-to-print subcontract per our SOW AL-1624-9578.
Download the current released version of this ACL form document, populate the ACL form tab, and save with file name format "ACL Record - BENDC-A-nn - AL-xxxx-xxxx-nnnn.xlsx", with actual magnet variant name, part number, and serial number. Guidance on form content to fill out is listed below.
Level of Care = High
Verification
Report/Traveler:
Actual Value:
Verification Outcome:
Arrival Inspection
Visual/Mechan ical Inspection
CMM
Inspection
Electrical & Hydraulic Tests
Power/Temper ature Test
Magnetic Measurement
Receiving Inspection Magnetic Measurement
O ffi ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: N ov em be r 1 7t h, D C
C A ut h
K ey
: 1 H
TA
2K
R2 C
S
Downloaded by: Martha Gamarano Grausz at November 18, 2026 12:52:08
Acceptance Criteria List Form
Prepared by: Prepaper's name (also enter preparer's initials in cover sheet Revision History)
Date: MM/DD/YYYY (also enter date in cover sheet Revision History) email: Preparer's email address
Group: Preparer's Org Chart Group
Part Name: BENDC-A-nn
Quantity: 1
Part Number:
Serial Number:
ACL form version: AL-1925-6318A
No. REQ ID Feature or Characteristic Acceptance Criteria Procedure ID Verifying Entity NCR ID (if any) Actual Value
Verification
Outcome
Verification
Report/Traveler
Arrival Inspection
1 origin here Gross Overall Inspection The magnet assembly as received in crate must be free of any obvious damage or defects. AL-1988-5439 n/a
2 per REF Drawings Magnet Identity The magnet ID plate format must be as specified and provide a unique part + serial number. " AL-xxxx-xxxx-nnnn
Visual/Mechanical Inspection
3 per REF Drawings Lifting Interfaces All designated attachment points must be free of damage/defects that would impact attachment of lifting hardware. AL-1988-5439 n/a
4 GID-86048 Magnet Assembly Mass Should = 1513 kg " measured value
5 per REF drawings Magnet Assembly Completeness All components on the magnet Bill of Materials must be present and free of damage/defects that would impact functionality. " n/a
6 per REF drawings Serialized Components All serialized part or sub-assembly serial numbers must agree with vendor FAT reports and be correctly formatted per our drawings. " n/a
7 per REF drawings Safety Cover The safety cover must be correctly installed, preventing access to live conductors. " n/a
8 origin here All visible coil exterior epoxy surfaces must be free of gross potting defects.a " n/a
9 per REF drawings All coils and coil exit leads must be held securely in place by the intended hardware. " n/a
10 per REF drawings All coil exit lead sleeving must be correctly installed, preventing access to live conductors. " n/a
11 per REF drawings All 5 thermal switches must be installed at their correct locations per coil drawings, on the water return lead egress. " n/a
12 per REF drawings All 4 thermocouples must be installed at their correct locations per coil drawings, and securely bonded to the coil epoxy surface. " n/a
13 per REF drawings All main coil circuit terminals and bus bars must be correctly connected and secure. " n/a
14 per REF drawings All 5 thermal switch circuits must be wired to terminals correctly, all connections must be secure. " n/a
15 per REF drawings Both main coil circuit power terminals must have correct polarity labels. " n/a
16 origin here Both main coil circuit power terminals must be free of damage/defects that would impact connection of exterior power cables. " n/a
17 origin here All 10 thermal switch circuit terminals must be free of damage/defects that would impact connection of exterior interlock cables. " n/a
18 per Ref Drawings The designated grounding point must be free of damage/defects that would impact connection of exterior ground cable. " n/a
19 per REF drawings Cooling Water Circuit Connections The cooling circuit must be routed correctly and all fittings secure. " n/a
20 per REF drawings The cooling circuit must have correct Supply and Return labels. " n/a
21 origin here All fittings must be free of damage/defects that would impact connection of exterior hoses. " n/a
22 per REF drawings Pole Surfaces Must be unpainted as specified and free of damage/defects that would impact CMM inspection and/or magnetic field performance. " n/a
23 per REF drawings Yoke Fasteners All 3 yoke half-to-half fasteners must be torqued to 550-555 N-m (407 ft-lb). " n/a
24 per REF drawings All 8 SMR nests must be installed at their correct locations per drawings, and free of damage/defects that would impact functionality. " n/a
25 origin here All 8 SMR nest magnets must be able to hold the intended tooling ball or SMR in place. " n/a
26 per REF drawings Supports Interfaces All designated attachment points must be free of damage/defects that would impact assembly of supports and adjustment mechanisms. " n/a
CMM Inspection
27 Per CMM Plan Combined poles surface profile ≤ 0.156 mm | common frame best fit AL-1988-5439 measured value
28 per REF drawings 2x quadrupole poles surface profile individually ≤ 0.02 mm | best fit " highest measured value
29 per REF drawings 2x mirror poles surface profile individually ≤ 0.02 mm | best fit " highest measured value
30 per REF drawings Quadrupole Gap = 12.67±0.04 mm " highest measured value
31 per REF drawings Mirror Pole Gap = 18±0.04 mm " highest measured value
32 per REF drawings 2x pole outer side pole length = 482.4±0.05 mm " x/2 within tol
33 Per CMM Plan 2x pole inner side pole length = 477.17±0.05 mm " x/2 within tol
34 per REF drawings Space Claim Dimensions 2x coil lengths = 499 +0/-0.5 mm " x/2 within tol
35 origin here Mechanical Fiducialization All 8 fiducial x,y,z-positions must be measured in the pole profiles best fit reference frame. " n/a mechanical fiducialization .txt file
36 origin here All function critical and space claim dimensions must remain with tolerance. " n/a
37 All 8 fiducials, σx ≤ 12 µm " value calculated from meas. data
38 All 8 fiducials, σy ≤ 12 µm " "
39 All 8 fiducials, σz ≤ 12 µm " "
Electrical Tests
40 origin here Electrical Circuit Continuity All 5 thermal switch circuits must have electrical continuity between terminals. AL-1988-5439 n/a
41 GID-86132 For main coil circuit: to yoke; to 5x thermal switch circuits Shall ≥ 2 GΩ @ ≥ 1200 V (GID-86131) " lowest measured value
42 AL-1624-8158 For trim coil circuit: to yoke; to 5x thermal switch circuits Shall ≥ 2 GΩ @ ≥ 600 V (AL-1624-8158)
43 AL-1624-8158 For 5x thermal switch circuits to yoke Shall ≥ 2 GΩ @ ≥ 300 V (AL-1624-8158) " lowest measured value
44 GID-86112 Main Coil Circuit Resistance Should = 73.5 mΩ @ 20°C " measured value corrected to 20 ° C
45 GID-86139 Trim Circuit Resistance Should = 137.8 mΩ @ 20°C " measured value corrected to 20 ° C
Hydraulic Tests
46 GID-86175 Hydrostatic Leak Test The circuit must pass @ Test Pressure Shall ≥ 1900 kPa AL-1988-5439 n/a
47 GID-86172 Cooling Water Flow Rate Should = 0.75*4 (GID-85991) + 0.84 (GID-86004) = 3.84 l/min @ Δp ≈ 448 kPa (GID-86168) " measured value
Power/Temperature Test
48 origin here Magnetic Field Polarity For both poles must be as specified, with main coil current polarity as labeled on terminals. AL-1988-5439 n/a
49 GID-86171
Must be logged for cooling water supply and return. ΔT Should = 12.0°C @ main coil design max current 193.7 A (GID-86113), ΔT Should = 0.5°C (GID-86184) @ corrector coil design max current 28.91 A (GID-86140) and Δp ≈ 448 kPa (GID-85990) " measured value
50 origin here Must be logged for 4x coil surface thermocouples, pole surface and ambient. " see log file
51 origin here The magnet assembly as inspected by infrared camera must free of any abnormal hot spots that would impact functionality. " n/a
Magnetic Measurement
52 origin here All 8 fiducial x,y,z-positions must be presented in a magnetic field measurement reference frame where, AL-1988-5439 n/a magnetic fiducialization .txt file
53 GID-86089 magnetic field centerc dx Shall = ±5 µm @ nominal quadrupole integral 23.54 T (GID-86045) " largest deviation value within specfied operating range
54 GID-86045 magnetic field centerc dy Shall = ±5 µm d " "
55 GID-86100 magnetic field rollc Shall = ±0.1 mrad d " "
56 AL-1344-9419 Fundamental Field Integral Strength The specifiede max dipole integral -0.4381 Tm must be reached at main coil excitation current Shall ≤199.47 A, translated to the SR Arc.f " value calculated from meas. data
57 origin here Dipole and quadrupole integral (B1 and B2) as function of main coil excitation current must be measured " see data file
58 GID-81915g Such that any field level within the spec. operating range can be set with accuracy Shall ≤ 5E-4 " TBD
59 GID-86091 B3(x) Shall = -32±16.4 1E-4 of B2 " largest measured Bn(x) - nominal Bn(x) difference (ΔBn) within specified operating range, at ref. radius 5 mm
60 GID-86092 B4(x) Shall = -36±5.8 1E-4 of B2 " "
61 GID-86093 B5(x) Shall = 1±0.3 1E-4 of B2 " "
62 GID-86094 B6(x) Shall = -6±0.3 1E-4 of B2 " "
63 GID-86095 B7(x) Shall = 0±0.3 1E-4 of B2 " "
64 GID-86096 B8(x) Shall = -2±0.3 1E-4 of B2 " "
65 GID-86097 B9(x) Shall = 0±0.3 1E-4 of B2 " "
66 GID-86098 B10(x) Shall = -2±0.3 1E-4 of B2 " "
67 GID-86101 A3 Shall = 0±16.6 1E-4 of B2 " measured value with largest Δ to nominal within specified operating range, at ref. radius 5 mm
68 GID-86102 A4 Shall = 0±5.8 1E-4 of B2 " "
69 GID-86103 A5 Shall = 0±0.3 1E-4 of B2 " "
70 GID-86104 A6 Shall = 0±0.3 1E-4 of B2 " "
71 GID-86105 A7 Shall = 0±0.3 1E-4 of B2 " "
72 GID-86106 A8 Shall = 0±0.3 1E-4 of B2 " "
73 GID-86107 A9 Shall = 0±0.3 1E-4 of B2 " "
74 GID-86108 A10 Shall = 0±0.3 1E-4 of B2 " "
75 GID-86027 Effective Magnetic Lengthi Shall = 513.5 ±0.5 mm " measured value with largest Δ to nominal within specified operating range
Electrical Insulation Resistance
Fundamental Field Integral Calibration
Magnetic Fiducialization
Steady State Temperature
Multipole Integral Field Qualityd,h
Coils
Electrical Circuit Connections
Electrical Circuit Interfaces
Cooling Water Circuit Interfaces
AL-1841-5925b
Fiducialization Interfaces
Split Reproduciblity
Function Critical Dimensions
O ffi ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: N ov em be r 1 7t h, D C
C A ut h
K ey
: 1 H
TA
2K
R2 C
S
Downloaded by: Martha Gamarano Grausz at November 18, 2026 12:52:08 https://lbnl-prod.jamacloud.com/perspective.req?docId=44714&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44798&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44778&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44805&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44841&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44838&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44837&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44755&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44711&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44766&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req#/items/36424?projectId=61 https://lbnl-prod.jamacloud.com/perspective.req#/items/36424?projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44757&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44758&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44759&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44760&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44761&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44762&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44763&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44764&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44767&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44768&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44769&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44770&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44771&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44772&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44773&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44774&projectId=61 https://lbnl-prod.jamacloud.com/perspective.req?docId=44693&projectId=61
Acceptance Criteria List Form
Additional Remarks:
Footnotes
a) Minor bubbles or pressure spots are accepted provided the coil has passed insulation tests. Cracks or exposed un-impregnated glass fiber tape are cause for rejection.
b) The listed acceptance criteria σ's correspond to two of the uncertainty sources in AL-1841-5925, CMM Inspection (10 µm 1σ) and Magnet Splitting (5.75 µm 1σ), with √(102+5.752) = 12 µm.
c)
d) Tolerances apply over the specified (GID-80726) operating range, which is 95-105% of the specified (GID-85866) nominal dipole integral.
e) The specified (GID-80689) operating range max is 105% of the specified (GID-86044) nominal dipole integral -0.4381 Tm, giving max = -0.46002 Tm. The intent is to measure the dipole integral using the stretched wire The expected value is to yield -0.3945 Tm; this measured value would then confirm the physics requirement of -0.4381 Tm on the beam trajectory.
f) Translated to current required to reach specified max dipole integral in the SR Arc, per SR Arc vs Free Space design estimates (AL-1344-9419), from the measured dipole integral as function of main coil excitation current.
g) The indicated acceptance criterion setpoint accuracy is assumed to be compliant with the GID-81915 0.1% requirement.
h)
i) Fundamental field component effective length = dipole integral divided by local dipole gradient at magnet longitudinal center. The tolerance applies to any field level within the specified operating range.
The tolerances in the BENDC magnet ESD AL-1207-7064, referenced by the REQ ID's, are expressed in units of G at the design excitation current level. These tolerances expressed in units of 1E-4 of the fundamental component B2 applies to any field level within the specified operating range. The Bn nominal values are x position-dependent, with values listed here for 2 specified sampling positions, x = -2.641, 0 mm, per AL-1925-6280.
Magnetic field center location relative to multipole integral field measurement coordinate system: dx = r*ΔB1/B2; dy = r*A1/B2; roll = atan(A2/B2)/2, where r is the radius at which the multipole components are presented, and ΔB1 = measured B1- nominal B1 at the measured B2 field level. The tolerances in the BENDC magnet ESD AL-1207-
7064, referenced by the REQ ID's, are expressed in units of G for multipole integral components B1, A1, and A2, at the design excitation current level. These tolerances expressed as magnetic field center location (dx, dy and roll) applies to any field level within the specified operating range. It should be noted that the magnetic field center location at a single field level is a measure of how well aligned the field measurement system is relative to the magnet, and therefore technically not an acceptance criterion for the magnet itself, but the max-min variation over the operating range is a property of the magnet, which must be within the specified tolerance span.
O ffi ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: N ov em be r 1 7t h, D C
C A ut h
K ey
: 1 H
TA
2K
R2 C
S
Downloaded by: Martha Gamarano Grausz at November 18, 2026 12:52:08 https://lbnl-prod.jamacloud.com/perspective.req#/items/36424?projectId=61 https://lbnl-prod.jamacloud.com/perspective.req#/items/36424?projectId=61 https://lbnl-prod.jamacloud.com/perspective.req#/items/36424?projectId=61