This document is an Acceptance Criteria List (ACL) for the SR PTL vacuum chambers as part of the Advanced Light Source Upgrade (ALS-U) project at the Lawrence Berkeley National Laboratory (LBNL).
The ACL outlines the detailed acceptance criteria and inspection procedures for the SR PTL vacuum chambers, including visual, mechanical, magnetic permeability, vacuum, and shipping inspections. It specifies requirements such as surface finish, dimensional tolerances, leak rates, pressure testing, and documentation to be provided. The ACL must be completed for each vacuum chamber before acceptance. This ACL is the authorizing document referenced in the LBNL ALS-U Quality Assurance Plan.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Printed hard copies of this document are for reference only.
SR PTL Vacuum Chamber ACL
Release Date: May 14 2024 10:44:54 AM PDT
Document Number: AL-1708-1515 Revision: A
Document Status: Released
Document Type: ACCEPTANCE CRITERIA LIST (ACL)
Category Code: AL7426
O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
Downloaded by: Mouda Tung at May 14, 2024 13:01:15O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
Downloaded by: Mouda Tung at May 14, 2024 13:01:15
AL-1708-1515 Rev. A Doc. Status: Released Page 2 of 11
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
TABLE OF CONTENTS
1 Revision History
2 Approvals
3 Abbreviations and Acronyms
4 Authorizing Document
5 Scope
6 Acceptance Criteria Listing Form
6.1 Visual Inspection
6.1 Mechanical Inspection
6.2 Magnetic permeability Inspection
6.3 Vacuum Inspection
6.4 Mechanical Inspection
6.5 Shipping inspection
6.6 Documentation
6.7 Observations / Comments
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
Downloaded by: Mouda Tung at May 14, 2024 13:01:15O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
AL-1708-1515 Rev. A Doc. Status: Released Page 3 of 11
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
1 REVISION HISTORY
Rev. CM Number Description of Change A Baseline
2 APPROVALS
The following individual(s) shall approve this document:
Approver Project Role Jiani Niu Project QA manager Olusola Omolayo Vacuum CAM Windchill Approved / Concurred By jianiniu,oomolayo
3 ABBREVIATIONS AND ACRONYMS
ALS-U Advanced Light Source Upgrade SR Storage Ring HE Helium HPN2 High purity Nitrogen PTL Photon Transfer Line QA Quality Assurance
4 AUTHORIZING DOCUMENT
LBNL QA Plan PUB 3111: https://commons.lbl.gov/display/rpm2/Quality+Assurance+Policy
LBNL ALS-U Quality Assurance Plan, AL-1024-3173, https://dcc.lbl.gov/download.php?filename=AL-
1024-3173A.pdf
5 SCOPE
This document describes the acceptance criteria for SR PTL vacuum chambers. This document must be filled out for each SR PTL vacuum chamber.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
Downloaded by: Mouda Tung at May 14, 2024 13:01:15O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P https://commons.lbl.gov/display/rpm2/Quality+Assurance+Policy
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6 ACCEPTANCE CRITERIA LISTING FORM
Level of Care : ☐ Very High ☐ High ☐ Medium ☐ Low
Prepared by: Group:
Email: Location:
Phone: Date:
Part Name: Quantity:
Part Number: S/N (if applicable)
NCR Reviewers
Additional Remarks:
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
Downloaded by: Mouda Tung at May 14, 2024 13:01:15O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
AL-1708-1515 Rev. A Doc. Status: Released Page 5 of 11
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.1 Visual Inspection
Verification and Testing Requirements
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
1.
AL-1705-
3155_SR PTL
Vacuum
Chamber ESD
No visual damage on the outside of the vacuum chamber
NCR #: PASS ☐ FAIL ☐
N/A ☐
INITIALS DATE
2.
AL-1705-
3155_SR PTL
Vacuum
Chamber ESD
LBNL Part and serial number are inscribed on chamber
3.
3155_SR PTL
Vacuum
Chamber ESD
Flange knife-edges are completely smooth and interruption-free when examined by lightly running an ethanol-wetted rubber cleanroom gloved finger around them.
4.
3155_SR PTL
Vacuum
Chamber ESD
Cleanroom wipes wetted with electronic grade ethanol do not yield debris or particles, or discoloration of the wipes
5.
3155_SR PTL
Vacuum
Chamber ESD
Presence of all fitting for cooling channel on the vacuum chamber ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
Downloaded by: Mouda Tung at May 14, 2024 13:01:15O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
AL-1708-1515 Rev. A Doc. Status: Released Page 6 of 11
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
6.
AL-1705-
3155_SR PTL
Vacuum
Chamber ESD
Threaded holes inspected with an electronic grade alcohol-soaked cleanroom swab do not yield particles or discoloration.
7.
3155_SR PTL
Vacuum
Chamber ESD
Presence of Pin (Round and Diamond) when required
8.
3155_SR PTL
Vacuum
Chamber ESD
No deformed or punched heater groove all around the vacuum chamber
9.
3155_SR PTL
Vacuum
Chamber ESD
Presence of fiducial nests on the chamber ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
Downloaded by: Mouda Tung at May 14, 2024 13:01:15O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
AL-1708-1515 Rev. A Doc. Status: Released Page 7 of 11
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.1 Mechanical Inspection
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
11.
AL-1705-
3155_SR PTL
Vacuum
Chamber ESD
CMM measurement verification before bakeout:
Tolerancing of agreed dimension are verified.
6.2 Magnetic permeability Inspection
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
10.
AL-1705-
3155_SR PTL
Vacuum
Chamber ESD
Magnetic permeability:
Base material < 1.01
Weld joint < 1.04 ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
Downloaded by: Mouda Tung at May 14, 2024 13:01:15O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
AL-1708-1515 Rev. A Doc. Status: Released Page 8 of 11
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.3 Vacuum Inspection
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
12.
AL-1705-
3155_SR PTL
Vacuum
Chamber ESD
RGA scan:
Check all RGA scans reach the required criteria:
o With the chamber baked and at room temperature, the Sum of all peaks higher than Mass
44 shall be lower than
1/1,000th of total pressure o Partial pressure of Mass 18 shall be less than Mass 2 o Partial pressure of Mass 69 shall be less than 1/2,000th of total pressure o Partial pressure of Mass 14 shall be less than Mass 18.
NCR #:
PASS ☐ FAIL ☐
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
13.
AL-1705-
3155_SR PTL
Vacuum
Chamber ESD
Final He Leak Test:
The chamber was pumped down below 1.0x10-4 Torr before leak checking
Verify that the maximum leak rate is below 1x10-10 torr-liters/sec
NCR #:
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
Downloaded by: Mouda Tung at May 14, 2024 13:01:15O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
AL-1708-1515 Rev. A Doc. Status: Released Page 9 of 11
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.4 Mechanical Inspection
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
16.
AL-1705-
3155_SR PTL
Vacuum
Chamber ESD
CMM measurement verification
After bakeout:
Tolerancing of agreed dimension are verified.
NCR #:
17.
3155_SR PTL
Vacuum
Chamber ESD
Pressure test:
Pressure: 120 Psi
Duration: 10 min
NCR #:
6.5 Shipping inspection
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
18.
AL-1705-
3155_SR PTL
Vacuum
Chamber ESD
HPN2 backfill:
The chamber shall be filled with HPN2 at or near atmospheric pressure
The chamber is shipped in sealed condition
NCR #:
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
Downloaded by: Mouda Tung at May 14, 2024 13:01:15O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
AL-1708-1515 Rev. A Doc. Status: Released Page 10 of 11
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.6 Documentation
ITE
M
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
19.
AL-1705-
3155_SR PTL
Vacuum
Chamber ESD
Documentations:
All documentation related to the vacuum chamber are provided such as :
He leak test report
CMM measurement report
Certification of conformance
Etc…
NCR #:
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
Downloaded by: Mouda Tung at May 14, 2024 13:01:15O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
AL-1708-1515 Rev. A Doc. Status: Released Page 11 of 11
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.7 Observations / Comments
Use the following table to make observations on the previous tests conducted if needed.
ITEM NO. Observation / Comments ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
Downloaded by: Mouda Tung at May 14, 2024 13:01:15O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
4t h, D C
C A ut h
K ey
: C
C
4P
File details come from the government source that posted it. Updated .