Meeting Directions.png
PNG image 1 MB Posted
- Attached to
- Yuba Gravel Placement
- Solicitation number
- W9123825QA015
About this file
The image is a detailed satellite/map view of the Englebright Dam and Narrows 2 Hydro Power Plant area, providing specific meeting directions for a federal contract site visit. The directions instruct participants to:
- Turn left on Pioria Road and travel 1.6 miles
- Continue straight on Scott Forbes Road for 4.2 miles
- Stay right for 1.7 miles
- The meeting location is marked with a "Meet Here" red arrow at coordinates 39.240311, -120.2715034
This map is associated with the U.S. Army Corps of Engineers' Yuba Gravel Placement solicitation (W9123825QA015), which involves a gravel augmentation project in the lower Yuba River to improve aquatic habitat for Central Valley spring-run Chinook salmon and steelhead. A pre-contract site visit is scheduled for 8 May 2025 at 10:00am PT, with questions due to Henry Barron by 13 May 2025 at 11:00am PT.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .