Amendment 007.pdf
PDF 1 MB Posted
- Solicitation number
- Not on record
About this file
Amendment 007 Lighting fixture information.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS ORDER ID ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Supplementary Page
PAGE 2 OF GS-01P-12-BW-D-0013/007
Description of Modification/Amendment:
Lighting fixture information is attached.
Supplementary Page
PAGE 3 OF GS-01P-12-BW-D-0013/007
PAGE 2 OF GS-01P-12-BW-D-0013/007
Amendment 007
GS-01P-12-BW-D-0013
Lighting Fixtures, Ribicoff and Cotter
PREVENTIVE MAINTENANCE ITEM
L-3 Lighting, Special Fixture (Frequency: Annual) Application:
This applies to special lighting fixtures such as found in lobbies, porticos, court rooms, and auditoriums, and for fixtures above 12 feet.
Checkpoints:
1. Clean fixture thoroughly.
2. Check all sockets, replace as needed.
3. Inspect anchors or anchoring device, tighten as needed.
4. Examine fixture glass, side panels, diffusers, etc., For cracks, breaks, etc. Replace as necessary.
5. If group re-lamping is due, change all lamps; otherwise, replace only those that are burned out.
6. Check operation.
7. Clean up work area and remove all debris.
Recommended Tools, Materials, and Equipment:
1. Standard tools – Basic
2. Ladder constructed according to OSHA/ANSI standards. Check ladder for defects. Do not use defective ladders.
LOCATION FIXTURE TYPE QUANITY LAMP
ANNEX COURT
1, 2, +3
CHANDLEIR 12 FIXTURES, 36
LAMP
13W PL/SP35
ANNEX COURT
1, 2, +3
SOFFIT 81 TWO LAMP STRIP
FIXTURES, 486 LAMPS
F40SP35/T212RS
ANNEX LOBBY RECESSED FIXTURE 3 FIXTURES, 6 LAMPS GE BIAX T/E ECO 26W
4 PIN
ANNEX LOBBY SPOT 4 FIXTURES, 4 LAMPS QUARTZ Lamp Unknown Size
1ST FLOOR LOBBY RECESSED FIXTURE 8 FIXTURES, 8 LAMPS GE MULTI-VAPOR
LAMP 175 WATT
MVR175/U -47760
2ND FLOOR NORTH
AND SOUTH
COURTROOMS
LIGHT CLOUD STRIP
FIXTURE
120 FIXTURES, 240
LAMPS
SYLVANIA OCTRON
XPS ECOLOGIC
F032/841XPS/ECO
L-4 Lighting, Outside; Incandescent (Frequency: Semiannual), Fluorescent, Mercury Vapor Or High Pressure Sodium ( Frequency: Five Years) Application:
PAGE 3 OF GS-01P-12-BW-D-0013/007
GS-01P-12-BW-D-0013
This guide applies to parking lot, street, loading dock, and perimeter lighting, and provides for group Re-lamping and maintenance of such fixtures outside the building.
Special Instructions.
1. Review the standard operating procedure for "Controlling Hazardous Energy Sources."
Checkpoints:
1. Open and tag switch.
2. Remove old lamp and clean fixture including reflector, refractor, and globes.
3. Inspect condition of wiring, contacts, terminals, and sockets. Look for evidence of overheating.
4. Install new lamp and assemble checking gaskets for proper seat.
5. Test operation of automatic switches.
6. Inspect lamp standards and mounting devices.
7. Clean up work area and remove all trash.
Recommended Tools, Materials, And Equipment:
1. Standard tools – Basic
2. Cleaning materials. Consult the Material Safety Data Sheets (MSDS) for hazardous ingredients and proper Personal Protective Equipment (PPE).
LOCATION FIXTURE TYPE QUANITY LAMP
PERIMETER DOWN LIGHT 21 FIXTURES, 21
LAMPS
GE MULTI VAPOR
LAMP
MXR100/U/MED
18680
PERIMETER WALL PAK 15 FIXTURES, 15
LAMPS
PHILLIPS CERAMLUX
ALTO C250S50 ALTO
PERIMETER GLOBE 9 FIXTURES, 9 LAMPS 60 WATT COMPACT
FLUORESCENT
EDISON BASE
ANNEX PARKING RECESSED FIXTURE 22 FIXTURES, 22
LAMPS
100 WATT METAL
HALIDE HX-HPF
ANNEX GUARD FLOOD 1 FIXTURE, 1 LAMP 250 WATTGE MULTI
VAPOR MVR250/U
42729
LOADING DOCK AND
SHELDON STREET
ENTRANCE
RECESSED EXTERIOR
FIXTURE
9 FIXTURES, 9 LAMPS 100 WATT METAL
HALIDE HX-HPF
PENTHOUSE
PERIMETER
EXTERIOR UTILITY
GLASS JAR TYPE
8 FIXTURES, 8 LAMPS 60 WATT COMPACT
FLUORESCENT
EDISON BASE
ANNEX ENTRANCE RECESSED FIXTURE 3 FIXTURES, 3 LAMPS 13W PL/SP35
PAGE 4 OF GS-01P-12-BW-D-0013/007
GS-01P-12-BW-D-0013
FLUORESCENT FIXTURES
Ribicoff FB
Qty
F32/T8 (7,488)
T8U6 (144)
GE ECOLUX HIGH OUTPUT F24W-T5-835-ECO (326)
GE ECOLUX HIGH EFFICIENCY F28W-T5-835-ECO (228)
Cotter FB
Qty
Linear Fluorescent Straight Lamp GE 00268-F32T8XLSPX35HCVG 4165
Linear Fluorescent - U-Shaped GE 28149 F32T8SP35/U6/ECO 324
Soft White Spiral® T3 GE 00262 – FLE26HT32SWCD3PK 26
Compact Fluorescent - Self-Ballasted GE 16459 – FLE13HT3/2/SW/2P 224
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 6 |
| DocNo: 007 |
| EffDate: FEB 02, 2012 |
| ReqNo: 1PSLP-12-0075 |
| ProjNo: |
| IssuedByCode: 1PSA |
| IssuedBy: ACQUISITION BRANCH, SVC CENTERS DIV |
GSA/PBS
10 CAUSEWAY ST., RM 1100
BOSTON MA 02222-1077
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolChg: Yes |
| AwdChg: Off |
| SolNo: GS-01P-12-BW-D-0013 |
| SolDate: DEC 19, 2011 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Supplementary Page. |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| Header: |
| 15B. CONTRACTOR/OFFEROR: |
| Footer1: |
| signature: |
File details come from the government source that posted it. Updated .