Summary of METRO RTA Trash and Recycle Services IFB #2026-10
This is a Request for Bids (IFB) issued by the METRO Regional Transit Authority (METRO RTA) located in Akron, Ohio, for comprehensive trash collection, recycling, hauling, transportation, and disposal services across all METRO RTA-owned and operated facilities. The contractor shall provide all necessary labor, equipment, containers, vehicles, transportation, and disposal services for municipal solid waste, single-stream recycling, and cardboard recycling at five primary locations: Rolling Acres Transit Center, RKP Transit Center, Independence Transit Center, Metro Kenmore Building, and Metro Maintenance and Operation Facility. Container requirements include trash containers ranging from 2-yard to 10-yard capacity at various locations with pickup frequencies from one to five times weekly, recycling containers, and a cardboard compactor on a will-call basis. The question submission deadline is August 24, 2026, at 4:00 p.m., with bid responses due September 3, 2026, at 4:00 p.m. through the OpenGov portal. The contract shall be awarded to the lowest and best overall bid meeting minimum requirements, with an initial term of three years and two optional renewal years at METRO's discretion.
Bidders must provide pricing for each line item covering trash and recycling services at specified locations, including additional services such as extra pickups, container delivery and removal, roll-off services, and contamination charges. The bidder must have a minimum of three years' experience providing similar commercial and governmental waste management services, maintain proper Ohio business licensing, possess all required waste hauling permits, and comply with federal, state, and local environmental regulations. The successful contractor must maintain commercial general liability insurance with statutory limits, workers' compensation coverage, and automobile liability insurance per state and federal guidelines, with certificates of insurance provided prior to contract execution. A bid bond equivalent to five percent of the bid price, a performance bond of 100 percent of the contract price, and a payment bond are required per Federal Transit Administration (FTA) standards. The contract is federally funded through FTA grants, and contractors must comply with all applicable federal transit regulations, civil rights requirements, DBE participation goals, prevailing wage standards, and debarment and suspension requirements. No prepayments or down payments shall be made, with payment to be issued via ACH following METRO Board of Trustees approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Trash_Removal_and_Recycling_Bid_Sheet_OG.xlsx | XLSX spreadsheet | |
| Independent_Cost_Estimate_ICE_Form.pdf | ||
| ice_trash.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR BIDS
METRO RTA Trash and Recycle Services #2026-10
FOR
METRO REGIONAL TRANSIT AUTHORITY
416 Kenmore Blvd.
Akron, Ohio 44301
BIDS DUE:
September 3, 2026
4:00 pm
IFB #2026-10
Table of Contents
Section 1 - Legal Notice Section 2 - Introduction Section 3 - General Information Section 4 - Bid Information Section 5 - Contractor Employment Requirements Section 6 - Contract Award and Regulations Section 7 - Termination or Breach of Contract Section 8 - Contract Rights Section 9 - Payments
Section 10 - Federal Transit Administration (FTA) Requirements Section 11 - Scope of Work Section 12 - Bid Line Items Section 13 - Vendor Questionnaire
Section 1 - Legal Notice
416 Kenmore Boulevard Akron, Ohio 44301-1099
(330) 762-7267 (330) 762-0854 FAX
LEGAL NOTICE
Notice is hereby given that METRO Regional Transit Authority (METRO) is requesting bids for: METRO
RTA Trash and Recycle Services
Detailed specifications are available by visiting https://procurement.opengov.com/portal/akronmetro.
Any questions should be submitted through the Question & Answer section of the project (IFB #2026-
10) on METRO's OpenGov Portal.
All bids must be submitted in accordance with requirements set forth in this bid solicitation, and must be received within METRO's OpenGov portal before 4:00 pm on Thursday, September 3, 2026. Results will be available online shortly after the submission deadline, If interested public opening will be held at
METRO 416 Kenmore Blvd. Akron, Ohio 44301 .
In connection with the carrying out of this project, the Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, age, national origin, or handicap.
All Offerors are certifying that they are not debarred or suspended by the Federal Government by signing the bid page.
METRO reserves the right to reject any and/or all bids, to re-advertise for bids and to waive any informality in any bid and to determine the most responsive bid by its own criteria, as described within the specification.
METRO further advises prospective Offerors that all bids must be filed on the forms provided by the
Authority, all required information in the Vendor Questionnaire section of this posting on OpenGov must be completed, and that all bids must be in response to IFB# 2026-10.
Akron Beacon Journal
Dawn Distler
Chief Executive Officer/Secretary-Treasurer July 23, 2026 and July 30, 2026 https://procurement.opengov.com/portal/akronmetro
Section 2 - Introduction
2.1 SUMMARY
METRO Regional Transit Authority (METRO RTA) is soliciting sealed bids from qualified contractors to provide comprehensive trash collection, recycling, hauling, transportation, and disposal services for all
METRO RTA-owned and operated facilities. The selected contractor shall furnish all labor, equipment, containers, vehicles, transportation, disposal fees, and related services necessary to ensure the efficient and environmentally responsible management of waste and recyclable materials generated at METRO
RTA locations.
Services will include the scheduled collection and disposal of municipal solid waste, single-stream recycling, cardboard recycling, and other approved recyclable materials at administrative offices, transit centers, maintenance facilities, operations buildings, and any additional METRO RTA locations identified during the contract term. Contractors shall provide appropriately sized containers, maintain all supplied equipment, and ensure compliance with all applicable federal, state, and local environmental regulations.
The objective of this procurement is to secure reliable, cost-effective waste management services that support METRO RTA’s operational needs while promoting sustainability initiatives and maximizing recycling opportunities. The successful bidder will demonstrate experience in commercial and governmental waste management services, possess all required licenses and permits, and provide responsive customer service with the ability to accommodate routine and emergency service requests.
The resulting contract will establish a comprehensive waste and recycling program that maintains clean, safe, and environmentally responsible facilities throughout the METRO RTA system. Similar public transit and government agency procurements commonly include waste collection, recycling services, container management, hauling, disposal, and regulatory compliance requirements.
2.2 CONTACT INFORMATION
Zachary Smith
Director of Asset Management
416 Kenmore Boulevard
Akron, OH 44301
Email: zachary.smith@yourmetrobus.org
Phone: (330) 564-2280
Department:
Maintenance
Department Head:
Eric Scott
Director
2.3 TIMELINE
Bid Post Date July 23, 2026 mailto:zachary.smith@yourmetrobus.org tel:(330)564-2280
Question Submission Deadline August 24, 2026, 4:00pm
Question Response Date August 25, 2026
Bid Submission Deadline September 3, 2026, 4:00pm
Section 3 - General Information
3.1 TERMINOLOGY
“Bid” or “Proposal” refers to the document drafted and submitted by the Proposer(s)/Bidder(s) in response to the Information for Bids.
“Bidder” or “Proposer” refers to the entity submitting the Bid or Proposal.
“Akron Metro Regional Transit Authority” (also referred to as “Akron Metro”, “Metro”, “Authority”, “Contractor”, “Buyer” or “Purchaser”) is the government entity who is soliciting proposals and bids with the RFP and/or IFB.
“Request for Proposals “or “Information for Bids” refers to the document prepared by the
Contractor/Buyer/Purchaser which outlines the scope of work of the Contractor’s project and is used to solicit for bids for the project.
3.2 BID SUBMISSION
Bidders shall submit through METRO's OpenGov portal and no submittals will be recognized if they are not received through OpenGov. Scans or photocopies of all required certifications and attestations are acceptable at the time of bid but originals shall be requested if necessary and provided to METRO upon request. Oversize pages used for drawings or similar purposes are allowed. Bids must set forth full, accurate, and complete information as required by the IFB. Each bid response, complete with affidavits and certifications and all required attachments, shall be submitted through the OpenGov portal.
All bids are due BEFORE 4:00 pm on Thursday, September 3, 2026. Bids received by Akron Metro after that date and time will not be opened or considered.
3.3 BID REQUIREMENTS
Bids shall be prepared in a clear, concise, and economical manner. Bids should be organized in a simple and straightforward manner. Price page(s) should be submitted either within their own identified section or as a separate file upload following any requirements noted in the Vendor Questionnaire.
There is no page limitation or minimum document size, but any information the Bidder submits is expected to be concise and relevant to the IFB.
Bids that do not adhere to the required format, are difficult to read or are deemed illegible by Akron
Metro and may be rejected.
Bids shall contain the following items and follow the exact sequence outlined below:
1. IFB Cover Page, providing the following information:
a. Identification of the Bidder(s), including name, address, and phone number of the appropriate contact person at each firm.
b. Signature of a person authorized to bind the proposing firm to the terms of the Bid.
2. Bidder Experience (including a brief narrative on capabilities as specifically related to this project)
3.4 POSTPONEMENT OR CANCELLATION OF INFORMATION FOR BIDS
Akron Metro RTA reserves the right to cancel, amend, or re-issue this IFB at any time, or change the date and time for submitting bids, by announcing same prior to the date and time established for Bid submittal.
3.5 EXAMINATION OF IFB AND CONTRACT DOCUMENTS
Bidders are expected to examine the scope of services required, schedules, instructions, and specifications, if any. Failure to do so will be at the Bidder's risk. It is the intent of these specifications to provide services of first quality, and the workmanship must be the best obtainable in the various trades.
The services, which the vendor proposes to furnish, must be high quality in all respects. No advantage will be taken by Contractor or vendor in the omission of any part or detail, which goes to make the services complete. All manner of workmanship and material used in the production of the services and not herein contained or specified shall be of the industry standard and shall conform to the best practices known in the industry. Contractor will assume responsibility for all equipment used in the proposed item, whether the same is manufactured by Contractor or purchased ready made from a source outside Contractor's company. It is the sole responsibility of Contractor to read the specifications and understand them.
The submission of a Bid shall constitute an acknowledgment upon which Akron Metro RTA may rely that the Bidder has thoroughly examined and is familiar with the solicitation, including any work site identified in the IFB, and has reviewed and inspected all applicable statutes, regulations, ordinances, and resolutions addressing or relating to the goods and services to be provided hereunder. The failure or neglect of a Bidder to receive or examine such documents, work sites, statutes, regulations, ordinances, or resolutions shall in no way relieve the Bidder from any obligations with respect to its Bid or to any
Contract awarded pursuant to this IFB. No claim for additional compensation will be allowed which is based on lack of knowledge or misunderstanding of this IFB, work sites, statutes, regulations, ordinances, or resolutions.
Section 4 - Bid Information
4.1 LEGAL ADVERTISEMENT FOR BIDS
Advertisement for bids for METRO RTA Trash and Recycle Services 2026-10 by the METRO Regional
Transit Authority (METRO) appeared in the Akron Beacon Journal on July 23, 2026 and July 30, 2026, and will posted on our website on Thursday, July 23, 2026.
4.2 DURATION OF CONTRACT
Duration of the proposed contract shall be for three (3) years and two (2) option years.
4.3 BID
Sealed bids for the above will be received online at METRO's OpenGov portal, all bids are due before
4:00 pm on Thursday, September 3, 2026, and thereafter will be publicly available online.
4.4 AMENDMENTS
No responses will be issued for requests for clarification or amendments ten (10) calendar days or less before the bid due date. If you find ambiguity in the contract it must be brought up prior to bid closing date.
4.5 BID BOND
FTA may accept the bonding policy and requirements of the recipient, provided that they meet the minimum requirements for construction contracts as follows:
1. A bid guarantee from each bidder equivalent to five (5) percent of the bid price. The "bid guarantees" shall consist of a firm commitment such as a bid bond, certified check, or other negotiable instrument accompanying a bid as assurance that the bidder will, upon acceptance of his bid, execute such contractual documents as may be required within the time specified.
2. A performance bond on the part to the Contractor for 100 percent of the contract price. A
"performance bond" is one executed in connection with a contract to secure fulfillment of all the contractor's obligations under such contract.
3. A payment bond on the part of the contractor for 100 percent of the contract price. A
"payment bond" is one executed in connection with a contract to assure payment, as required by law, of all persons supplying labor and material in the execution of the work provided for in the contract. Payment bond amounts required from Contractors are as follows:
a. 50% of the contract price if the contract price is not more than $1 million;
b. 40% of the contract price if the contract price is more than $1 million but not more than
$5 million; or
c. $2.5 million if the contract price is more than $5 million.
4. A cash deposit, certified check or other negotiable instrument may be accepted by a grantee in lieu of performance and payment bonds, provided the grantee has established a procedure to assure that the interest of FTA is adequately protected. An irrevocable letter of credit would also satisfy the requirement for a bond.
Bid Bond Requirements (construction)
1. Bid Security - A Bid Bond must be issued by a fully qualified surety company acceptable to
(Recipient) and listed as a company currently authorized under 31 CFR, Part 223 as possessing a Certificate of Authority as described thereunder.
2. Rights Reserved - In submitting this Bid, it is understood and agreed by bidder that the right is reserved by (Recipient) to reject any and all bids, or part of any bid, and it is agreed that the Bid may not be withdrawn for a period of ninety (90) days subsequent to the opening of bids, without the written consent of (Recipient). It is also understood and agreed that if the undersigned bidder should withdraw any part or all of his bid within ninety (90) days after the bid opening without the written consent of (Recipient), shall refuse or be unable to enter into this Contract, as provided above, or refuse or be unable to furnish adequate and acceptable Performance Bonds and Labor and Material Payments Bonds, as provided above, or refuse or be unable to furnish adequate and acceptable insurance, as provided above, he shall forfeit his bid security to the extent of (Recipient's) damages occasioned by such withdrawal, or refusal, or inability to enter into an agreement, or provide adequate security therefor.
It is further understood and agreed that to the extent the defaulting bidder's Bid Bond, Certified Check, Cashier's Check, Treasurer's Check, and/or Official Bank Check (excluding any income generated thereby) which has been retained by (Recipient) shall prove inadequate to fully recompense (Recipient) for the damages occasioned by default, then the undersigned bidder agrees to indemnify (Recipient) and pay over to (Recipient) the difference between the bid security and (Recipient's) total damages, so as to make
(Recipient) whole.
The undersigned understands that any material alteration of any of the above or any of the material contained on this form, other than that requested, will render the bid unresponsive.
Performance and Payment Bonding Requirements (Construction)
The Contractor shall be required to obtain performance and payment bonds as follows:
1. Performance bonds
a. The penal amount of performance bonds shall be 100 percent of the original contract price, unless the (Recipient) determines that a lesser amount would be adequate for the protection of the (Recipient).
b. The (Recipient) may require additional performance bond protection when a contract price is increased. The increase in protection shall generally equal 100 percent of the increase in contract price. The (Recipient) may secure additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
2. Payment bonds
a. The penal amount of the payment bonds shall equal:
i. Fifty percent of the contract price if the contract price is not more than $1 million.
ii. Forty percent of the contract price if the contract price is more than $1 million but not more than $5 million; or
iii. Two and one half million if the contract price is more than $5 million.
b. If the original contract price is $5 million or less, the (Recipient) may require additional protection as required by subparagraph 1 if the contract price is increased.
Performance and Payment Bonding Requirements (Non-Construction)
The Contractor may be required to obtain performance and payment bonds when necessary to protect the (Recipient's) interest.
1. The following situations may warrant a performance bond:
a. (Recipient) property or funds are to be provided to the contractor for use in performing the contract or as partial compensation (as in retention of salvaged material).
b. A contractor sells assets to or merges with another concern, and the (Recipient), after recognizing the latter concern as the successor in interest, desires assurance that it is financially capable.
c. Substantial progress payments are made before delivery of end items starts.
d. Contracts are for dismantling, demolition, or removal of improvements.
2. When it is determined that a performance bond is required, the Contractor shall be required to obtain performance bonds as follows:
a. The penal amount of performance bonds shall be 100 percent of the original contract price, unless the (Recipient) determines that a lesser amount would be adequate for the protection of the (Recipient).
b. The (Recipient) may require additional performance bond protection when a contract price is increased. The increase in protection shall generally equal 100 percent of the increase in contract price. The (Recipient) may secure additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
3. A payment bond is required only when a performance bond is required, and if the use of payment bond is in the (Recipient's) interest.
4. When it is determined that a payment bond is required, the Contractor shall be required to obtain payment bonds as follows:
a. The penal amount of payment bonds shall equal:
i. Fifty percent of the contract price if the contract price is not more than $1 million.
ii. Forty percent of the contract price if the contract price is more than $1 million but not more than $5 million; or
iii. Two and one half million if the contract price is increased.
Advance Payment Bonding Requirements
The Contractor may be required to obtain an advance payment bond if the contract contains an advance payment provision, and a performance bond is not furnished. The (recipient) shall determine the amount of the advance payment bond necessary to protect the (Recipient).
Patent Infringement Bonding Requirements (Patent Indemnity)
The Contractor may be required to obtain a patent indemnity bond if a performance bond is not furnished, and the financial responsibility of the Contractor is unknown or doubtful. The (recipient) shall determine the amount of the patent indemnity to protect the (Recipient).
Warranty of the Work and Maintenance Bonds
1. The Contractor warrants to (Recipient), the Architect and/or Engineer that all materials and equipment furnished under this Contract will be of highest quality and new unless otherwise specified by (Recipient), free from faults and defects and in conformance with the Contract
Documents. All work not so conforming to these standards shall be considered defective. If required by the Project Manager, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment.
2. The Work furnished must be of first quality and the workmanship must be the best obtainable in the various trades. The Work must be of safe, substantial and durable construction in all respects. The Contractor hereby guarantees the Work against defective materials or faulty workmanship for a minimum period of one (1) year after Final Payment by (Recipient) and shall replace or repair any defective materials or equipment or faulty workmanship during the period of the guarantee at no cost to (Recipient). As additional security for these guarantees, the Contractor shall, prior to the release of Final
Payment, furnish separate Maintenance (or Guarantee) Bonds in form acceptable to
(Recipient) written by the same corporate surety that provides the Performance Bond and
Labor and Material Payment Bond for this Contract. These bonds shall secure the
Contractor's obligation to replace or repair defective materials and faulty workmanship for a minimum period of one (1) year after Final Payment and shall be written in an amount equal to ONE HUNDRED PERCENT (100%) of the CONTRACT SUM, as adjusted (if at all).
4.6 DISPOSITION OF CERTIFIED OR CASHIERS CHECK
Said certified or cashiers check to be forfeited to METRO as agreed amount of liquidated damages in case of failure to enter into a contract as above described. The check will be released or returned to the bidder in the case his bid is rejected.
In case the bid is accepted, the check will be returned after the contract has been signed. The check of the next lowest bidder will be retained until the lowest responsible bidder has signed. If he fails to do so, said check shall be further retained until the second lowest responsible bidder shall have signed; and in default hereof, the check shall be forfeited to METRO as liquidated damages.
4.7 FORM OF BID
Every bid must be made within METRO's OpenGov portal and must contain the full name of every person, firm, or corporation interested in the bid, and the address of the person, firm, or the president and secretary of the corporation bidding; and if a corporation, the name of the State in which it is incorporated.
4.8 NAME OF BIDDER
Each bid must contain a page that is clearly signed with the full name and address of each person interested in it. In case of a partnership, the firm name and address of each individual party must be given.
4.9 SIGNATURE OF BIDDER
Firm, corporate, or individual name of the bidder must be signed by the bidder in the space provided for the signature on the bid blank. In case of a corporation, the title of the officer signing must be stated and each officer must be thereunto duly authorized. In the case of a partnership, the signature of at least one of the partners must follow the firm name, using the term "member of firm." In case of an individual, use the term "doing business as" or "sole owner."
4.10 BIDDER AFFIDAVITS
Bidder is required to submit with his bid an affidavit stating that neither he nor his agents, nor any other party for him has paid or agreed to pay, directly or indirectly, any persons, firm, or corporation any money or valuable consideration for assistance in procuring or attempting to procure the contract herein referred to and further agreeing that no such money or reward will be hereafter paid. This affidavit must be on the form attached hereto and made part of this bid.
Each bidder, who is a foreign corporation, i.e., a corporation not chartered in Ohio, but licensed to do business in Ohio, is required to submit with his bid an affidavit duly executed by the President or
Executive Director of the corporation, stating in said affidavit that said foreign corporation had, in accordance with the provisions of the
Revised Code of the State of Ohio, obtained a certificate authorizing it to do business in the State of
Ohio. The certificates, or certified copies of same, are obtainable from the Office of the Secretary of
State, Columbus, Ohio.
4.11 SPECIFICATIONS TO BE PART OF THE CONTRACT
Specifications, statements, and the bid, which accompany the bids, which are accepted therewith, and which do not conflict with the provisions herein contained, shall be part of any contract that is entered into.
4.12 EXPLANATIONS (WRITTEN AND/OR ORAL)
Should a bidder find a discrepancy in or omissions from these specifications, or should there be any doubt as to their meaning, bidder shall at once make inquiry to the Director of Finance.
4.13 WITHDRAWAL OF BID
A submitted bid may be withdrawn prior to the deadline for submission by clicking the "unsubmit" button. Once the bid is unsubmitted/withdrawn, METRO has no response from the bidder. Any resubmission must be resubmitted prior to the bid submission deadline. If a bidder wishes to withdraw their bid after the submission deadline, but prior to award of the contract, they should contact METRO’s
Procurement Officer immediately.
4.14 CONSIDERATION OF BID
All bids received in conformity with these specifications shall, as soon as possible be tabulated.
4.15 REJECTION OF ACCEPTANCE OF BIDS
The Executive Director reserves the right to accept or reject any or all bids, and any parts of any bid. In awarding a contract, the Executive Director reserves the right to consider all elements entering into the question of determining the responsibility of the bidder. Any bid which is incomplete, conditional, obscure, or which contains additions not called for, or irregularities of any kind, may be cause for rejection of the bid. In case of any discrepancy between the price written in the bid and that given in figures for any item, the price in writing will be considered as the bid.
4.16 UNACCEPTABLE BIDS
No bid will be accepted from or contract awarded to any person, firm, or corporation that is in arrears or is in default to METRO upon any debt or contract, or that is a defaulter as surety or otherwise upon any obligation to said Authority or has failed to perform faithfully any previous contract with the Authority.
Section 5 - Contractor Employment Requirements
5.1 WORKERS' COMPENSATION ACT
The Contractor shall comply with the State Law known as the Workers' Compensation Act and shall pay into the State insurance fund the necessary premiums required by the Act or elect and maintain status as a Qualified Self Insured as allowed by the Act to cover all employees furnishing said services to
METRO, and under the control of the Contractor, and shall relieve METRO from any costs due to accidents and other liabilities mentioned in said Act.
5.2 SOCIAL SECURITIES ACT
The Contractor shall be and remain an independent Contractor with respect to all services performed hereunder and agrees to and does hereby accept full and exclusive liability for payment of any and all contributions or taxes for social security, unemployment insurance, and old age retirement benefits or annuities now or hereafter imposed under any State and Federal law which are measured by the wages, salaries, or other remunerations paid to persons by the Contractor on work performed under the terms of this contract and further agrees to obey all lawful rules and regulations and to meet all lawful requirements which are now or may be issued or promulgated under said respective laws by any duly authorized State or Federal officials; and said Contractor also agrees to indemnify and save harmless the
Board of Trustees from any contributions or liability therefor.
5.3 EQUAL EMPLOYMENT OPPORTUNITY
In implementing the Project/Contract, the bidder/respondent may not discriminate against any employee or applicant for employment because of race, color, creed, sex, disability, age or national origin. The Recipient agrees to take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, creed, sex, disability, age or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.
5.4 DISADVANTAGED BUSINESS ENTERPRISE
To the extent authorized by applicable federal laws, regulations, or requirements, the Recipient agrees to facilitate, and assures that each Third Party Participant will facilitate, participation by small business concerns owned and controlled by socially and economically disadvantaged individuals, also referred to as
“Disadvantaged Business Enterprises” (DBEs), in the Underlying Agreement as follows:
A. Statutory and Regulatory Requirements. The Recipient agrees to comply with:
1. Section 11101(e) of IIJA;
2. U.S. DOT regulations, “Participation by Disadvantaged Business Enterprises in Department of
Transportation Financial Assistance Programs,” 49 CFR Part 26; and
3. Federal transit law, specifically 49 U.S.C. § 5332, as provided in section 12 of this Master
Agreement.
B. DBE Program Requirements. A Recipient that receives planning, capital and/or operating assistance and that will award prime third party contracts exceeding $250,000 in a federal fiscal year must have a DBE program that is approved by FTA and meets the requirements of 49 CFR Part 26.
C. Special Requirements for a Transit Vehicle Manufacturer (TVM). The Recipient agrees that:
1. TVM Certification. Each TVM, as a condition of being authorized to bid or propose on FTA-assisted transit vehicle procurements, must certify that it has complied with the requirements of
49 CFR Part 26; and
2. Reporting TVM Awards. Within 30 days of any third party contract award for a transit vehicle purchase, the Recipient must submit to FTA the name of the TVM contractor and the total dollar value of the third party contract using the Transit Vehicle Award Reporting Form on FTA’s website. The Recipient must also submit additional notifications if options are exercised in subsequent years to ensure that the TVM is still in good standing.
D. Assurance. As required by 49 C.F.R. § 26.13(a):
1. Recipient Assurance. The Recipient agrees and assures that:
a. It must not discriminate based on race, color, national origin, or sex in the award and performance of any FTA or U.S. DOT-assisted contract, or in the administration of its DBE program or the requirements of 49 CFR Part 26;
b. It must take all necessary and reasonable steps under 49 CFR Part 26 to ensure nondiscrimination in the award and administration of U.S. DOT-assisted contracts;
c. Its DBE program, as required under 49 CFR Part 26 and as approved by U.S. DOT, is incorporated by reference and made part of the Underlying Agreement; and
d. Implementation of its DBE program approved by U.S. DOT is a legal obligation and failure to carry out its terms shall be treated as a violation of this Master Agreement.
2. Subrecipient/Third Party Contractor/Third Party Subcontractor Assurance. The Recipient agrees and assures that it will include the following assurance in each sub-agreement and third party contract it signs with a Subrecipient or Third Party Contractor and agrees to obtain the agreement of each of its Subrecipients, Third Party Contractors, and Third Party Subcontractors to include the following assurance in every sub-agreement and third party contract it signs:
a. The Subrecipient, each Third Party Contractor, and each Third Party Subcontractor must not discriminate based on race, color, national origin, or sex in the award and performance of any FTA or U.S. DOT-assisted sub-agreement, third party contract, and third party subcontract, as applicable, and the administration of its DBE program or the requirements of
49 CFR Part 26;
b. The Subrecipient, each Third Party Contractor, and each Third Party Subcontractor must take all necessary and reasonable steps under 49 CFR Part 26 to ensure nondiscrimination in the award and administration of U.S. DOT-assisted sub-agreements, third party contracts, and third party subcontracts, as applicable;
c. Failure by the Subrecipient and any of its Third Party Contractors or Third Party
Subcontractors to carry out the requirements of this subparagraph 12.e(4)(ii) is a material breach of this sub-agreement, third party contract, or third party subcontract, as applicable;
and
d. The following remedies, or such other remedy as the Recipient deems appropriate, include, but are not limited to, withholding monthly progress payments, assessing sanctions, liquidated damages, and/or disqualifying the Subrecipient, Third Party Contractor, or Third
Party Subcontractor from future bidding as non-responsible.
E. Remedies. Upon notification to the Recipient of its failure to carry out its approved program, FTA or
U.S. DOT may impose sanctions as provided for under 49 CFR Part 26, and, in appropriate cases, refer the matter for enforcement under either or both 18 U.S.C. § 1001, and/or the Program Fraud Civil
Remedies Act of 1986, 31 U.S.C. § 3801, et seq.
5.5 DBE PARTICIPATION REQUIREMENTS
All prime or general Contractors are hereby notified that they must show that all reasonable good faith efforts were made to meet the minimum DBE participation goals on this contract.
If a bidder or proposer finds it impossible to fully meet the DBE goal of this contract, the bidder must complete Schedule D: Certification of Contractor Regarding Unavailability of a Disadvantaged (Minority)
Business Enterprise (DBE) accompanied by documentation showing that all reasonable good faith efforts were made toward fulfilling the goal.
All bidders or proposers are hereby notified to be responsive that they must submit with their bids or bid, the DBE Affidavit, the Letter of Intent, and the Certificate of DBE Assurance.
For a list of qualified DBEs please visit the State of Ohio’s web site at www.ohioucp.org.
Section 6 - Contract Award and Regulations
6.1 AWARD OF CONTRACT
The contract shall be awarded to the lowest and best overall bid meeting the minimum requirements as set forth in the specifications. METRO will pay no interest, finance, or carrying charges on our unpaid balance. There will be no down payment or prepayment made as part of this award.
6.2 INELIGIBLE CONTRACTORS / DEBARMENT AND SUSPENSION
This Contract is a covered transaction for purposes of 49 CFR Part 29. As such, the Contractor is required to verify that the Contractor, its principals, as defined at 49 CFR 29.995, or affiliates, as defined at 49 CFR
29.905, are not excluded, or disqualified as defined at 49 CFR 29.940 and 29.945.
The Contractor is required to comply with 49 CFR 29, Subpart C and must include the requirement to comply with 49 CFR 29, Subpart C in any lower tier covered transaction it enters into.
6.3 AUDIT AND INSPECTION OF RECORDS
1. Where the Purchaser is not a State but a local government and is the FTA Recipient or a subgrantee of the FTA Recipient in accordance with 49 CFR 18.36(i), the Contractor agrees to provide the Purchaser, the FTA Administrator, the Comptroller General of the United
States or any of their authorized representatives access to any books, documents, papers and records of the Contractor which are directly pertinent to this contract for the purposes of making audits, examinations, excerpts and transcriptions. Contractor also agrees, pursuant to 49 CFR 633.17 to provide the FTA Administrator or his authorized representatives including any PMO Contractor access to Contractor's records and construction sites pertaining to a major capital project, defined at 49 U.S.C. 5302(a)1, which is receiving federal financial assistance through the programs described at 49 U.S.C. 5307, 5309 or 5311.
2. Where the Purchaser is a State and is the FTA Recipient or a subgrantee of the FTA Recipient in accordance with 49 CFR 633.17, Contractor agrees to provide the Purchaser, the FTA
Administrator or his authorized representatives, including any PMO Contractor, access to the Contractor's records and construction sites pertaining to a major capital project, defined at 49 U.S.C. 5302(a)1, which is receiving federal financial assistance through the programs described at 49 U.S.C. 5307, 5309 or 5311. By definition, a major capital project excludes contracts of less than the simplified acquisition threshold currently set at $250,000.
https://www.ohioucp.org/
3. Where any Purchaser which is the FTA Recipient or a subgrantee of the FTA Recipient in accordance with 49 U.S.C. 5325(a) enters into a contract for a capital project or improvement (defined at 49 U.S.C. 5302(a)1) through other than competitive bidding, the
Contractor shall make available records related to the contract to the Purchaser, the
Secretary of Transportation and the Comptroller General or any authorized officer or employee of any of them for the purposes of conducting an audit and inspection.
4. The Contractor agrees to permit any of the foregoing parties to reproduce by any means whatsoever or to copy excerpts and transcriptions as reasonably needed.
5. The Contractor agrees to maintain all books, records, accounts and reports required under this contract for a period of not less than three years after the date of termination or expiration of this contract, except in the event of litigation or settlement of claims arising from the performance of this contract, in which case Contractor agrees to maintain same until the Purchaser, the FTA Administrator, the Comptroller General, or any of their duly authorized representatives, have disposed of all such litigation, appeals, claims or exceptions related thereto. Reference 49 CFR 18.39(i) (11).
6. FTA does not require the inclusion of these requirements in subcontracts.
6.4 SUBCONTRACT APPROVAL
Any subcontract the bidder may wish to enter into must be approved by prior to the execution of the subcontract, and all the requirements of the FTA third party contracts must be included within said subcontracts to gain approval of METRO.
6.5 OWNERSHIP OF DOCUMENTS
METRO and FTA will become owners of all documents prepared by the bidder upon payment for same by METRO, except any documents which may be protected by patent, lease or other written documents which provides proof of ownership.
6.6 AMENDMENTS TO THE CONTRACT
This agreement may be amended at any time, providing any amendment by staff is approved by resolution of METRO’s Board of Trustees.
6.7 CARGO PREFERENCE (WHERE APPLICABLE)
The Contractor agrees:
a. to use privately owned United States-Flag commercial vessels to ship at least 50 percent of the gross tonnage (computed separately for dry bulk carriers, dry cargo liners, and tankers) involved, whenever shipping any equipment, material, or commodities pursuant to the underlying contract to the extent such vessels are available at fair and reasonable rates for United States-Flag commercial vessels;
b. to include these requirements in all subcontracts issued pursuant to this contract when the subcontract may involve the transport of equipment, material, or commodities by ocean vessel.
c. requires Contractors and subcontractors at every tier to use United States flag air carriers, to the extent service by these carriers is available. When the contract may involve the international transportation of goods, equipment, or personnel by air, the contract must. 49 U.S.C. 40118 and 4 CFR Part 52.
6.8 ENVIRONMENTAL, RESOURCE CONSERVATION, AND ENERGY REQUIREMENTS
The Contractor and all of its subcontractors shall recognize mandatory standards and policies relating to the following requirements:
Energy Requirements
The contractor agrees to comply with the Energy Policy and Conservation requirements and are applicable to all contracts. The Recipient agrees to, and assures that its subrecipients, if any, will comply with the mandatory energy standards and policies of its state energy conservation plans under the Energy Policy and Conservation Act, as amended, 42 U.S.C. § 6201 et seq., and perform an energy assessment for any building constructed, reconstructed, or modified with federal assistance as required under FTA regulations, “Requirements for Energy Assessments,” 49 C.F.R.
part 622, subpart C.
Clean Water
The Clean Air and Clean Water Act requirements apply to each contract and subcontract exceeding $150,000. Each contract and subcontract must contain a provision that requires the recipient to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401–7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251– 1387). Violations must be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA)
Clean Air
FTA-funded projects must meet the requirements of the Clean Air Act. (42 U.S.C. § 7401 et seq.)
Recovered Materials
The Contractor agrees to comply with all the requirements of Section 6002 of the Resource
Conservation and Recovery Act (RCRA), as amended (42 U.S.C. 6962), including but not limited to the regulatory provisions of 40 CFR Part 247, and Executive Order 12873, as they apply to the procurement of the items designated in Subpart B of 40 CFR Part 247.
6.9 SEISMIC SAFETY REQUIREMENTS
The Contractor agrees that any new building or addition to an existing building will be designed and constructed in accordance with the standards for Seismic Safety required in Department of
Transportation Seismic Safety Regulations 49 CFR Part 41 and will certify to compliance to the extent required by the regulation. The Contractor also agrees to ensure that all work performed under this contract including work performed by a subcontractor is in compliance with the standards required by the Seismic Safety Regulations and the certification of compliance issued on the project.
Section 7 - Termination or Breach of Contract
7.1 TERMINATION FOR CONVENIENCE (GENERAL PROVISION)
METRO may terminate this contract, in whole or in part, at any time with 30 days’ prior written notice to the Contractor when it is in the Government's best interest. The
Contractor shall be paid its costs, including contract closeout costs, and profit on work performed up to the time of termination. The Contractor shall promptly submit its termination claim to METRO to be paid the Contractor. If the Contractor has any property in its possession belonging to METRO, the Contractor will account for the same, and dispose of it in the manner the METRO directs.
7.2 TERMINATION FOR DEFAULT [BREACH OR CAUSE] (GENERAL PROVISION)
If the Contractor does not deliver supplies in accordance with the contract delivery schedule. If the contract is for services, the Contractor fails to perform in the manner called for in the contract. If the
Contractor fails to comply with any other provisions of the contract, METRO may terminate this contract for default. Termination shall be effected by serving a notice of termination on the Contractor setting forth the manner in which the Contractor is in default. The Contractor will only be paid the contract price for supplies delivered and accepted, or services performed in accordance with the manner of performance set forth in the contract.
If it is later determined by METRO that the Contractor had an excusable reason for not performing, such as a strike, fire, or flood, events which are not the fault of or are beyond the control of the Contractor.
METRO, after setting up a new delivery of performance schedule, may allow the Contractor to continue work, or treat the termination as a termination for convenience.
7.3 OPPORTUNITY TO CURE (GENERAL PROVISIONS)
METRO in its sole discretion may, in the case of a termination for breach or default, allow the Contractor thirty (30) days in which to cure the defect. In such case, the notice of termination will state the time period in which cure is permitted and other appropriate conditions.
If Contractor fails to remedy to METRO’s satisfaction the breach or default or any of the terms, covenants, or conditions of this Contract within ten (10) days after receipt by Contractor or written notice from METRO setting forth the nature of said breach or default, shall have the right to terminate the Contract without any further obligation to Contractor. Any such termination for default shall not in any way operate to preclude METRO from also pursuing all available remedies against Contractor and its sureties for said breach or default.
7.4 WAIVER OF REMEDIES FOR ANY BREACH
In the event that METRO elects to waive its remedies for any breach by Contractor of any covenant, term or condition of this Contract, such waiver by METRO shall not limit METRO’s remedies for any succeeding breach of that or of any other term, covenant, or condition of this Contract.
7.5 TERMINATION FOR CONVENIENCE (PROFESSIONAL OR TRANSIT SERVICE CONTRACTS)
METRO, by written notice, may terminate this contract, in whole or in part, when it is in the
Government's interest. If this contract is terminated, METRO shall be liable only for payment under the payment provisions of this contract for services rendered before the effective date of termination.
7.6 TERMINATION FOR DEFAULT (SUPPLIES AND SERVICE)
If the Contractor fails to deliver supplies or to perform the services within the time specified in this contract or any extension or if the Contractor fails to comply with any other provisions of this contract, METRO may terminate this contract for default. METRO shall terminate by delivering to the Contractor a
Notice of Termination specifying the nature of the default. The Contractor will only be paid the contract price for supplies delivered and accepted, or services performed in accordance with the manner or performance set forth in this contract.
If, after termination for failure to fulfill contract obligations, it is determined that the Contractor was not in default, the rights and obligations of the parties shall be the same as if the termination had been issued for the convenience of METRO.
7.7 TERMINATION FOR DEFAULT (TRANSPORTATION SERVICES)
If the Contractor fails to pick up the commodities or to perform the services, including delivery services, within the time specified in this contract or any extension or if the Contractor fails to comply with any other provisions of this contract, METRO may terminate this contract for default. METRO shall terminate by delivering to the Contractor a Notice of Termination specifying the nature of default. The Contractor will only be paid the contract price for services performed in accordance with the manner of performance set forth in this contract.
If this contract is terminated while the Contractor has possession of METRO’s goods, the Contractor shall, upon direction of METRO, protect and preserve the goods until surrendered to the METRO or its agent. The Contractor and METRO shall agree on payment for the preservation and protection of goods.
Failure to agree on an amount will be resolved under the Dispute clause.
If, after termination for failure to fulfill contract obligations, it is determined that the Contractor was not in default, the rights and obligations of the parties shall be the same as if the termination had been issued for the convenience of METRO.
7.8 TERMINATION FOR DEFAULT (CONSTRUCTION)
If the Contractor refuses or fails to prosecute the work or any separable part, with the diligence that will insure its completion within the time specified in this contract or any extension or fails to complete the work within this time, or if the Contractor fails to comply with any other provisions of this contract, METRO may terminate this contract for default. METRO shall terminate by delivering to the Contractor a
Notice of Termination specifying the nature of the default. In this event, METRO may take over the work and compete it by contract or otherwise, and may take possession of and use any materials, appliances, and plant on the work site necessary for completing the work. The Contractor and its sureties shall be liable for any damage to METRO resulting from the Contractor's refusal or failure to complete the work within specified time, whether or not the Contractor's right to proceed with the work is terminated. This liability includes any increased costs incurred by METRO in completing the work.
The Contractor's right to proceed shall not be terminated nor will the Contractor be charged with damages under this clause if:
If, after termination of the Contractor's right to proceed, it is determined that the Contractor was not in default, or that the delay was excusable, the rights and obligations of the parties will be the same as if the termination had been issued for the convenience of METRO.
7.9 TERMINATION FOR CONVENIENCE OR DEFAULT (ARCHITECT AND ENGINEERING)
METRO may terminate this contract in whole or in part, for METRO’s convenience or because of the failure of the Contractor to fulfill the contract obligations. METRO shall terminate by delivering to the
Contractor a Notice of Termination specifying the nature, extent, and effective date of the termination.
Upon receipt of the notice, the Contractor shall (1) immediately discontinue all services affected (unless the notice directs otherwise), and (2) deliver to the Contracting Officer all data, drawings, specifications, reports, estimates, summaries, and other information and materials accumulated in performing this contract, whether completed or in process.
If the termination is for the convenience of METRO, the Contracting Officer shall make an equitable adjustment in the contract price but shall allow no anticipated profit on unperformed services.
If the termination is for failure of the Contractor to fulfill the contract obligations, METRO may complete the work by contact or otherwise and the Contractor shall be liable for any additional cost incurred by
METRO.
If, after termination for failure to fulfill contract obligations, it is determined that the Contractor was not in default, the rights and obligations of the parties shall be the same as if the termination had been issued for the convenience of METRO.
7.10 TERMINATION FOR CONVENIENCE OF DEFAULT (COST-TYPE CONTRACTS)
METRO may terminate this contract, or any portion of it, by serving a notice or termination on the
Contractor. The notice shall state whether the termination is for convenience of METRO or for the default of the Contractor. If the termination is for default, the notice shall state the manner in which the
Contractor has failed to perform the requirements of the contract. The Contractor shall account for any property in its possession paid for from funds received from METRO, or property supplied to the
Contractor by the METRO. If the termination is for default, may fix the fee, if the contract provides for a fee, to be paid the Contractor in proportion to the value, if any, of work performed up to the time of termination. The Contractor shall promptly submit its termination claim to METRO and the parties shall negotiate the termination settlement to be paid the Contractor.
If the termination is for the convenience of METRO, the Contractor shall be paid its contract closeout costs, and a fee, if the contract provided for payment of a fee, in proportion to the work performed up to the time of termination.
If, after serving a notice of termination for default, METRO determines that the Contractor has an excusable reason for not performing, such as strike, fire, flood, events which are not the fault of and are beyond the control of the Contractor, METRO, after setting up a new work schedule, may allow the
Contractor to continue work, or treat the…