12) Response to Questions 2 - RFP MG 05102024.pdf

PDF 69 KB Posted

Attached to
Advanced Light Source Upgrade (ALS-U) Accumulator Ring to Storage Ring (ATS)/ Storage Ring to Accumulator Ring (STA) Base Supports & Rafts
Solicitation number
MG-05102024
Issued by

About this file

This document is a response to questions regarding RFP MG-05102024 for the Advanced Light Source Upgrade (ALS-U) Accumulator Ring to Storage Ring (ATS)/ Storage Ring to Accumulator Ring (STA) Base Supports & Rafts.

The key details are: The RFP is for the fabrication of 20mm strut bosses, which are intended to be machined prior to welding and require full thread engagement with no bottom tap. The thread length is prioritized over location, and the boss dimensions must be reported in the pre-paint/powder coating inspection report. Any nonconformances will be reviewed on a case-by-case basis. The timeline indicates the RFP was released on 05/10/2024, with supplier questions due by 05/24/2024 and proposals due by 06/07/2024.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LBNL Response to Questions 02 Re: LBNL RFP MG-05102024 – 05/29/2024

1. Part AL-1506-9923 is used as an example.

On part number AL-1506-9923 find number 15 and 16, there is a M20x2.5 thru find number 15 and 16 only. There are critical dimensions called out to datum C.

If this part is machined first and then welded on, meeting the +-1mm is going to be very difficult. If it is welded on and then machined, what is the minimum depth for this tapped feature if breaking through is undesirable? What are the critical elements of this feature? Is there is a preferred manufacturing order.?

LBNL Response: The 20 mm strut bosses are intended to be machined prior to welding and designed for full thread engagement, no bottom tap. The thread length is prioritized over location.

The boss dimensions are required to be reported in the pre-paint/powder coating inspection report, any nonconformances will be reviewed on a case-by-case basis.