Metal_Building_RFQ__2_.pdf

PDF 158 KB Posted

Attached to
DNR Metal Storage Building Installation in 4 Ohio State Parks
Solicitation number
SRC0000026960
Issued by
Belmont County, Lake County, Preble County, Sandusky County, Ohio

About this file

This is a Request for Quote (RFQ) from the Ohio Department of Natural Resources Division of Parks and Watercraft for the purchase and installation of four metal storage buildings at various state park locations across Ohio. The project involves constructing four separate storage buildings: a 16'x20'x7' shed for UTVs at Headlands Beach State Park, a 16'x24'x7' shed for UTVs and a Jon boat at East Harbor State Park, and two 30'x50'x14' sheds for construction equipment at DNR North Construction in Ravenna and DNR South Construction in Bainbridge. Each building requires specific features including metal siding, roofing, man doors, garage doors, gutters, and downspouts. The project must be completed by June 30, 2025, and bidders are encouraged to visit the sites before submitting proposals.

The contract will be awarded to the lowest responsive and responsible bidder by line item, with suppliers able to bid on one or multiple buildings. All buildings must meet minimum construction standards including 26-gauge metal for roofing and siding, and suppliers must obtain necessary building permits and provide engineer-stamped as-built drawings. Installation costs must be included in the pricing, with three locations requiring prepared gravel bases and one requiring inspection of an existing concrete pad by a structural engineer. Invoicing must be submitted directly to Ohio Shared Services with specific documentation requirements and the Origin-DNR-472 designation.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev. 6/3/22

Needed Service or Supply: Purchase and Installation of Metal Storage Buildings for DNR State Park locations

Project Background: The Division of Parks and Watercraft requires a total of four metal storage buildings at State Park locations across Ohio. Each building will be a separate project so a supplier may bid on and be awarded one or multiple projects.

Specifications/Scope of Work

FOR EACH BUILDING:

• Buildings may be pole barn construction with laminated wood posts, treated at the bottom or metal posts minimum 14-gauge metal.

• Roof minimum 1 ft overhang on the gutter sides.

• Metal for roof and siding – 26 gauge minimum.

• Awarded supplier to obtain applicable building permits and coordinate inspections with the Ohio

Department of Commerce.

• Supplier to provide as-built records including engineer stamped as-built drawings and operation and maintenance manuals for all building components.

• Completion by June 30, 2025

Building 1: 16’ x 20’ x 7’ Storage Shed to house 2 UTVs

• Metal siding – tan

• Metal roof and trim – brown

• Man Door

• Gutters and downspouts

• (2) Roll-up garage doors with minimum dimensions of 8’x7’ to be located on the 20’ side.

• Doors must be able to be locked from the outside.

• The structure must be durable enough to withstand the environmental conditions of the Lake Erie shoreline and keep the vehicles secure while not in use.

• To be installed on a prepared gravel base

• Shipping / Delivery and Installation costs must be included in the cost of the item.

• Delivery: Headlands Beach State Park, 9601 Headlands Road, Mentor, OH 44060

Contact: Captain Christopher Desh, 419-341-4010, Christopher.desh@dnr.ohio.gov

Building 2: 16’ x 24’ x 7’ Storage Shed to house 2 UTVs and a Jon boat for emergency response

• Metal siding – tan mailto:Christopher.desh@dnr.ohio.gov

• Metal roof and trim – green

• Side entry walk in Man Door (white) minimum dimensions of 36”x 80”. Located on long side near the front

• Gutters and downspouts

• Roll-up garage door (white) with minimum dimensions of 8’x7’. Located on short side/ front

• Door must be able to be locked from the outside.

• The structure must be durable enough to withstand the environmental conditions of the Lake Erie shoreline and keep the vehicles secure while not in use.

• To be installed and anchored on a prepared gravel base

• Shipping / Delivery and Installation costs must be included in the cost of the item.

• Delivery: East Harbor State Park, 1169 N. Buck Rd. Marblehead, OH 43440

Contact: LT Chad German, 419-350-7360, chad.german@dnr.ohio.gov

Building 3: 30’ x 50’ x 14’ Storage Shed to house construction equipment

• Metal siding- tan

• Metal roof and trim – brown

• Man Door - (white) minimum dimensions of 36”x 80” - prefer to be on front left with garage doors

• (3) garage doors 12’w x 12’h on long side

• Downspouts and Gutters

• To be installed on a prepared gravel base

• Shipping / Delivery and Installation costs must be included in the cost of the item.

• Delivery: DNR North Construction, 4958 Rock Spring Rd, Ravenna, OH 44266

Contact: Mike Swan, 330-221-7055, michael.swan@dnr.ohio.gov

Building 4: 30’ x 50’ x 14’ Storage Shed to house construction equipment

• Metal siding- tan

• Metal roof and trim – brown

• Man Door - (white) minimum dimensions of 36”x 80” on the short wall left corner

• (3) garage doors 12’w x 12’h on long side

• Downspouts and Gutters

• To be installed on an existing concrete pad – Prior to this installation the pad will need to be inspected and signed off by a certified structural engineer.

• Shipping / Delivery and Installation costs must be included in the cost of the item.

• Delivery: DNR South Construction, 7902 Upp Rd, Bainbridge, OH 45612

Contact: Mike Swan, 330-221-7055, michael.swan@dnr.ohio.gov mailto:chad.german@dnr.ohio.gov

Photos/Diagrams: See separate document

Site Visit & Point of Contact

Prior to submitting a bid response, offerors are encouraged to visit the parks to see the proposed locations.

Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.

Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.

Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by line item.

Bill to information: (FSS requirement)

Origin-DNR-472

All invoices must be submitted DIRECTLY to Ohio Shared Services (FSS).

-EMAIL the invoice to: invoices@ohio.gov -FAX the invoice to: 1-614-485-1039 -MAIL the invoice to: Financial Shared Services, PO Box 182880, Columbus, Ohio 43218-2880

In order to process your invoice, please make sure all the required information listed below is on your invoice before submitting it to FSS or they will be returned for not being a proper invoice.

1. Must include the Purchase Order (PO) number assigned and Origin Number listed above

2. Supplier full name as it appears on your PO

3. The Ship to and/or service facility name and full address

4. Unique invoice number

5. Date of service or date work was completed.

6. Complete itemization of services performed, materials or goods supplied and/or labor furnished

7. Line charge(s). If parts are included, please break out lines with product and charges separately.

8. No State of Ohio sales tax

9. Remit to address must match our records for payment

For the purchase of services:

mailto:invoices@ohio.gov

The awarded supplier will be required to sign an Addendum to Bid Quote or Personal Services Agreement. Example attached.

File details come from the government source that posted it. Updated .