Mechanical Systems - floorplans .pdf
PDF 3 MB Posted
- Attached to
- RFQ- HVAC Service Agreement- Central Point
- Solicitation number
- S-25700-00016910
- Issued by
- Jackson County, Cheshire CDP, Oregon
About this file
This file consists of mechanical systems floor plans and specifications for the Central Point Office Renovation & Addition project for the Oregon State Police, located at 4500 Rogue Valley Highway, Central Point, Oregon 97502. The plans detail HVAC systems, piping configurations, and mechanical infrastructure across multiple phases of construction. Phase 1 includes laboratory spaces such as screening exam rooms, microscopy/ALS rooms, chemistry labs, biology/trace processing areas, and associated support spaces including evidence storage, file rooms, and administrative offices. Phase 2 encompasses administrative command areas, patrol operations, detective bureaus, medical examiner facilities including autopsy suites, evidence processing areas, and locker rooms. The mechanical systems utilize variable refrigerant flow (VRF) technology with multiple fan coil units, make-up air units (MAU), heat recovery ventilation, and specialized exhaust systems for laboratory fume hoods and chemical storage cabinets. The design incorporates plenum return air path arrangements with distributed filter cabinets utilizing MERV-8 and MERV-13 rated filters of varying dimensions. Ductwork specifications, piping connections, natural gas distribution, and seismic separation considerations are detailed throughout the plans with cross-references to construction details.
The mechanical design was prepared by Alliant Systems, LLC (CCB# 153420), a Portland-based firm, under the professional seal of Sean C. Murray, PE (License #64563PE, Oregon, expires 12-31-26). The plans reflect 100% construction document status dated June 18, 2024, under Oregon State Police Contract #PO-257-000008511, with project number D-1244-52251. Multiple revisions are documented from initial design through June 2024, incorporating requests for information (RFI) resolutions. The mechanical systems are designed to support specialized laboratory operations, secure evidence processing, and administrative functions requiring precise environmental controls, including temperature and humidity maintenance, exhaust management for hazardous materials, and flexible HVAC distribution across multiple building sections separated by seismic expansion boundaries.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASSET INVENTORY- MFR recommended PM schedule.pdf | ||
| ME Cooler.freezer - floorplans .pdf | ||
| Sample ContractForServices .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R E
F
T P
P T
T
P
T
T
TT
T
T
T
T
T
T
12345678
A
B
C
D
PUBLIC
LOBBY
S101
LOBBY
TOILET
S102
LATENT
PRINTS
F123
SCREENING
EXAM
ROOM -
SUSPECT
F109.3
MICROSCOPY/ALS
ROOM
F109.1
SCREENING
EXAM
ROOM -
VICTIM
F109.2
EVIDENCE
STORAGE
F107
FILE
ROOM
F108
TOILET
F118
LAB
SUPPLY
STORAGE
F121
TOILET
F119
BOTTLED
GAS
F130
MECH
S105
ELEC
S109
LP LAB
TECH
OFC
F127
CHEMISTRY
F122
INSTRUMENTATION
F122.1
BIO LAB
TEC
OFC
F113
BIO LAB
TEC
OFC
F112
ADMIN
OFC
F111
ABIS
F128
TOOL
STORAGE
F117
BIOLOGY/TRACE
PROCESSING/FIREAMRS
F109
LP LAB
TECH
OFC
F126
LP LAB
TECH
OFC
F125
MDF
S106
IMAGING
/ ALS
ROOM
F123.1
CHEM
LAB
TEC
OFC
F114
CHEM
LAB
TEC
OFC
F115
CHEM
LAB
TEC
OFC
F116
SECURE
EVIDENCE
PROCESSING
F103.2
LIBRARY/CONFERENCE/TRAINING
F106 LAB
DIRECTOR
F105
EVIDENCE
INTAKE
F103.1
EVIDENCE
CONTRIBUTER
RECEIVING
AREA
F101
LOBBY
VESTIBULE
S100
FIRE
RISER
S107
SEMI-SECURE
LOBBY
S103
EXIT
STAIR
S108
ELEVATOR
S104
LAB
CIRCULATION
F102
LP LAB
TECH
OFC
F124
UH-1.01
CUH-1.01
14/10 EXH
UP IN SHAFT
10"Ø
6"Ø
FC-1.02
FC-1.01
FC-1.03
FC-1.05
FC-1.04
F
G
H
J
K
30/10
SLSM
12"Ø W
6Ø
S1
6Ø
S1
6Ø
S1
(TYP. 2)
6Ø
S1
6Ø
S1
(TYP. 2)
12/12 RA
OPENING
(TYP 6)
46/10
SLSM
10Ø
S1
(TYP 2)
30/10
SLSM
S3
10/8
10"Ø W
R2
10/8
E3 12/12
E3
24/24
8Ø
S1
14"Ø W
18/8 W
10"Ø W
10Ø
S1
(TYP 2)
30/10
SLSM
12"Ø W
8Ø
S1
8Ø S2
8Ø
S1
8"Ø W 6"Ø W
6"Ø W
8"Ø W
"Ø
W
"Ø
E3
(TYP 2)
12/12
E1
10/6
CVS-1.09
CVS-1.10
18/14
SLSM
12"Ø W
8Ø
S1
14/14 SLSM
8"Ø W
6"Ø W
"Ø
W
8Ø
S1
8Ø
S1
8Ø
S1
(TYP. 3)
6Ø
S1
(TYP 2)
8Ø
S1
8Ø
S1
8Ø
S1
"Ø
8Ø
S1
14"Ø W
30/10
SLSM
10"Ø W
10/10
14"Ø W
"Ø
W
8"Ø W
"Ø
W
AC-1.02
1 1 1 1
S3
10/6
S3
12/8
UC
UC
UC
UC
UC
LAB
SUPPLY
STORAGE
F110
"Ø
W "Ø
W
"Ø
W
ADMIN/OFFICE
STORAGE
F104
E
AC-1.01
EMERGENCY
ELEC
S110
36/18 WALL LOUVER BY GC
650 CFM EXHAUSTEF-1.03
EF-1.04
36/18 WALL LOUVER
BY GC 750 CFM
EXHAUST
12/12
/1
BDD
BDD
24/24 DOOR GRILLE BY GC
24/24 INTERIOR MERV-8
FILTER BY MECH (TYP. 2)
PR-01
PR-01
PR-01
PR-01
PR-02
2.2
NOTE: LAB/ADMIN HVAC
SYSTEMS UTILIZE PLENUM
RETURN AIR PATH
ARRANGEMENT.
ALL LIGHTING, WIRING, AND
DEVICES IN THESE AREAS TO
BE PLENUM RATED
PR-02
S
PDERETI
GER
ROF E S S I ONA L
RE
ENIGN
E
64563PE
OREGON
EXPIRES 12-31-24
09 000225 S E
AN
C. MURR
A
Y
DIGITAL SIGNATURE
ALLIANT SYSTEMS, LLC
351 NW 12th AVE
PORTLAND, OR 97209
PHONE: 503/619-4000
FAX: 503/230-9238
WWW.ALLIANT-SYSTEMS.COM
CCB# 153420
REVISIONS: DATE
PROJECT NUMBER:
SHEET NUMBER:
DESIGNER CONTACT:
CAD:
PLOT DATE:
JED # 22017500
M2.01
100% CONSTRUCTION
DOCUMENTS 06/18/24
D-1244-52251
MECHANICAL LEVEL 1 -
HVAC FLOOR PLANS -
PHASE 1
CENTRAL POINT OFFICE
RENOVATION & ADDITION
OREGON STATE POLICE
CONTRACT
#PO-257-000008511
06/18/24
4500 ROGUE VALLEY HWY
CENTRAL POINT, OR 97502
S. MURRAY
503-619-4000
S.MURRAY@ALLIANT-SYSTEMS.COM
J. HAGGARD
HVAC NOTES BY SYMBOL
1 12/12 RETURN AIR TRANSFER OPENING: COORDINATE W/ GC TO PROVIDE 12/12
TRANSFER OPENING THRU FULL HEIGHT WALL ABOVE CEILING GRID.
MECHANICAL CONTRACTOR TO PROVIDE 12/12 DUCTBOARD TRANSFER BOOT
FOR SOUND ATTENUATION. WALL TRANSFER BOOT MAY BE INSTALLED ON
EITHER SIDE OF WALL OPENING COORDINATE TO MAINTAIN OPTIMAL PLENUM
CLEARANCE.
2 24/12 RETURN AIR TRANSFER OPENING: COORDINATE W/ GC TO PROVIDE 24/12
TRANSFER OPENING THRU FULL HEIGHT WALL ABOVE CEILING GRID.
MECHANICAL CONTRACTOR TO PROVIDE 24/12 DUCTBOARD TRANSFER BOOT
FOR SOUND ATTENUATION. WALL TRANSFER BOOT MAY BE INSTALLED ON
EITHER SIDE OF WALL OPENING COORDINATE TO MAINTAIN OPTIMAL PLENUM
CLEARANCE
3 PLENUM BOOT AT RETURN AIR TRANSFER GRILLE: MECHANICAL CONTRACTOR
TO PROVIDE 12/12 DUCTBOARD TRANSFER BOOT FOR SOUND ATTENUATION AT
PLENUM SIDE OF HIGH-SIDEWALL RETURN AIR GRILLE.
4 DOOR UNDERCUT FOR MAKEUP AIR TRANSFER: COORDINATE W/ GC TO
PROVIDE 3/4" DOOR UNDERCUT FOR MAKEUP AIR TRANSFER ACROSS
DOORWAY.
5 OA DUCT CONNECTION TO VRV FAN COIL: EXTEND TEMPERED OUTDOOR AIR
DUCT CONNECTION FROM MAU-1.01 TERMINAL UNIT CVS-1.09 TO RETURN AIR
CONNECTION AT VRV FAN COIL UNIT. SEE DETAIL 4/M3.00 FOR ADDITIONAL
INFORMATION.
6 SUSPENDED VRV FAN COIL UNIT INSTALLATION: SUPPORT AND RESTRAIN
SUSPENDED VRV FAN COIL UNIT AND ASSOCIATED DUCT AND ACCESSORIES IN
ACCORDANCE W/ MANUF'S REQUIREMENTS AND PROJECT SPECIFIC
STRUCTURAL AND SEISMIC CALCULATIONS AND DETAILS. SEE DETAIL 4/M3.00
FOR ADDITIONAL INFORMATION.
7 WALL MOUNTED DUCTLESS FAN COIL UNIT INSTALLATION: SUPPORT AND
RESTRAIN WALL MOUNT FAN COIL UNIT AND ASSOCIATED PIPING
ANDSACCESSORIES IN ACCORDANCE W/ MANUF'S REQUIREMENTS AND
PROJECT SPECIFIC STRUCTURAL AND SEISMIC CALCULATIONS AND DETAILS.
SEE DETAIL 1/M3.00 FOR ADDITIONAL INFORMATION.
8 SUSPENDED TERMINAL UNIT (AIR VALVE) INSTALLATION: SUPPORT AND
RESTRAIN SUSPENDED TERMINAL UNIT AND ASSOCIATED DUCT AND
ACCESSORIES IN ACCORDANCE W/ MANUF'S REQUIREMENTS AND PROJECT
SPECIFIC STRUCTURAL AND SEISMIC CALCULATIONS AND DETAILS.
BALANCE TO CONSTANT VOLUME AIRFLOW AS INDICATED IN DESIGN
SCHEDULES. SEE DETAIL 2/M3.00 FOR ADDITIONAL INFORMATION.
9 FUME HOOD EXHAUST CONNECTION: EXTEND STAINLESS STEEL LAB EXHAUST
SERVICE TO FUME HOOD OUTLET AND CONNECT IN ACCORDANCE W/ MANUF'S
REQUIREMENTS. BALANCE TO CONSTANT VOLUME AIRFLOW AS INDICATED IN
DESIGN SCHEDULES.
10 CHEMICAL STORAGE CABINET EXHAUST CONNECTION: EXTEND STAINLESS
STEEL LAB EXHAUST SERVICE TO CHEMICAL STORAGE CABINET OUTLET AND
CONNECT IN ACCORDANCE W/ MANUF'S REQUIREMENTS. BALANCE TO
CONSTANT VOLUME AIRFLOW AS INDICATED IN DESIGN SCHEDULES.
11 CHEMICAL WORKSTATION BENCHTOP EXHAUST CONNECTION: EXTEND
STAINLESS STEEL LAB EXHAUST SERVICE DOWN TO INLET GRILLE AT
BENCHTOP. BALANCE TO CONSTANT VOLUME AIRFLOW AS INDICATED IN
DESIGN SCHEDULES.
12 THERMOSTAT CONTROLLED EXHAUST FAN: COORDINATE INSTALLATION OF
CEILING-HUNG EXHAUST FAN AND THERMOSTAT FOR UTILITY ROOM HEAT
RELIEF. CONFIGURE FAN CONTROLS TO TURN ON AT ROOM TEMP >80F (ADJ.)
AND TURN OFF AT ROOM TEMP <85F (ADJ.)
13 EXTERIOR WALL LOUVER: ARCH TO SPECIFY AND GC TO FURNISH AND
INSTALL EXTERIOR SIDEWALL EXHAUST GRILLE W/ SIZE INDICATED. MECH TO
COORDINATE INTERIOR DUCT CONNECTION REQUIREMENTS AND FURNISH
AND INSTALL DAMPER AS SPECIFIED IN EXHAUST FAN SCHEDULE.
14 EXTERIOR DOOR GRILLE W/ INTERIOR FILTER: ARCH TO SPECIFY AND GC TO
FURNISH AND INSTALL VENTILATION INTAKE GRILLE AT EXTERIOR DOOR W/ MIN
50% FREE AREA. MECH TO FURNISH AND INSTALL INTERIOR FILTER FRAME W/
1" MERV-8 DISPOSABLE FILTER.
15 EXTEND 6" SS DUCT TAP TO CONNECT TO CEILING MOUNT ARTICULATING
EXHAUST SNORKEL (LAB EQUIP ITEM SN-01)
- COORDINATE MOUNTING LOCATION AND CONFIGURATION
- PROVIDE DUCT TRANSITION TO 100 MM DEVICE CONNECTION
- BALANCE TO 150 CFM EXHAUST W/ SNORKEL VALVE FULL OPEN
N
KEY PLAN
PHASE 1 PHASE 2
PHASE 3
8' 16'4'0 1/8" = 1'-0"M2.01
2 MECHANICAL LEVEL 1 - LAB-ADMIN PARTIAL HVAC FLOOR PLAN / PHASE-1
J. INSTALLING CONTRACTOR SHALL TRACK ANY FIELD INSTALLATION CHANGES
TO DESIGN DRAWINGS AND DELIVER LEGIBLE AS-BUILT DRAWINGS TO GC AND
OWNER AT END OF PROJECT.
I. SUPPORT AND RESTRAIN ALL MECHANICAL SYSTEMS AND COMPONENTS IN
ACCORDANCE WITH PROJECT SPECIFIC STRUCTURAL SUPPORT AND SEISMIC
RESTRAINT CALCULATIONS, DETAILS, AND INSTALLATION GUIDANCE.
H. IN ACCORDANCE WITH SECTION 714 OF OREGON BUILDING CODE, REVIEW
ARCHITECTURAL LIFE-SAFETY DRAWINGS FOR LOCATION OF FIRE AND SMOKE
RATED WALLS, AND FLOOR OR CEILING ASSEMBLIES. FIELD VERIFY
INSTALLATION CONDITIONS AND PROVIDE APPROPRIATE UL LISTED SEALANT
SYSTEM(S) AT ALL LOCATIONS WHERE PIPING PENETRATES RATED...
G. IDENTIFIED DUCT DIMENSIONS INDICATE CLEAR INSIDE MEASUREMENTS OF
SHEETMETAL DUCT. FOR DOUBLE-WALL OR INSULATION LINED DUCTWORK,
TOTAL DIMENSION OF ASSEMBLY IS THE REPORTED INNER DIMENSION PLUS 2X
THE DEPTH OF INTERNAL LINING.
F. DETAIL SHEET METAL INSTALLATION TO MAINTAIN EQUAL SPACING FOR
SUPPLY GRILLES IN AREAS WITHOUT CEILING INSTALLATION.
E. ALL FLEX DUCT TO BE MAXIMUM 5' IN LENGTH AND BE ROUTED WITH
MANUFACTURER RECOMMENDED SUPPORT ACCESSORIES WITHIN 18" ZONE
ABOVE CEILING GRID OR FRAMING.
D. UNLESS OTHERWISE NOTED, SIZE OF ALL DIFFUSER/GRILLE BRANCH
DUCTWORK IS THE SAME AS DIFFUSER/GRILLE NECK SIZE.
C. COORDINATE SPECIFIC POWER REQUIREMENTS FOR HVAC EQUIPMENT WITH
ELECTRICAL CONTRACTOR PRIOR TO RELEASING FOR FABRICATION OR...
B. COORDINATE ROUTING OF DUCT AND PIPING SYSTEMS AND LOCATIONS OF
HVAC EQUIPMENT WITH OTHER TRADES TO MAINTAIN REQUIRED ELECTRICAL
CLEARANCES AND ACCESS FOR LIFETIME INSPECTION AND SERVICE AT ALL
COMPONENTS.
A. MECHANICAL CONTRACTOR TO VERIFY INSTALLATION CONDITIONS AND FINAL
EQUIPMENT SUBMITTALS AND NOTIFY ENGINEER OF ANY CONFLICTS OR
DIFFERENCES BETWEEN PLANS AND FIELD CONDITIONS.
HVAC GENERAL NOTES
3 ADDENDUM-03 04/10/23
PR-01 100% CONST. DOCUMENTS 06/16/23
PR-02 100% CD REVISIONS 06/30/23
4 RFI-10 PR-01/02 REVISIONS 10/06/23
6 RFI-12 REVISION 01/04/23
7 RFI-24 REVISION 04/04/24
adschw Rectangle z.mafoti Callout VRV Indoor Unit Training (Location might vary by vendor) adschw Text Box
HVAC EQUIPMENT TRAINING SITE
REF.
T
T
T
T
T C
T
T
T
T
P
P
12345678
A
B
C
D
FPB-2.01
FPB-2.02
FPB-2.03
VAV-2.06
VAV-2.05
DISPATCH
CONSOLES
D211
DISPATCH
SUPERVISORS
D210
DISPATCH
DEPUTY
DIRECTOR
D209
DISPATCH
DIRECTOR
D208
DISPATCH
LOCKERS
D201
DISPATCH
WELLNESS
D205
DISPATCH
BREAK
AREA
D207
CONFERENCE
ROOM
D206
TRAINING/AREA
COMMAND
MEETING
RM
S202
TRAINING
RM
TOILET
S206
TRAINING
STORAGE
S203
JAN
S207
ELEVATOR
S204
DISPATCH
IDF
D204
TRAINING
RM
TOILET
S205
TOILETS
D202
STORAGE
D203
HALL
S201EXIT
STAIR
S208
VAV-2.04
VAV-2.11
14/14 EXH UP
TO EF-1.02
6"Ø
"Ø
8"Ø
10/10
10/10
8"Ø W
"Ø
W
14"Ø W
/1
W
10"Ø W
HRC-1.02
CU-1.01
CU-1.02
F
G
H
J
K
MAU-1.01
/1
16/16 W
"Ø
W (T
Y P
S3
12/8
14/14 SLSM
12"Ø W
12"Ø W
10"Ø W
8"Ø W 8Ø
S1
(TYP 4)
E3
(TYP 2)
12/12-6Ø
E1
10/6
VAV-2.07
VAV-2.08
14/14 8"Ø
E3
24/24 10Ø
S1
E3
24/24
12/10
SLSM
8"Ø W
8"Ø W
8Ø
S1
12/8 SLSM
12/10
SLSM
8"Ø W
8Ø
S1
8Ø
S1
8Ø
S1
14/14
SLSM
8Ø
S1
(TYP. 2)
R4
(TYP 2)
24/24
10"Ø W 12/10 SLSM
10Ø
S1
(TYP 4)
10Ø
S1
(TYP 4)
40/30 RA
OPENING
36/24 RA
OPENING
8"Ø W 12/10 SLSM
10Ø
S1
10"Ø W "Ø
W (T
Y P
"Ø
W (T
Y P
24/12 RA
OPENING
HP-1.01
EF-1.01
E3
12/12-6Ø
10Ø S2
38/22 x 38/18 K-27
ELBOWS W/ TURN
VANES UP TO
RTU-1.01 ABOVE
24/54 (2" K-27) RA
UP TO RTU-1.01
24/54 (2" K-27) RA
BOOT W/ 30/54
UPTURNED INLET
36/42 SA (2" K-27) DN WITHIN
MAU-1.01 CURB SEE SHEET M2.01
FOR CONTINUATION
36/42 SA (2" K-27 W/ MYLAR ) DN
WITHIN EF-1.01 CURB SEE SHEET
M2.01 FOR CONTINUATION
"Ø
W
UC
UC 4
UC
UC
M3.00
M3.00
M3.01
18/14
SLSM
10Ø
S1
10Ø
S1
10Ø
S1
(TYP. 4)
E
14"Ø W
16/16 SLSM
14"Ø W
16/16 SLSM
24/12 RA
OPENING
/1
W
S7
18/18
1.5
FSD
1.5
FSD
FSD-1.01
R2
16/16
FDS-1.02
FPB-2.10
16/16 SLSM
FPB-2.0910"Ø W
14"Ø W
8"Ø W 6"Ø W
ST-3
ST-2
22x18x36
44x18x60
/1
W
38/10 x 38/18 K-27
ELBOWS W/ TURN
VANES UP TO
RTU-1.01 ABOVE
10"Ø W
F-1.02 8
PR-01
PR-01
PR-01
PR-01
16/16 W
PR-01
"Ø
W
PR-01
PR-01
PR-01
2.2
14/10 EXH DN IN
SHAFT (650 CFM)
NOTE: DISPATCH AND TRAINING
AREA HVAC SYSTEMS UTILIZE
PLENUM RETURN AIR PATH
ARRANGEMENT.
ALL LIGHTING, WIRING, AND
DEVICES IN THESE AREAS TO BE
PLENUM RATED
PR-02
S
PDERETI
GER
ROF E S S I ONA L
RE
ENIGN
E
64563PE
OREGON
EXPIRES 12-31-24
09 000225 S E
AN
C. MURR
A
Y
DIGITAL SIGNATURE
ALLIANT SYSTEMS, LLC
351 NW 12th AVE
PORTLAND, OR 97209
PHONE: 503/619-4000
FAX: 503/230-9238
WWW.ALLIANT-SYSTEMS.COM
CCB# 153420
REVISIONS: DATE
PROJECT NUMBER:
SHEET NUMBER:
DESIGNER CONTACT:
CAD:
PLOT DATE:
JED # 22017500
M2.03
100% CONSTRUCTION
DOCUMENTS 06/18/24
D-1244-52251
MECHANICAL LEVEL 2 -
HVAC FLOOR PLAN -
PHASE 1
CENTRAL POINT OFFICE
RENOVATION & ADDITION
OREGON STATE POLICE
CONTRACT
#PO-257-000008511
06/18/24
4500 ROGUE VALLEY HWY
CENTRAL POINT, OR 97502
S. MURRAY
503-619-4000
S.MURRAY@ALLIANT-SYSTEMS.COM
J. HAGGARD
KEY PLAN
PHASE 1 PHASE 2
PHASE 3
HVAC NOTES BY SYMBOL
1 12/12 RETURN AIR TRANSFER OPENING: COORDINATE W/ GC TO PROVIDE 12/12
TRANSFER OPENING THRU FULL HEIGHT WALL ABOVE CEILING GRID.
MECHANICAL CONTRACTOR TO PROVIDE 12/12 DUCTBOARD TRANSFER BOOT
FOR SOUND ATTENUATION. WALL TRANSFER BOOT MAY BE INSTALLED ON
EITHER SIDE OF WALL OPENING COORDINATE TO MAINTAIN OPTIMAL PLENUM
CLEARANCE
2 24/12 RETURN AIR TRANSFER OPENING: COORDINATE W/ GC TO PROVIDE 24/12
TRANSFER OPENING THRU FULL HEIGHT WALL ABOVE CEILING GRID.
MECHANICAL CONTRACTOR TO PROVIDE 24/12 DUCTBOARD TRANSFER BOOT
FOR SOUND ATTENUATION. WALL TRANSFER BOOT MAY BE INSTALLED ON
EITHER SIDE OF WALL OPENING COORDINATE TO MAINTAIN OPTIMAL PLENUM
CLEARANCE
3 PLENUM BOOT AT RETURN AIR TRANSFER GRILLE: MECHANICAL CONTRACTOR
TO PROVIDE 16/12 DUCTBOARD TRANSFER BOOT FOR SOUND ATTENUATION AT
PLENUM SIDE OF HIGH-SIDEWALL RETURN AIR GRILLE.
4 DOOR UNDERCUT FOR MAKEUP AIR TRANSFER: COORDINATE W/ GC TO
PROVIDE 3/4" DOOR UNDERCUT FOR MAKEUP AIR TRANSFER ACROSS
DOORWAY
5 SUSPENDED VAV TERMINAL UNIT INSTALLATION: SUPPORT AND RESTRAIN
SUSPENDED TERMINAL UNIT AND ASSOCIATED DUCT AND ACCESSORIES IN
ACCORDANCE W/ MANUF'S REQUIREMENTS AND PROJECT SPECIFIC
STRUCTURAL AND SEISMIC CALCULATIONS AND DETAILS.
BALANCE TO SUPPLY AIRFLOW AS INDICATED IN DESIGN SCHEDULES. SEE
DETAIL 2/M3.00 FOR ADDITIONAL INFORMATION
6 SUSPENDED FAN POWERED VAV TERMINAL UNIT INSTALLATION: SUPPORT AND
RESTRAIN SUSPENDED FAN POWERED TERMINAL UNIT AND ASSOCIATED DUCT
AND ACCESSORIES IN ACCORDANCE W/ MANUF'S REQUIREMENTS AND
PROJECT SPECIFIC STRUCTURAL AND SEISMIC CALCULATIONS AND DETAILS.
BALANCE TO SUPPLY AND RETURN AIRFLOW AS INDICATED IN DESIGN
SCHEDULES. SEE DETAIL 3/M3.00 FOR ADDITIONAL INFORMATION
7 FAN POWERED VAV TERMINAL SOUND WRAP: WRAP FAN POWERED TERMINAL
UNIT W/ 1 PSF ACOUSTIC DUCT LAGGING. DETAIL INSTALLATION TO MAINTAIN
SERVICE ACCESS TO UNIT
8 INLINE FILTER CABINET: PROVIDE W/ SHOP FABRICATED INLINE DUCT CABINET
W/ FILTER RACK AND ACCESS DOOR. REFER TO FILTER SCHEDULE FOR
DIMENSIONS. PROVIDE W/ FILTER DIFFERENTIAL PRESSURE SENSOR TIED TO
ALARM AT BAS WHEN FILTER DROP EXCEEDS 0.65" WG (ADJ).
9 30/18 RETURN AIR TRANSFER OPENING: COORDINATE W/ GC TO PROVIDE 30/18
TRANSFER OPENING THRU FULL HEIGHT WALL ABOVE CEILING GRID.
MECHANICAL CONTRACTOR TO PROVIDE 24/12 DUCTBOARD TRANSFER BOOT
FOR SOUND ATTENUATION. WALL TRANSFER BOOT MAY BE INSTALLED ON
EITHER SIDE OF WALL OPENING COORDINATE TO MAINTAIN OPTIMAL PLENUM
CLEARANCE
10 PROVIDE THERMOSTAT MOUNTED AT EXTERIOR WALL W/ INSULATED BASE
8' 16'4'0 1/8" = 1'-0"M2.03
1 MECHANICAL LEVEL 2 - PHASE 1 PARTIAL HVAC FLOOR PLAN
N
J.
INSTALLING CONTRACTOR SHALL TRACK ANY FIELD INSTALLATION CHANGES TO
DESIGN DRAWINGS AND DELIVER LEGIBLE AS-BUILT DRAWINGS TO GC AND
OWNER AT END OF PROJECT.
I.
SUPPORT AND RESTRAIN ALL MECHANICAL SYSTEMS AND COMPONENTS IN
ACCORDANCE WITH PROJECT SPECIFIC STRUCTURAL SUPPORT AND SEISMIC
RESTRAINT CALCULATIONS, DETAILS, AND INSTALLATION GUIDANCE.
H.
IN ACCORDANCE WITH SECTION 714 OF OREGON BUILDING CODE, REVIEW
ARCHITECTURAL LIFE-SAFETY DRAWINGS FOR LOCATION OF FIRE AND SMOKE
RATED WALLS, AND FLOOR OR CEILING ASSEMBLIES. FIELD VERIFY
INSTALLATION CONDITIONS AND PROVIDE APPROPRIATE UL LISTED SEALANT
SYSTEM(S) AT ALL LOCATIONS WHERE PIPING PENETRATES RATED ASSEMBLIES.
G.
IDENTIFIED DUCT DIMENSIONS INDICATE CLEAR INSIDE MEASUREMENTS OF
SHEETMETAL DUCT. FOR DOUBLE-WALL OR INSULATION LINED DUCTWORK,
TOTAL DIMENSION OF ASSEMBLY IS THE REPORTED INNER DIMENSION PLUS 2X
THE DEPTH OF INTERNAL LINING.
F.
DETAIL SHEET METAL INSTALLATION TO MAINTAIN EQUAL SPACING FOR SUPPLY
GRILLES IN AREAS WITHOUT CEILING INSTALLATION.
E.
ALL FLEX DUCT TO BE MAXIMUM 5' IN LENGTH AND BE ROUTED WITH
MANUFACTURER RECOMMENDED SUPPORT ACCESSORIES WITHIN 18" ZONE
ABOVE CEILING GRID OR FRAMING.
D.
UNLESS OTHERWISE NOTED, SIZE OF ALL DIFFUSER/GRILLE BRANCH DUCTWORK
IS THE SAME AS DIFFUSER/GRILLE NECK SIZE.
C.
COORDINATE SPECIFIC POWER REQUIREMENTS FOR HVAC EQUIPMENT WITH
ELECTRICAL CONTRACTOR PRIOR TO RELEASING FOR FABRICATION OR
PURCHASE.
B. COORDINATE ROUTING OF DUCT AND PIPING SYSTEMS AND LOCATIONS OF HVAC
EQUIPMENT WITH OTHER TRADES TO MAINTAIN REQUIRED ELECTRICAL
CLEARANCES AND ACCESS FOR LIFETIME INSPECTION AND SERVICE AT ALL
COMPONENTS.
A. MECHANICAL CONTRACTOR TO VERIFY INSTALLATION CONDITIONS AND FINAL
EQUIPMENT SUBMITTALS AND NOTIFY ENGINEER OF ANY CONFLICTS OR
DIFFERENCES BETWEEN PLANS AND FIELD CONDITIONS.
HVAC GENERAL NOTES
PR-01
3 ADDENDUM-03 04/10/23
PR-01 100% CONST. DOCUMENTS 06/16/23
PR-02 100% CD REVISIONS 06/30/23
4 RFI-10 PR-01/02 REVISIONS 10/06/23
z.mafoti Cloud z.mafoti Callout MAU Training Site z.mafoti Cloud z.mafoti Callout VRV Outdoor Unit Training Site
12345678 X1 X2 X3 X5
A
B
C
D
EF-2.02
CLEARR 10' -
0"
PHASE-2 GENERAL EXHAUST
W/ DUCT MOUNTED HEAT
RECOVERY COIL HRC-2.02
EF-1.02
CLEARR 10' -
0"
C
LE
A R
R
5'
NEW 100% OUTDOOR AIR PACKAGED
ROOFTOP UNIT TO SERVE MEDICAL
EXAMINER SPACES W/ INTEGRAL
HEAT RECOVERY COIL HRC-2.03
CLEARR 2
5'
0"
HEAT RECOVERY
CONNECTION BETWEEN LAB
EXHAUST (EF-1.01) AND LAB
HVAC UNIT (MAU-1.01)
NEW 100% OUTDOOR AIR
PACKAGED ROOFTOP UNIT TO
SERVE FORENSIC LAB SPACES
W/ INTEGRAL HEAT RECOVERY
COIL HRC-1.01
UTILITY SET LAB EXHAUST
W/ INTEGRAL HEAT
RECOVERY COIL
HRC-1.03
NEW PACKAGED ROOFTOP
VAV UNIT (ON E-POWER) TO
SERVE 2ND FLOOR PHASE-1
DISPATCH AND ADMIN SPACES
MAU-2.01
HEAT RECOVERY CONNECTION
BETWEEN GENERAL EXHAUST
(EF-2.02) AND LAB HVAC UNIT
(MAU-1.01)
HEAT RECOVERY
CONNECTION BETWEEN
GENERAL EXHAUST
(EF-1.02) AND LAB HVAC
UNIT (MAU-1.01)
MAU-1.01
RTU-1.01
F
G
H
J
K
X6 X7 X8 X9 X10 X11 X12
HP-1.01
DRC-2.01
EF-1.01
32/14 EXH DN
96"x96"x96" COIL
CABINET WITH
FILTER RACK
28"Ø UP TO 3' ABOVE
ADJACENT ROOF
EF-2.01
30/28 DN
96"x96"x96" COIL
CABINET WITH
FILTER RACK
CU-1.01
CU-1.02 1
M3.00
M3.00
CU-2.01
M3.00
XA
XB
XC
AA
BA
XD
CA
DA
XE
EA
5A 3A4A 2A 1A
E
(IDF S123)
(PHASE-1 VRF SYSTEM)
HEAT RECOVERY CONNECTION
BETWEEN ME EXHAUST
(EF-2.01) AND ME HVAC UNIT
(MAU-2.01)
UTILITY SET LAB EXHAUST
W/ INTEGRAL HEAT
RECOVERY COIL
HRC-2.01
DRYER EXHAUST ROOF CAP
INSTALLED ON 12" HIGH CURB
EXTEND 4" AL DRYER EXH UP
FROM BELOW AND TERMINATE
AT CAP FITTING
PHASE-2 GENERAL
EXHAUST (1150
CFM) (ON E-POWER)
W/ DUCT MOUNTED
HEAT RECOVERY
COIL HRC-1.02
(MDF S106)
EF-2.03
PHASE-2 ELEC
RM S118 HEAT
RELIEF
M3.01
M3.01
F-1.01 3
F-2.01
5/8" RS, 1/4" RL PIPING
DOWN THRU ROOF,
SEE SHEET MP2.02
FOR CONTINUATION
M3.01
M3.02
M3.02
PR-01
PR-01
X42.2
PR-02
PR-02
PR-02
2 1/2" HRS, 2 1/2"
HRR PIPING DN
THRU ROOF SEE
SHEET MP2.01 FOR
CONTINUATION
M3.01
1" (2-PSI) NG PIPING DN
THRU ROOF SEE SHEET
MP2.01 FOR
CONTINUATION
2" HEAT RECOVERY
SUPPLY/RETURN PIPING
DN THRU ROOF SEE
SHEET MP2.01 FOR
CONTINUATION
M3.01
M3.00
5/8" RSD, 1/4" RL
PIPING DN TO AC-2.01
BELOW SEE SHEET
MP2.02 FOR
CONTINUATION
PR-02
PR-02
5/8", 1-3/8", 1-1/8" REFRIG
PIPING DN THRU ROOF
SEE SHEET MP2.01 FOR
CONTINUATION
M3.01
5/8" RS, 1/4" RL PIPING DN
THRU ROOF, SEE SHEET
MP2.02 FOR CONTINUATION
(TYPICAL 2)
PR-02
PR-02
3/4" (2-PSI) NG PIPING
DN THRU ROOF, SEE
SHEET MP2.03 FOR
CONTINUATION
M3.01 1" (2-PSI) NG PIPING
DN THRU ROOF, SEE
SHEET MP2.02 FOR
CONTINUATION
2-1/2" HEAT RECOVERY
SUPPLY/RETURN PIPING
DN THRU ROOF WITHIN
EF-2.01 CABINET. SEE
SHEET MP-2.02 FOR
CONTINUATION
2" HEAT RECOVERY
SUPPLY/RETURN PIPING DN
THRU ROOF WITHIN MAU-2.01
CABINET. SEE SHEET MP-2.02
FOR CONTINUATION
M3.01
M3.04
M3.01
M3.01
PR-02
PR-02
PR-02
M3.04
M3.01
M3.04
8 8
S
PDERETI
GER
ROF E S S I ONA L
RE
ENIGN
E
64563PE
OREGON
EXPIRES 12-31-24
09 000225 S E
AN
C. MURR
A
Y
DIGITAL SIGNATURE
ALLIANT SYSTEMS, LLC
351 NW 12th AVE
PORTLAND, OR 97209
PHONE: 503/619-4000
FAX: 503/230-9238
WWW.ALLIANT-SYSTEMS.COM
CCB# 153420
REVISIONS: DATE
PROJECT NUMBER:
SHEET NUMBER:
DESIGNER CONTACT:
CAD:
PLOT DATE:
JED # 22017500
M2.04
100% CONSTRUCTION
DOCUMENTS 06/18/24
D-1244-52251
MECHANICAL HVAC
ROOF PLAN
CENTRAL POINT OFFICE
RENOVATION & ADDITION
OREGON STATE POLICE
CONTRACT
#PO-257-000008511
06/18/24
4500 ROGUE VALLEY HWY
CENTRAL POINT, OR 97502
S. MURRAY
503-619-4000
S.MURRAY@ALLIANT-SYSTEMS.COM
J. HAGGARD
8' 16'4'0 1/8" = 1'-0"M2.04
1 MECHANICAL ROOF HVAC PLAN
N
J.
INSTALLING CONTRACTOR SHALL TRACK ANY FIELD INSTALLATION CHANGES TO DESIGN
DRAWINGS AND DELIVER LEGIBLE AS-BUILT DRAWINGS TO GC AND OWNER AT END OF
PROJECT.
I.
SUPPORT AND RESTRAIN ALL MECHANICAL SYSTEMS AND COMPONENTS IN
ACCORDANCE WITH PROJECT SPECIFIC STRUCTURAL SUPPORT AND SEISMIC
RESTRAINT CALCULATIONS, DETAILS, AND INSTALLATION GUIDANCE.
H.
IN ACCORDANCE WITH SECTION 714 OF OREGON BUILDING CODE, REVIEW
ARCHITECTURAL LIFE-SAFETY DRAWINGS FOR LOCATION OF FIRE AND SMOKE RATED
WALLS, AND FLOOR OR CEILING ASSEMBLIES. FIELD VERIFY INSTALLATION CONDITIONS
AND PROVIDE APPROPRIATE UL LISTED SEALANT SYSTEM(S) AT ALL LOCATIONS WHERE
PIPING PENETRATES RATED ASSEMBLIES.
G.
IDENTIFIED DUCT DIMENSIONS INDICATE CLEAR INSIDE MEASUREMENTS OF
SHEETMETAL DUCT. FOR DOUBLE-WALL OR INSULATION LINED DUCTWORK, TOTAL
DIMENSION OF ASSEMBLY IS THE REPORTED INNER DIMENSION PLUS 2X THE DEPTH O...
F.
DETAIL SHEET METAL INSTALLATION TO MAINTAIN EQUAL SPACING FOR SUPPLY
GRILLES IN AREAS WITHOUT CEILING INSTALLATION.
E.
ALL FLEX DUCT TO BE MAXIMUM 5' IN LENGTH AND BE ROUTED WITH MANUFACTURER
RECOMMENDED SUPPORT ACCESSORIES WITHIN 18" ZONE ABOVE CEILING GRID OR
FRAMING.
D.
UNLESS OTHERWISE NOTED, SIZE OF ALL DIFFUSER/GRILLE BRANCH DUCTWORK IS THE
SAME AS DIFFUSER/GRILLE NECK SIZE.
C.
COORDINATE SPECIFIC POWER REQUIREMENTS FOR HVAC EQUIPMENT WITH
ELECTRICAL CONTRACTOR PRIOR TO RELEASING FOR FABRICATION OR PURCHASE.
B. COORDINATE ROUTING OF DUCT AND PIPING SYSTEMS AND LOCATIONS OF HVAC
EQUIPMENT WITH OTHER TRADES TO MAINTAIN REQUIRED ELECTRICAL CLEARANCES
AND ACCESS FOR LIFETIME INSPECTION AND SERVICE AT ALL COMPONENTS.
A. MECHANICAL CONTRACTOR TO VERIFY INSTALLATION CONDITIONS AND FINAL
EQUIPMENT SUBMITTALS AND NOTIFY ENGINEER OF ANY CONFLICTS OR DIFFERENCES
BETWEEN PLANS AND FIELD CONDITIONS.
HVAC GENERAL NOTES
3 ADDENDUM-03 04/10/23
PR-01 100% CONST. DOCUMENTS 06/16/23
PR-02 100% CD REVISIONS 06/30/23
4 RFI-10 PR-01/02 REVISIONS 10/06/23
5 RFI-11 REVISION 11/20/23
8 RFI-31 REVISION 06/18/24
z.mafoti Cloud z.mafoti Callout z.mafoti Callout RTU-1.01 Training Site
F
R E
F
R E
F
REF. REF.
T
P T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TT
T
T
T T
TT
T
T
T
T
TT
TT
T
T
T
T
T
T
X1 X2 X3 X5
CVS-2.01
CVE-2.01
CVE-2.02
CVE-2.03
CVS-2.02
CVS-2.03
CVS-2.05
COMMANDER
A102
ADMINISTRATIVE
ASSISTANT
A101.2
SECURE
FILES
A112
SUPPLY
STORAGE
A149
F & W
SIU
A122.1
F & W
TROOPERS
A122
SUPPLY
STORAGE
A124
LT (CID,
F&W, OPS)
A104
LT (CID,
F&W, OPS)
A103
ATF/FED
OFC (2)
A144
COPY/STORAGE
A105
SECURE
DUI
REVIEW
ZONE
A129
PATROL
AREA
A129.1
MCS
SGT
A142
MCS
DETECTIVES
A140
MCS
SPECIALIST
DETECTIVES
A140.1
CONFERENCE
ROOM
A138
DES
SECURED
FILE
STORAGE
A137
SUPPLY
STORAGE
A148
SOFT
INTERVIEW
ROOM
A108
INTERVIEW
ROOM
A109
EVIDENCE
OFFICE
AREA
A117
BAG &
TAG
A115
EVIDENCE
INTAKE
A116
PROPERTY
ROOM
A118
EVIDENCE
PURGE
AREA
A118.1
DRUG
VAULT
A120
LARGE
EVIDENCE
STORAGE
A119
LOCKER
AREA
A113
STAFF
TOILETS/
CHANGING
A113.3
STAFF
TOILETS/
CHANGING
A113.1
STAFF
TOILETS/
CHANGING
A113.2
IT
OFFICE
S114
PRIVATE
LOBBY
REPORT
ROOM
A107
LOUNGE/BREAK
AREA
S112
WELLNESS
A111
VENDING
S121.2
DES
ASSISTANT
A134.2
ADMIN
STAFF
A101
FLEX
RM
S111
VESTIBULE
S100
PUBLIC
LOBBY
S101
FRONT
WINDOW
A101.1
ELEC
S118
MECH
S119
JAN
S113
IDF
S123
COOLER
M102
ISO-FREEZER
M102.1
AUTOPSY
RECEPTION
M101
RECEIVING
VESTIBULE
M100
AUTOPSY
SUITE
M103
ISO-AUTOPSY
M103.2
SALLY
PORT
M100.1
PATHOLOGIST
OFC
M104
PATHOLOGIST
OFC
M105
CONFERENCE
ROOM
M106
TECH
OFFICE
POD
M111
F & W
TEAMING
AREA
A122.2
ARMORY
STORAGE
A150
LAUNDRY/DRYING
M117
OFFICE
M103.1
DES
SGT
OFC (2)
A135
STORAGE/
DRYING
RM
A114
LAB
M115
X-RAY
ROOM
M118
TOILET
M109
TOILET
M108
JAN/SUPPLY
M107
UNISEX
LOCKER
ROOM
M119
ADMIN/COPY/FILE
ROOM
M113
ADMIN
OFC
M112
UNISEX
LOCKER
ROOM
M120
STORAGE
/ FLEX
OFFICE
S122
ME
OPEN
CIRCULATION
M114
TOILET
S115
TOILET
S116
VESTIBULE
S117
VESTIBULE
S120
PATROL
SGT (2)
A131
PATROL
SGT (2)
A132
PATROL
TROOPERS
A130
PATROL
TEAMING
AREA
A130.1
NATIONAL
GUARD
ANALYST
A134.1
DES LT
A136
DES
DETECTIVES
A134
AUTOPSY
SUPPLIES
CHEMICAL
STORAGE
M116
F & W
LT
A122.3
ODOT
A143
STORAGE
A151
VESTIBULE
M121
VESTIBULE
M110
UH-2.01
UH-2.02
CUH-2.02
CUH-2.01
/1
E
X H
14"Ø
12"Ø W
/1
W
CVS-2.04
14"Ø W
6"Ø W
10"Ø W
CVS-2.10
CVS-2.11
8"Ø W
16/14 W
CVS-2.08
CVS-2.09
6"Ø W
30/14 W
6"Ø
CVS-2.07
"Ø
"Ø
W
CVE-2.05
CVE-2.06
/1
CVE-2.08
CVE-2.07
"Ø
6"Ø W
"Ø
O A
W "Ø
W
"Ø
W
6"Ø
10"Ø W
"Ø
W
"Ø
W4"Ø W
8"Ø W
8"Ø W
8"Ø W16/12 OA W
14"Ø OA W
10"Ø W
6"Ø W
"Ø
W
10"Ø W
6"Ø W
8"Ø W
10"Ø OA W
"Ø
O A
W
8"Ø W
6"Ø W
8"Ø W
10"Ø
20/12 EXH
/1
E
X H
"Ø
EF-2.02
ABOVE
(1660 CFM)
10"Ø EXH
HRC-2.02
FC-2.12
FC-2.13
FC-2.14
FC-2.15
FC-2.17
FC-2.18
FC-2.29
FC-2.28
FC-2.24
FC-2.27
FC-2.30
FC-2.33
FC-2.10
FC-2.32
FC-2.21
X6 X7 X8 X9 X10 X11 X12
FC-2.31
FC-2.11
FC-2.16
FC-2.22
FC-2.23
FC-2.26
CVS-1.08
8Ø
S1
(TYP. 2)
14"Ø W
/1
S
L S
M
20/18 OA W
20/18 OA W
20/12 OA W
20/12 OA W
8"Ø W
6Ø
S1
10Ø
S1
(TYP. 5)
/1
S
L S
M
12"Ø W
14"Ø W
"Ø
W
S3
12/6
/1
S
L S
M "Ø
W
10Ø
S1
(TYP. 2)
8"Ø W
8Ø
S1
(TYP. 2)
S3
(TYP. 2)
6/6
S3
6/6
6Ø
S1
/1
S
L S
M
12"Ø W
8Ø
S1
(TYP. 2)
6Ø
S1
/1
S
L S
M
14"Ø W
12Ø
S1
(TYP. 2)
30/12
SLSM
10"Ø W 10"Ø W
8Ø
S1
8Ø
S1
8Ø
S1
8Ø
S1
8Ø
S1
(TYP. 3)
/1
S
L S
M
8"Ø W 10"Ø W
"Ø
8"Ø
S3
(TYP. 2)
12/6
S3
12/6
8Ø
S1
8Ø
S1
8Ø
S1
6Ø
S1
(TYP. 2)
18/12
SLSM
"Ø
W "Ø
W
8Ø
S1
6Ø S2
(TYP. 3)
/1
S
L S
M
"Ø
W
8Ø
S1
(TYP. 2)
18/12
SLSM
6Ø
S1
14Ø
S1
(TYP. 2)
30/12 SLSM
14"Ø W
8"Ø W
8Ø
S1
6Ø
S1
S3
6/6
6Ø
S1
8Ø
S1
(TYP. 2)
6Ø
S1
10Ø
S1
(TYP. 2)
46/12
SLSM
"Ø
W
10"Ø W
8Ø
S1
(TYP. 2)
8Ø
S1
(TYP. 4)
6Ø
S1
12"Ø W
/1
S
L S
M
14"Ø W
20/10 RA
6"Ø W
6"Ø W
46/12 SLSM
"Ø
W 12Ø
S1
(TYP. 2)
12Ø
S1
(TYP. 2)
E1
(TYP. 2)
12/8
E1
(TYP.3)
12/12
E1
24/24-8Ø
E1
24/2480 E1
12/6
E1
12/6
/1
E
X H
E3
(TYP. 2)
12/12-6Ø
E3
24/24-6Ø
/1
S
L S
M
S3
(TYP. 2)
12/6
12"Ø W /1
S
L S
M
CUH-1.01
"Ø
14"Ø
24/14 24/14
14"Ø
/2
E
X H
16"Ø
16/15 EXH
8"Ø W
3 1/4" X 22" WALL STACK
DOWN TO LOW WALL 8X10
GRILLE, MOUNT 8" AFF.
/1
22/12
10" DIA. SS EXH DN TO SINK
EXH CONNECTION
350 CFM (TYP.2)
10" DIA. SS EXH DN TO SINK
EXH CONNECTION
350 CFM (TYP.2)
8Ø
S1
UC
12Ø S2
12Ø S2
(TYP. 2)
10" DIA. SS EXH DN TO
SINK EXH CONNECTION
350 CFM (TYP.2)
14"Ø W
"Ø
W
3 1/4" X 22" WALL STACK
DOWN TO LOW WALL 8X10
GRILLE, MOUNT 8" AFF.
/1
24/14
SLSM
12Ø S2
(TYP. 4)
14"Ø W
"Ø
/1
W
14/12 W
12Ø S2
20/12
12Ø E4
(TYP. 2)
12Ø
S1
(TYP. 2)
14"Ø W
8Ø
E3
8Ø E4 1
"Ø
8Ø S2
8Ø
S1
6Ø S2
12"Ø
6Ø
E3100
6Ø S2
SDJ-2.01
SDJ-2.02
6Ø
E3
6Ø
E3
(TYP. 2)
"Ø
"Ø
10"Ø CVS-2.06
8Ø
S1
(TYP. 2)
12"Ø W
8Ø
S1
10Ø
S1
(TYP. 2)1
/1
S
L S
M
12Ø E4
(TYP. 2)
14/12 12"Ø
"Ø
12"Ø W
10Ø E4
(TYP. 3)
8Ø
S1
/1
/1
S
L S
M
10" DIA. SS EXH DN TO
SINK EXH CONNECTION
350 CFM (TYP.2)
CVE-2.0412Ø
S1
(TYP. 3)
12Ø E4
10Ø
S1
12"Ø W
16"Ø W
14"Ø W
12Ø E4
8Ø
S1
AC-2.01
1.5
FSD
1.5
FSD
1.5
FSD
FC-2.20
FC-2.19
"Ø
W
SDJ-1.01
FSD-2.01
FSD-2.02
R2
20/10
1.5
FSD
30/28
24/14
/1
FC-2.34
46/10 SLSM
DWB-2.01
4" AL DRYER
EXH UP
THRU ROOF
8"Ø
UC
UC1
3 UC
8/8
T1
T'FER
8"Ø
UC
UC
UC
"Ø
W
"Ø
W
"Ø
W
6"Ø W
4"Ø W
FC-2.253
"Ø
12"Ø W
/1
S
L S
M
/1
S
L S
M
12"Ø W
12/8
SLSM
46/12
SLSM
12/8
SLSM
12/10
SLSM
"Ø
14/13
SLSM
16/14
SLSM
8Ø
S1
8Ø
S1
12/10 SLSM
12/8 SLSM
6"Ø W6"Ø W
4"Ø W
6"Ø W
6"Ø W
"Ø
W
"Ø
W
10Ø
S110Ø
S1
8Ø
S1
8Ø
S1
8"Ø W 2 2
8Ø
E1
4"Ø W
UC1
R2 12/12
24/12 RA
OPENING
14/12 RA
OPENING
XA
XB
XC
AA
BA
XD
CA
DA
XE
EA
5A 3A4A 2A 1A
12/12 RA
OPENING
22/20 RA
OPENING
22/20 T1
X' FER
24/12 T1
X'FER
12/12 RA
OPENING
UC
12/12 RA
OPENING
UC
UC
24/12 RA
OPENING
E3
(TYP. 2)
12/12-6Ø
8"Ø
NOTE: SALLYPORT CONSTRUCTION TO
INCLUDE PERMANENT DISTRIBUTED
OPENINGS TO PROVIDE 'NATURAL
VENTILATION' FOR VEHICLE PARKING AS
REQUIRED BY OSSC SECTION 406.5
SEE ARCHITECTURAL DRAWINGS FOR
ADDITIONAL DETAILS
11 24/24 DOOR GRILLE BY
GC 24/24 INTERIOR
MERV-8 FILTER BY MECH
3 3
16"Ø W
3 3
F-2.0213
12/12 DUCT W/
SCREENED INLET UP
TO EF-2.03 ABOVE
FUME HOOD (EQ-XX)
765 CFM EXHAUST
(SS CONSTR)
(SS CONSTR)
FSD-2.04
FSD-2.03
12/8
SLSM
38/32 UP TO
MAU-2.01
ON ROOF
X'FER
PR-01
"Ø
W
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01 PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
PR-01
X4
NOTE: ME/ADMIN AND AREA
COMMAND HVAC SYSTEMS
UTILIZE PLENUM RETURN AIR
PATH ARRANGEMENT.
ALL LIGHTING, WIRING, AND
DEVICES IN THESE AREAS TO
BE PLENUM RATED
PR-02
E2
10/8
E2
10/8
6 6
ST-4
38/32X38/18
ELBOW
SILENCER8
(2" K-27 UP)
(2
K -2
W
F
S K
L
IN
E R
14 1214 12
14 12
"Ø
W
4"Ø EXH
4" DIA. EXH
S
PDERETI
GER
ROF E S S I ONA L
RE
ENIGN
E
64563PE
OREGON
EXPIRES 12-31-26
09 000225 S E
AN
C. MURR
A
Y
DIGITAL SIGNATURE
ALLIANT SYSTEMS, LLC
351 NW 12th AVE
PORTLAND, OR 97209
PHONE: 503/619-4000
FAX: 503/230-9238
WWW.ALLIANT-SYSTEMS.COM
CCB# 153420
REVISIONS: DATE
PROJECT NUMBER:
SHEET NUMBER:
DESIGNER CONTACT:
CAD:
PLOT DATE:
JED # 22017500
M2.02
100% CONSTRUCTION
DOCUMENTS 06/18/24
D-1244-52251
MECHANICAL LEVEL 1 -
HVAC FLOOR PLAN -
PHASE 2
CENTRAL POINT OFFICE
RENOVATION & ADDITION
OREGON STATE POLICE
CONTRACT
#PO-257-000008511
06/18/24
4500 ROGUE VALLEY HWY
CENTRAL POINT, OR 97502
S. MURRAY
503-619-4000
S.MURRAY@ALLIANT-SYSTEMS.COM
J. HAGGARD
N
HVAC NOTES BY SYMBOL
1 DOOR UNDERCUT FOR MAKEUP AIR TRANSFER: COORDINATE W/ GC TO PROVIDE
3/4" DOOR UNDERCUT FOR MAKEUP AIR TRANSFER ACROSS DOORWAY.
2 OA DUCT CONNECTION TO VRV FAN COIL: EXTEND TEMPERED OUTDOOR AIR
DUCT CONNECTION FROM MAU-1.01 TERMINAL UNIT CVS-1.09 TO RETURN AIR
CONNECTION AT VRV FAN COIL UNIT. SEE DETAIL 4/M3.00 FOR ADDITIONAL
INFORMATION.
3 SUSPENDED VRV FAN COIL UNIT INSTALLATION: SUPPORT AND RESTRAIN
SUSPENDED VRV FAN COIL UNIT AND ASSOCIATED DUCT AND ACCESSORIES IN
ACCORDANCE W/ MANUF'S REQUIREMENTS AND PROJECT SPECIFIC STRUCTURAL
AND SEISMIC CALCULATIONS AND DETAILS. SEE DETAIL 4/M3.00 FOR ADDITIONAL
INFORMATION.
4 WALL MOUNTED DUCTLESS FAN COIL UNIT INSTALLATION: SUPPORT AND
RESTRAIN WALL MOUNT FAN COIL UNIT AND ASSOCIATED PIPING
ANDSACCESSORIES IN ACCORDANCE W/ MANUF'S REQUIREMENTS AND PROJECT
SPECIFIC STRUCTURAL AND SEISMIC CALCULATIONS AND DETAILS. SEE DETAIL
1/M3.00 FOR ADDITIONAL INFORMATION.
5 SUSPENDED TERMINAL UNIT (AIR VALVE) INSTALLATION: SUPPORT AND RESTRAIN
SUSPENDED TERMINAL UNIT AND ASSOCIATED DUCT AND ACCESSORIES IN
ACCORDANCE W/ MANUF'S REQUIREMENTS AND PROJECT SPECIFIC STRUCTURAL
AND SEISMIC CALCULATIONS AND DETAILS.
BALANCE TO CONSTANT VOLUME AIRFLOW AS INDICATED IN DESIGN SCHEDULES.
SEE DETAIL 2/M3.00 FOR ADDITIONAL INFORMATION
6 12/12 RETURN AIR TRANSFER OPENING: COORDINATE W/ GC TO PROVIDE 12/12
TRANSFER OPENING THRU FULL HEIGHT WALL ABOVE CEILING GRID.
MECHANICAL CONTRACTOR TO PROVIDE 12/12 DUCTBOARD TRANSFER BOOT FOR
SOUND ATTENUATION. WALL TRANSFER BOOT MAY BE INSTALLED ON EITHER
SIDE OF WALL OPENING COORDINATE TO MAINTAIN OPTIMAL PLENUM
CLEARANCE.
7 24/12 RETURN AIR TRANSFER OPENING: COORDINATE W/ GC TO PROVIDE 24/12
TRANSFER OPENING THRU FULL HEIGHT WALL ABOVE CEILING GRID.
MECHANICAL CONTRACTOR TO PROVIDE 24/12 DUCTBOARD TRANSFER BOOT FOR
SOUND ATTENUATION. WALL TRANSFER BOOT MAY BE INSTALLED ON EITHER
SIDE OF WALL OPENING COORDINATE TO MAINTAIN OPTIMAL PLENUM CLEARANCE
8 PLENUM BOOT AT RETURN AIR TRANSFER GRILLE: MECHANICAL CONTRACTOR
TO PROVIDE 12/12 DUCTBOARD TRANSFER BOOT FOR SOUND ATTENUATION AT
PLENUM SIDE OF HIGH-SIDEWALL RETURN AIR GRILLE.
9 PLENUM BOOT AT RETURN AIR TRANSFER GRILLE: MECHANICAL CONTRACTOR
TO PROVIDE 24/12 DUCTBOARD TRANSFER BOOT FOR SOUND ATTENUATION AT
PLENUM SIDE OF HIGH-SIDEWALL RETURN AIR GRILLE.
10 THERMOSTAT CONTROLLED EXHAUST FAN: COORDINATE INSTALLATION OF
ROOF-MOUNTED EXHAUST FAN AND THERMOSTAT FOR UTILITY ROOM HEAT
RELIEF. CONFIGURE FAN CONTROLS TO TURN ON AT ROOM TEMP >80F (ADJ.) AND
TURN OFF AT ROOM TEMP <85F (ADJ.)
11 EXTERIOR DOOR GRILLE W/ INTERIOR FILTER: ARCH TO SPECIFY AND GC TO
FURNISH AND INSTALL VENTILATION INTAKE GRILLE AT EXISTING EXTERIOR DOOR
W/ MIN 50% FREE AREA. MECH TO FURNISH AND INSTALL INTERIOR FILTER FRAME
W/ 1" MERV-8 DISPOSABLE FILTER.
12 EXHAUST DUCT FOR ISO-AUTOPSY CONNECTIONS AND PRIMARY DUCT MAIN UP
TO EF-2.01 ABOVE TO HAVE WELDED JOINTS
13 INLINE FILTER CABINET: PROVIDE W/ SHOP FABRICATED INLINE DUCT CABINET W/
FILTER RACK AND ACCESS DOOR. REFER TO FILTER SCHEDULE FOR DIMENSIONS.
PROVIDE W/ FILTER DIFFERENTIAL PRESSURE SENSOR TIED TO ALARM AT BAS
WHEN FILTER DROP EXCEEDS 0.65" WG (ADJ).
14 RFI-38 AIRFLOW REVISIONS: SUPPLY AIRFLOW CHANGES MADE AT DIFFUSERS
ASSOCIATED WITH DESIGNATED FAN COILS TO ALIGN WITH RFI-31 PROCUREMENT
DRIVEN FAN COIL MODEL CHANGES. MINOR CFM ADJUSTMENTS PRORATED
ACROSS ALL AFFECTED DIFFUSERS. NO REDUCTION IN FAN COIL HEAT/COOL
CAPACITY
15 CHEMICAL STORAGE CABINET EXHAUST CONNECTION: EXTEND GALVANIZED
STEEL LAB EXHAUST SERVICE TO CHEMICAL STORAGE CABINET OUTLET AND
CONNECT IN ACCORDANCE W/ MANUF'S REQUIREMENTS. BALANCE TO +/- 20 CFM
CONSTANT VOLUME AIRFLOW TO MAINTAIN CABINET INTERIOR AT NEGATIVE
PRESSURE RELATIVE TO ROOM.
16 CHEMICAL STORAGE CABINET EXHAUST CONNECTION: EXTEND STAINLESS STEEL
LAB EXHAUST SERVICE TO CHEMICAL STORAGE CABINET OUTLET AND CONNECT
IN ACCORDANCE W/ MANUF'S REQUIREMENTS. BALANCE TO +/- 20 CFM CONSTANT
VOLUME AIRFLOW TO MAINTAIN CABINET INTERIOR AT NEGATIVE PRESSURE
RELATIVE TO ROOM.
KEY PLAN
PHASE 1 PHASE 2
PHASE 3
8' 16'4'0 1/8" = 1'-0"M2.02
1 MECHANICAL LEVEL 1 - PHASE 2 PARTIAL HVAC FLOOR PLAN
J.
INSTALLING CONTRACTOR SHALL TRACK ANY FIELD INSTALLATION CHANGES TO
DESIGN DRAWINGS AND DELIVER LEGIBLE AS-BUILT DRAWINGS TO GC AND
OWNER AT END OF PROJECT.
I.
SUPPORT AND RESTRAIN ALL MECHANICAL SYSTEMS AND COMPONENTS IN
ACCORDANCE WITH PROJECT SPECIFIC STRUCTURAL SUPPORT AND SEISMIC
RESTRAINT CALCULATIONS, DETAILS, AND INSTALLATION GUIDANCE.
H.
IN ACCORDANCE WITH SECTION 714 OF OREGON BUILDING CODE, REVIEW
ARCHITECTURAL LIFE-SAFETY DRAWINGS FOR LOCATION OF FIRE AND SMOKE
RATED WALLS, AND FLOOR OR CEILING ASSEMBLIES. FIELD VERIFY
INSTALLATION CONDITIONS AND PROVIDE APPROPRIATE UL LISTED SEALANT
SYSTEM(S) AT ALL LOCATIONS WHERE PIPING PENETRATES RATED ASSEMBLIES.
G.
IDENTIFIED DUCT DIMENSIONS INDICATE CLEAR INSIDE MEASUREMENTS OF
SHEETMETAL DUCT. FOR DOUBLE-WALL OR INSULATION LINED DUCTWORK,
TOTAL DIMENSION OF ASSEMBLY IS THE REPORTED INNER DIMENSION PLUS 2X
THE DEPTH OF INTERNAL LINING.
F.
DETAIL SHEET METAL INSTALLATION TO MAINTAIN EQUAL SPACING FOR SUPPLY
GRILLES IN AREAS WITHOUT CEILING INSTALLATION.
E.
ALL FLEX DUCT TO BE MAXIMUM 5' IN LENGTH AND BE ROUTED WITH
MANUFACTURER RECOMMENDED SUPPORT ACCESSORIES WITHIN 18" ZONE
ABOVE CEILING GRID OR FRAMING.
D.
UNLESS OTHERWISE NOTED, SIZE OF ALL DIFFUSER/GRILLE BRANCH DUCTWORK
IS THE SAME AS DIFFUSER/GRILLE NECK SIZE.
C.
COORDINATE SPECIFIC POWER REQUIREMENTS FOR HVAC EQUIPMENT WITH
ELECTRICAL CONTRACTOR PRIOR TO RELEASING FOR FABRICATION OR
PURCHASE.
B. COORDINATE ROUTING OF DUCT AND PIPING SYSTEMS AND LOCATIONS OF HVAC
EQUIPMENT WITH OTHER TRADES TO MAINTAIN REQUIRED ELECTRICAL
CLEARANCES AND ACCESS FOR LIFETIME INSPECTION AND SERVICE AT ALL
COMPONENTS.
A. MECHANICAL CONTRACTOR TO VERIFY INSTALLATION CONDITIONS AND FINAL
EQUIPMENT SUBMITTALS AND NOTIFY ENGINEER OF ANY CONFLICTS OR
DIFFERENCES BETWEEN PLANS AND FIELD CONDITIONS.
HVAC GENERAL NOTES
3 ADDENDUM-03 04/10/23
PR-01 100% CONST. DOCUMENTS 06/16/23
PR-02 100% CD REVISIONS 06/30/23
4 RFI-10 PR-01/02 REVISIONS 10/06/23
5 RFI-11 REVISION 11/20/23
6 RFI-12 REVISION 01/04/23
7 RFI-24 REVISION 04/04/24
8 RFI-31 REVISION 06/18/24
12 RFI-39 REVISION 03/12/25
13 RFI-41 REVISION 04/24/25
14 RFI-42 REVISION 05/30/25
17 RFI-0496 REVISION 08/05/25
reesbi
RFI
reesbi Group
RFI 0369
reesbi Arrow reesbi Arrow ashlul
RFI
ashlul Group
RFI 068
ashlul
RFI
ashlul Group
RFI 097
noahpr Navigation Buttons
INDEX PAGE
noahpr Navigation Buttons next > noahpr
< back
X1 X2 X3 X5
COMMANDER
A102
ADMINISTRATIVE
ASSISTANT
A101.2
SECURE
FILES
A112
SUPPLY
STORAGE
A149
F & W
SGT
A125
F & W
SIU
A122.1
F & W
TROOPERS
A122
SUPPLY
STORAGE
A124
LT (CID,
F&W, OPS)
A104
LT (CID,
F&W, OPS)
A103
ATF/FED
OFC (2)
A144
COPY/STORAGE
A105
SECURE
DUI
REVIEW
ZONE
A129
PATROL
AREA
A129.1
MCS
SGT
A142
MCS
DETECTIVES
A140
MCS
SPECIALIST
DETECTIVES
A140.1
CONFERENCE
ROOM
A138
DES
SECURED
FILE
STORAGE
A137
SUPPLY
STORAGE
A148
SOFT
INTERVIEW
ROOM
A108
INTERVIEW
ROOM
A109
EVIDENCE
OFFICE
AREA
A117
BAG &
TAG
A115
EVIDENCE
INTAKE
A116
PROPERTY
ROOM
A118
EVIDENCE
PURGE
AREA
A118.1
DRUG
VAULT
A120
LARGE
EVIDENCE
STORAGE
A119
REFRIGERATION
AREA
A118.2
LOCKER
AREA
A113
STAFF
TOILETS/
CHANGING
A113.3
STAFF
TOILETS/
CHANGING
A113.1
STAFF
TOILETS/
CHANGING
A113.2
IT
OFFICE
S114
PRIVATE
LOBBY
REPORT
ROOM
A107
LOUNGE/BREAK
AREA
S112
WELLNESS
A111
VENDING
S121.2
DES
ASSISTANT
A134.2
ADMIN
STAFF
A101
FLEX
RM
S111
VESTIBULE
S100
PUBLIC
LOBBY
S101
FRONT
WINDOW
A101.1
ELEC
S118
MECH
S119
JAN
S113
IDF
S123
COOLER
M102
ISO-FREEZER
M102.1
AUTOPSY
RECEPTION
M101
RECEIVING
VESTIBULE
M100
AUTOPSY
SUITE
M103
ISO-AUTOPSY
M103.2
SALLY
PORT
M100.1
PATHOLOGIST
OFC
M104
PATHOLOGIST
OFC
M105
CONFERENCE
ROOM
M106
TECH
OFFICE
POD
M111
F & W
TEAMING
AREA
A122.2
ARMORY
STORAGE
A150
LAUNDRY/DRYING
M117
OFFICE
M103.1
DES
SGT
OFC (2)
A135
STORAGE/
DRYING
RM
A114
LAB
M115
X-RAY
ROOM
M118
TOILET
M109
TOILET
M108
JAN/SUPPLY
M107
UNISEX
LOCKER
ROOM
M119
ADMIN/COPY/FILE
ROOM
M113
ADMIN
OFC
M112
UNISEX
LOCKER
ROOM
M120
STORAGE
/ FLEX
OFFICE
S122
ME
OPEN
CIRCULATION
M114
TOILET
S115
TOILET
S116
VESTIBULE
S117
VESTIBULE
S120
PATROL
SGT (2)
A131
PATROL
SGT (2)
A132
PATROL
TROOPERS
A130
PATROL
TEAMING
AREA
A130.1
NATIONAL
GUARD
ANALYST
A134.1
DES LT
A136
DES
DETECTIVES
A134
AUTOPSY
SUPPLIES
CHEMICAL
STORAGE
M116
F & W
LT
A122.3
ODOT
A143STORAGE
A151
VESTIBULE
M121
VESTIBULE
M110
VRF-2.29
FC-2.28
HRC-2.02
BS-2.01-1
BS-2.01-2
BS-2.02-2
BS-2.02-3
BS-2.02-1
FC-2.24
FC-2.27
FC-2.21
FC-2.30
FC-2.32
FC-2.33
FC-2.18
FC-2.17
FC-2.14 FC-2.15
FC-2.13FC-2.12
FC-2.10
/4
N G
-P
S I)
1 1/4" NG (2-PSI)
/4
N G
-P
S I)
3/4" (2-PSI) NG
PIPING DOWN TO
GWH-02 (199 MBH)
1" NG (2-PSI)
1" (2-PSI) NG PIPING
UP TO MAU-2.01
ABOVE (540MBH)
X6 X7 X8 X9 X10 X11 X12
/4
N
G
-P
S I)
1 1/4" NG (2-PSI)
M
NGM-2.01
NATURAL GAS
SUB METER
SPJ-2.01
BS-1.01-2
SPJ-2.04
SPJ-2.03
SPJ-2.02
SPJ-2.07
SPJ-2.08
SPJ-2.09
FC-2.19
FC-2.20
FC-2.31
FC-2.11
FC-2.22
FC-2.23
FC-2.26
FC-2.16
AC-2.01
MP2.02
2 3
2-1/2" HRS, HRR
UP TO HRC-2.01
(EF-2.01)
M3.01
M3.01
M3.00
3 (TYP.)
M3.012-1/2" HRR
2-1/2" HRS
SPJ-2.05
SPJ-2.06
2 3
2 3
3/8", 5/8" UP
TO FC-2.34
1/2", 1-1/8", 3/4"
UP TO BS-2.01-2
3/8", 5/8" UP TO
FC-2.13
1/4", 1/2" UP TO
FC-2.19
3/8", 5/8" UP TO FC-2.12
3/8", 5/8" UP TO
FC-2.20
3/8", 7/8", 3/4"
UP TO BS-2.01-1
1/4", 1/2" UP TO
FC-2.14
3/8", 5/8" UP
TO FC-2.15
1/4", 1/2" UP TO
FC-2.17
1/4", 1/2" UP TO
FC-2.18
3/8", 5/8" UP TO
FC-2.16
5/8", 1-1/8", 3/4"
UP TO BS-2.02-1
1/4", 1/2" UP TO
FC-2.29
3/8", 5/8" UP TO
FC-2.31
1/4", 1/2" UP
TO FC-2.28
3/8", 5/8" UP TO
FC-2.32
3/8", 5/8" UP TO
FC-2.33
1/2",1-1/8", 3/4"
3/8", 5/8", 1/2"
UP TO BS-2.02-2
1/4", 1/2" UP TO
FC-2.30
1/4", 1/2" UP
TO FC-2.21
1/4", 1/2" UP TO
FC-2.22
1/4", 1/2" UP TO
FC-2.23
3/8", 7/8", 3/4"
UP TO BS-2.02-3
3/8", 5/8" UP TO
FC-2.27
1/4", 1/2" UP TO
FC-2.24
1/4", 1/2" UP TO
FC-2.26
3/8", 5/8" UP TO
FC-2.25
FC-2.25
XA
XB
XC
AA
BA
XD
CA
DA
XE
EA
5A 3A4A 2A 1A
FC-2.34 PR-01
PR-01
PR-01
X4
5/8" RSD, 1/4" RL PIPING
UP TO CU-2.01 ABOVE
5/8" RSD, 1/4" RL PIPING
DN TO CU-2.01
2" HRS, 2" HRR
PIPING UP TO
HRC-2.03 AT
MAU-2.01
M3.04
M3.04
3-WAY VALVE AT
CEILING PLENUM
2-1/2" BYPASS W/ FLOW
CONTROL VALVE SET TO 40 GPM
1-1/4" HRR PIPING TO COIL
M3.04
3/4", 1-3/8", 1-1/8"
PIPING UP TO
HP-2.02 ABOVE
3/4", 1-3/8", 1-1/8"
PIPING UP TO
HP-2.01 ABOVE
2 1/2" BYPASS
G
H
X12
AS-2
ET-2
GF-2
P-2
PF-2
2 1/2" FROM HRC-2.01/MAU-2.01
2 1/2" TO HRC-2.01/MAU-2.01
LAUNDRY/DRYING
M117
JAN/SUPPLY
M107
SEE HEAT RECOVERY
SYSTEM SCHEMATIC
PIPING DIAGRAM
M3.04
M3.01
M3.01
M3.01
XD
NOTE: INSTALL 3-WAY VALVE
FOR HEAT RECOVERY LOOP
TEMPERATURE MAINTENANCE
AT MAU-2.01 COIL CONNECTIONS
AT F-2.01 CABINET SEE DETAIL
M3.04
S
PDERETI
GER
ROF E S S I ONA L
RE
ENIGN
E
64563PE
OREGON
EXPIRES 12-31-26
9 000225
S E
AN
C. MURR
A
Y
DIGITAL SIGNATURE
ALLIANT SYSTEMS, LLC
351 NW 12th AVE
PORTLAND, OR 97209
PHONE: 503/619-4000
FAX: 503/230-9238
WWW.ALLIANT-SYSTEMS.COM
CCB# 153420
REVISIONS: DATE
PROJECT NUMBER:
SHEET NUMBER:
DESIGNER CONTACT:
CAD:
PLOT DATE:
JED # 22017500
MP2.02
100% CONSTRUCTION
DOCUMENTS 06/18/24
D-1244-52251
MECHANICAL LEVEL 1 -
PIPING FLOOR PLAN -
PHASE 2
CENTRAL POINT OFFICE
RENOVATION & ADDITION
OREGON STATE POLICE
CONTRACT
#PO-257-000008511
06/18/24
4500 ROGUE VALLEY HWY
CENTRAL POINT, OR 97502
S. MURRAY
503-619-4000
S.MURRAY@ALLIANT-SYSTEMS.COM
J. HAGGARD
N
KEY PLAN
PHASE 1 PHASE 2
PHASE 3
8' 16'4'0
1/8" = 1'-0"MP2.02
1 MECHANICAL LEVEL 1 - PHASE 2 PARTIAL PIPING FLOOR PLAN
0 4' 8'2'
1/4" = 1'-0"MP2.02
2 MECHANICAL LEVEL 1 - PHASE 2 PARTIAL PIPING FLOOR ENLARGE PLAN
PIPING NOTES BY SYMBOL
1 PROVIDE FLEXIBLE PIPING JOINT AT PIPING CROSSING BUILDING SEISMIC
SEPARATION BOUNDARY AT GRID LINE X12 . SEE DETAIL 5/M3.02
2 PROVIDE FLEXIBLE PIPING JOINT AT PIPING CROSSING BUILDING SEISMIC
SEPARATION BOUNDARY AT GRID LINE X1 . SEE DETAIL 5/M3.02
3 COORDINATE W/ GC'S DESIGNATED FIRE CAULKING TRADE PARTNER TO
PROVIDE APROPRIATE UL-LISTED FIRE RATED SEAL OR PROTECTIVE
ASSEMBLY AT PIPING CROSSING CROSSING FIRE OR FIRE/SMOKE RATED
PARTIONS SEE DETAIL 13/M3.00
4 NOT USED
5 COORDINATE CEILING ACCESS PANEL OR LAY-IN TILE PLACEMENT AT 3-WAY
VALVE LOCATION. LABEL ACCESS AND VALVE IN ACCORDANCE W/ STANDARDS
DETAILED ON SHEET M0.00
PR-01 100% CONST. DOCUMENTS 06/16/23
PR-02 100% CD REVISIONS 06/30/23
4 RFI-10 PR-01/02 REVISIONS 10/06/23
5 RFI-11 REVISION 11/20/23
8 RFI-31 REVISION 06/18/24
12 RFI-39 REVISION 03/12/25
kevida
RFI
kevida Group
RFI 97
kevida
RFI
kevida Group
RFI 68
noahpr Navigation Buttons
INDEX PAGE
noahpr Navigation Buttons next > noahpr
< back
F
R E
F
R E
F
REF. REF.
X1 X2 X3 X5 X6 X7 X8 X9 X10 X11 X12
XA
XB
XC
AA
BA
XD
CA
DA
XE
EA
5A 3A4A 2A 1A
COMMANDER
A102
ADMINISTRATIVE
ASSISTANT
A101.2
SECURE
FILES
A112
SUPPLY
STORAGE
A149
F & W
SIU
A122.1
F & W
TROOPERS
A122
SUPPLY
STORAGE
A124
LT (CID,
F&W, OPS)
A104
LT (CID,
F&W, OPS)
A103
ATF/FED
OFC (2)
A144
COPY/STORAGE
A105
SECURE
DUI
REVIEW
ZONE
A129
PATROL
AREA
A129.1
MCS
SGT
A142
MCS
DETECTIVES
A140
MCS
SPECIALIST
DETECTIVES
A140.1
CONFERENCE
ROOM
A138
DES
SECURED
FILE
STORAGE
A137
SUPPLY
STORAGE
A148
SOFT
INTERVIEW
ROOM
A108
INTERVIEW
ROOM
A109
EVIDENCE
OFFICE
AREA
A117
BAG &
TAG
A115
EVIDENCE
INTAKE
A116
PROPERTY
ROOM
A118
EVIDENCE
PURGE
AREA
A118.1
DRUG
VAULT
A120
LARGE
EVIDENCE
STORAGE
A119
LOCKER
AREA
A113
STAFF
TOILETS/
CHANGING
A113.3
STAFF
TOILETS/
CHANGING
A113.1
STAFF
TOILETS/
CHANGING
A113.2
IT
OFFICE
S114
PRIVATE
LOBBY
REPORT
ROOM
A107
LOUNGE/BREAK
AREA
S112
WELLNESS
A111
VENDING
S121.2
DES
ASSISTANT
A134.2
ADMIN
STAFF
A101
FLEX
RM
S111
VESTIBULE
S100
PUBLIC
LOBBY
S101
FRONT
WINDOW
A101.1
ELEC
S118
MECH
S119
JAN
S113
IDF
S123
COOLER
M102
ISO-FREEZER
M102.1
AUTOPSY
RECEPTION
M101
RECEIVING
VESTIBULE
M100
AUTOPSY
SUITE
M103
ISO-AUTOPSY
M103.2
SALLY
PORT
M100.1
PATHOLOGIST
OFC
M104
PATHOLOGIST
OFC
M105
CONFERENCE
ROOM
M106
TECH
OFFICE
POD
M111
F & W
TEAMING
AREA
A122.2
ARMORY
STORAGE
A150
LAUNDRY/DRYING
M117
OFFICE
M103.1
DES
SGT
OFC (2)
A135
STORAGE/
DRYING
RM
A114
LAB
M115
X-RAY
ROOM
M118
TOILET
M109
TOILET
M108 JAN/SUPPLY
M107
UNISEX
LOCKER
ROOM
M119
ADMIN/COPY/FILE
ROOM
M113
ADMIN
OFC
M112
UNISEX
LOCKER
ROOM
M120
STORAGE
/ FLEX
OFFICE
S122
ME
OPEN
CIRCULATION
M114
TOILET
S115
TOILET
S116
VESTIBULE
S117
VESTIBULE
S120
PATROL
SGT (2)
A131
PATROL
SGT (2)
A132
PATROL
TROOPERS
A130
PATROL
TEAMING
AREA
A130.1
NATIONAL
GUARD
ANALYST
A134.1
DES LT
A136
DES
DETECTIVES
A134
AUTOPSY
SUPPLIES
CHEMICAL
STORAGE
M116
F & W
LT
A122.3
ODOT
A143
STORAGE
A151
VESTIBULE
M121
VESTIBULE
M110
HRC-2.02
FC-2.12
FC-2.13
FC-2.14
FC-2.15
FC-2.17
FC-2.18
FC-2.29
FC-2.28
FC-2.24
FC-2.27
FC-2.30
FC-2.33
FC-2.10
FC-2.32
FC-2.21
FC-2.31
FC-2.11
FC-2.16
FC-2.22
FC-2.23
FC-2.26
20/10 RA
SDJ-2.01
SDJ-2.02
1.5
FSD
1.5
FSD
1.5
FSD
FC-2.20
FC-2.19
SDJ-1.01
FSD-2.01
FSD-2.02
R2
20/10
1.5
FSD
FC-2.34
8/8
T1
T'FER
8"Ø
FC-2.25
R2 12/12
24/12 RA
OPENING
12/12 RA
OPENING
22/20 RA
OPENING
22/20 T1
X' FER
24/12 T1
X'FER
12/12 RA
OPENING
12/12 RA
OPENING
24/12 RA
OPENING
(SS CONSTR)
(SS CONSTR)
FSD-2.04
FSD-2.03
X'FER
SPJ-2.07
SPJ-2.08
SPJ-2.09
SPJ-2.10
SPJ-2.11
SPJ-2.01
SPJ-2.04
SPJ-2.03
SPJ-2.02
SPJ-2.05
SPJ-2.06
FC-2.10:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (2)
24"x18"x2" MERV-13 FILTER
PLENUM TRANSFER OPENING W/ BOOT
PLENUM RETURN AIR TRANSFER
OPENING IN FULL HEIGHT WALL, SIZE
AS NOTED, W/ SOUND-LINED ACOUSTIC
BOOT(TYPICAL)
12/12
PLENUM TRANSFER OPENING
PLENUM RETURN AIR
TRANSFER OPENING IN FULL
HEIGHT WALL, SIZE AS NOTED
(TYPICAL)
CEILING RETURN GRILLE
24/24 CEILING MOUNT RETURN
AIR GRILLE W/ ACOUSTIC BOOT
IN PLENUM (TYPICAL)
12/12
12/1212/12
12/1224/12
12/12
12/12
12/12
12/12
12/12
12/12
12/12
24/12
24/12
SIDEWALL RETURN GRILLE
SIDEWALL MOUNTED RETURN
AIR GRILLE W/ ACOUSTIC BOOT
IN PLENUM (TYPICAL)
12/12 12/12
24/12 24/12 24/12
FC-2.14:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (1)
24"x16"x2" MERV-13 FILTER
FC-2.12:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (2)
24"x18"x2" MERV-13 FILTER
FC-2.13:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (2)
24"x18"x2" MERV-13 FILTER
FC-2.15:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (2)
24"x18"x2" MERV-13 FILTER
FC-2.20:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (1)
24"x16"x2" MERV-13 FILTER
FC-2.19:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (1)
24"x16"x2" MERV-13 FILTER
FC-2.34:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (2)
24"x18"x2" MERV-13 FILTER
12/12 12/12
FC-2.24:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (1)
20"x12"x2" MERV-13 FILTER
FC-2.25:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (5)
24"x18"x2" MERV-13 FILTER
FC-2.27:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (1)
24"x16"x2" MERV-13 FILTER
FC-2.29:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (1)
20"x12"x2" MERV-13 FILTER
FC-2.17:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (1)
24"x16"x2" MERV-13 FILTER
FC-2.31:
MIN. 12" x 30" ACCESS AT
LAY-IN CEILING TO
REPLACE (2) 24"x18"x2"
MERV-13 FILTER
FC-2.18:
MIN. 12" x 30" ACCESS AT
LAY-IN CEILING TO
REPLACE (1) 24"x16"x2"
MERV-13 FILTER
FC-2.28:
MIN. 12" x 30" ACCESS AT
LAY-IN CEILING TO
REPLACE (1) 24"x16"x2"
MERV-13 FILTER
FC-2.33:
MIN. 24" x 24" ACCESS THRU
ACCESS DOOR TO
REPLACE (2) 24"x18"x2"
MERV-13 FILTER
FC-2.32:
MIN. 12" x 30" ACCESS AT
LAY-IN CEILING TO
REPLACE (2) 24"x18"x2"
MERV-13 FILTER
FC-2.30:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (1)
20"x12"x2" MERV-13 FILTER
FC-2.21:
MIN. 12" x 30" ACCESS AT LAY-IN
CEILING TO REPLACE (1)
20"x12"x2" MERV-13 FILTER
FC-2.16:
ACCESS AT LAY-IN CEILING
TO REPLACE (1) 21"x21"x1.5"
MERV-13 FILTER
FC-2.11:
ACCESS AT LAY-IN CEILING
TO REPLACE (1) 21"x21"x1.5"
MERV-13 FILTER
FC-2.26:
ACCESS AT LAY-IN CEILING
TO REPLACE (1) 21"x21"x1.5"
MERV-13 FILTER
FC-2.22:
ACCESS AT LAY-IN CEILING
TO REPLACE (1) 21"x21"x1.5"
MERV-13 FILTER
FC-2.23:
ACCESS AT LAY-IN CEILING
TO REPLACE (1) 21"x21"x1.5"
MERV-13 FILTER
F-2.02
F-2.02:
MIN. 24" x 36" ACCESS AT
LAY-IN CEILING TO REPLACE
(2) 24" x12"x1" MERV-8 FILTER
COORDINATE ACCESS FOR
INSPECTION AND SERVICE
ABOVE WALK-IN COOLER
X4
NOTE: ME/ADMIN AND AREA
COMMAND HVAC SYSTEMS UTILIZE
PLENUM RETURN AIR PATH
ARRANGEMENT.
ALL LIGHTING, WIRING, AND DEVICES
IN THESE AREAS TO BE PLENUM
RATED
PR-02
S
PDERETI
GER
ROF E S S I ONA L
RE
ENIGN
E
64563PE
OREGON
EXPIRES 12-31-24
09 000225 S E
AN
C. MURR
A
Y
DIGITAL SIGNATURE
ALLIANT SYSTEMS, LLC
351 NW 12th AVE
PORTLAND, OR 97209
PHONE: 503/619-4000
FAX: 503/230-9238
WWW.ALLIANT-SYSTEMS.COM
CCB# 153420
REVISIONS: DATE
PROJECT NUMBER:
SHEET NUMBER:
DESIGNER CONTACT:
CAD:
PLOT DATE:
JED # 22017500
M5.02
100% CONSTRUCTION
DOCUMENTS 06/18/24
D-1244-52251
MECHANICAL LEVEL 1 -
COORDINATION FLOOR
PLAN - PHASE 2
CENTRAL POINT OFFICE
RENOVATION & ADDITION
OREGON STATE POLICE
CONTRACT
#PO-257-000008511
06/18/24
4500 ROGUE VALLEY HWY
CENTRAL POINT, OR 97502
S. MURRAY
503-619-4000
S.MURRAY@ALLIANT-SYSTEMS.COM
J. HAGGARD
N
KEY PLAN
PHASE 1 PHASE 2
PHASE 3
8' 16'4'0 1/8" = 1'-0"M5.02
1 MECHANICAL LEVEL 1 - PHASE 2 PARTIAL COORDINATION FLOOR PLAN
7. FILTER CABINET INSTALLATION AT OPEN CEILING REQUIRES LADDER...
6. PLENUM FILTER INSTALLATION AT HARD LID CEILING REQUIRES LADDER ACCESS AND OPENING CEILING ACCESS...
5. CEILING DIFFUSER FACE FILTER INSTALLATION REQUIRES LADDER ACCESS
4. PLENUM FILTER INSTALLATION AT LAY-IN CEILING REQUIRES LADDER ACCESS AND REMOVAL AND REINSTALLATION OF LAY-IN TILE
3. FILTERS TO BE INSERTED IN PLENUM MOUNTED FILTER CABINET
2. FILTERS TO BE INSERTED IN CEILING MOUNTED SUPPLY AIR DIFFUSER ASSEMBLY
1. FILTERS TO BE INSERTED IN FILTER RACK AT PLENUM MOUNTED FAN COIL RETURN AIR DUCT ASSEMBLY
NOTES
F-2.02 FILTER CABINET FOR HEAT RECLAIM COIL (HRC-2.02) MERV-8 (2) 24" x 12" x 1" 3, 7
FC-2.34 BREAKROOM - PH2 MERV-13 (2) 18" x 24" x 2" 1, 4
FC-2.33 E PATHOLOGIST OFC - PH2 MERV-13 (2) 18" x 24" x 2" 1, 6
FC-2.32 TECH OFFICE POD / CONF MERV-13 (2) 18" x 24" x 2" 1, 4
FC-2.31 ADMIN OFFICE/COPY/FILE - PH2 MERV-13 (2) 18" x 24" x 2" 1, 4
FC-2.30 LOCKER AREA - PH2 MERV-13 (1) 20" x 12" x 2" 1, 4
FC-2.29 EVIDENCE INTAKE/ OFFICE AREA - PH2 MERV-13 (1) 20" x 12" x 2" 1, 4
FC-2.28 PROPERTY ROOM/EVIDENCE STORAGE - PH2 MERV-13 (1) 24" x 16" x 2" 1, 4
FC-2.27 SE LT (CID, F&W, OPS) - PH2 MERV-13 (1) 24" x 16" x 2" 1, 4
FC-2.26 SE COMMANDER OFFICE - PH2 MERV-13 (1) 21" x 21" x 1.5" 1, 4
FC-2.25 SE ADMINISTRATIVE - PH2 MERV-13 (2) 18" x 24" x 2" 1, 4
FC-2.24 ADMIN STAFF - PH2 MERV-13 (1) 20" x 12" x 2" 1, 4
FC-2.23 SOFT INTERVIEW ROOM - PH2 MERV-13 (1) 21" x 21" x 1.5" 1, 4
FC-2.22 INTERVIEW ROOM - PH2 MERV-13 (1) 21" x 21" x 1.5" 1, 4
FC-2.21 WELLNESS - PH2 MERV-13 (1) 20" x 12" x 2" 1, 4
FC-2.20 PATROL SGT - PH2 MERV-13 (1) 24" x 16" x 2" 1, 4
FC-2.19 DES OFFICE/SUPPLY STORAGE - PH2 MERV-13 (1) 24" x 16" x 2" 1, 4
FC-2.18 ATF/FED OFFICE - PH2 MERV-13 (1) 24" x 16" x 2" 1, 4
FC-2.17 FLEX OFFICE - PH2 MERV-13 (1) 24" x 16" x 2" 1, 4
FC-2.16 NE CONFERENCE ROOM - PH2 MERV-13 (1) 21" x 21" x 1.5" 1, 4
FC-2.15 N MCS SPECIALIST DETECTIVES - PH2 MERV-13 (2) 18" x 24" x 2" 1, 4
FC-2.14 N MCS DETECTIVES - PH2 MERV-13 (1) 24" x 16" x 2" 1, 4
FC-2.13 N DES DETECTIVES - PH2 MERV-13 (2) 18" x 24" x 2" 1, 4
FC-2.12 NW PATROL TROOPERS - PH2 MERV-13 (2) 18" x 24" x 2" 1, 4
FC-2.11 F&W SGT - PH2 MERV-13 (1) 21" x 21" x 1.5" 1, 4
FC-2.10 NW F&W TROOPERS - PH2 MERV-13 (2) 18" x 24" x 2" 1, 4
RATING QUANTITY
SIZE
W x H x D
UNIT TAG AREA SERVED
FILTERS
NOTES
PHASE-2 DISTRIBUTED HVAC FILTER SCHEDULE
GROUND FLOOR
PR-01
PR-01 100% CONST. DOCUMENTS 06/16/23
PR-02 100% CD REVISIONS 06/30/23
4 RFI-10 PR-01/02 REVISIONS 10/06/23
X199Z X200Z IND3XP4GE X201Z
RFI 068
INDEX PAGE next >< back
File details come from the government source that posted it. Updated .