3) AL-1977-2101B_SOW.pdf
PDF 5 MB Posted
- Solicitation number
- MG-11192026
- Issued by
-
Department of Energy
About this file
This is a Statement of Work (SOW) for the manufacture and delivery of bending magnet types BENDB and BENDC for the ALS-U (Advanced Light Source Upgrade) storage ring at Lawrence Berkeley National Laboratory, released October 21, 2026.
The basic scope requires the subcontractor to manufacture, assemble, inspect, and test five BENDB and five BENDC dipole magnets, including CoFe pole pieces, heat treatment, final machining, and procurement of long-lead raw materials (copper, steel, CoFe). Deliverables include one first-article magnet of each type due December 17, 2027, four production magnets of each type due July 28, 2028, two sets of spare coils due July 28, 2028, and proof of purchase for materials sufficient to produce ten additional magnets due September 17, 2027. Four optional scope packages offer additional quantities of production magnets (5, 5, 10, and 10 units respectively) with delivery dates in September and November 2028. Each delivery requires complete Factory Acceptance Test (FAT) report packages, applicable certificates and product data, nonconformance/deviation documentation, and written LBNL approval before shipping. The subcontractor must maintain an effective Quality Assurance program, develop Manufacturing and Inspection Plans for each magnet type, submit monthly schedule updates and status reports, hold twice-monthly project meetings, and maintain a designated project manager as single point of contact. LBNL will establish a Windchill project portal for document management and data exchange. Critical hold points include preliminary and final Manufacturing Readiness Reviews, FAT procedures and shipping plan reviews, and verification of magnetic field performance before series production authorization. Shipping containers must comply with ASTM D6199 wood quality standards, incorporate shock detection devices, include comprehensive labeling and markings, and ensure magnets are secured and protected throughout transport and storage in temperature- and humidity-controlled facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 9) Rep Cert BENDB and BENDC.docx | DOCX document | |
| 2) Sample SubK Rev. 1- RFP MG-11182026.pdf | ||
| AL-1977-2102A.pdf | ||
| 1) RFP-BVSS BENDB and BENDC Rev. 1.pdf | ||
| AL-1925-6318A.pdf | ||
| 7) Past Performance Reference Form B.docx | DOCX document | |
| 5) GP-Commercial Supplies and Services.pdf | ||
| AL-1925-6317A.pdf | ||
| 8) AL-1208-0209C.pdf | ||
| 6) GP-Commercial Foreign.pdf | ||
| 4) AL-1977-2097A_TS.pdf | ||
| AL-1477-4120N.pdf | ||
| AL-1479-9548N.pdf | ||
| 10) Price Proposal Schedule A RFP MG-11182026.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR THE ALS-U STORAGE RING BENDB AND
BENDC MAGNETS
RELEASE DATE : 2026-10-21
AUTHOR:
DOCUMENT NUMBER: AL-1977-2101 REVISION: B
DOCUMENT STATUS: RELEASED
DOCUMENT TYPE: SPECIFICATION
CATEGORY CODE: AL0511
O ffi ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, D C
C A ut h
K ey
: J W
O O
PS
L9
A J
Downloaded by: Windchill Watermarker
AL-1977-2101 REV.B Doc.Status:RELEASED Page 2 of 22
TABLE OF CONTENTS
1 Revision History 3 2 Approvals 3 3 Abbreviations and Acronyms 3 4 Introduction 5
4.1 Project overview 5
4.2 Description of items 5
5 Scope of Work 6
5.1 Options 6
6 Deliverables 7
6.1 List of items 7
6.2 First articles 8
6.3 Production series 8
6.4 Closeout checklist 8
7 Project Administration 8
7.1 Roles and responsibilities 8
7.2 Reporting / communication requirements 9
7.3 Documentation requirements 9
7.4 Reviews 10
7.5 Hold points and what’s required 10
8 Shipping, Handling, and Storage 11
8.1 Containers 12
8.2 Packaging 13
8.3 Storage and shipping 13
9 Quality Assurance 14
9.1 Quality reporting requirements 14
9.2 Manufacturing and inspection plan 15
9.3 Acceptance Criteria 15
10 Applicable Documents 15 Appendix A: Closeout Checklist 17 Appendix B: Storage Ring Multibend Achromat Sectors 18 Appendix C: Subcontractor Data Requirements List 20
Advanced Light Source
Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document Control
Center release information in the lower-left corner of the document's pages
Printed hard copies of this document are for reference only.
ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 3 of 22
1 REVISION HISTORY
Rev. CM Number Description of Change
A Original Release
2 APPROVALS
The following individual(s) shall review this document:
Reviewer Project Role
The following individual(s) reviewed this document:
Reviewed by: MLERCHE
The following individual(s) shall approve this document:
Approver Project Role
The following individual(s) approved this document:
Approved by: OOMOLAYO,MLEITNER,CASWENSON,SOPRESTEMON
3 ABBREVIATIONS AND ACRONYMS
ACL Acceptance Criteria List
ALS Advanced Light Source
ALS-U Advanced Light Source Upgrade
BENDB Configuration “B” Dipole Bending Electromagnet
BENDC Configuration “C” Dipole Bending Electromagnet
CoFe Cobalt Iron
CMM Coordinate Measurement Machine
FAT Factory Acceptance Test fMRR final Manufacturing Readiness Review
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 4 of 22
LBNL* Lawrence Berkeley National Laboratory
MIP Manufacturing and Inspection Plan
NCR Nonconformance Report pMRR preliminary Manufacturing Readiness Review
RFP Request for Proposal
SOW Statement of Work
University* The Regents of the University of California
*For the purposes of this SOW, the terms University and LBNL are used interchangeably.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 5 of 22
4 INTRODUCTION
4.1 Project overview
ALS-U is an upgrade project to the Lawrence Berkeley National Laboratory (LBNL) Advanced
Light Source (ALS). The ALS is a 1.9 GeV storage ring operating at 500 mA of beam current. It is optimized to produce intense beams of soft x-rays, which offer spectroscopic contrast, nanometer-scale resolution, and broad temporal sensitivity. The ALS facility includes an accelerator complex and photon delivery system that is capable of providing the foundations for an upgrade that will achieve world-leading soft x-ray coherent flux. The existing ALS provides a ready-made foundation, including conventional facilities and also includes extensive beamlines
(up to 40 simultaneously operating beamlines) and instrumentation, an experimental hall, computing resources, ancillary laboratories, offices, and related infrastructure that will be heavily utilized in an upgrade scenario.
The ALS will be upgraded with a multibend achromat lattice design that will provide a soft x-ray source that is orders of magnitudes brighter — an up to 100-1000 times increase in brightness — and will provide a significantly higher fraction of coherent light in the soft x-ray region than is currently available at ALS.
4.2 Description of items
The purpose of this statement of work (SOW) is to define the manufacturing, assembly, inspection, and testing work required to provide the bending magnet types BENDB, and BENDC for the ALS-U storage ring. These magnets are to be provided under a build-to-print subcontract, where the Subcontractor is responsible for mechanical tolerances, while LBNL is responsible for magnetic field performance and is providing the manufacturing drawings.
The BENDB and BENDC types are gradient dipoles with a high, specified quadrupole/dipole field ratio, implemented through a design using mirror pole pieces (see Figure 4-1). These magnets can also be described as asymmetric quadrupoles. The two types are mechanically identical except for their poles having different curvature, due to their nominal bend angles being slightly different.
The installation locations of these dipole magnets within each sector of the storage ring are mapped out in Appendix B.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 6 of 22
Figure 4-1 CAD views of the BENDB and BENDC dipole magnet types.
5 SCOPE OF WORK
The basic scope of work is the manufacture, assembly, inspection, and testing of the magnets listed in Table 6-1. This includes the manufacture, inspection, and any mechanical and/or magnetic testing of the CoFe poles, their heat treatment and final machining. The work is to be completed as specified in this SOW and the applicable technical specification documents listed in Section 6. Documentation requirements are summarized in Appendix C.
The procurement of long lead raw material (copper for coils, steel for the all yokes and CoFe material for magnet poles), for five (5) BEND B and five (5) BEND C magnets is also included in the basic scope.
5.1 Options
Optional additional Bend B and Bend C magnets are included in the prospective Subcontractor’s scope of work as listed in Table 6-2.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 7 of 22
6 DELIVERABLES
6.1 List of items
6.1.1 Basic Scope
The required deliverables consist of the magnets, spare coils and material listed in Table 6-1 and the associated documentation listed in Sections 6.2 – 6.4.
Table 6-1 List of deliverables.
Item
No.
Name Qty Description Delivery Due Date
0001 BENDB dipole magnet (1 st article) 1
AL-1477-4120
12/17/27
0002 BENDB dipole magnets (production) 4 7/28/28
0003 BENDC dipole magnet (1 st article) 1
AL-1479-9548
12/17/27
0004 BENDC dipole magnets (production) 4 7/28/28
0005 BENDB/C set of spare coils 2
AL-1469-4114,
AL-1469-5062
7/28/28
Copper, steel and CoFe material sufficient to complete five additional
BEND B and BEND C magnets each for a total of ten magnets
N/A N/A 9/17/27
0007 Closeout Checklist 1 per Appendix A 7/28/28
6.1.2Optional Scope
Deliverables for four (4) scope options are listed in Table 6-2 below. Options may be requested and then executed in any combination, including all together or not at all.
Table 6-2 List of optional deliverables.
Option Name Qty Description Delivery Due Date
1 BENDB dipole magnets (production) 5 AL-1477-4120 9/15/28
2 BENDC dipole magnets (production) 5 AL-1479-9548 9/15/28
3 BENDB dipole magnets (production) 10 AL-1477-4120 11/17/28
4 BENDC dipole magnets (production) 10 AL-1479-9548 11/17/28
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 8 of 22
6.2 First articles
Each 1st article delivery requires:
1. The complete assembled and tested magnet
2. The complete Factory Acceptance Test (FAT) report package
3. All applicable certificates and product data
4. All applicable nonconformance or deviation documentation, if any
5. Written approval from LBNL to proceed with shipping
6.3 Production series
The production series may be split into delivery batches as agreed in the subcontract. Each production series delivery requires:
1. The complete assembled and tested magnets
2. The complete FAT report package for each magnet
3. All applicable certificates and product data
4. All applicable nonconformance or deviation documentation, if any
5. Written approval from LBNL to proceed with shipping
6.4 Closeout checklist
At the time of the final delivery, the Subcontractor must submit a closeout checklist per
Appendix A to verify that all required deliverables have been provided.
7 PROJECT ADMINISTRATION
7.1 Roles and responsibilities
The subcontract will name two University specialists to oversee the contractual and technical aspects of the procurement:
1. The University Procurement Specialist is responsible for the full subcontract lifecycle from solicitation to subcontract award, administration, and any contractual issues that arise thereafter.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 9 of 22
2. The University Technical Representative is responsible for the technical aspects of the subcontract, beginning with the subcontract award through receipt and acceptance of deliverables.
The Subcontractor must identify a project manager who will act as the single point of contact for the University representatives. The project manager must be available for the duration of the subcontract to resolve issues and provide technical, programmatic, and schedule updates.
7.2 Reporting/communication requirements
1. Upon award of the subcontract, the University Technical Representative will contact the Subcontractor to set up a project kick-off meeting to establish communication requirements, including the use of the portal that will be used for data exchange.
2. Project meetings are required to be held twice per month once production has begun, but the frequency of required meetings may be higher during the period leading up to production.
3. Written monthly schedule updates are required. The schedule must include lead times of different components and materials, high-level production sequences of key components (e.g. coils, yoke parts), and planned dates for shipment to LBNL.
4. Written monthly status reports are required and must include explanations for schedule changes as well as a list of completed quantities of key components (e.g.
coils, yoke parts) through production sequences.
5. Site visits by LBNL personnel, or a selected designee, will be at the discretion of
LBNL, including access to the factory where the manufacturing and assembly work is performed.
6. Action item tracking is required. The Subcontractor must document action items in written form for all project meetings.
7. Other reports or data may be required as requested in writing.
7.3 Documentation requirements
Upon award of the subcontract, LBNL will establish a Windchill project portal to be used by the
Subcontractor to both gain access to applicable documents and submit – in electronic format – all documentation required in this SOW, including Quality Assurance (QA) data, certificates of conformance, test results, models, and drawings, as applicable.
Acceptable document formats include .docx, .xlsx, and other editable Office file formats, PDF, image formats, and .txt or .csv for measurement data, as applicable.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 10 of 22
7.4 Reviews
The University technical representative will work with the Subcontractor to establish an appropriate timeline and location for all reviews. Reviews may be conducted onsite (University or Subcontractor facilities) or via web/video conferencing. External (non-University) reviewers may be included at the University’s discretion.
The review types required for this scope of work are:
● preliminary Manufacturing Readiness Review (pMRR). This review will be conducted at the Subcontractor’s site for each 1 st article magnet. The
Subcontractor must present their proposed Manufacturing and Inspection Plan
(MIP) for LBNL approval.
● FAT procedures review. This review will be conducted at the Subcontractor’s site for each 1 st article magnet. The Subcontractor must demonstrate their proposed test and inspection procedures and present, for LBNL review and approval, the report formats corresponding to the specified FAT report package for the coils, yoke, and assembled magnet for LBNL approval.
● Shipping plan review. This review will be conducted for each magnet type.
The Subcontractor must present, for LBNL review and approval, how their proposed container design, packaging, and shipping procedures meet the requirements in Section 8.
● Final Manufacturing Readiness Review (fMRR). This review will be conducted for each magnet type. The Subcontractor must present any revisions to the MIP implemented during 1 st article production, for LBNL approval.
7.5 Hold points and what’s required
Written approval from LBNL is required to proceed beyond any identified hold points listed below.
● Hold for the 1 st article production approvals. Successful completion of the pMRR (see section 7.4) is required for each magnet type. LBNL will review and respond within 10 business days of full documentation receipt.
● Hold for 1 st article shipment approval. The following is required:
o Successful completion of the FAT procedures review (see Section 7.4).
o Successful completion of the shipping plan review (see Section 7.4)
The Subcontractor may propose long lead purchases and/or fabrication ahead of hold points, subject to
LBNL approval.
Test and inspection demonstrations may be conducted over multiple site visits to accommodate different timelines for coils, yoke parts and magnet assemblies.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 11 of 22 o Approval of the FAT report and documentation package for each 1 article magnet is required. LBNL will review and respond within 10 business days of full documentation receipt.
● Hold for series production approval. The series production of each magnet type must start only after:
o Successful verification of 1 st article magnetic field performance and other functional acceptance criteria per Section 9.3.1. LBNL will carry out the required testing and respond within 25 business days of receiving the 1 article shipments.
o Successful completion of the fMRR. LBNL will review and respond within
10 business days of full documentation receipt.
Until this hold point is satisfied, any fabrication or manufacturing beyond 1st article magnets is performed at the Subcontractor’s risk.
● Hold for production batch shipment approval. The Subcontractor must submit the FAT report and documentation packages for all batch deliverables.
LBNL will review and respond within 10 business days of full documentation receipt.
● Hold for subcontract closeout. Closeout requires that the Subcontractor complete and submit the Closeout Checklist in Appendix A.
8 SHIPPING, HANDLING, AND STORAGE
LBNL requires that the design of all packaging materials, containers, crates, as well as the shipping plan for each shipment be submitted to the University for review and approval. Specific requirements are listed in this section.
8.1 Containers
The design for any container that will be used to package or ship a magnet assembly must be submitted to LBNL for review and approval before fabrication of the container may begin. The level of design detail provided must be sufficient to recreate or repurchase additional equipment containers, if needed.
Container requirements are:
1. The container must be constructed of materials that meet or exceed the quality standards for Wood Groups II, III, or IV per ASTM D6199 – Standard Practice for Quality of Wood Members of Containers and Pallets.
2. The design and construction must allow for air shipment.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 12 of 22
3. All containers must consist of a base structure that is capable of being transported with a standard forklift on at least two sides of the container.
4. Containers are to be reusable with sides that attach using clips or other standard attachments that allow for ease of disassembly and/or reuse.
5. Each container must be constructed so that it fully supports and protects each item throughout storage and shipping; the container must fully enclose the magnet assembly.
6. The magnet is required to be secured to the base pallet or skid in a manner that will prevent shifting during transport.
7. An appropriate shock detection device – such as Shockwatch
– must be affixed to each container.
The design for the exterior of all containers must include the following markings and information:
a. A label that includes all required identifying information, including the subcontract number, LBNL point-of-contact, and delivery address;
b. Arrows indicating the appropriate container orientation;
c. Markings that clearly identify tie-down points, lifting points, and the container’s center of gravity;
d. Clear and obvious labels that indicate the contents are fragile and the container includes monitoring equipment;
e. Serial or identification numbers of the components contained therein – LBNL will provide the serial number after manufacturing readiness review;
f. Shipments that originate from a country with an official language other than
English: pictorial labels or labels written in both the originating native language and English.
8.2 Packaging
All packaging design must be submitted to LBNL for review and approval before items are packaged. Each magnet assembly must be blocked/cribbed/supported to prevent movement or overstressing the component during transport.
Packaging requirements include:
● The use of desiccant in magnet packaging is strictly forbidden.
● Foam packing material must be placed between the magnet pole tips to ensure there is no interaction between the poles or other hardware during shipment.
● The conductor must be braced with foam or cribbing to protect it from being bent during handling.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 13 of 22
● Cribbing must be placed between the magnet and the sides of the container to minimize movement during transportation.
The shipping container should incorporate a moisture barrier to prevent condensation during air shipment.
8.3 Storage and shipping
Prior to storing or shipping a magnet assembly, all water lines and magnet conductors must be free of any liquid. The use of forced dry air to evacuate each conductor is preferred.
Should the magnet assembly require storage, the storage location must be a temperature- and moisture controlled, secured storage facility. Acceptable ambient air temperature during storage is between 5◦ C and 40◦ C. Acceptable humidity level in the storage location is below 85%. The magnet assemblies must be stored in such a way as to be fully sheltered from any natural or manmade conditions that may damage them in any way. This shelter requirement also applies to the shipping container should the magnet assembly require storage while packed in an
LBNL-approved shipping container.
When transported by road, the magnet assemblies must be transported on air ride trailers with the air ride feature engaged.
The shipping container must be secured in the transportation vehicle at a minimum of two mounting locations in such a way that prevents the container’s movement or tilting.
Mishandling of the magnet assembly can result in excessive loading that may be catastrophic to the shipping container and/or magnet assembly. The worst hypothetical accident condition
(HAC) is anticipated to be a 0.3 meter drop onto an unyielding surface.
9 QUALITY ASSURANCE
9.1 Quality reporting requirements
9.1.1Subcontractor quality program The Subcontractor must maintain and apply the QA program that the University has deemed effective for this procurement based on the Subcontractor’s response to the ALS-U Supplier
Quality Evaluation Survey.
If requested, the Subcontractor must provide additional information regarding aspects of their
QA program relevant to this SOW. Upon review, the University may deem that reasonable additions or modifications to certain QA processes are necessary, and post-award surveys may be required and must be supported by the Subcontractor.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 14 of 22
9.1.2Deviation requests A deviation request applies to any request that seeks to modify a process, document, or drawing.
A deviation request does NOT apply to components that the Subcontractor manufactured that do not conform to the specifications provided by the University; see Section 9.1.3 for nonconformance reporting.
To submit a deviation request, the Subcontractor must provide a written request that can only be implemented after review and approval by the University. If needed, the University can provide a deviation request form, or – with University approval – the Subcontractor can submit their own customary deviation request documentation.
9.1.3Nonconformance reports A nonconformance report (NCR) provides a written summary that describes how a particular product does not conform to defined specifications or how a procedure does not conform to defined requirements. A nonconformance may be determined and reported by either the
Subcontractor or the University.
Once a nonconformance is identified, an NCR must be submitted to the University within three business days. The University uses its standard NCR form that the Subcontractor can request.
Or, with prior University approval, the Subcontractor can use their own customary NCR documentation.
The University will provide a written dispensation establishing a path forward for each nonconformance. However, once a nonconformance has been identified, no further operation may be performed on the nonconforming item without the University’s written approval to proceed. Additionally, if a process or processes is/are found to produce nonconforming components, all work utilizing that/those process/es must immediately cease upon discovery until the process/es can be reviewed with input from the University. Leave to resume the process/es is at the discretion of the University.
9.2 Manufacturing and inspection plan
The Subcontractor must develop a Manufacturing and Inspection Plan (MIP) for each magnet type, consisting of all work instructions, test and inspection procedures, and report templates that are needed to produce the magnets according to the technical specifications. This includes any instructions, procedures, or report templates that are provided to, or developed by, lower-tier subcontractors. The MIP must also include a sourcing plan, identifying which manufacturing, inspection, and testing activities are performed in-house vs. by lower-tier subcontractors. Each MIP must be submitted for LBNL approval before the start of 1st article production.
9.3 Acceptance Criteria
9.3.1Technical Acceptance Criteria Each magnet will be accepted upon receipt of:
1. The complete FAT report package
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 15 of 22
2. All applicable certificates and product data
3. All applicable non-conformance or deviation documentation including:
a. verification of their compliance with the technical specifications or
b. with LBNL approval of the related non-conformance or deviation.
9.3.2Functional acceptance criteria Receiving inspection and testing, including magnetic field measurements, will be carried out by
LBNL for each magnet after delivery to verify the functional acceptance criteria list (ACL) for each magnet type. ACLs will be made available to the Subcontractor if requested. In case a magnet does not meet functional acceptance criteria and the cause is traced to a non-conformance for which the Subcontractor is responsible that went undetected, the
Subcontractor is responsible for correcting the non-conformance.
10 APPLICABLE DOCUMENTS
The documents listed in this section are considered to be a part of this document. All information contained in an applicable document must be valid to the fullest extent, unless specifically noted within this document. Applicable documents must originate from the LBNL
Document Control Center (DCC) and will be made available by LBNL as needed.
Document
Number Title
AL-1977-2097 Technical Specification for the ALS-U Storage Ring BENDB and BENDC Magnets
AL-1208-0209 ALS-U Supplier Quality Evaluation Survey
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 16 of 22
APPENDIX A: CLOSEOUT CHECKLIST
The closeout checklist summarizes all Subcontractor deliverables. Submitting this completed checklist is required to close out the contract.
For each item, the Subcontractor must indicate yes or no (Y/N) that the item was delivered according to requirements. For any “N” (no) response, an explanation must be provided in the comments below the table as to why that deliverable is not complete. It is then up to LBNL to accept the deliverable as is through a waiver, or work with the Subcontractor for completion of the task before closeout.
Item Section Description Complete?
(Y/N)
1 9.2 BENDB/C MIP
2 7.4 All BENDB/C review presentations
3 6 Qty. 5 BENDB dipole magnets
4 6 Qty. 5 BENDB FAT report packages
5 6 Qty. 5 BENDC dipole magnets
6 6 Qty. 5 BENDC FAT report packages
7 6 Qty. 2 BENDB/C spare coil sets
8 6 Qty. 6 BENDB/C spare coil test reports
9 6 Proof of purchase for copper, steel and CoFe to produce ten additional magnets
10 6 All applicable certificates and product data for the BENDB/C magnets, spare coils and material.
11 9.1 All applicable nonconformance or deviation documentation for the
BENDB/C magnets and spare coils, if any
12 N/A All Government Furnished Property (GFP) and/or materials purchased by LBNL for this project have been returned to and received by LBNL
Comments:
Attachments:
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 17 of 22
APPENDIX B: STORAGE RING MULTIBEND ACHROMAT SECTORS
The BENDA, BENDB, and BENDC magnets will be installed in the locations indicated in the
CAD drawings below. Each figure shows one of the four different arc sector configurations that will make up the new ALS-U storage ring.
Figure B-1 3D CAD view of the ALS-U storage ring transfer line region Sector 1 magnet configuration.
Figure B-2 3D CAD view of the ALS-U storage ring magnet configuration, Sectors 2-3, 5-7, and 9-11.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 18 of 22
Figure B-3 3D CAD view of the Hard-Bend (HBEND) ALS-U storage ring magnet configuration, Sectors 4 and 8.
Figure B-4 3D CAD view of the ALS-U storage ring transfer line region Sector 12 magnet configuration.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
APPENDIX C:SUBCONTRACTOR DATA REQUIREMENTS LIST
The different types of documents required to be provided by the Subcontractor as defined by this SOW and the § 10 applicable technical specifications are listed in Table C-1 below. The set of documents that is unique to an individual magnet is referred to as the magnet’s “FAT report package” throughout this SOW, while documentation that apply to multiple (or all) items of a production series are referred to as “certificates and product data.”
Table C-1 Summary of Subcontractor-provided documentation as required per SOW section or applicable document.
Document Type For Item/Component Qty Item No. SOW ref AL-1977-2097 ref.
FAT Report Package
Magnet assembly FAT report
AL-1477-4120 BENDB-DIPOLE MAGNET-SR
1/magnet
0001, 2 § 6.2, 6.3 § 7.1
AL-1479-9548 BENDC, DIPOLE MAGNET-SR 0003, 4
CMM inspection report
AL-1477-4038 LOWER YOKE WELDMENT/…
1/magnet
0001-4
§ 6.2, 6.3 § 7.3
AL-1477-4117 UPPER YOKE WELDMENT/…
AL-1571-6112 MIRROR POLE BENDB … -LWR YOKE
0001, 2
AL-1577-1313 MIRROR POLE BENDB … -UPR YOKE
AL-1479-7023 LOWER YOKE ASSY-BENDB
AL-1479-7490 UPPER YOKE ASSY-BENDB
AL-1582-0773 MIRROR POLE BENDC … -LWR
YOKE
0003, 4
AL-1582-1322 MIRROR POLE BENDC … -UPR
YOKE
AL-1581-9170 LOWER YOKE ASSY-BENDC
AL-1582-0975 UPPER YOKE ASSY-BENDC
AL-1478-3597 QUAD POLE PIECE, BENDB
2/magnet
0001, 2
AL-1509-5740 QUAD POLE PIECE-BENDC 0003, 4
ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 20 of 22
Coil test report
AL-1479-7004 MAIN COIL … -LOWER YOKE
1/magnet 0001-5 § 6.2, 6.3 § 6.3 AL-1577-1591 MAIN COIL ASSY-UPPER YOKE
AL-1583-6422 TRIM COIL-BENDB/BENDC
Certificates and Product Data
Material certificate
6.48x6.48Ø3.18 hollow conductor
≥1/series 0001-6 § 6.2, 6.3
§ 6.1 4.76x4.76Ø3.18 hollow conductor
7 AWG square solid conductor low carbon steel ≥1/series 0001-4 § 7.1
Product data sheet Coil potting epoxy 1/series 0001-5 § 6.2, 6.3 § 6.1
Heat treatment log
Low carbon steel yoke parts ≥1/series 0001-4 § 6.2, 6.3
§ 7.1
CoFe pole pieces ≥1/series § 7.2
Project Administration
Project meeting minutes n/a
1/project meeting
0001-6
§ 7.2 n/a
Project schedule 1/month
Project status report 1/month pMRR review presentation
1/work package § 7.4
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 21 of 22
FAT procedures review presentation
1/work package
Shipping plan review presentation
1/work package fMRR review presentation
1/work package
MIP 1/series
Closeout Checklist 1/contract 0007 § 6.4
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
AL-1977-2101 REV.B Doc.Status:RELEASED Page 22 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: O ct ob er
1s t, C A ut h
K ey
: J W
O O
PS
L9
A
| 1REVISION HISTORY |
| 2APPROVALS |
| 3ABBREVIATIONS AND ACRONYMS |
| 4INTRODUCTION |
| 4.1Project overview |
| 4.2Description of items |
| 5SCOPE OF WORK |
| 5.1Options |
| 6DELIVERABLES |
| 6.1List of items |
| 6.1.1Basic Scope |
| 6.1.2Optional Scope |
| 6.2First articles |
| 6.3Production series |
| 6.4Closeout checklist |
| 7PROJECT ADMINISTRATION |
| 7.1Roles and responsibilities |
| 7.2Reporting/communication requirements |
| 7.3Documentation requirements |
| 7.4Reviews |
| 7.5Hold points and what’s required |
| 8SHIPPING, HANDLING, AND STORAGE |
| 8.1Containers |
| 8.2Packaging |
| 8.3Storage and shipping |
| 9QUALITY ASSURANCE |
| 9.1Quality reporting requirements |
| 9.1.1Subcontractor quality program |
| 9.1.2Deviation requests |
| 9.1.3Nonconformance reports |
| 9.2Manufacturing and inspection plan |
| 9.3Acceptance Criteria |
| 9.3.1Technical Acceptance Criteria |
| 9.3.2Functional acceptance criteria |
| 10APPLICABLE DOCUMENTS |
| APPENDIX A: CLOSEOUT CHECKLIST |
| APPENDIX B: STORAGE RING MULTIBEND ACHROMAT SECTORS |
| APPENDIX C:SUBCONTRACTOR DATA REQUIREMENTS LIST |