About this file
This is an Independent Cost Estimate (ICE) Form template designed for state and local procurement processes, specifically applicable to the METRO Regional Transit Authority (METRO RTA) in Ohio for trash and recycling services. The form provides a standardized framework for documenting cost estimates across multiple procurement categories including materials, construction, and services. The template accommodates both standard items with unit pricing and non-standard items or services requiring detailed cost breakdowns that include labor rates, overhead allocation, and profit margins. The form includes sections for documenting the estimation methodology, whether derived from published price lists, engineering assessments, third-party quotes, or other sources, and requires preparer signature and authorization.
The cost estimate structure supports itemized tracking of delivered costs, freight considerations, and data sources for standard products, while allowing flexibility for complex service or repair items that require detailed spreadsheet attachments explaining cost rationale. For services, repairs, and non-standard items, the form captures material costs, direct costs, labor classifications with hourly rates, allocated overhead percentages, selling, general and administrative (SG&A) expenses, and profit margins to arrive at total cost projections. The template provides multiple row entries for both standard items and service-based costs, enabling comprehensive documentation necessary for METRO RTA's evaluation of qualified waste management contractors who will provide trash collection, recycling services, container management, hauling, and disposal services across its facilities in Ohio.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| METRO_RTA_Trash_and_Recycle_Services.pdf | ||
| ice_trash.pdf | ||
| Trash_Removal_and_Recycling_Bid_Sheet_OG.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEPENDENT COST ESTIMATE
Requisition Number: Date of Estimate:
Contract Type:
���� Material
���� Construction
���� Services
���� Other (Specify)
Description of Goods/Services:
Method of Obtaining the Estimate:
I have obtained the following estimate from:
���� Published Price List/Past pricing (Date)
���� Engineering or technical estimate
���� Independent Third Party estimate
���� Other (Specify)
Cost Estimate Details:
Through the method stated above it has been determined that the total cost of the goods/services is expected to be $ Details are shown below.
COST OF STANDARD ITEMS
PRODUCT
COST ($/EA)
DELIVERED
COST ($/EA)
NO FREIGHT NOTES / DATA SOURCE
A
COST OF SERVICES, REPAIRS, OR NON-STANDARD ITEMS
ITEM/TASK:
MATERIAL
OTHER
DIRECT
COSTS
LABOR
(RATE,HOURS)
LABOR
CLASS
ALLOCATED
OVERHEAD SG&A PROFIT TOTAL
B
Signature of Preparer The preceding cost estimate was obtained or prepared by:
(For complex items or tasks, attach detailed spreadsheet(s) explaining rationale.)
| Requisition Number: |
| Date of Estimate: |
| Other (Specify): |
| Description of Goods/Services: |
| Published Price List/Past pricing (Date: |
| Other (Specify: |
| PRODUCT_Row_1: |
| COST ($/EA) DELIVERED_Row_1: |
| COST ($/EA) NO FREIGHT_Row_1: |
| NOTES / DATA SOURCE_Row_1: |
| PRODUCT_Row_2: |
| COST ($/EA) DELIVERED_Row_2: |
| COST ($/EA) NO FREIGHT_Row_2: |
| NOTES / DATA SOURCE_Row_2: |
| PRODUCT_Row_3: |
| COST ($/EA) DELIVERED_Row_3: |
| COST ($/EA) NO FREIGHT_Row_3: |
| NOTES / DATA SOURCE_Row_3: |
| PRODUCT_Row_4: |
| COST ($/EA) DELIVERED_Row_4: |
| COST ($/EA) NO FREIGHT_Row_4: |
| NOTES / DATA SOURCE_Row_4: |
| PRODUCT_Row_5: |
| COST ($/EA) DELIVERED_Row_5: |
| COST ($/EA) NO FREIGHT_Row_5: |
| NOTES / DATA SOURCE_Row_5: |
| PRODUCT_Row_6: |
| COST ($/EA) DELIVERED_Row_6: |
| COST ($/EA) NO FREIGHT_Row_6: |
| NOTES / DATA SOURCE_Row_6: |
| MATERIAL_Row_1: |
| OTHER DIRECT COSTS_Row_1: |
| LABOR (RATE,HOURS)_Row_1: |
| LABOR CLASS_Row_1: |
| ALLOCATED OVERHEAD_Row_1: |
| SG&A_Row_1: |
| PROFIT_Row_1: |
| TOTAL_Row_1: |
| MATERIAL_Row_2: |
| OTHER DIRECT COSTS_Row_2: |
| LABOR (RATE,HOURS)_Row_2: |
| LABOR CLASS_Row_2: |
| ALLOCATED OVERHEAD_Row_2: |
| SG&A_Row_2: |
| PROFIT_Row_2: |
| TOTAL_Row_2: |
| MATERIAL_Row_3: |
| OTHER DIRECT COSTS_Row_3: |
| LABOR (RATE,HOURS)_Row_3: |
| LABOR CLASS_Row_3: |
| ALLOCATED OVERHEAD_Row_3: |
| SG&A_Row_3: |
| PROFIT_Row_3: |
| TOTAL_Row_3: |
| MATERIAL_Row_4: |
| OTHER DIRECT COSTS_Row_4: |
| LABOR (RATE,HOURS)_Row_4: |
| LABOR CLASS_Row_4: |
| ALLOCATED OVERHEAD_Row_4: |
| SG&A_Row_4: |
| PROFIT_Row_4: |
| TOTAL_Row_4: |
| MATERIAL_Row_5: |
| OTHER DIRECT COSTS_Row_5: |
| LABOR (RATE,HOURS)_Row_5: |
| LABOR CLASS_Row_5: |
| ALLOCATED OVERHEAD_Row_5: |
| SG&A_Row_5: |
| PROFIT_Row_5: |
| TOTAL_Row_5: |
| MATERIAL_Row_6: |
| OTHER DIRECT COSTS_Row_6: |
| LABOR (RATE,HOURS)_Row_6: |
| LABOR CLASS_Row_6: |
| ALLOCATED OVERHEAD_Row_6: |
| SG&A_Row_6: |
| PROFIT_Row_6: |
| TOTAL_Row_6: |
| The preceding cost estimate was obtained or prepared by: |
| PrintButton1: |
| NumericField1: |
| : |
File details come from the government source that posted it. Updated .