This document is a solicitation for Project 621-18-104 to renovate the B-wing ground floor at the Veterans Affairs Medical Center in Mountain Home, Tennessee. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.
The scope of work includes demolishing existing HVAC, plumbing and electrical systems; installing new HVAC, plumbing and electrical systems; and renovating patient rooms, offices and common areas. Specific requirements include a new air handling unit, VAV terminal units, control valves, ductwork, piping and air devices. Bids are due by August 15, 2020 and the contract is to be awarded by September 15, 2020. Pricing is to be provided using standard construction industry forms.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# DEMOLITION NOTE IDENTIFICATION
INDICATES ITEM TO BE REMOVED
FIRE DAMPER
MANUAL VOLUME DAMPER
CEILING RETURN, EXHAUST OR TRANSFER REGISTER
CEILING SUPPLY DIFFUSER
MITERED ELBOW WITH TURNING VANES
RETURN DUCT TURNING UP
RETURN DUCT TURNING DOWN
EXHAUST DUCT TURNING UP
EXHAUST DUCT TURNING DOWN
SUPPLY DUCT TURNING UP (ROUND OR RECTANGULAR)
SUPPLY DUCT TURNING DOWN (ROUND OR RECTANGULAR)
10"x10" SQUARE OR RECTANGULAR DUCTWORK
PIPE TURNING UP
PIPE TURNING DOWN
DUCT SMOKE DETECTOR
A
(CFM)
AIR TERMINAL DESIGNATION
WITH CFM INDICATED
GENERAL
DUCTWORK
MOTORIZED CONTROL DAMPER
INDICATES ROUND DUCTWORK
RETURN, EXHAUST OR TRANSFER AIR FLOW
SUPPLY AIR FLOW
ADJUSTABLEADJ.
ABOVE FINISHED FLOORAFF
ABOVE FINISHED GRADEAFG
ALUMINUMAL.
CAPACITYCAP.
DIAMETERDIA.
EXTERNAL STATIC PRESSUREESP
ENTERINGENT.
GAUGEGA
HEATINGHTG.
MOUNTINGMTG.
NOT TO SCALENTS
TYPICALTYP.
HIEGHTHT.
RETURN AIRRA
AUTOMATIC AIR VENT
VALVES AND ACCESSORIES
BALL VALVE
BOTTOM CONNECTION
BUTTERFLY VALVE
CAPPED PIPE
CHECK VALVE
CONCENTRIC REDUCER
DIRECTION OF FLOW
FLEXIBLE CONNECTION
GLOBE VALVE
PRESSURE/TEMPERATURE TEST PLUG
PRESSURE GAUGE WITH GAUGE COCK
INVERTED BUCKET STEAM TRAP
STRAINER WITH BALL BLOW DOWN VALVE
STRAINER WITH GATE BLOW DOWN VALVE
TWO WAY CONTROL VALVE
TOP CONNECTION
UNION
CWR
MPS
MPC
D
CWS
CHILLED WATER RETURN
MEDIUM PRESSURE STEAM SUPPLY
MEDIUM PRESSURE CONDENSATE RETURN
DIRECTION OF FLOW
CONDENSATE DRAIN LINE
CHILLED WATER SUPPLY
PIPING
FLEXIBLE DUCT CONNECTION
LEGEND
SD
# CONSTRUCTION NOTE IDENTIFICATION
INDICATES NEW ITEM
INDICATES EXISTING ITEM
LIMIT OF WORK
ROOM NUMBER IDENTIFICATIONXXX
Ø
LPS
LPC
LOW PRESSURE STEAM SUPPLY
LOW PRESSURE CONDENSATE RETURN
TO BE DETERMINEDTBD
HWR
HWS
HOT WATER RETURN
HOT WATER SUPPLY
M
F
FIRE AND SMOKE DAMPERFSD
CUBIC FEET PER MINUTECFM
GALLONS PER MINUTEGPM
MINIMUMMIN
MAXIMUMMAX
1000 BTUS PER HOURMBH
VARIABLE AIR VOLUMEVAV
VARIABLE FREQUENCY DRIVEVFD
DUCT STATIC PRESSURE SENSORDSP
DUCT OFFSET DOWN
DUCT OFFSET UP
SMOKE DAMPERS
CONTROLCTRL. FLOAT AND THERMOSTATIC STEAM TRAP
MANUAL AIR VENTMV
AV
GATE VALVE
HOSE CONNECTION
BALANCING VALVE
PIPE CONTINUATION
DUCT CONTINUATION
CONTRACTING OFFICER'S REPRESENTATIVE COR
BUILDING AUTOMATION SYSTEMBAS
FLOOR DRAINFD
ENGINEERING CONTROL CENTERECC
OPERATINGOPER.
MANUFACTURERMNFR.
POUNDSLBS
INCHESIN
AIR HANDLING UNITAHU
ULTRA VIOLETUV
EXHAUST AIREA
SUPPLY AIRSA
EXHAUST FANEF
EXHAUST CONTROL VALVEECV
CONTROL VALVE FLOW COEFFICIENTCV
POLYVINYL CHLORIDEPVC
NUMBERNO.
HOURHR
OUTDOOR AIROA
STATIC PRESSURESP
KILOGRAMKG
NOISE CRITERIANC
FEET PER MINUTEFPM
AIR TERMINAL UNITATU
VELOCITYVEL.
COOLINGCLG.
CONNECTIONCONN.
TEMPERATURETEMP.
LEAVINGLVG.
PRESSUREPRESS.
HOT WATERHW
CHILLED WATERCHW
OCCUPIEDOCC.
UNOCCUPIEDUNOCC.
FEETFT
WATER COLUMNWC
WATER GAUGEWG
HORSE POWERHP
KILOWATTKW
POUNDS PER SQUARE INCH GAUGEPSIG
ROTATIONS PER MINUTERPM
MANUAL VOLUME DAMPERMVD
DRY BULBDB
WET BULBWB
HANDS OFF AUTO SWITCHH-O-A
ENTERING AIR TEMPERATUREEAT
LEAVING AIR TEMPERATURELAT
ENTERING WATER TEMPERATUREEWT
LEAVING WATER TEMPERATURELWT
WATER PRESSURE DROPWPD
STEELSTL
CONSTRUCTIONCONST.
HORIZONTALHORIZ.
ARCHITECTARCH.
NOTE APPLIES TO
DUCT IN DIRECTION
INDICATED BY ARROW
H
T
HUMIDITY SENSOR
TEMPERATURE SENSOR
ASSEMBLYASSY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 WAW JPN
621-18-104
M-001
FINAL CONSTRUCTION
DRAWINGS FOR BID
MECHANICAL LEGEND
27. ALL EQUIPMENT REMOVED FROM THE BUILDING, DURING DEMOLITION, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED
FROM THE SITE, UNLESS OTHERWISE NOTED. THIS PROJECT REQUIRES AHU
CONTROLLERS AND VAV HOT WATER CONTROL VALVES TO BE CAREFULLY
REMOVED AND GIVEN TO THE COR. SEE DEMOLITION PLANS FOR MORE
INFORMATION.
28. EXISTING DUCT, PIPE AND EQUIPMENT SIZES NOTED ARE FOR THE
CONVENIENCE OF THE CONTRACTOR ONLY AND ARE NOT WARRANTED TO BE
CORRECT. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DUCT, PIPE
AND EQUIPMENT SIZES AND THEIR RESPECTIVE LOCATIONS BEFORE
PROCEEDING WITH ANY ASSOCIATED WORK.
29. PRIOR TO SUBMITTING A PROPOSAL THE CONTRACTOR IS STRONGLY
ENCOURAGED TO VISIT THE SITE AND THOROUGHLY INSPECT ALL EXISTING
CONDITIONS TO INSURE THAT THE WORK REPRESENTED ON THE DRAWINGS
CAN BE INSTALLED AS INDICATED.
30. REFER TO ELECTRICAL DRAWINGS FOR VOLTAGE AND PHASE
REQUIREMENTS FOR ALL EQUIPMENT REQUIRING AN ELECTRICAL
CONNECTION.
31. CONSTRUCTION MUST BE COMPLETED IN PHASES. REFER TO
ARCHITECTURAL DRAWINGS FOR IDENTIFICATION OF THE BUILDING AREAS
TO BE INCLUDED IN EACH PHASE. ADDITIONAL NOTES ARE PROVIDED HERE
WHEN NECESSARY TO PROVIDE SUPPLEMENTARY INSTRUCTIONS. WORK
WILL SOMETIMES BE REQUIRED IN, AND ABOVE THE CEILING OF, AREAS
OUTSIDE OF THE PHASE THAT IS CURRENTLY UNDER CONSTRUCTION. THE
CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE WORK THAT MAY BE
COMPLETED IN EACH PHASE AND REGULARLY COORDINATING WITH THE
GOVERNMENT THE AREAS IN WHICH WORK MUST OCCUR.
32. INTERIOR SURFACES OF SOME EXISTING DUCTS TO BE RE-USED MUST BE
CLEANED AND RE-SEALED, AS INDICATED. SOME DUCTS ARE INSIDE OF, AND
OTHERS ARE OUTSIDE OF, THE RENOVATION AREA. MEDIUM PRESSURE
SUPPLY AND LOW PRESSURE RETURN DUCTS SERVED BY AIR HANDLING UNIT
200-AC4 MUST BE CLEANED AND RE-SEALED AS INDICATED. THIS WORK
SHALL BE COMPLETED DURING THE FIRST PHASE OF THIS PROJECT.
33. THIS PROJECT REQUIRES THE TESTING OF SOME SUPPLY AND EXHAUST
AIRFLOW RATES PRIOR TO BEGINNING CONSTRUCTION, SO THAT ACTUAL
EXISTING AIRFLOW RATES MAY BE RESTORED FOLLOWING THE WORK
DESCRIBED HEREIN. REFER TO VAV TERMINAL UNIT SCHEDULE AND SHEET
MH103 FOR ADDITIONAL INFORMATION.
34. SUPPLY AIRFLOW RATES AT VAV TERMINAL UNITS AND RETURN AIRFLOW
RATES AT GRILLES THAT ARE CONNECTED TO AHU 200-AC4 MUST BE
REBALANCED BY THIS PROJECT. EXHAUST AIRFLOW RATES AT GROUND
FLOOR GRILLES SERVED BY FANS 200-EF17, -EF-18, AND -EF29 MUST BE
REBALANCED BY THIS PROJECT. EXHAUST AIRFLOW RATES IN FIRST AND
SECOND FLOOR DUCT BRANCHES AND AT FANS 200-EF17, -EF-18, AND -EF29
MUST BE REBALANCED BY THE PROJECT FOLLOWING GROUND FLOOR DUCT
SYSTEM MODIFICATIONS AND SEALING. REFER TO VAV TERMINAL UNIT
SCHEDULE AND SHEET MH103 FOR ADDITIONAL INFORMATION.
35. HOT WATER (HW) FLOWS MUST BE REBALANCED AT VAV TERMINAL UNITS
ASSOCIATED WITH AHU 200-AC4, AS INDICATED ON VAV TERMINAL UNIT
SCHEDULE.
36. COORDINATE ALL HVAC SYSTEM OUTAGES WITH THE COR, PROVIDING
ADVANCE NOTICE OF ALL SUCH OUTAGES AS REQUIRED BY THE
SPECIFICATIONS. NO OUTAGES OF HVAC EQUIPMENT OR SYSTEMS SERVING
OCCUPIED AREAS OF THE FACILITY MAY EXCEED 12 HOURS DURATION.
TEMPORARY HVAC EQUIPMENT, DUCTS, PIPING, CONTROLS, ETC. ARE
INDICATED IN THESE CONSTRUCTION DOCUMENTS AND ARE REQUIRED TO
LIMIT OUTAGE DURATIONS. OVERTIME WORK AND WORK OUTSIDE OF
NORMAL BUSINESS HOURS (I.E., OUTSIDE OF 7:30AM – 5:30PM) WILL BE
REQUIRED FOR ALL OUTAGES.
37. RUN-OUT DUCTS TO INDIVIDUAL AIR DEVICES AND TO INLETS OF INDIVIDUAL
VAV TERMINAL UNITS SHALL MATCH THE SIZE SCHEDULED FOR THE AIR
DEVICE NECK OR THE VAV TERMINAL UNIT INLET, UNLESS OTHERWISE
NOTED.
38. THE AIR HANDLING UNIT TO BE PROVIDED BY THE PROJECT WILL HAVE
SECTIONS LARGER THAN EXISTING BUILDING DOORS AND PASSAGEWAYS
AVAILABLE, WHICH WILL REQUIRE SECTIONS TO BE DISASSEMBLED AND
RE-ASSEMBLED ON SITE. UNITS WITH SECTIONS RE-ASSMBLED ON SITE MUST
HAVE THE FULLY ASSEMBLED UNIT CASING TESTED FOR LEAKAGE BEFORE
CONNECTING DUCTS. UNIT SHALL MEET OR EXCEED LEAKAGE CLASS 6 (CL =
6) AS BASED ON THE LEAK TESTING METHOD DESCRIBED IN THE SMACNA
HVAC AIR DUCT LEAKAGE TEST MANUAL. PROVIDE ON-SITE TEST DATA
CONFIRMING THAT UNIT'S CABINET CONSTRUCTION AND ASSEMBLY
COMPLIES WITH THESE REQUIREMENTS. UNITS FAILING INITIAL LEAKAGE
TESTS MUST BE ADJUSTED AND REPAIRED, AS NECESSARY, FOLLOWING
SEALING METHODS RECOMMENDED BY THE UNIT MANUFACTURER. CAULK
OR SEALANT APPLIED TO THE EXTERIOR OF ASSEMBLED UNIT CASING JOINTS
OR SEAMS IS PROHIBITED.
39. THE PROJECT INCLUDES DEMOLITION AND INSTALLATION OF SMOKE
DAMPERS, DUCT MOUNTED SMOKE DETECTORS, AND OTHER CONTROL
DEVICES THAT REQUIRE COORDINATION WITH FIRE ALARM SYSTEM WORK
INDICATED IN THESE CONSTRUCTION DOCUMENTS.
40. IN EVERY SUPPLY, RETURN, AND EXHAUST AIR DUCT BRANCH IN TEMPORARY
AND NEW DUCT SYSTEMS, PROVIDE A MANUAL VOLUME DAMPER IN THE
BRANCH, NEAR THE MAIN DUCT, FOR BALANCING AIRFLOW. THIS INCLUDES
DAMPERS EVERY RUN-OUT DUCT TO AN INDIVIDUAL AIR DEVICE, INCLUDING
THOSE OCCURRING AS AN EXTENSION AT THE END OF THE MAIN DUCT.
1. GENERAL NOTES ON THIS DRAWING ARE APPLICABLE TO EACH MECHANICAL
DRAWING OF THIS SET. NOTES SPECIFIC TO INDIVIDUAL MECHANICAL
DRAWINGS WILL BE SHOWN ON THE RESPECTIVE MECHANICAL DRAWING.
2. THE CONTRACTOR SHALL PROVIDE A COMPLETE HVAC SYSTEM TO INCLUDE
ALL LABOR, MATERIALS, TOOLS, AND EQUIPMENT FOR A COMPLETE AND
FUNCTIONAL SYSTEM INCLUDING ALL NECESSARY APPURTENANCES
CUSTOMARILY INCLUDED IF NOT SPECIFICALLY CALLED OUT.
3. ENTIRE INSTALLATION, INCLUDING MATERIALS, EQUIPMENT, AND
WORKMANSHIP, SHALL CONFORM WITH ALL APPLICABLE LAWS, CODES, AND
REGULATIONS OF MUNICIPAL, STATE AND FEDERAL AUTHORITIES.
4. THIS PROJECT SHALL CONFORM TO APPLICABLE ASHRAE, NFPA, AND
SMACNA STANDARDS AND OTHER REGULATORY BODIES HAVING
JURISDICTION OVER THE CLASS OF WORK.
5. MATERIALS AND EQUIPMENT SHALL HAVE STAMPS OR SEALS OF ARI, ASME,
UL, AND ASTM.
6. THE CONTRACTOR SHALL MAKE TESTS FOR ACCEPTANCE AND APPROVAL AS
REQUIRED BY CODE AND THE REQUIREMENTS OF APPLICABLE REGULATORY
AGENCIES. REQUIRED TESTS SHALL BE PERFORMED IN THE PRESENCE OF
THE GOVERNMENT UNLESS OTHERWISE WAIVED IN WRITING.
7. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES,
DOCUMENTS, AND SERVICES RELATED TO INSTALLATION OF THE WORK.
8. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE OTHER TRADES
IN ORDER TO RESOLVE ANY CONFLICT THAT MIGHT ARISE DUE TO THE
LOCATION OF EQUIPMENT OR THE USE OF SPACE.
9. EQUIPMENT OF HIGHER ELECTRICAL CHARACTERISTICS MAY BE FURNISHED
PROVIDED SUCH PROPOSED EQUIPMENT IS APPROVED IN WRITING AND
CONNECTING ELECTRICAL SERVICE, CIRCUIT BREAKERS AND CONDUIT SIZES
ARE APPROPRIATELY MODIFIED AT NO COST TO THE OWNER.
10. RUN ALL HORIZONTAL PIPING AND DUCTWORK ABOVE CEILING UNLESS
OTHERWISE NOTED.
11. CUT OPENINGS, AS REQUIRED, IN THE EXISTING CONSTRUCTION FOR THE
INSTALLATION OF PIPING, DUCTWORK, AND EQUIPMENT. PATCH AND REPAIR
TO MATCH THE EXISTING ADJACENT CONSTRUCTION.
12. MAKE DUCT PENETRATIONS OF ALL WALLS WITH SHEET METAL DUCTS.
FLEXIBLE DUCT PENETRATIONS OF WALLS ARE NOT ACCEPTABLE.
13. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT
LOCATION OF DIFFUSERS, REGISTERS, AND GRILLES.
14. DUCTWORK SIZES ARE INSIDE CLEAR DIMENSIONS.
15. ALL ELBOWS IN DUCTWORK SHALL BE RADIUS ELBOWS UNLESS OTHERWISE
NOTED. WHERE SQUARE ELBOWS ARE SHOWN, INSTALL TURNING VANES.
16. PROVIDE DYNAMIC FIRE AND SMOKE DAMPERS IN ACCORDANCE WITH THEIR
U.L. LISTING AND THE REQUIREMENTS OF NFPA-90A.
17. DO NOT INSTALL EQUIPMENT, PIPING OR DUCTWORK OVER ANY ELECTRICAL
EQUIPMENT OR ELECTRICAL SERVICE SPACE.
18. LAYOUT OF PIPING AND DUCTWORK IS DIAGRAMMATIC. RUN ALL EXPOSED
PIPING AND DUCTWORK AS HIGH AS POSSIBLE UNLESS OTHERWISE NOTED.
ALLOW FOR RISES, DROPS AND OFFSETS AS REQUIRED.
19. INSTALL MECHANICAL EQUIPMENT TO FACILITATE SERVICING, MAINTENANCE,
AND REPAIR OR REPLACEMENT OF EQUIPMENT COMPONENTS. AS MUCH AS
PRACTICAL, CONNECT EQUIPMENT FOR EASE OF DISCONNECTING, WITH A
MINIMUM OF INTERFERENCE WITH OTHER INSTALLATIONS. PIPING SHALL
NOT INTERFERE WITH FILTER PULL.
20. MECHANICAL CONTRACTOR SHALL PROVIDE AUTOMATIC CONTROL DEVICES,
SUCH AS TEMPERATURE SENSORS, RELAYS, PRESSURE SWITCHES WHICH
ARE ASSOCIATED WITH MECHANICAL EQUIPMENT AND ASSOCIATED
CONTROL WIRING FROM STARTER TO THE CONTROL DEVICE. ELECTRICAL
CONTRACTOR SHALL PROVIDE CONDUIT AND WIRING FROM POWER SOURCE
TO DISCONNECT SWITCH, FROM DISCONNECT SWITCH TO STARTER, AND
FROM STARTER TO THE EQUIPMENT.
21. ALL CONTROL WIRING SHALL BE IN CONDUIT. NO CONDUIT SHALL BE
SURFACE MOUNTED IN FINISHED SPACES. ALL ELECTRICAL WORK SHALL BE
IN ACCORDANCE WITH NATIONAL ELECTRICAL CODE.
22. LOCATE THERMOSTATS 48" ABOVE FINISHED FLOOR OR AS NOTED ON THE
PLANS.
23. ALL VALVES ARE FULL LINE SIZE EXCEPT CONTROL AND BALANCING VALVES.
24. PROVIDE PRESSURE/TEMPERATURE (P/T) PLUGS, WITH CAPS UP AND
DOWNSTREAM OF ALL EQUIPMENT, AT THE SUPPLY AND RETURN TAPS OF
ALL PIPING BRANCHES AND/OR WHERE INDICATED. PROVIDE EXTENDED
PLUGS AND LABELS WHERE PIPING IS INSULATED. PROVIDE REMOVABLE
INSULATION PLUG.
25. PROVIDE MANUAL AIR VENTS AT ALL HIGH SPOTS AND THE ENDS OF ALL
PIPING LOOPS. PROVIDE 1/2" DRAIN VALVES AT LOW POINTS IN PIPING.
PROVIDE MINIMUM PITCH SUFFICIENT TO INSURE ADEQUATE VENTING AND
DRAINING.
26. PROVIDE FLUSHING VALVES AND TEES AT BOTH SIDES OF ALL EQUIPMENT.
TAPS SHALL MATCH EQUIPMENT PIPING UP TO 1". FOR LARGER EQUIPMENT
AND PIPE LOOPS PROVIDE 1 1/2" TAPS AND VALVES.
GENERAL NOTES
24x8
16x7
24x8 16x8 x
10x8
8x6 x x
28x16 ø ø x 0 8 x
16x10
14ø 12ø
16x6 14x6 x x ø
14ø 12ø 8ø
12x10
12x5
16x10 40x1242x12
14x7 16x10 x
18x12 16x12 16x10 x x x
12x10 x x
8x5
8x5 x
8x5
8ø 14x8
32x16 x
10x88x7 ø ø 6 ø ø x
B006
PATIENT ROOM
B008
PATIENT ROOM
B010
PATIENT ROOM
B012
PATIENT ROOM
B014
PATIENT ROOM
B016
MULTI-PURPOSE
LOUNGE
B016C
FEMALE LOCKERS
B016D
TOILET
B016B
TOILET
B016A
MALE LOCKERS
B015
HOUSEKEEPING
B011
MED ROOM
B017
MULTI-PURPOSE
ROOM
B013
OFFICE
B017A
BATH
C006B
NURSE STATION
B003
DIETIC KITCHEN
B005
SOILED UTILITY
B006
WORK STATION
B001
STORAGE
B030
DIALYSIS UNIT
WORK AREA
B056
TOILET
B028A
PATIENT ROOM
B026
PATIENT ROOM
B028
OFFICE
B007
CLEAN LINEN
B020
PATIENT ROOM
B022
PATIENT ROOM
B024
PATIENT ROOM
B018
LOGISTICS
STORAGE
C006B
CORRIDOR
B002
TELE
B004
ELECTRICAL
B031
UNIT DIRECTOR
2" HWR
2" HWR
1 1/2" HWS
2" HWR
1 1/2" HWS
9 8 3 24567
M
O
P
Q
Q.1
R
S
P.1
N
N.1
M.5
2.5 1.5
VAV
VAV VAV VAV VAV VAV VAV
VAV
VAV
VAV
VAV
VAV
VAV VAV VAV VAV VAV
VAV
VAV
VAV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 WAW JPN
621-18-104
MD101
FINAL CONSTRUCTION
DRAWINGS FOR BID
HVAC DEMOLITION - B WING GROUND
FLOOR
3/16" = 1'-0"
DEMOLITION PLAN - GROUND FLOOR - B WING
3/16" = 1' - 0" 0 5' 10' 20'
GRAPHIC SCALE(S)
KEY PLAN
DEMOLITION KEY NOTES#
GENERAL NOTES
A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.
B. REMOVE ALL DUCTWORK AND PIPING WITHIN RENOVATION AREA.
REMOVAL SHALL INCLUDE ALL HANGERS AND SUPPORTS.
C. REMOVE ALL VAV TERMINALS WITHIN RENOVATION AREA. REMOVAL
SHALL INCLUDE ALL SUPPORTS, CONTROLS, WIRING.
D. REMOVE ALL AIR DEVICES WITHIN RENOVATION AREA.
E. CAREFULLY REMOVE AND RETAIN ALL VAV TERMINAL UNIT HOT WATER
CONTROL VALVES IN THE SCOPE OF DEMOLITION AND DELIVER THE
CONTROL VALVES TO THE COR.
F. REFER TO ARCHITECTURAL DRAWINGS FOR WORK ASSOCIATED WITH
WALLS, DOORS, ETC. THE LINES TYPES USED ON ARCHITECTURAL
ELEMENTS ON THIS DRAWING DO NOT NECESSARILY MATCH THE
LEGEND FOR MECHANICAL DRAWINGS.
G. HEATING WATER SUPPLY AND RETURN SIZES ARE 3/4" UNLESS
SPECIFICALLY NOTED OTHERWISE.
1. DEMOLISH SUPPLY DUCTWORK UP TO LIMIT SHOWN AND CAP.
2. DEMOLISH RETURN DUCTWORK UP TO LIMIT SHOWN AND CAP.
3. DEMOLISH EXHAUST DUCTWORK UP TO LIMIT SHOWN AND PERMANENTLY
CAP.
4. DEMOLISH HEATING HOT WATER PIPING TO LIMITS SHOWN.
5. DIALYSIS UNIT MUST REMAIN OPERATIONAL DURING PHASE 1
CONSTRUCTION. ALL HVAC WORK WILL OCCUR IN PHASE 1 EXCEPT FOR
DIALYSIS UNIT, WHICH WILL OCCUR IN PHASE 2.
6. WHILE TEMPORARY AIR HANDLING UNIT IS IN SERVICE, CAP ALL OPEN ENDS
OF EXISTING DUCT.
7. HEATING HOT WATER PIPING IS A REVERSE RETURN SYSTEM. WHILE
DEMOLITION AND CONSTRUCTION OCCUR, PROVIDE A LOCKING BALL VALVE
IN EACH OF THE THREE PIPES. CONNECT THE INCOMING AND OUTGOING HWR
PIPING, MATCHING LARGER OF TWO PIPE SIZES, AND OPEN HWR VALVES TO
ALLOW HWR FLOW. CLOSE THE HWS ISOLATION VALVE. WHEN
CONSTRUCTION IS COMPLETE, REMOVE THE HWR CROSS CONNECTION AND
LOCK ALL VALVES OPEN.
8. DEMOLISH RETURN DUCTWORK UP TO LIMIT SHOWN AND PERMANENTLY CAP.
F x x x
26x1028x10 x x x
22x10
14x6
14x6
14x6
14x6
14x6 x ø
8x6 ø
8ø
8ø
8ø
8ø
14x6
14x6
14x6
14x6
14x6
14x6 x x x x x x
C014
OFFICE
C013
OFFICE
C011A
BATH
C011
OFFICE
C012A
BATH
C012
OFFICE
C010
OFFICE
C008
OFFICE
C009
STORE
C007
OFFICE
C007A
BATH
C008A
BATH
C006
OFFICE
C005
OFFICE
C003
OFFICE
C003A
BATH
C004A
BATH
C004
OFFICE
C002A
OFFICE
C002B
OFFICE
C001A
BATH
C001
OFFICE
C002C
NURSE MGR
C002
CORRIDOR
x
22x14
1 1/2" HWS
2" HWR
2" HWR
F
G
15161720
H
E
D
C
B.5
B
14.1 14
2" HWR
2" HWR
1 1/2" HWS
14x10
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
7 6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 WAW JPN
621-18-104
MD102
FINAL CONSTRUCTION
DRAWINGS FOR BID
HVAC DEMOLITION - C WING GROUND
FLOOR
3/16" = 1'-0"
DEMOLITION PLAN - GROUND FLOOR - C WING
1. DEMOLISH SUPPLY DUCTWORK UP TO LIMITS SHOWN AND CAP.
2. DEMOLISH RETURN DUCTWORK UP TO LIMITS SHOWN AND CAP.
3. DEMOLISH EXHAUST DUCTWORK UP TO LIMITS SHOWN AND PERMANENTLY
CAP.
4. DEMOLISH HEATING HOT WATER PIPING UP TO LIMITS SHOWN.
5. DEMOLISH EXHAUST DUCT AND AIR DEVICE IN/ON VERTICAL CHASE, WHICH
EXTENDS TO ROOF. SEE ARCHITECTURAL PLANS FOR WALL DEMOLITION
WORK REQUIRED.
6. WHILE TEMPORARY AIR HANDLING UNIT IS IN SERVICE, CAP ALL OPEN ENDS
OF EXISTING DUCT.
7. HEATING HOT WATER PIPING IS A REVERSE RETURN SYSTEM. WHILE
DEMOLITION AND CONSTRUCTION OCCUR, PROVIDE A LOCKING BALL VALVE
IN EACH OF THE THREE PIPES. CONNECT THE INCOMING AND OUTGOING HWR
PIPING, MATCHING LARGER OF TWO PIPE SIZES, AND OPEN HWR VALVES TO
ALLOW HWR FLOW. CLOSE THE HWS ISOLATION VALVE. WHEN
CONSTRUCTION IS COMPLETE, REMOVE THE HWR CROSS CONNECTION AND
LOCK ALL VALVES OPEN.
A. REMOVE SUPPLY, RETURN AND EXHAUST DUCTWORK WITHIN
RENOVATION AREA. REMOVAL SHALL INCLUDE ALL HANGERS AND
SUPPORTS.
B. REMOVE ALL VAV TERMINALS WITHIN RENOVATION AREA. REMOVAL
SHALL INCLUDE ALL SUPPORTS, CONTROLS, WIRING.
C. REMOVE SUPPLY, EXHAUST AND RETURN AIR DEVICES WITHIN
RENOVATION AREA.
D. CAREFULLY REMOVE AND RETAIN ALL VAV TERMINAL UNIT HOT WATER
CONTROL VALVES IN THE SCOPE OF DEMOLITION AND DELIVER THE
CONTROL VALVES TO THE COR.
E. REFER TO ARCHITECTURAL DRAWINGS FOR WORK ASSOCIATED WITH
WALLS, DOORS, ETC. THE LINE TYPES USED ON ARCHITECTURAL
ELEMENTS ON THIS DRAWING DO NOT NECESSARILY MATCH THE
LEGEND FOR MECHANICAL DRAWINGS.
F. HEATING WATER SUPPLY AND RETURN SIZES ARE 3/4" UNLESS
SPECIFICALLY NOTED OTHERWISE.
3/16" = 1' - 0" 0 5' 10' 20'
GRAPHIC SCALE(S)
KEY PLAN
DEMOLITION KEY NOTES#
GENERAL NOTES
STAIR
TOILET
C122A
STAIR
TOILET
C122A
F
F
S T
A
IR
TOILET
B121A
S T
A
IR
TOILET
B121A
F
F
STAIR
TOILET
STAIR
TOILETF
S T
A
IR
TOILET
B121A
S T
A
IR
TOILET
B121A
F
F
15161720 19
E
D
C
B.5
B
A.5 x
R A
20x6
14x10
EA
EA20x6
EA
3 245
O
P
Q
Q.1
R
S
P.1
2.5 1.5
420x6 RA
20x6
20x6
EA
EA
15161720 19
E
D
C
B.5
B
A.5
1 12
200-EF20
200-EF32
200-EF31
3 245
O
P
Q
Q.1
R
S
P.1
2.5 1.5
200-EF19
200-EF33
15161720 19
E
D
C
B.5
B
A.5
20x6
EA
R A x
14x10
EA
3 245
O
P
Q
Q.1
R
S
P.1
2.5 1.5 x
20x6 RA
E A 7
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 WAW JPN
621-18-104
MD103
FINAL CONSTRUCTION
DRAWINGS FOR BID
HVAC DEMOLITION - CHASES
3/16" = 1' - 0" 0 5' 10' 20'
GRAPHIC SCALE(S)
KEY PLAN
DEMOLITION KEY NOTES#
GENERAL NOTES
A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.
B. REFER TO ARCHITECTURAL DRAWINGS FOR ROOFING AND CHASE WALL
WORK, ASSOCIATED WITH WORK SHOWN HERE.
1. DEMOLISH POWER ROOF VENTILATOR AND ROOF CURB. REFER TO
ARCHITECTURAL DRAWINGS FOR ROOF WORK REQUIRED.
2. DEMOLISH POWER ROOF VENTILATOR, AND LEAVE ROOF CURB READY FOR
RE-USE.
3. DEMOLISH EXHAUST AIR DUCT IN CHASE AND EXHAUST AIR GRILLE MOUNTED
ON CHASE WALL.
4. RETURN AIR DUCT TO REMAIN.
5. DEMOLISH EXHAUST AIR DUCT, DUCT IN CHASE AND ABOVE CEILING.
6. TO FAN 200-EF19
7. TO FAN 200-EF33
8. TO FAN 200-EF20
9. TO FAN 200-EF32
10. TO FAN 200-EF31
3/16" = 1'-0"
DEMOLITION PLAN - SECOND FLOOR - C WING
3/16" = 1'-0"2
DEMOLITION PLAN - SECOND FLOOR - B WING
3/16" = 1'-0"
DEMOLITION PLAN - ROOF - C WING
3/16" = 1'-0"3
DEMOLITION PLAN - ROOF - B WING
3/16" = 1'-0"
DEMOLITION PLAN - FIRST FLOOR - C WING
3/16" = 1'-0"1
DEMOLITION PLAN - FIRST FLOOR - B WING
14 15
C029
MECH ROOM
C026
TOILET
C028
RECYCLING
C024
STORAGE
AHU-200-AC4
1 1/2"
1 1/2"
4" CWS
4" CWR
MPS
LPC
D x
60x48
66x24 x
60x48
1720 1921
M
O
P
P.1
N
N.1
FD FD
FD
1 1/2"
LPC
3" HWS
3" HWR
4" CWR
4" CWS
6"
4"
MPS
MPC
18x14
EA
8x6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 WAW JPN
621-18-104
MD401
FINAL CONSTRUCTION
DRAWINGS FOR BID
HVAC DEMOLITION - MECHANICAL
ROOM
1/2" = 1'-0"1
DEMOLITION PLAN - MECHANICAL ROOM GROUND FLOOR
1/2" = 1' - 0" 0 1' 5'6" 2' 3' 4'
GRAPHIC SCALE(S)
KEY PLAN
DEMOLITION KEY NOTES#
GENERAL NOTES
1. DEMOLISH AIR HANDLING UNIT AND ALL RELATED DUCT, PIPING, AND
ATTACHMENTS.
2. DEMOLISH SA DUCT TO LIMITS OF DEMOLITION SHOWN.
3. DEMOLISH RELIEF AIR DUCT IN ENTIREITY.
4. DEMOLISH OA/RA MIXING BOX IN ENTIREITY.
5. DEMOLISH RA DUCT TO LIMITS OF DEMOLITION SHOWN.
6. DEMOLISH RA FAN AND ALL ASSOCIATED ATTACHMENTS AND SUPPORTS.
7. DEMOLISH FIRE DAMPER.
8. DUPLEX STEAM CONDENSATE RECEIVER TO REMAIN.
9. DEMOLISH BUILDING STEAM PIPING TO LIMITS OF DEMOLITION SHOWN.
10. DEMOLISH BUILDING STEAM CONDENSATE PIPING TO LIMITS OF DEMOLITION
SHOWN.
11. DEMOLISH CHILLED WATER SUPPLY AND RETURN PIPING TO LIMITS OF
DEMOLITION SHOWN.
12. DEMOLISH COOLING COIL CONDENSATE DRAIN PIPING.
13. EXISTING HVAC SYSTEM CONTROL PANEL CABINETS. CAREFULLY REMOVE
AND RETAIN AIR HANDLING UNIT CONTROLLER AND DELIVER THE
CONTROLLER TO THE COR. ANY CONTROLS EQUIPMENT OUTSIDE OF
PROJECT SCOPE TO REMAIN.
14. EXISTING ELECTRICAL PANELS TO REMAIN.
15. EXISTING TRANSFORMER TO REMAIN.
16. DEMOLISH EXISTING SUPPLY FAN VFD.
17. DEMOLISH EXISTING RETURN FAN VFD.
18. MASONRY CHASE THROUGH ROOF, WITH OPEN GRATE AT TOP.
19. LOW PRESSURE STEAM CONDENSATE DOWN FROM FLOOR ABOVE. MUST BE
REROUTED DURING PROJECT.
20. DEMOLISH COMBINATION FIRE/SMOKE DAMPER AND CONTROLS.
21. TEMPORARILY CAP DUCTWORK WHILE TEMPORARY UNIT IS IN SERVICE.
A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.
B. FOLLOWING DEMOLITION SHOWN HERE, ALL SHEET METAL SUPPLY AND
EXHAUST DUCT TO BE RE-USED MUST BE SEALED, AS SPECIFIED.
1720 1921
M
O
P
P.1
N
N.1
4" CWS
1 1/2"
LPC
MPS
66x24
88x24 x x2 x
1 1/2"
MVD 11
4" CWR
3" HWR
3" HWS
4" CWS
4" CWR
6"
4" MPC
MPS
1/2" = 1'-0"1
TEMPORARY WORK - MECHANICAL ROOM GROUND FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 WAW JPN
621-18-104
MD402
FINAL CONSTRUCTION
DRAWINGS FOR BID
HVAC TEMPORARY WORK -
MECHANICAL ROOM
1/2" = 1' - 0" 0 1' 5'6" 2' 3' 4'
GRAPHIC SCALE(S)
KEY PLAN
TEMPORARY WORK KEY NOTES#
GENERAL NOTES
A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.
B. THIS DRAWING IS INTENDED TO SHOW TEMPORARY DUCTS, PIPING,
ETC. REQUIRED DURING REPLACEMENT OF AHU, TO MINIMIZE HVAC
OUTAGES IN THE AREA SERVED BY THE AHU. ALL TEMPORARY WORK
SHALL BE REMOVED AT THE COMPLETION OF CONSTRUCTION.
C. TEMPORARY SYSTEMS SHALL HAVE ALL OF THE SAME, COMPONENTS,
FEATURES, CONTROLS, ETC. AS THE PERMANENT REPLACEMENT
SYSTEMS.
D. REFER TO SHEET MD403 FOR CONTINUATION OF OUTDOOR PIPING AND
DUCTS TO TEMPORARY UNIT.
1. REMOVE WALL LOUVER AS NECESSARY TO ALLOW FOR ROUTING OF
DUCTWORK, PIPING, CONDUIT, ETC. THROUGH EXTERIOR WALL.
2. EXTEND RETURN AIR DUCT TO TEMPORARY UNIT.
3. INSTALL DUCTS AND PIPING AS HIGH AS POSSIBLE TO ALLOW
CONSTRUCTION OF REPLACEMENT AHU BELOW.
4. EXTEND CHILLED WATER PIPING TO TEMPORARY UNIT.
5. EXTEND STEAM PIPING TO TEMPORARY INIT.
6. EXTEND STEAM CONDENSATE PIPING TO TEMPRARY UNIT.
7. CONNECT 1-1/4" STEAM CONDENSATE FROM ABOVE TO PIPING TO
CONDENSATE RECEIVER.
8. CONDENSATE RECEIVER.
9. PROVIDE PERMANENT FIRE AND SMOKE DAMPERS AT WALL
PENETRATION. (OR EXISTING DAMPERS MAY BE USED, IF
OPERATIONAL, WITH TEMPORARY DUCTS, PROVIDED THAT PERMANENT
DAMPERS ARE INSTALLED WITH PERMANENT DUCTS).
10. TEMPORARILY CAP DUCTWORK WHILE TEMPORARY UNIT IS IN
SERVICE.
11. BALANCE FOR 55% OF TEMPORARY RETURN AIRFLOW.
12. OFFSET DUCTS AS REQUIRED TO AVOID PIPING AND CONDUIT.
G
161720
H
M
I
J
K
L
N
M.5 x
C022B
ANTE ROOM
C022A
TOILET
C022
ICU-1 ISOLATION
C024
STRETCHER/
HOLDING
x
RELIEF AIROA
x x
36x18
1 1/2"
1 1/4"
4" CWR
4" CWS
LPC
MPS
MVD
36x40
74x22
S
72x20 SA BOTTOM 70x20 RA TOP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 WAW JPN
621-18-104
MD403
FINAL CONSTRUCTION
DRAWINGS FOR BID
HVAC TEMPORARY WORK -
COURTYARD
1/8" = 1'-0"
TEMPORARY WORK - COURTYARD GROUND FLOOR
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
TEMPORARY WORK KEY NOTES#
GENERAL NOTES
A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.
B. THIS DRAWING IS INTENDED TO SHOW A TEMPORARY AIR HANDLING
UNIT, DUCTS, PIPING, ETC. REQUIRED DURING REPLACEMENT OF AHU,
TO MINIMIZE HVAC OUTAGES IN THE AREA SERVED BY THE AHU. ALL
TEMPORARY WORK SHALL BE REMOVED AT THE COMPLETION OF
CONSTRUCTION.
C. TEMPORARY EQUIPMENT AND SYSTEMS SHALL HAVE ALL OF THE SAME
COMPONENTS, FEATURES, CONTROLS, ETC. AS THE PERMANENT
REPLACEMENT UNIT, AS SCHEDULED AND SPECIFIED HEREIN.
D. REFER TO SHEET MD402 FOR CONTINUATION OF TEMPORARY DUCT
AND PIPING INSIDE MECHANICAL ROOM.
E. INTERIOR EXISTING DUCT AND DEVICES SHOWN ON THIS PLAN ARE
INTENDED ONLY FOR REFERENCE. REFER TO SHEETS MH101-4 FOR
ADDITIONAL WORK REQUIRED.
F. WHILE TEMPORARY UNIT IS IN SERVICE CAP ALL OPEN ENDS OF
EXISTING DUCTS.
G. TEMPORARY DUCT AND PIPING SHALL BE INSULATED AS SPECIFIED
FOR INDOOR AND OUTDOOR DUCTS.
1. REMOVE PORTION OF WALL LOUVER AS NECESSARY TO ALLOW FOR
ROUTING OF DUCTWORK, PIPING, CONDUIT, ETC.
2. PROVIDE TEMPORARY SUPPORTS FOR DUCTWORK, PIPING, ETC.
ROUTED FROM TEMPORARY AHU. REFER TO STRUCTURAL FOR
SUPPORT DETAILS.
3. TEMPORARY AIR HANDLING UNIT 200-AC4-T.
4. PROVIDE DRYWELL FOR TEMPORARY UNIT COOLING COIL
CONDENSATE. ABANDON DRY WELL WHEN TEMPORARY UNIT IS
REMOVED.
6. CONNECT SUPPLY DUCT INTO EXISITING.
7. CONNECT RETURN DUCT INTO EXISTING.
8. ACCESS CLEARANCE SPACE.
9. LOCATION OF DUCT RISE TO ABOVE CEILING ELEVATION.
10. BALANCE FOR 45% OF RETURN AIRFLOW.
11. DUCT SLOPE DOWN.
12. DUCT SLOPE UP.
13. DUCT AND PIPING ELEVATION CHANGE TO PENETRATE LOUVER AS
HIGH AS POSSIBLE BELOW BEAM AT EXTERIOR WALL.
14. PROVIDE TEMPORARY PIPE SUPPORTS AT MAXIMUM SPACING OF 10
FEET IN A MANNER THAT ALLOWS LANDSCAPE MAINTENANCE BELOW
PIPING.
15. PROVIDE TEMPORARY DUCT SUPPORTS USING LUMBER OR SIMILARLY
SOFT MATERIALS TO PREVENT DAMAGE TO EXISTING WALL AND FLOOR
FINISHES.
16. PROVIDE RADIUS ELBOWS.
FEC
FEC
FEC
FEC
FF
B024
MD WORKROOM
B020
MD WORKROOM
B022
LAB
B023
EXAM ROOM
B021
EXAM ROOMB025
EXAM ROOM
B027
EXAM ROOM
B029
TOILET
B026
EXAM ROOM, RN
B028
RECEPTION/ADMINB030
WAITING ROOM
B032
PATIENT
EDUCATION
B001
CLEAN SUPPLY
B007
NOURISHMENT
B008
DIALYSATE PREP
AND MEDS
B009
CLEAN UTILITY
B018
PICC STATION
B019
REPAIR SHOP &
EQUIP STORAGE
B016D
TOILET B016B
TOILET
B016C
F LOCKERS
B016A
M LOCKERS
B016
STAFF LOUNGE
B015
RD STATION
B014
RD STATION
B013
RD STATION
B012
RD ISOLATION
B012A
TOILET
B003
TOILET
B006A
HT/WT
B010
HAC
B011
SOILED UTILITY
B006
NURSE STATION
B017
NURSE STATION
B032A
STORAGE
B031
EXAM ROOM, LPN
C
C
E
O
N
C
J
I
I
B
VAV-AC4-41
VAV-AC4-48
VAV-AC4-47
VAV-AC4-49
VAV-AC4-52
VAV-AC4-51
VAV-AC4-50
VAV-AC4-46
VAV-AC4-44
VAV-AC4-45
VAV-AC4-43
32x16 x x
30x10 30x10 20x10 12x10
16x12 14x12
12x10
8x10 ø 8 ø ø
10ø
8x10 ø6 ø
6x6 x ø
10x10 8x10 x x ø
8ø
8ø
10x12 8x12
48x14 46x12 x
42x12 36x12 32x12 x
10x10 x
8x6 x
16x1012x10
I
VAV-AC4-42A
VAV-AC4-53
VAV-AC4-54
x x
2" HWR
2" HWR
HWR
1 1/2" HWS
B
B
E
E
I
J
I
J
E
B
C
C 115C
B
C
I
I
I
I 35C
B
B
E
C
J
I
I
L
12x8 ø
12x8 14x10 x
I
E 235C
E
2" HWR
2" HWR
1 1/2" HWS
48x16
32x1634x1636x16
T
TT
T
T
T
T
T
T
T
T
T
T
T
1" HWS
2" HWR
HWS
HWR
2" HWR
x
8x6
8ø D
D
D
D
I
C
C
E
J
I
12x8
I
I x x
ECV-B1
10 9 8 3 24567
M
O
P
Q
Q.1
R
S
P.1
N
N.1
M.5
2.5 1.5
10x10
C
J
12x8
2" HWR
1 1/2" HWS
10x8
I
I
I
I
I
10x88x8
1 1/4" HWS
VAV-AC4-54
VAV-AC4-43
VAV-AC4-45
VAV-AC4-44
VAV-AC4-46
VAV-AC4-42A
VAV-AC4-41
D
VAV-AC4-48
VAV-AC4-51
VAV-AC4-50
VAV-AC4-52
VAV-AC4-49
VAV-AC4-47
VAV-AC4-53
B005
ELEC ROOM
G
I
10x10
20x12
T T
VAV-AC4-42B
VAV-AC4-42B 1
ø ø
12x8 12x8 ø
12x8
VAV-AC4-42C
VAV-AC4-42C
x
12x8
1 1/4" HWS
24x12
H
H x1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 WAW JPN
621-18-104
MH101
FINAL CONSTRUCTION
DRAWINGS FOR BID
HVAC FLOOR PLAN - B WING GROUND
FLOOR
3/16" = 1'-0"1
FLOOR PLAN - GROUND FLOOR - B WING
A. REFER TO M-001 FOR GENERAL NOTES ON THIS PROJECT.
B. HEATING WATER SUPPLY AND RETURN SIZES ARE 3/4" UNLESS SPECIFICALLY
NOTED OTHERWISE.
C. ROUTE SUPPLY MAINS AS HIGH AS POSSIBLE IN CEILING. INSTALL VAV BOXES
WITHIN 12 INCHES OF CEILING.
3/16" = 1' - 0" 0 5' 10' 20'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1. CONNECT SUPPLY DUCT INTO EXISTING AT SCOPE OF WORK.
2. CONNECT RETURN DUCT INTO EXISTING AT SCOPE OF WORK.
3. CONNECT HEATING HOT WATER LINES INTO EXISTING AT SCOPE OF WORK
4. ROUTE EXHAUST DUCTS THROUGH WALL AND INTO CHASE UP TO FANS ON
ROOF.
5. DDC CONTROL PANEL FOR B WING
6. DIALYSIS UNIT MUST REMAIN OPERATIONAL DURING PHASE 1 CONSTRUCTION.
ALL HVAC WORK WILL OCCUR IN PHASE 1 EXCEPT FOR DIALYSIS UNIT, WHICH
WILL OCCUR IN PHASE 2. EXISTING DIALYSIS UNIT WILL THEN BECOME
PATIENT EDUCATION B032 AND WAITING ROOM B030.
7. DUCT OFFSET AROUND OBSTACLE.
8. TRANSITION DUCT MAIN DOWN TO WITHIN 12 INCHES OF CEILING.
REFER TO MH103 FOR DETAILED DRAWING
OF THIS ICU AREA.
F
C013
STORAGE, CLEAN
SUPPLY
C013
RD/RO STORAGE
C012
ICU-14
C012A
TOILET
C010A
TOILET
C010
ICU-15
C006B
OFFICEC008B
OFFICE
C008A
OFFICE
C006A
OFFICE
C005B
OFFICE
C007B
SHARED USE
OFFICE
C007A
NURSE
MANAGER'S
OFFICE
C005A
OFFICE
C004
CONFERENCE
C003
TOILET
C010
CORRIDOR
C010
CORRIDOR
C009
ICU-17
C009A
TOILET
C011B
TOILET
C011A
ANTE ROOM
C011
ISO BARI ICU-16
C002A
OFFICE
C002B
OFFICE
C002C
NURSE MGR
C002
CORRIDOR
x x x
20x632x10 x x
18x10 16x8 10x8 x x x x
6x10
14x12 x
12x8 12x8
6x8 6x8
10x810x10 ø
12x8
6ø
10x8
VAV-AC4-63
VAV-AC4-55
VAV-AC4-64
VAV-AC4-62
VAV-AC4-56
VAV-AC4-61
VAV-C4-60 VAV-C4-57
VAV-C4-58
8x6
8x6 8x6 x
L
N
M
L
L
L x x x
20x10
8x6
12x8
VAV-C4-59
F
L x
B
B
I
I
C
I
A
C
I
E
J
A
I
G
I 215 I
I
I
B
A
J
B
C
T
T
T
T
T
T
T
T
T
B
1" HWS
2" HWR
1 1/2" HWS
HWS
H x
C
C
I
I
I
ECV-C1
F
G
15161720
H
E
D
C
B.5
B
14.1 14 ø ø x x x x
D
D
D
D x x
2" HWR 1 1/2" HWS
2" HWR
1 1/2" HWS
2" HWR
1 1/4" HWS2 1/2" HWR
2 1/2" HWR
2 1/2" HWR
VAV-AC4-61
VAV-AC4-55
VAV-AC4-62
VAV-AC4-63
VAV-AC4-56
VAV-C4-60
VAV-C4-57
VAV-C4-58
VAV-C4-59
T
VAV-AC4-64
2" HWR
8 8
8x68x6
12x6 x x x x x
22x16
22x16
H
J x
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 WAW JPN
621-18-104
MH102
FINAL CONSTRUCTION
DRAWINGS FOR BID
HVAC FLOOR PLAN - C WING GROUND
FLOOR
3/16" = 1'-0"
FLOOR PLAN - GROUND FLOOR - C WING
A. REFER TO M-001 FOR GENERAL NOTES ON THIS PROJECT.
B. HEATING WATER SUPPLY AND RETURN SIZES ARE 3/4" UNLESS SPECIFICALLY
NOTED OTHERWISE.
C. ROUTE SUPPLY MAINS AS HIGH AS POSSIBLE IN CEILING. INSTALL VAV BOXES
WITHIN 12 INCHES OF CEILING.
3/16" = 1' - 0" 0 5' 10' 20'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1. CONNECT SUPPLY DUCT INTO EXISTING.
2. CONNECT RETURN DUCT INTO EXISTING.
3. CONNECT HEATING HOT WATER LINES INTO EXISTING.
4. CONNECT EXHAUST DUCT INTO EXISTING.
5. ROUTE EXHAUST DUCT INTO CHASE. TURN DUCT UP IN CHASE.
6. DDC CONTROL PANEL FOR C WING.
7. DUCT OFFSET AROUND OBSTACLE.
8. INSTALL AND PLACE RETURN DUCT IN SERVICE WITHIN 8 HOURS OF THE
DEMOLITION OF THE RETURN DUCT CURRENTLY SERVING ROOMS C055 AND
C053.
9. REBALANCE EXISTING AIR DEVICES ASSOCIATED WITH VAV-C4-59 TO
AIRFLOWS SHOWN.
10. REBALANCE EXISTING RETURN AIR REGISTER TO AIRFLOW SHOWN.
DN
DN
DN
DN
C016
ICU 4 - BARIATRIC
C018A
TOILET
C018
ICU-3
CG33
CORRIDOR
C055
ELECTRICAL
C053
TEL
C021
NOURISH
C019
WARD CLERK/
TEAM WORK
CG35
ELEVATOR LOBBY
C006B
WAITING
C026
TOILET
C028
RECYCLING
C029
MECH ROOM
C022B
ANTE ROOM
C026
CONSULT
CO26A
HAC
C030
STAFF CONF/
LOUNGE
C030A
FEMALE LOCKERS
C038
STAFF TOILET
C040
STAFF TOILET
C042
LOGISTICS STOR
C023
MEDS
CG25
CORRIDOR
C034
EMS SOILED
HOLDING
C025
OFFICE
C032
SPS SOILED
C031
LINEN
C031A
STAFF TOILET
B035
PATIENT ROOM
B033
ISOLATION
SURGERY
B037
PATIENT ROOM
B039
PATIENT ROOM
B043
PATIENT ROOM
CO45
ICU-7
C047
ICU-6
C049
ICU-5 BARIATRIC
C051
IT
CG22
CORRIDOR
C037
PROCEDURE
B057
ICU WAITING
ROOM
B065
HAC
B059
TEL
B067
ELECTRICAL
B069
TOILET
B036
ON CALL ROOM
C033A
TOILET
B053
OFFICE
B055A
WOMENS
LOCKERS
B055
HALL
B057B
MEN
B057A
WOMEN
BG03
CORRIDOR
B036A
BATH
C006B
CORRIDOR
B035
TRASH AND LINEN
REMOVAL
C024
STORAGE
C022A
TOILET
C022
ICU-1 ISOLATION
C020
ICU-2C020A
TOILET
C017
CLEAN
C057A
CRASH
C041A
TOILET
C028
RECYCLING
C028A
HOUSE-KEEPING
C030B
MALE LOCKERS
C027A
ALCOVE
C036A
EQUIP
C027
TEAM WORK
B055A
MENS LOCKERS
B002
TELE
B004
ELEC
C035A
TOILET
B037A
TOILET
B039A
TOILET
C036
MED GAS
VAV-AC4-04
VAV-AC4-03
VAV-AC4-26
VAV-AC4-84 VAV-AC4-28
VAV-AC4-07 VAV-AC4-08
VAV-AC4-09
VAV-AC4-10
VAV-AC4-11
VAV-AC4-16VAV-AC4-17VAV-AC4-21
VAV-AC4-23
VAV-AC4-12
VAV-AC4-13
VAV-AC4-14
VAV-AC4-06
VAV-AC4-01
VAV-AC4-02 VAV-AC4-24
VAV-AC4-31
VAV-AC4-18 VAV-AC4-27
VAV-AC4-83
VAV-AC4-72
VAV-AC4-71
VAV-AC4-73
VAV-AC4-75
VAV-AC4-74 VAV-AC4-22
VAV-AC4-76
VAV-AC4-77 VAV-AC4-78
VAV-AC4-82
VAV-AC4-20
SEE MH401
38x16
48x16 66x18 x x
42x1848x24 56x10 48x10 x x
18x16
10x10 x x ø ø ø ø 8 ø ø ø
28x10 24x10 x
10x8
10x8
10x8
30x10 18x10 x x ø1 ø ø x x
10ø
4ø
34x10 x x x
28x10
36x10 x
18x10 x
16x10 12x8 x
8x6 x ø
8ø ø
66x24 x x ø 8 ø ø ø
10x8 x x
VAV-AC4-80
VAV-AC4-81
VAV-AC4-25
VAV-AC4-29
VAV-AC4-15
15161720
H
1921 12.5 12 11 10 9 8
M
O
P
Q
Q.1
R
I
J
K
L
S
P.1
N
N.1
M.5
14.1 14
130 * x
12014x6
8x6
6x6 x x
8x6
6x6
12x8
8x6 x
C049A
TOILET
C047A
TOILET
C045A
TOILET
C043A
TOILET
5ø
6x6 ø ø6 ø x
24x10 16x8 9x6 x ø ø x x
14x8 5ø x x
90*
28x10
26x10 28x12 x x x1
10x8
10x8
10x8
AV-1
AV-2
AV-4
AV-3
ø
7ø
24x10 16x7 x
314x6 x
8x6
8x6
6x6 x x x
8x6
6ø ø
16x12
12x24
VAV-AC4-79
14x28
28x12
FSD
FSD
FSD
FSD
FSD
FSD
FSD
VAV-AC4-05
x
VAV-AC4-32
x
FSD
VAV-AC4-30
FSD FSD
FSD
FSD
200-AC4-19
FSD
FSD
8ø ø ø ø
12ø
10ø 8ø
8ø ø
8ø
4ø 8ø ø
6ø
6ø ø ø1 ø ø ø ø ø ø ø
8ø
10ø
8ø ø
48x14 46x1248x16
34x16 32x1636x16
5 5 5
5 5 x
C024
STRETCHER/
HOLDING
DSP
T
VAV-AC4-71
T T
VAV-AC4-73
VAV-AC4-72
T
VAV-AC4-83
T
VAV-AC4-75
T
VAV-AC4-82
T
VAV-AC4-74
T
T VAV-AC4-79
VAV-AC4-76
T
T
VAV-AC4-77
VAV-AC4-78
T
T VAV-AC4-81
VAV-AC4-80
T
VAV-AC4-84
x x
16ø24x16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 WAW JPN
621-18-104
MH103
FINAL CONSTRUCTION
DRAWINGS FOR BID
HVAC FLOOR PLAN - ICU GROUND
FLOOR
1/8" = 1'-0"1
HVAC FLOOR PLAN - ICU GROUND FLOOR
A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.
B. DUCT CLEANING AND SEALING MUST BE PERFORMED TO THE MAXIMUM
EXTENT PRACTICAL DURING THE TWO SYSTEM OUTAGES REQUIRED TO
PLACE THE TEMPORARY AIR HANDLING UNIT IN SERVICE AND TO PLACE THE
PERMANENT UNIT IN SERVICE. ANY ADDITIONAL OUTAGES REQUIRED TO
CLEAN AND SEAL DUCTS SHALL BE SCHEDULED IN ADVANCE AND
COORDINATED WITH THE COR, AS SPECIFIED. SUCH OUTAGES SHALL HAVE
A MAXIMUM 4 HOURS DURATION, AND NO MORE THAN TWO ICU ROOMS
SHALL HAVE HVAC INTERRUPTED AT A TIME. ADDITIONAL SMALL
TEMPORARY AIR CONDITIONERS AND/OR TEMPORARY DUCT CONNECTIONS
SHALL BE PROVIDED, AS NECESSARY TO MEET THESE REQUIREMENTS.
WORK AREAS AND TEMPORARY MEASURES SHALL BE APPROVED BY THE
COR IN ADVANCE.
C. PROTECT ALL SMOKE AND FIRE/SMOKE DAMPERS, AND ASSOCIATED DUCT
SMOKE DETECTORS, FROM DAMAGE DURING CLEANING AND SEALING
DUCTS.
D. REBALANCE AIRFLOWS IN MEDIUM PRESSURE SUPPLY AIR DUCTS BETWEEN
AHU 200-AC4 AND VAV TERMINAL UNITS ASSOCIATED WITH THE AHU.
AIRFLOWS ARE INDICATED ON VAV TERMINAL UNIT SCHEDULE.
E. REBALANCE AIRFLOWS IN RETURN AIR DUCTS ASSOCIATED WITH AHU 200-
AC4. AIRFLOWS AT AIR DEVICES ARE INDICATED ON THIS DRAWING.
F. REBALANCE AIRFLOWS IN EXHAUST DUCTS ASSOCIATED WITH EXISTING
FANS 200-EF17, -EF18, AND -EF29 AS INDICATED ON THIS DRAWING. PRIOR
TO ANY OTHER WORK, THE AIRFLOWS IN THE EXISTING FIRST AND SECOND
FLOOR EXHAUST BRANCH DUCTS SHALL BE MEASURED AND VERIFIED TO
MATCH THE TABLES BELOW, AND DIFFERENCES SHALL BE REPORTED IN
WRITING. EXHAUST AIRFLOW RATES SHALL BE REBALANCED IN FIRST AND
SECOND FLOOR DUCT BRANCHES FOLLOWING COMPLETION OF ALL OTHER
WORK. EXISTING AIRFLOWS SHALL BE RESTORED DURING REBALANCING.
MANUAL VOLUME DAMPERS SHALL BE ADDED IN THE DUCT BRANCHES TO
PROVIDE A METHOD OF QUICKLY BALANCING THE AIRFLOW FOR EACH
FLOOR. FOLLOWING GROUND FLOOR DUCT MODIFICATIONS AND SEALING.
G. WORK SHOWN ON THIS DRAWING IS PART OF THE PROJECT’S FIRST PHASE.
H. FOR EXISTING VAV TERMINAL UNITS TO BE REPLACED OR RECEIVE NEW
CONTROLS, AS INDICATED IN THE VAV TERMINAL UNIT SCHEDULE, EXISTING
HOT WATER CONTROL VALVES SHALL BE CAREFULLY REMOVED AND
DELIVERED TO THE VAMC’S COR.
I. FOR EXISTING TERMINAL UNITS SCHEDULED TO HAVE CONTROLS
REPLACED, ALL INACTIVE PNEUMATIC CONTROL TUBING SHALL BE
REMOVED TO THE MAXIMUM EXTENT POSSIBLE. PERMANENTLY CAP
DEMOLISHED BRANCHES AT ACTIVE PNEUMATIC CONTROL TUBING
MAINS/BRANCHES. PROVIDE REPLACEMENT WALL TEMPERATURE SENSORS
IN EXISTING LOCATIONS.
3/16" = 1' - 0" 0 5' 10' 20'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1. EXHAUST DUCT UP TO FAN 200-EF17 ON ROOF.
2. EXHAUST DUCT UP TO FAN 200-EF18 ON ROOF.
3. EXHAUST DUCT UP TO FAN 200-EF29 ON ROOF.
4. EXHAUST AIRFLOW CONTROL VALVE FOR ISOLATION EXHAUST.
5. CLEAN AND SEAL MEDIUM PRESSURE SUPPLY DUCT.
6. CLEAN AND SEAL LOW PRESSURE RETURN DUCT.
7. PROVIDE SENSOR PRIOR TO DUCT DEMOLITION SHOWN ON OTHER
DRAWINGS FOR VFD CONTROL OF EXISTING, TEMPORARY, AND
PERMANENT AIR HANDLING UNITS.
8. DEMOLISH DUCT AND PERMANENTLY CAP OPEN ENDS.
9. LABEL AS ABANDONDED IN PLACE. APPLY LABEL EVERY 10 FEET.
FAN TOTAL 1,540 1,270 N/A
LOCATIONS SERVED BY FAN
200-EF29 (GENERAL EXHAUST)
ORIGINAL
DESIGN
AIRFLOW
(CFM)
REQUIRED
DESIGN
AIRFLOW
(CFM)
DUCT SIZE
FOR ADDED
MVD (W X H,
INCHES)
FAN TOTAL 6,750 6,328 N/A
SECOND FLOOR BRANCH SUBTOTAL 2,020 2,020 12 X 10
FIRST FLOOR BRANCH SUBTOTAL 2,020 2,020 36 X 10
GROUND FLOOR SUBTOTAL 2,710 2,288 28 x 14
LOCATIONS SERVED BY FAN
200-EF18 (GENERAL EXHAUST)
ORIGINAL
DESIGN
AIRFLOW
(CFM)
REQUIRED
DESIGN
AIRFLOW
(CFM)
DUCT SIZE
FOR ADDED
MVD (W X H,
INCHES)
FAN TOTAL 4,040 4,325 N/A
SECOND FLOOR BRANCH SUBTOTAL 875 875 36 X 10
FIRST FLOOR BRANCH SUBTOTAL 1,055 1,055 12 X 10
GROUND FLOOR SUBTOTAL 2,110 2,395 28 X 12
LOCATIONS SERVED BY FAN
200-EF17 (ISOLATION EXHAUST)
ORIGINAL
DESIGN
AIRFLOW
(CFM)
REQUIRED
DESIGN
AIRFLOW
(CFM)
DUCT SIZE
FOR ADDED
MVD (W X H,
INCHES)
STAIR
TOILET
C122A
STAIR
TOILET
C122A
FF
S T
A
IR
TOILET
B121A
S T
A
IR
TOILET
B121A
F
F
STAIR
TOILET
C121A
STAIR
TOILET
C121A
F
S T
A
IR
TOILET
B121A
S T
A
IR
TOILET
B121A
F
15161720 19
E
D
C
B.5
B
A.5 x
R A
8 9
12x8 x x x
0 10
3 245
O
P
Q
Q.1
R
S
P.1
2.5 1.5
RA
20x6 x
14x10
12x8
12x8
15161720 19
E
D
C
B.5
B
A.5
200-EFC2
200-EFC1 2
200-EFC3
3 24
O
P
Q
Q.1
R
S
P.1
2.5 1.5 1
200-EFB1
200-EFB2
200-EFB3
15161720 19
E
D
C
B.5
B
A.5
R A3 x
20x10
12x8
3 245
O
P
Q
Q.1
R
S
P.1
2.5 1.5
RA
20x6
14x10
12x8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 WAW JPN
621-18-104
MH104
FINAL CONSTRUCTION
DRAWINGS FOR BID
HVAC FLOOR PLAN - CHASES
3/16" = 1' - 0" 0 5' 10' 20'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.
1. ISOLATION EXHAUST FAN AND ROOF CURB.
2. GENERAL EXHAUST FAN ON EXISTING ROOF CURB, WITH ADAPTER CURB.
3. EXHAUST DUCT TO FAN ON ROOF.
4. UP TO 200-EFB1
5. UP TO 200-EFB2. ROUTE DUCTS ABOVE EXISTING PIPE AND DUCTS.
6. UP TO 200-EFB3. ROUTE DUCTS ABOVE EXISTING PIPE AND DUCTS.
7. UP TO 200-EFC1
8. UP TO 200-EFC2. ROUTE DUCTS ABOVE EXISTING PIPE AND DUCTS.
9. UP TO 200-EFC3. ROUTE DUCTS ABOVE EXISTING PIPE AND DUCTS.
10. ABOVE CEILING WORK MUST BE ACCOMPLISHED WITH EXISTING CEILING
GRID IN PLACE.
3/16" = 1'-0"5
FLOOR PLAN - SECOND FLOOR - C WING
3/16" = 1'-0"
FLOOR PLAN - SECOND FLOOR - B WING
3/16" = 1'-0"6
FLOOR PLAN - ROOF - C WING
3/16" = 1'-0"
FLOOR PLAN - ROOF - B WING
3/16" = 1'-0"4
FLOOR PLAN - FIRST FLOOR - C WING
3/16" = 1'-0"
FLOOR PLAN - FIRST FLOOR - B WING
C029
MECH ROOM
C026
TOILET
C024
STORAGE
C028
RECYCLING
66x24
88x24
VAV-AC4-65
T
CWP-AC4/
CTRL VALVE
1 1/2"
LPC
MPS
x
44x60
1720 1921
M
O
P
P.1
N
N.1
F
FD
FD
VAV-AC4-65
F
FS
S
FS
MH402
x
1 1/2"
200-AC4
4" CWR
4" CWS
K
MH402
66x24 x x
1 1/4" D
3/4" D
88x24
3" HWR
3" HWS
4" CWS
4" CWR
4"
6" MPS
LPC
1 1/2" LPC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 WAW JPN
621-18-104
MH401
FINAL CONSTRUCTION
DRAWINGS FOR BID
HVAC FLOOR PLAN - MECHANICAL
ROOM
1/2" = 1'-0"
FLOOR PLAN - MECHANICAL ROOM GROUND FLOOR
A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.
B. WALL LOUVERS PENETRATED FOR ROUTING OF DUCT SYSTEMS SHALL
REMAIN BUT BE COVERED WITH INSULATED SHEET METAL ON INDOOR FACE
WHERE NO LONGER ACTIVE.
C. ALL SHEET METAL SUPPLY AND RETURN DUCT TO BE RE-USED MUST HAVE
INTERIORS CLEANED, AS SPECIFIED. FOLLOWING DUCT CLEANING, ALL SUCH
DUCTS MUST BE SEALED, AS SPECIFIED.
D. WHILE TEMPORARY AIR HANDLING UNIT IS IN SERVICE, CAP ALL OPEN ENDS
OF EXISTING DUCT.
1/2" = 1' - 0" 0 1' 5'6" 2' 3' 4'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1. PROVIDE AIR HANDLING UNIT AND ALL ASSOCIATED APPURTENANCES.
2. CONNECT TO EXISTING SUPPLY AIR DUCT.
3. ROUTE RELIEF AIR DUCT TO EXISITING WALL PENETRATION AND PROVIDE
ECONOMIZER CONTROL DAMPER.
4. ROUTE OUTSIDE AIR DUCT THROUGH LOUVER AND TO AHU MIXING BOX.
5. CONNECT TO EXISTING RA DUCT.
6. LOCATE RA FAN ABOVE AIR HANDLER AND SUPPORT FROM ABOVE USING
SPRING ISOLATORS AND FOUR THREADED RODS TO TWO L 3 X 3 X 3/16
TRAPEZE HANGERS BELOW SUPPORT FEET ON FAN.
7. DUPLEX CONDENSATE RECEIVER TO REMAIN.
8. CONNECT TO BUILDING STEAM PIPING.
9. CONNECT TO STEAM CONDENSATE PIPING.
10. CONNECT TO CHILLED WATER SUPPLY AND RETURN.
11. ROUTE COOLING COIL CONDENSATE DRAIN PIPING TO NEAREST ACCESSIBLE
FLOOR DRAIN. PARTIAL REMOVAL OF CONCRETE FLOOR WILL BE NECESSARY
TO ACCOMMODATE FLOOR DRAIN AND INSULATION.
12. EXISTING CONTROL PANELS. INSTALL DDC HVAC SYSTEM CONTROLS IN
EXISTING PANELS.
13. EXISTING ELECTRICAL PANEL.
14. EXISTING TRANSFORMER.
15. LOCATE NEW VFDS FOR RETURN FAN AND CHILLED WATER PUMP HERE.
16. OUTDOOR STAINLESS STEEL SHEET METAL PLENUM/DUCT ROUTED UP
BUILDING IN FRONT OF BLANKED OFF LOUVER SECTION.
17. PROVIDE BACKING MATERIAL IN TRAP, AND PLUG AND SEAL FLOOR DRAIN
WITH NON-SHRINK GROUT, MAKING IT FLUSH WITH FINISHED FLOOR.
18. CONNECT 1-1/4" STEAM CONDENSATE FROM ABOVE TO PIPING TO
CONDENSATE RECEIVER.
19. 60 X 36 RETURN AIR TAKE OFF DOWN AND TRANSITION INTO UNIT 76 X 26 WITH
MINIMUM 3" MITERED ATTACHMENT TO HORIZONTAL DUCT.
20. 88 X 22 SUPPLY AIR DISCHARGE FROM UNIT WITH MINIMUM 3" MITERED
ATTACHMENT TO HORIZONTAL DUCT.
21. REROUTE 10 FEET OF HUBLESS CAST IRON DRAIN PIPING AND FITTINGS,
FROM FLOOR DRAIN IN MECHANICAL ROOM ABOVE, TO MAKE ROOM FOR
MODIFIED RETURN AIR DUCT.
GROUND FLOOR
0'-0"
FIRST FLOOR
12'-8"
GROUND FLOOR
0'-0"
FIRST FLOOR
12'-8"
19 22 23 x
24x88
34x65
200-AC4
1 1/2"
MPS
LPC
1 1/2"
TO CONDENSATE
RECEIVER
LPC
52x22
1 1/2"
4" CWR
CWP-AC4/
CTRL VALVE
3/4" D 1 1/4" D
4" CWS
RA FAN
SUPPLY
FAN
VFD
GROUND FLOOR
0'-0"
FIRST FLOOR
12'-8"
SECOND FLOOR
27'-8"
ROOF
42'-8"
GROUND FLOOR
0'-0"
FIRST FLOOR
12'-8"
SECOND FLOOR
27'-8"
ROOF
42'-8"
60x44
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
F
440 Martin Luther King Jr. Blvd Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
C
U s e rs \J o h n .N ie s e n \D o c u m e n ts \8
T
M M
V A
M t H o m e A c u te C a re
M
J o h n
.N ie s e n . r v t
AE DESIGN RENOVATE B GROUND
FLOOR BLDG. 200 FOR ACUTE
CARE BEDS
VAMC AT MOUNTAIN HOME, TN
JUN 23, 2020 Checker JPN
621-18-104
MH402
FINAL CONSTRUCTION
DRAWINGS FOR BID
HVAC SECTIONS AND ELEVATIONS
A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.
B. WALL LOUVERS PENETRATED FOR ROUTING OF DUCT SYSTEMS SHALL
REMAIN BUT BE COVERED WITH INSULATED SHEET METAL ON INDOOR FACE
WHERE NO LONGER ACTIVE.
1. LOUVER L-1 ON FRONT FACE AND LOUVER L-2 ON SOUTH FACE.
2. SUPPORT VERTICAL DUCT FROM STEEL STRUCTURE SURROUNDING DUCT
USING SMACNA DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE,
THIRD EDITION, FIGURE 5-8B. PROVIDE SUPPORTS FROM STRUCTURAL
MEMBER AT EACH FLOOR AND ROOF.
3. 60 X 46 DUCT TO RELIEF CHASE.
4. DUCT RUN OUT TO VAV-AC4-65.
5. HUMIDIFIER DRAIN TO FLOOR DRAIN.
6. COOLING COIL CONDENSATE DRAIN TO FLOOR DRAIN.
7. PROVIDE TRAPEZE HANGING SUPPRT FOR RA-FAN 200-AC4. PROVIDE
VIBRATION ISOLATION IN VERTICAL SUPPORT RODS.
8. VIBRATION ISOLATORS.
1/2" = 1'-0"1
MECHANICAL ROOM SECTION
1/2" = 1' - 0" 0 1' 5'6" 2' 3' 4'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1/2" = 1'-0"2
OUTDOOR AIR DUCT RISER ELEVATION
D U
C T
H E
IG
H
T
H1/
H 1/
H
1/
H
6" M
IN
[1 m m
AIR HANDLING UNIT DRAIN TRAP DETAIL
NTS
DRAW THRU X + 1" X/2 + 1
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE
NIPPLE ON THE DRAIN PAN PIPING SHALL BE RIGID
COPPER TYPE L OR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .