Mechanical Set Final Acute Care.pdf

PDF 2 MB Posted

Attached to
Z1DA--Project 621-18-104 - Renovate B-Ground for Acute Care
Solicitation number
36c24920r0065
Issued by

About this file

This document is a solicitation for Project 621-18-104 to renovate the B-wing ground floor at the Veterans Affairs Medical Center in Mountain Home, Tennessee. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

The scope of work includes demolishing existing HVAC, plumbing and electrical systems; installing new HVAC, plumbing and electrical systems; and renovating patient rooms, offices and common areas. Specific requirements include a new air handling unit, VAV terminal units, control valves, ductwork, piping and air devices. Bids are due by August 15, 2020 and the contract is to be awarded by September 15, 2020. Pricing is to be provided using standard construction industry forms.

View the file

Other files

File Type Posted
AS Built Drawings.pdf PDF
B-Ground Sign in Sheet 27 July.pdf PDF
As Builts SO18382862 Latitude.pdf PDF
Section 22 66 00 - CHEMICAL-WASTE SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES.pdf PDF
Eskola Warranty.pdf PDF
Pre Bid Sign in.pdf PDF
36C24920R0065 0003.pdf PDF
Detail 5A501Revised 2020 08 10.pdf PDF
PPQ - Renovate B Ground for Acute Beds.pdf PDF
36C24920R0065 0002.docx DOCX document
36C24920R0065 0001.docx DOCX document
0 Combined Specs Vol 2 revised 7-10-2020.pdf PDF
S02 - CALCULATION OF SELF PERFORMED WORK.pdf PDF
Fire Protection Set Final Acute Care.pdf PDF
General Set Final Acute Care.pdf PDF
0 Combined Specs Vol 1 revised 7-8-2020.pdf PDF
Price Proposal Template.xlsx XLSX spreadsheet
Structural Set Final Acute Care.pdf PDF
Header List Attachments.txt TXT text file
Addendum NO 1.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
0 Combined Specs Vol 2 revised 7 -8 -2020.pdf PDF
36C24920R0065_1.docx DOCX document
Plumbing set Final Acute Care.pdf PDF
WD TN20200111 1-3-2020.pdf PDF
Contractor EMR Certification Form.pdf PDF
Electrical FINAL Acute Care.pdf PDF
Equipment set Final Acute Care.pdf PDF
Architectural set Final Acute Care.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# DEMOLITION NOTE IDENTIFICATION

INDICATES ITEM TO BE REMOVED

FIRE DAMPER

MANUAL VOLUME DAMPER

CEILING RETURN, EXHAUST OR TRANSFER REGISTER

CEILING SUPPLY DIFFUSER

MITERED ELBOW WITH TURNING VANES

RETURN DUCT TURNING UP

RETURN DUCT TURNING DOWN

EXHAUST DUCT TURNING UP

EXHAUST DUCT TURNING DOWN

SUPPLY DUCT TURNING UP (ROUND OR RECTANGULAR)

SUPPLY DUCT TURNING DOWN (ROUND OR RECTANGULAR)

10"x10" SQUARE OR RECTANGULAR DUCTWORK

PIPE TURNING UP

PIPE TURNING DOWN

DUCT SMOKE DETECTOR

A

(CFM)

AIR TERMINAL DESIGNATION

WITH CFM INDICATED

GENERAL

DUCTWORK

MOTORIZED CONTROL DAMPER

INDICATES ROUND DUCTWORK

RETURN, EXHAUST OR TRANSFER AIR FLOW

SUPPLY AIR FLOW

ADJUSTABLEADJ.

ABOVE FINISHED FLOORAFF

ABOVE FINISHED GRADEAFG

ALUMINUMAL.

CAPACITYCAP.

DIAMETERDIA.

EXTERNAL STATIC PRESSUREESP

ENTERINGENT.

GAUGEGA

HEATINGHTG.

MOUNTINGMTG.

NOT TO SCALENTS

TYPICALTYP.

HIEGHTHT.

RETURN AIRRA

AUTOMATIC AIR VENT

VALVES AND ACCESSORIES

BALL VALVE

BOTTOM CONNECTION

BUTTERFLY VALVE

CAPPED PIPE

CHECK VALVE

CONCENTRIC REDUCER

DIRECTION OF FLOW

FLEXIBLE CONNECTION

GLOBE VALVE

PRESSURE/TEMPERATURE TEST PLUG

PRESSURE GAUGE WITH GAUGE COCK

INVERTED BUCKET STEAM TRAP

STRAINER WITH BALL BLOW DOWN VALVE

STRAINER WITH GATE BLOW DOWN VALVE

TWO WAY CONTROL VALVE

TOP CONNECTION

UNION

CWR

MPS

MPC

D

CWS

CHILLED WATER RETURN

MEDIUM PRESSURE STEAM SUPPLY

MEDIUM PRESSURE CONDENSATE RETURN

DIRECTION OF FLOW

CONDENSATE DRAIN LINE

CHILLED WATER SUPPLY

PIPING

FLEXIBLE DUCT CONNECTION

LEGEND

SD

# CONSTRUCTION NOTE IDENTIFICATION

INDICATES NEW ITEM

INDICATES EXISTING ITEM

LIMIT OF WORK

ROOM NUMBER IDENTIFICATIONXXX

Ø

LPS

LPC

LOW PRESSURE STEAM SUPPLY

LOW PRESSURE CONDENSATE RETURN

TO BE DETERMINEDTBD

HWR

HWS

HOT WATER RETURN

HOT WATER SUPPLY

M

F

FIRE AND SMOKE DAMPERFSD

CUBIC FEET PER MINUTECFM

GALLONS PER MINUTEGPM

MINIMUMMIN

MAXIMUMMAX

1000 BTUS PER HOURMBH

VARIABLE AIR VOLUMEVAV

VARIABLE FREQUENCY DRIVEVFD

DUCT STATIC PRESSURE SENSORDSP

DUCT OFFSET DOWN

DUCT OFFSET UP

SMOKE DAMPERS

CONTROLCTRL. FLOAT AND THERMOSTATIC STEAM TRAP

MANUAL AIR VENTMV

AV

GATE VALVE

HOSE CONNECTION

BALANCING VALVE

PIPE CONTINUATION

DUCT CONTINUATION

CONTRACTING OFFICER'S REPRESENTATIVE COR

BUILDING AUTOMATION SYSTEMBAS

FLOOR DRAINFD

ENGINEERING CONTROL CENTERECC

OPERATINGOPER.

MANUFACTURERMNFR.

POUNDSLBS

INCHESIN

AIR HANDLING UNITAHU

ULTRA VIOLETUV

EXHAUST AIREA

SUPPLY AIRSA

EXHAUST FANEF

EXHAUST CONTROL VALVEECV

CONTROL VALVE FLOW COEFFICIENTCV

POLYVINYL CHLORIDEPVC

NUMBERNO.

HOURHR

OUTDOOR AIROA

STATIC PRESSURESP

KILOGRAMKG

NOISE CRITERIANC

FEET PER MINUTEFPM

AIR TERMINAL UNITATU

VELOCITYVEL.

COOLINGCLG.

CONNECTIONCONN.

TEMPERATURETEMP.

LEAVINGLVG.

PRESSUREPRESS.

HOT WATERHW

CHILLED WATERCHW

OCCUPIEDOCC.

UNOCCUPIEDUNOCC.

FEETFT

WATER COLUMNWC

WATER GAUGEWG

HORSE POWERHP

KILOWATTKW

POUNDS PER SQUARE INCH GAUGEPSIG

ROTATIONS PER MINUTERPM

MANUAL VOLUME DAMPERMVD

DRY BULBDB

WET BULBWB

HANDS OFF AUTO SWITCHH-O-A

ENTERING AIR TEMPERATUREEAT

LEAVING AIR TEMPERATURELAT

ENTERING WATER TEMPERATUREEWT

LEAVING WATER TEMPERATURELWT

WATER PRESSURE DROPWPD

STEELSTL

CONSTRUCTIONCONST.

HORIZONTALHORIZ.

ARCHITECTARCH.

NOTE APPLIES TO

DUCT IN DIRECTION

INDICATED BY ARROW

H

T

HUMIDITY SENSOR

TEMPERATURE SENSOR

ASSEMBLYASSY.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 WAW JPN

621-18-104

M-001

FINAL CONSTRUCTION

DRAWINGS FOR BID

MECHANICAL LEGEND

27. ALL EQUIPMENT REMOVED FROM THE BUILDING, DURING DEMOLITION, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED

FROM THE SITE, UNLESS OTHERWISE NOTED. THIS PROJECT REQUIRES AHU

CONTROLLERS AND VAV HOT WATER CONTROL VALVES TO BE CAREFULLY

REMOVED AND GIVEN TO THE COR. SEE DEMOLITION PLANS FOR MORE

INFORMATION.

28. EXISTING DUCT, PIPE AND EQUIPMENT SIZES NOTED ARE FOR THE

CONVENIENCE OF THE CONTRACTOR ONLY AND ARE NOT WARRANTED TO BE

CORRECT. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DUCT, PIPE

AND EQUIPMENT SIZES AND THEIR RESPECTIVE LOCATIONS BEFORE

PROCEEDING WITH ANY ASSOCIATED WORK.

29. PRIOR TO SUBMITTING A PROPOSAL THE CONTRACTOR IS STRONGLY

ENCOURAGED TO VISIT THE SITE AND THOROUGHLY INSPECT ALL EXISTING

CONDITIONS TO INSURE THAT THE WORK REPRESENTED ON THE DRAWINGS

CAN BE INSTALLED AS INDICATED.

30. REFER TO ELECTRICAL DRAWINGS FOR VOLTAGE AND PHASE

REQUIREMENTS FOR ALL EQUIPMENT REQUIRING AN ELECTRICAL

CONNECTION.

31. CONSTRUCTION MUST BE COMPLETED IN PHASES. REFER TO

ARCHITECTURAL DRAWINGS FOR IDENTIFICATION OF THE BUILDING AREAS

TO BE INCLUDED IN EACH PHASE. ADDITIONAL NOTES ARE PROVIDED HERE

WHEN NECESSARY TO PROVIDE SUPPLEMENTARY INSTRUCTIONS. WORK

WILL SOMETIMES BE REQUIRED IN, AND ABOVE THE CEILING OF, AREAS

OUTSIDE OF THE PHASE THAT IS CURRENTLY UNDER CONSTRUCTION. THE

CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE WORK THAT MAY BE

COMPLETED IN EACH PHASE AND REGULARLY COORDINATING WITH THE

GOVERNMENT THE AREAS IN WHICH WORK MUST OCCUR.

32. INTERIOR SURFACES OF SOME EXISTING DUCTS TO BE RE-USED MUST BE

CLEANED AND RE-SEALED, AS INDICATED. SOME DUCTS ARE INSIDE OF, AND

OTHERS ARE OUTSIDE OF, THE RENOVATION AREA. MEDIUM PRESSURE

SUPPLY AND LOW PRESSURE RETURN DUCTS SERVED BY AIR HANDLING UNIT

200-AC4 MUST BE CLEANED AND RE-SEALED AS INDICATED. THIS WORK

SHALL BE COMPLETED DURING THE FIRST PHASE OF THIS PROJECT.

33. THIS PROJECT REQUIRES THE TESTING OF SOME SUPPLY AND EXHAUST

AIRFLOW RATES PRIOR TO BEGINNING CONSTRUCTION, SO THAT ACTUAL

EXISTING AIRFLOW RATES MAY BE RESTORED FOLLOWING THE WORK

DESCRIBED HEREIN. REFER TO VAV TERMINAL UNIT SCHEDULE AND SHEET

MH103 FOR ADDITIONAL INFORMATION.

34. SUPPLY AIRFLOW RATES AT VAV TERMINAL UNITS AND RETURN AIRFLOW

RATES AT GRILLES THAT ARE CONNECTED TO AHU 200-AC4 MUST BE

REBALANCED BY THIS PROJECT. EXHAUST AIRFLOW RATES AT GROUND

FLOOR GRILLES SERVED BY FANS 200-EF17, -EF-18, AND -EF29 MUST BE

REBALANCED BY THIS PROJECT. EXHAUST AIRFLOW RATES IN FIRST AND

SECOND FLOOR DUCT BRANCHES AND AT FANS 200-EF17, -EF-18, AND -EF29

MUST BE REBALANCED BY THE PROJECT FOLLOWING GROUND FLOOR DUCT

SYSTEM MODIFICATIONS AND SEALING. REFER TO VAV TERMINAL UNIT

SCHEDULE AND SHEET MH103 FOR ADDITIONAL INFORMATION.

35. HOT WATER (HW) FLOWS MUST BE REBALANCED AT VAV TERMINAL UNITS

ASSOCIATED WITH AHU 200-AC4, AS INDICATED ON VAV TERMINAL UNIT

SCHEDULE.

36. COORDINATE ALL HVAC SYSTEM OUTAGES WITH THE COR, PROVIDING

ADVANCE NOTICE OF ALL SUCH OUTAGES AS REQUIRED BY THE

SPECIFICATIONS. NO OUTAGES OF HVAC EQUIPMENT OR SYSTEMS SERVING

OCCUPIED AREAS OF THE FACILITY MAY EXCEED 12 HOURS DURATION.

TEMPORARY HVAC EQUIPMENT, DUCTS, PIPING, CONTROLS, ETC. ARE

INDICATED IN THESE CONSTRUCTION DOCUMENTS AND ARE REQUIRED TO

LIMIT OUTAGE DURATIONS. OVERTIME WORK AND WORK OUTSIDE OF

NORMAL BUSINESS HOURS (I.E., OUTSIDE OF 7:30AM – 5:30PM) WILL BE

REQUIRED FOR ALL OUTAGES.

37. RUN-OUT DUCTS TO INDIVIDUAL AIR DEVICES AND TO INLETS OF INDIVIDUAL

VAV TERMINAL UNITS SHALL MATCH THE SIZE SCHEDULED FOR THE AIR

DEVICE NECK OR THE VAV TERMINAL UNIT INLET, UNLESS OTHERWISE

NOTED.

38. THE AIR HANDLING UNIT TO BE PROVIDED BY THE PROJECT WILL HAVE

SECTIONS LARGER THAN EXISTING BUILDING DOORS AND PASSAGEWAYS

AVAILABLE, WHICH WILL REQUIRE SECTIONS TO BE DISASSEMBLED AND

RE-ASSEMBLED ON SITE. UNITS WITH SECTIONS RE-ASSMBLED ON SITE MUST

HAVE THE FULLY ASSEMBLED UNIT CASING TESTED FOR LEAKAGE BEFORE

CONNECTING DUCTS. UNIT SHALL MEET OR EXCEED LEAKAGE CLASS 6 (CL =

6) AS BASED ON THE LEAK TESTING METHOD DESCRIBED IN THE SMACNA

HVAC AIR DUCT LEAKAGE TEST MANUAL. PROVIDE ON-SITE TEST DATA

CONFIRMING THAT UNIT'S CABINET CONSTRUCTION AND ASSEMBLY

COMPLIES WITH THESE REQUIREMENTS. UNITS FAILING INITIAL LEAKAGE

TESTS MUST BE ADJUSTED AND REPAIRED, AS NECESSARY, FOLLOWING

SEALING METHODS RECOMMENDED BY THE UNIT MANUFACTURER. CAULK

OR SEALANT APPLIED TO THE EXTERIOR OF ASSEMBLED UNIT CASING JOINTS

OR SEAMS IS PROHIBITED.

39. THE PROJECT INCLUDES DEMOLITION AND INSTALLATION OF SMOKE

DAMPERS, DUCT MOUNTED SMOKE DETECTORS, AND OTHER CONTROL

DEVICES THAT REQUIRE COORDINATION WITH FIRE ALARM SYSTEM WORK

INDICATED IN THESE CONSTRUCTION DOCUMENTS.

40. IN EVERY SUPPLY, RETURN, AND EXHAUST AIR DUCT BRANCH IN TEMPORARY

AND NEW DUCT SYSTEMS, PROVIDE A MANUAL VOLUME DAMPER IN THE

BRANCH, NEAR THE MAIN DUCT, FOR BALANCING AIRFLOW. THIS INCLUDES

DAMPERS EVERY RUN-OUT DUCT TO AN INDIVIDUAL AIR DEVICE, INCLUDING

THOSE OCCURRING AS AN EXTENSION AT THE END OF THE MAIN DUCT.

1. GENERAL NOTES ON THIS DRAWING ARE APPLICABLE TO EACH MECHANICAL

DRAWING OF THIS SET. NOTES SPECIFIC TO INDIVIDUAL MECHANICAL

DRAWINGS WILL BE SHOWN ON THE RESPECTIVE MECHANICAL DRAWING.

2. THE CONTRACTOR SHALL PROVIDE A COMPLETE HVAC SYSTEM TO INCLUDE

ALL LABOR, MATERIALS, TOOLS, AND EQUIPMENT FOR A COMPLETE AND

FUNCTIONAL SYSTEM INCLUDING ALL NECESSARY APPURTENANCES

CUSTOMARILY INCLUDED IF NOT SPECIFICALLY CALLED OUT.

3. ENTIRE INSTALLATION, INCLUDING MATERIALS, EQUIPMENT, AND

WORKMANSHIP, SHALL CONFORM WITH ALL APPLICABLE LAWS, CODES, AND

REGULATIONS OF MUNICIPAL, STATE AND FEDERAL AUTHORITIES.

4. THIS PROJECT SHALL CONFORM TO APPLICABLE ASHRAE, NFPA, AND

SMACNA STANDARDS AND OTHER REGULATORY BODIES HAVING

JURISDICTION OVER THE CLASS OF WORK.

5. MATERIALS AND EQUIPMENT SHALL HAVE STAMPS OR SEALS OF ARI, ASME,

UL, AND ASTM.

6. THE CONTRACTOR SHALL MAKE TESTS FOR ACCEPTANCE AND APPROVAL AS

REQUIRED BY CODE AND THE REQUIREMENTS OF APPLICABLE REGULATORY

AGENCIES. REQUIRED TESTS SHALL BE PERFORMED IN THE PRESENCE OF

THE GOVERNMENT UNLESS OTHERWISE WAIVED IN WRITING.

7. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES,

DOCUMENTS, AND SERVICES RELATED TO INSTALLATION OF THE WORK.

8. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE OTHER TRADES

IN ORDER TO RESOLVE ANY CONFLICT THAT MIGHT ARISE DUE TO THE

LOCATION OF EQUIPMENT OR THE USE OF SPACE.

9. EQUIPMENT OF HIGHER ELECTRICAL CHARACTERISTICS MAY BE FURNISHED

PROVIDED SUCH PROPOSED EQUIPMENT IS APPROVED IN WRITING AND

CONNECTING ELECTRICAL SERVICE, CIRCUIT BREAKERS AND CONDUIT SIZES

ARE APPROPRIATELY MODIFIED AT NO COST TO THE OWNER.

10. RUN ALL HORIZONTAL PIPING AND DUCTWORK ABOVE CEILING UNLESS

OTHERWISE NOTED.

11. CUT OPENINGS, AS REQUIRED, IN THE EXISTING CONSTRUCTION FOR THE

INSTALLATION OF PIPING, DUCTWORK, AND EQUIPMENT. PATCH AND REPAIR

TO MATCH THE EXISTING ADJACENT CONSTRUCTION.

12. MAKE DUCT PENETRATIONS OF ALL WALLS WITH SHEET METAL DUCTS.

FLEXIBLE DUCT PENETRATIONS OF WALLS ARE NOT ACCEPTABLE.

13. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT

LOCATION OF DIFFUSERS, REGISTERS, AND GRILLES.

14. DUCTWORK SIZES ARE INSIDE CLEAR DIMENSIONS.

15. ALL ELBOWS IN DUCTWORK SHALL BE RADIUS ELBOWS UNLESS OTHERWISE

NOTED. WHERE SQUARE ELBOWS ARE SHOWN, INSTALL TURNING VANES.

16. PROVIDE DYNAMIC FIRE AND SMOKE DAMPERS IN ACCORDANCE WITH THEIR

U.L. LISTING AND THE REQUIREMENTS OF NFPA-90A.

17. DO NOT INSTALL EQUIPMENT, PIPING OR DUCTWORK OVER ANY ELECTRICAL

EQUIPMENT OR ELECTRICAL SERVICE SPACE.

18. LAYOUT OF PIPING AND DUCTWORK IS DIAGRAMMATIC. RUN ALL EXPOSED

PIPING AND DUCTWORK AS HIGH AS POSSIBLE UNLESS OTHERWISE NOTED.

ALLOW FOR RISES, DROPS AND OFFSETS AS REQUIRED.

19. INSTALL MECHANICAL EQUIPMENT TO FACILITATE SERVICING, MAINTENANCE,

AND REPAIR OR REPLACEMENT OF EQUIPMENT COMPONENTS. AS MUCH AS

PRACTICAL, CONNECT EQUIPMENT FOR EASE OF DISCONNECTING, WITH A

MINIMUM OF INTERFERENCE WITH OTHER INSTALLATIONS. PIPING SHALL

NOT INTERFERE WITH FILTER PULL.

20. MECHANICAL CONTRACTOR SHALL PROVIDE AUTOMATIC CONTROL DEVICES,

SUCH AS TEMPERATURE SENSORS, RELAYS, PRESSURE SWITCHES WHICH

ARE ASSOCIATED WITH MECHANICAL EQUIPMENT AND ASSOCIATED

CONTROL WIRING FROM STARTER TO THE CONTROL DEVICE. ELECTRICAL

CONTRACTOR SHALL PROVIDE CONDUIT AND WIRING FROM POWER SOURCE

TO DISCONNECT SWITCH, FROM DISCONNECT SWITCH TO STARTER, AND

FROM STARTER TO THE EQUIPMENT.

21. ALL CONTROL WIRING SHALL BE IN CONDUIT. NO CONDUIT SHALL BE

SURFACE MOUNTED IN FINISHED SPACES. ALL ELECTRICAL WORK SHALL BE

IN ACCORDANCE WITH NATIONAL ELECTRICAL CODE.

22. LOCATE THERMOSTATS 48" ABOVE FINISHED FLOOR OR AS NOTED ON THE

PLANS.

23. ALL VALVES ARE FULL LINE SIZE EXCEPT CONTROL AND BALANCING VALVES.

24. PROVIDE PRESSURE/TEMPERATURE (P/T) PLUGS, WITH CAPS UP AND

DOWNSTREAM OF ALL EQUIPMENT, AT THE SUPPLY AND RETURN TAPS OF

ALL PIPING BRANCHES AND/OR WHERE INDICATED. PROVIDE EXTENDED

PLUGS AND LABELS WHERE PIPING IS INSULATED. PROVIDE REMOVABLE

INSULATION PLUG.

25. PROVIDE MANUAL AIR VENTS AT ALL HIGH SPOTS AND THE ENDS OF ALL

PIPING LOOPS. PROVIDE 1/2" DRAIN VALVES AT LOW POINTS IN PIPING.

PROVIDE MINIMUM PITCH SUFFICIENT TO INSURE ADEQUATE VENTING AND

DRAINING.

26. PROVIDE FLUSHING VALVES AND TEES AT BOTH SIDES OF ALL EQUIPMENT.

TAPS SHALL MATCH EQUIPMENT PIPING UP TO 1". FOR LARGER EQUIPMENT

AND PIPE LOOPS PROVIDE 1 1/2" TAPS AND VALVES.

GENERAL NOTES

24x8

16x7

24x8 16x8 x

10x8

8x6 x x

28x16 ø ø x 0 8 x

16x10

14ø 12ø

16x6 14x6 x x ø

14ø 12ø 8ø

12x10

12x5

16x10 40x1242x12

14x7 16x10 x

18x12 16x12 16x10 x x x

12x10 x x

8x5

8x5 x

8x5

8ø 14x8

32x16 x

10x88x7 ø ø 6 ø ø x

B006

PATIENT ROOM

B008

PATIENT ROOM

B010

PATIENT ROOM

B012

PATIENT ROOM

B014

PATIENT ROOM

B016

MULTI-PURPOSE

LOUNGE

B016C

FEMALE LOCKERS

B016D

TOILET

B016B

TOILET

B016A

MALE LOCKERS

B015

HOUSEKEEPING

B011

MED ROOM

B017

MULTI-PURPOSE

ROOM

B013

OFFICE

B017A

BATH

C006B

NURSE STATION

B003

DIETIC KITCHEN

B005

SOILED UTILITY

B006

WORK STATION

B001

STORAGE

B030

DIALYSIS UNIT

WORK AREA

B056

TOILET

B028A

PATIENT ROOM

B026

PATIENT ROOM

B028

OFFICE

B007

CLEAN LINEN

B020

PATIENT ROOM

B022

PATIENT ROOM

B024

PATIENT ROOM

B018

LOGISTICS

STORAGE

C006B

CORRIDOR

B002

TELE

B004

ELECTRICAL

B031

UNIT DIRECTOR

2" HWR

2" HWR

1 1/2" HWS

2" HWR

1 1/2" HWS

9 8 3 24567

M

O

P

Q

Q.1

R

S

P.1

N

N.1

M.5

2.5 1.5

VAV

VAV VAV VAV VAV VAV VAV

VAV

VAV

VAV

VAV

VAV

VAV VAV VAV VAV VAV

VAV

VAV

VAV

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 WAW JPN

621-18-104

MD101

FINAL CONSTRUCTION

DRAWINGS FOR BID

HVAC DEMOLITION - B WING GROUND

FLOOR

3/16" = 1'-0"

DEMOLITION PLAN - GROUND FLOOR - B WING

3/16" = 1' - 0" 0 5' 10' 20'

GRAPHIC SCALE(S)

KEY PLAN

DEMOLITION KEY NOTES#

GENERAL NOTES

A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.

B. REMOVE ALL DUCTWORK AND PIPING WITHIN RENOVATION AREA.

REMOVAL SHALL INCLUDE ALL HANGERS AND SUPPORTS.

C. REMOVE ALL VAV TERMINALS WITHIN RENOVATION AREA. REMOVAL

SHALL INCLUDE ALL SUPPORTS, CONTROLS, WIRING.

D. REMOVE ALL AIR DEVICES WITHIN RENOVATION AREA.

E. CAREFULLY REMOVE AND RETAIN ALL VAV TERMINAL UNIT HOT WATER

CONTROL VALVES IN THE SCOPE OF DEMOLITION AND DELIVER THE

CONTROL VALVES TO THE COR.

F. REFER TO ARCHITECTURAL DRAWINGS FOR WORK ASSOCIATED WITH

WALLS, DOORS, ETC. THE LINES TYPES USED ON ARCHITECTURAL

ELEMENTS ON THIS DRAWING DO NOT NECESSARILY MATCH THE

LEGEND FOR MECHANICAL DRAWINGS.

G. HEATING WATER SUPPLY AND RETURN SIZES ARE 3/4" UNLESS

SPECIFICALLY NOTED OTHERWISE.

1. DEMOLISH SUPPLY DUCTWORK UP TO LIMIT SHOWN AND CAP.

2. DEMOLISH RETURN DUCTWORK UP TO LIMIT SHOWN AND CAP.

3. DEMOLISH EXHAUST DUCTWORK UP TO LIMIT SHOWN AND PERMANENTLY

CAP.

4. DEMOLISH HEATING HOT WATER PIPING TO LIMITS SHOWN.

5. DIALYSIS UNIT MUST REMAIN OPERATIONAL DURING PHASE 1

CONSTRUCTION. ALL HVAC WORK WILL OCCUR IN PHASE 1 EXCEPT FOR

DIALYSIS UNIT, WHICH WILL OCCUR IN PHASE 2.

6. WHILE TEMPORARY AIR HANDLING UNIT IS IN SERVICE, CAP ALL OPEN ENDS

OF EXISTING DUCT.

7. HEATING HOT WATER PIPING IS A REVERSE RETURN SYSTEM. WHILE

DEMOLITION AND CONSTRUCTION OCCUR, PROVIDE A LOCKING BALL VALVE

IN EACH OF THE THREE PIPES. CONNECT THE INCOMING AND OUTGOING HWR

PIPING, MATCHING LARGER OF TWO PIPE SIZES, AND OPEN HWR VALVES TO

ALLOW HWR FLOW. CLOSE THE HWS ISOLATION VALVE. WHEN

CONSTRUCTION IS COMPLETE, REMOVE THE HWR CROSS CONNECTION AND

LOCK ALL VALVES OPEN.

8. DEMOLISH RETURN DUCTWORK UP TO LIMIT SHOWN AND PERMANENTLY CAP.

F x x x

26x1028x10 x x x

22x10

14x6

14x6

14x6

14x6

14x6 x ø

8x6 ø

8ø

8ø

8ø

8ø

14x6

14x6

14x6

14x6

14x6

14x6 x x x x x x

C014

OFFICE

C013

OFFICE

C011A

BATH

C011

OFFICE

C012A

BATH

C012

OFFICE

C010

OFFICE

C008

OFFICE

C009

STORE

C007

OFFICE

C007A

BATH

C008A

BATH

C006

OFFICE

C005

OFFICE

C003

OFFICE

C003A

BATH

C004A

BATH

C004

OFFICE

C002A

OFFICE

C002B

OFFICE

C001A

BATH

C001

OFFICE

C002C

NURSE MGR

C002

CORRIDOR

x

22x14

1 1/2" HWS

2" HWR

2" HWR

F

G

15161720

H

E

D

C

B.5

B

14.1 14

2" HWR

2" HWR

1 1/2" HWS

14x10

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

7 6

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 WAW JPN

621-18-104

MD102

FINAL CONSTRUCTION

DRAWINGS FOR BID

HVAC DEMOLITION - C WING GROUND

FLOOR

3/16" = 1'-0"

DEMOLITION PLAN - GROUND FLOOR - C WING

1. DEMOLISH SUPPLY DUCTWORK UP TO LIMITS SHOWN AND CAP.

2. DEMOLISH RETURN DUCTWORK UP TO LIMITS SHOWN AND CAP.

3. DEMOLISH EXHAUST DUCTWORK UP TO LIMITS SHOWN AND PERMANENTLY

CAP.

4. DEMOLISH HEATING HOT WATER PIPING UP TO LIMITS SHOWN.

5. DEMOLISH EXHAUST DUCT AND AIR DEVICE IN/ON VERTICAL CHASE, WHICH

EXTENDS TO ROOF. SEE ARCHITECTURAL PLANS FOR WALL DEMOLITION

WORK REQUIRED.

6. WHILE TEMPORARY AIR HANDLING UNIT IS IN SERVICE, CAP ALL OPEN ENDS

OF EXISTING DUCT.

7. HEATING HOT WATER PIPING IS A REVERSE RETURN SYSTEM. WHILE

DEMOLITION AND CONSTRUCTION OCCUR, PROVIDE A LOCKING BALL VALVE

IN EACH OF THE THREE PIPES. CONNECT THE INCOMING AND OUTGOING HWR

PIPING, MATCHING LARGER OF TWO PIPE SIZES, AND OPEN HWR VALVES TO

ALLOW HWR FLOW. CLOSE THE HWS ISOLATION VALVE. WHEN

CONSTRUCTION IS COMPLETE, REMOVE THE HWR CROSS CONNECTION AND

LOCK ALL VALVES OPEN.

A. REMOVE SUPPLY, RETURN AND EXHAUST DUCTWORK WITHIN

RENOVATION AREA. REMOVAL SHALL INCLUDE ALL HANGERS AND

SUPPORTS.

B. REMOVE ALL VAV TERMINALS WITHIN RENOVATION AREA. REMOVAL

SHALL INCLUDE ALL SUPPORTS, CONTROLS, WIRING.

C. REMOVE SUPPLY, EXHAUST AND RETURN AIR DEVICES WITHIN

RENOVATION AREA.

D. CAREFULLY REMOVE AND RETAIN ALL VAV TERMINAL UNIT HOT WATER

CONTROL VALVES IN THE SCOPE OF DEMOLITION AND DELIVER THE

CONTROL VALVES TO THE COR.

E. REFER TO ARCHITECTURAL DRAWINGS FOR WORK ASSOCIATED WITH

WALLS, DOORS, ETC. THE LINE TYPES USED ON ARCHITECTURAL

ELEMENTS ON THIS DRAWING DO NOT NECESSARILY MATCH THE

LEGEND FOR MECHANICAL DRAWINGS.

F. HEATING WATER SUPPLY AND RETURN SIZES ARE 3/4" UNLESS

SPECIFICALLY NOTED OTHERWISE.

3/16" = 1' - 0" 0 5' 10' 20'

GRAPHIC SCALE(S)

KEY PLAN

DEMOLITION KEY NOTES#

GENERAL NOTES

STAIR

TOILET

C122A

STAIR

TOILET

C122A

F

F

S T

A

IR

TOILET

B121A

S T

A

IR

TOILET

B121A

F

F

STAIR

TOILET

STAIR

TOILETF

S T

A

IR

TOILET

B121A

S T

A

IR

TOILET

B121A

F

F

15161720 19

E

D

C

B.5

B

A.5 x

R A

20x6

14x10

EA

EA20x6

EA

3 245

O

P

Q

Q.1

R

S

P.1

2.5 1.5

420x6 RA

20x6

20x6

EA

EA

15161720 19

E

D

C

B.5

B

A.5

1 12

200-EF20

200-EF32

200-EF31

3 245

O

P

Q

Q.1

R

S

P.1

2.5 1.5

200-EF19

200-EF33

15161720 19

E

D

C

B.5

B

A.5

20x6

EA

R A x

14x10

EA

3 245

O

P

Q

Q.1

R

S

P.1

2.5 1.5 x

20x6 RA

E A 7

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 WAW JPN

621-18-104

MD103

FINAL CONSTRUCTION

DRAWINGS FOR BID

HVAC DEMOLITION - CHASES

3/16" = 1' - 0" 0 5' 10' 20'

GRAPHIC SCALE(S)

KEY PLAN

DEMOLITION KEY NOTES#

GENERAL NOTES

A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.

B. REFER TO ARCHITECTURAL DRAWINGS FOR ROOFING AND CHASE WALL

WORK, ASSOCIATED WITH WORK SHOWN HERE.

1. DEMOLISH POWER ROOF VENTILATOR AND ROOF CURB. REFER TO

ARCHITECTURAL DRAWINGS FOR ROOF WORK REQUIRED.

2. DEMOLISH POWER ROOF VENTILATOR, AND LEAVE ROOF CURB READY FOR

RE-USE.

3. DEMOLISH EXHAUST AIR DUCT IN CHASE AND EXHAUST AIR GRILLE MOUNTED

ON CHASE WALL.

4. RETURN AIR DUCT TO REMAIN.

5. DEMOLISH EXHAUST AIR DUCT, DUCT IN CHASE AND ABOVE CEILING.

6. TO FAN 200-EF19

7. TO FAN 200-EF33

8. TO FAN 200-EF20

9. TO FAN 200-EF32

10. TO FAN 200-EF31

3/16" = 1'-0"

DEMOLITION PLAN - SECOND FLOOR - C WING

3/16" = 1'-0"2

DEMOLITION PLAN - SECOND FLOOR - B WING

3/16" = 1'-0"

DEMOLITION PLAN - ROOF - C WING

3/16" = 1'-0"3

DEMOLITION PLAN - ROOF - B WING

3/16" = 1'-0"

DEMOLITION PLAN - FIRST FLOOR - C WING

3/16" = 1'-0"1

DEMOLITION PLAN - FIRST FLOOR - B WING

14 15

C029

MECH ROOM

C026

TOILET

C028

RECYCLING

C024

STORAGE

AHU-200-AC4

1 1/2"

1 1/2"

4" CWS

4" CWR

MPS

LPC

D x

60x48

66x24 x

60x48

1720 1921

M

O

P

P.1

N

N.1

FD FD

FD

1 1/2"

LPC

3" HWS

3" HWR

4" CWR

4" CWS

6"

4"

MPS

MPC

18x14

EA

8x6

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 WAW JPN

621-18-104

MD401

FINAL CONSTRUCTION

DRAWINGS FOR BID

HVAC DEMOLITION - MECHANICAL

ROOM

1/2" = 1'-0"1

DEMOLITION PLAN - MECHANICAL ROOM GROUND FLOOR

1/2" = 1' - 0" 0 1' 5'6" 2' 3' 4'

GRAPHIC SCALE(S)

KEY PLAN

DEMOLITION KEY NOTES#

GENERAL NOTES

1. DEMOLISH AIR HANDLING UNIT AND ALL RELATED DUCT, PIPING, AND

ATTACHMENTS.

2. DEMOLISH SA DUCT TO LIMITS OF DEMOLITION SHOWN.

3. DEMOLISH RELIEF AIR DUCT IN ENTIREITY.

4. DEMOLISH OA/RA MIXING BOX IN ENTIREITY.

5. DEMOLISH RA DUCT TO LIMITS OF DEMOLITION SHOWN.

6. DEMOLISH RA FAN AND ALL ASSOCIATED ATTACHMENTS AND SUPPORTS.

7. DEMOLISH FIRE DAMPER.

8. DUPLEX STEAM CONDENSATE RECEIVER TO REMAIN.

9. DEMOLISH BUILDING STEAM PIPING TO LIMITS OF DEMOLITION SHOWN.

10. DEMOLISH BUILDING STEAM CONDENSATE PIPING TO LIMITS OF DEMOLITION

SHOWN.

11. DEMOLISH CHILLED WATER SUPPLY AND RETURN PIPING TO LIMITS OF

DEMOLITION SHOWN.

12. DEMOLISH COOLING COIL CONDENSATE DRAIN PIPING.

13. EXISTING HVAC SYSTEM CONTROL PANEL CABINETS. CAREFULLY REMOVE

AND RETAIN AIR HANDLING UNIT CONTROLLER AND DELIVER THE

CONTROLLER TO THE COR. ANY CONTROLS EQUIPMENT OUTSIDE OF

PROJECT SCOPE TO REMAIN.

14. EXISTING ELECTRICAL PANELS TO REMAIN.

15. EXISTING TRANSFORMER TO REMAIN.

16. DEMOLISH EXISTING SUPPLY FAN VFD.

17. DEMOLISH EXISTING RETURN FAN VFD.

18. MASONRY CHASE THROUGH ROOF, WITH OPEN GRATE AT TOP.

19. LOW PRESSURE STEAM CONDENSATE DOWN FROM FLOOR ABOVE. MUST BE

REROUTED DURING PROJECT.

20. DEMOLISH COMBINATION FIRE/SMOKE DAMPER AND CONTROLS.

21. TEMPORARILY CAP DUCTWORK WHILE TEMPORARY UNIT IS IN SERVICE.

A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.

B. FOLLOWING DEMOLITION SHOWN HERE, ALL SHEET METAL SUPPLY AND

EXHAUST DUCT TO BE RE-USED MUST BE SEALED, AS SPECIFIED.

1720 1921

M

O

P

P.1

N

N.1

4" CWS

1 1/2"

LPC

MPS

66x24

88x24 x x2 x

1 1/2"

MVD 11

4" CWR

3" HWR

3" HWS

4" CWS

4" CWR

6"

4" MPC

MPS

1/2" = 1'-0"1

TEMPORARY WORK - MECHANICAL ROOM GROUND FLOOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 WAW JPN

621-18-104

MD402

FINAL CONSTRUCTION

DRAWINGS FOR BID

HVAC TEMPORARY WORK -

MECHANICAL ROOM

1/2" = 1' - 0" 0 1' 5'6" 2' 3' 4'

GRAPHIC SCALE(S)

KEY PLAN

TEMPORARY WORK KEY NOTES#

GENERAL NOTES

A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.

B. THIS DRAWING IS INTENDED TO SHOW TEMPORARY DUCTS, PIPING,

ETC. REQUIRED DURING REPLACEMENT OF AHU, TO MINIMIZE HVAC

OUTAGES IN THE AREA SERVED BY THE AHU. ALL TEMPORARY WORK

SHALL BE REMOVED AT THE COMPLETION OF CONSTRUCTION.

C. TEMPORARY SYSTEMS SHALL HAVE ALL OF THE SAME, COMPONENTS,

FEATURES, CONTROLS, ETC. AS THE PERMANENT REPLACEMENT

SYSTEMS.

D. REFER TO SHEET MD403 FOR CONTINUATION OF OUTDOOR PIPING AND

DUCTS TO TEMPORARY UNIT.

1. REMOVE WALL LOUVER AS NECESSARY TO ALLOW FOR ROUTING OF

DUCTWORK, PIPING, CONDUIT, ETC. THROUGH EXTERIOR WALL.

2. EXTEND RETURN AIR DUCT TO TEMPORARY UNIT.

3. INSTALL DUCTS AND PIPING AS HIGH AS POSSIBLE TO ALLOW

CONSTRUCTION OF REPLACEMENT AHU BELOW.

4. EXTEND CHILLED WATER PIPING TO TEMPORARY UNIT.

5. EXTEND STEAM PIPING TO TEMPORARY INIT.

6. EXTEND STEAM CONDENSATE PIPING TO TEMPRARY UNIT.

7. CONNECT 1-1/4" STEAM CONDENSATE FROM ABOVE TO PIPING TO

CONDENSATE RECEIVER.

8. CONDENSATE RECEIVER.

9. PROVIDE PERMANENT FIRE AND SMOKE DAMPERS AT WALL

PENETRATION. (OR EXISTING DAMPERS MAY BE USED, IF

OPERATIONAL, WITH TEMPORARY DUCTS, PROVIDED THAT PERMANENT

DAMPERS ARE INSTALLED WITH PERMANENT DUCTS).

10. TEMPORARILY CAP DUCTWORK WHILE TEMPORARY UNIT IS IN

SERVICE.

11. BALANCE FOR 55% OF TEMPORARY RETURN AIRFLOW.

12. OFFSET DUCTS AS REQUIRED TO AVOID PIPING AND CONDUIT.

G

161720

H

M

I

J

K

L

N

M.5 x

C022B

ANTE ROOM

C022A

TOILET

C022

ICU-1 ISOLATION

C024

STRETCHER/

HOLDING

x

RELIEF AIROA

x x

36x18

1 1/2"

1 1/4"

4" CWR

4" CWS

LPC

MPS

MVD

36x40

74x22

S

72x20 SA BOTTOM 70x20 RA TOP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 WAW JPN

621-18-104

MD403

FINAL CONSTRUCTION

DRAWINGS FOR BID

HVAC TEMPORARY WORK -

COURTYARD

1/8" = 1'-0"

TEMPORARY WORK - COURTYARD GROUND FLOOR

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

TEMPORARY WORK KEY NOTES#

GENERAL NOTES

A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.

B. THIS DRAWING IS INTENDED TO SHOW A TEMPORARY AIR HANDLING

UNIT, DUCTS, PIPING, ETC. REQUIRED DURING REPLACEMENT OF AHU,

TO MINIMIZE HVAC OUTAGES IN THE AREA SERVED BY THE AHU. ALL

TEMPORARY WORK SHALL BE REMOVED AT THE COMPLETION OF

CONSTRUCTION.

C. TEMPORARY EQUIPMENT AND SYSTEMS SHALL HAVE ALL OF THE SAME

COMPONENTS, FEATURES, CONTROLS, ETC. AS THE PERMANENT

REPLACEMENT UNIT, AS SCHEDULED AND SPECIFIED HEREIN.

D. REFER TO SHEET MD402 FOR CONTINUATION OF TEMPORARY DUCT

AND PIPING INSIDE MECHANICAL ROOM.

E. INTERIOR EXISTING DUCT AND DEVICES SHOWN ON THIS PLAN ARE

INTENDED ONLY FOR REFERENCE. REFER TO SHEETS MH101-4 FOR

ADDITIONAL WORK REQUIRED.

F. WHILE TEMPORARY UNIT IS IN SERVICE CAP ALL OPEN ENDS OF

EXISTING DUCTS.

G. TEMPORARY DUCT AND PIPING SHALL BE INSULATED AS SPECIFIED

FOR INDOOR AND OUTDOOR DUCTS.

1. REMOVE PORTION OF WALL LOUVER AS NECESSARY TO ALLOW FOR

ROUTING OF DUCTWORK, PIPING, CONDUIT, ETC.

2. PROVIDE TEMPORARY SUPPORTS FOR DUCTWORK, PIPING, ETC.

ROUTED FROM TEMPORARY AHU. REFER TO STRUCTURAL FOR

SUPPORT DETAILS.

3. TEMPORARY AIR HANDLING UNIT 200-AC4-T.

4. PROVIDE DRYWELL FOR TEMPORARY UNIT COOLING COIL

CONDENSATE. ABANDON DRY WELL WHEN TEMPORARY UNIT IS

REMOVED.

6. CONNECT SUPPLY DUCT INTO EXISITING.

7. CONNECT RETURN DUCT INTO EXISTING.

8. ACCESS CLEARANCE SPACE.

9. LOCATION OF DUCT RISE TO ABOVE CEILING ELEVATION.

10. BALANCE FOR 45% OF RETURN AIRFLOW.

11. DUCT SLOPE DOWN.

12. DUCT SLOPE UP.

13. DUCT AND PIPING ELEVATION CHANGE TO PENETRATE LOUVER AS

HIGH AS POSSIBLE BELOW BEAM AT EXTERIOR WALL.

14. PROVIDE TEMPORARY PIPE SUPPORTS AT MAXIMUM SPACING OF 10

FEET IN A MANNER THAT ALLOWS LANDSCAPE MAINTENANCE BELOW

PIPING.

15. PROVIDE TEMPORARY DUCT SUPPORTS USING LUMBER OR SIMILARLY

SOFT MATERIALS TO PREVENT DAMAGE TO EXISTING WALL AND FLOOR

FINISHES.

16. PROVIDE RADIUS ELBOWS.

FEC

FEC

FEC

FEC

FF

B024

MD WORKROOM

B020

MD WORKROOM

B022

LAB

B023

EXAM ROOM

B021

EXAM ROOMB025

EXAM ROOM

B027

EXAM ROOM

B029

TOILET

B026

EXAM ROOM, RN

B028

RECEPTION/ADMINB030

WAITING ROOM

B032

PATIENT

EDUCATION

B001

CLEAN SUPPLY

B007

NOURISHMENT

B008

DIALYSATE PREP

AND MEDS

B009

CLEAN UTILITY

B018

PICC STATION

B019

REPAIR SHOP &

EQUIP STORAGE

B016D

TOILET B016B

TOILET

B016C

F LOCKERS

B016A

M LOCKERS

B016

STAFF LOUNGE

B015

RD STATION

B014

RD STATION

B013

RD STATION

B012

RD ISOLATION

B012A

TOILET

B003

TOILET

B006A

HT/WT

B010

HAC

B011

SOILED UTILITY

B006

NURSE STATION

B017

NURSE STATION

B032A

STORAGE

B031

EXAM ROOM, LPN

C

C

E

O

N

C

J

I

I

B

VAV-AC4-41

VAV-AC4-48

VAV-AC4-47

VAV-AC4-49

VAV-AC4-52

VAV-AC4-51

VAV-AC4-50

VAV-AC4-46

VAV-AC4-44

VAV-AC4-45

VAV-AC4-43

32x16 x x

30x10 30x10 20x10 12x10

16x12 14x12

12x10

8x10 ø 8 ø ø

10ø

8x10 ø6 ø

6x6 x ø

10x10 8x10 x x ø

8ø

8ø

10x12 8x12

48x14 46x12 x

42x12 36x12 32x12 x

10x10 x

8x6 x

16x1012x10

I

VAV-AC4-42A

VAV-AC4-53

VAV-AC4-54

x x

2" HWR

2" HWR

HWR

1 1/2" HWS

B

B

E

E

I

J

I

J

E

B

C

C 115C

B

C

I

I

I

I 35C

B

B

E

C

J

I

I

L

12x8 ø

12x8 14x10 x

I

E 235C

E

2" HWR

2" HWR

1 1/2" HWS

48x16

32x1634x1636x16

T

TT

T

T

T

T

T

T

T

T

T

T

T

1" HWS

2" HWR

HWS

HWR

2" HWR

x

8x6

8ø D

D

D

D

I

C

C

E

J

I

12x8

I

I x x

ECV-B1

10 9 8 3 24567

M

O

P

Q

Q.1

R

S

P.1

N

N.1

M.5

2.5 1.5

10x10

C

J

12x8

2" HWR

1 1/2" HWS

10x8

I

I

I

I

I

10x88x8

1 1/4" HWS

VAV-AC4-54

VAV-AC4-43

VAV-AC4-45

VAV-AC4-44

VAV-AC4-46

VAV-AC4-42A

VAV-AC4-41

D

VAV-AC4-48

VAV-AC4-51

VAV-AC4-50

VAV-AC4-52

VAV-AC4-49

VAV-AC4-47

VAV-AC4-53

B005

ELEC ROOM

G

I

10x10

20x12

T T

VAV-AC4-42B

VAV-AC4-42B 1

ø ø

12x8 12x8 ø

12x8

VAV-AC4-42C

VAV-AC4-42C

x

12x8

1 1/4" HWS

24x12

H

H x1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 WAW JPN

621-18-104

MH101

FINAL CONSTRUCTION

DRAWINGS FOR BID

HVAC FLOOR PLAN - B WING GROUND

FLOOR

3/16" = 1'-0"1

FLOOR PLAN - GROUND FLOOR - B WING

A. REFER TO M-001 FOR GENERAL NOTES ON THIS PROJECT.

B. HEATING WATER SUPPLY AND RETURN SIZES ARE 3/4" UNLESS SPECIFICALLY

NOTED OTHERWISE.

C. ROUTE SUPPLY MAINS AS HIGH AS POSSIBLE IN CEILING. INSTALL VAV BOXES

WITHIN 12 INCHES OF CEILING.

3/16" = 1' - 0" 0 5' 10' 20'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

1. CONNECT SUPPLY DUCT INTO EXISTING AT SCOPE OF WORK.

2. CONNECT RETURN DUCT INTO EXISTING AT SCOPE OF WORK.

3. CONNECT HEATING HOT WATER LINES INTO EXISTING AT SCOPE OF WORK

4. ROUTE EXHAUST DUCTS THROUGH WALL AND INTO CHASE UP TO FANS ON

ROOF.

5. DDC CONTROL PANEL FOR B WING

6. DIALYSIS UNIT MUST REMAIN OPERATIONAL DURING PHASE 1 CONSTRUCTION.

ALL HVAC WORK WILL OCCUR IN PHASE 1 EXCEPT FOR DIALYSIS UNIT, WHICH

WILL OCCUR IN PHASE 2. EXISTING DIALYSIS UNIT WILL THEN BECOME

PATIENT EDUCATION B032 AND WAITING ROOM B030.

7. DUCT OFFSET AROUND OBSTACLE.

8. TRANSITION DUCT MAIN DOWN TO WITHIN 12 INCHES OF CEILING.

REFER TO MH103 FOR DETAILED DRAWING

OF THIS ICU AREA.

F

C013

STORAGE, CLEAN

SUPPLY

C013

RD/RO STORAGE

C012

ICU-14

C012A

TOILET

C010A

TOILET

C010

ICU-15

C006B

OFFICEC008B

OFFICE

C008A

OFFICE

C006A

OFFICE

C005B

OFFICE

C007B

SHARED USE

OFFICE

C007A

NURSE

MANAGER'S

OFFICE

C005A

OFFICE

C004

CONFERENCE

C003

TOILET

C010

CORRIDOR

C010

CORRIDOR

C009

ICU-17

C009A

TOILET

C011B

TOILET

C011A

ANTE ROOM

C011

ISO BARI ICU-16

C002A

OFFICE

C002B

OFFICE

C002C

NURSE MGR

C002

CORRIDOR

x x x

20x632x10 x x

18x10 16x8 10x8 x x x x

6x10

14x12 x

12x8 12x8

6x8 6x8

10x810x10 ø

12x8

6ø

10x8

VAV-AC4-63

VAV-AC4-55

VAV-AC4-64

VAV-AC4-62

VAV-AC4-56

VAV-AC4-61

VAV-C4-60 VAV-C4-57

VAV-C4-58

8x6

8x6 8x6 x

L

N

M

L

L

L x x x

20x10

8x6

12x8

VAV-C4-59

F

L x

B

B

I

I

C

I

A

C

I

E

J

A

I

G

I 215 I

I

I

B

A

J

B

C

T

T

T

T

T

T

T

T

T

B

1" HWS

2" HWR

1 1/2" HWS

HWS

H x

C

C

I

I

I

ECV-C1

F

G

15161720

H

E

D

C

B.5

B

14.1 14 ø ø x x x x

D

D

D

D x x

2" HWR 1 1/2" HWS

2" HWR

1 1/2" HWS

2" HWR

1 1/4" HWS2 1/2" HWR

2 1/2" HWR

2 1/2" HWR

VAV-AC4-61

VAV-AC4-55

VAV-AC4-62

VAV-AC4-63

VAV-AC4-56

VAV-C4-60

VAV-C4-57

VAV-C4-58

VAV-C4-59

T

VAV-AC4-64

2" HWR

8 8

8x68x6

12x6 x x x x x

22x16

22x16

H

J x

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 WAW JPN

621-18-104

MH102

FINAL CONSTRUCTION

DRAWINGS FOR BID

HVAC FLOOR PLAN - C WING GROUND

FLOOR

3/16" = 1'-0"

FLOOR PLAN - GROUND FLOOR - C WING

A. REFER TO M-001 FOR GENERAL NOTES ON THIS PROJECT.

B. HEATING WATER SUPPLY AND RETURN SIZES ARE 3/4" UNLESS SPECIFICALLY

NOTED OTHERWISE.

C. ROUTE SUPPLY MAINS AS HIGH AS POSSIBLE IN CEILING. INSTALL VAV BOXES

WITHIN 12 INCHES OF CEILING.

3/16" = 1' - 0" 0 5' 10' 20'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

1. CONNECT SUPPLY DUCT INTO EXISTING.

2. CONNECT RETURN DUCT INTO EXISTING.

3. CONNECT HEATING HOT WATER LINES INTO EXISTING.

4. CONNECT EXHAUST DUCT INTO EXISTING.

5. ROUTE EXHAUST DUCT INTO CHASE. TURN DUCT UP IN CHASE.

6. DDC CONTROL PANEL FOR C WING.

7. DUCT OFFSET AROUND OBSTACLE.

8. INSTALL AND PLACE RETURN DUCT IN SERVICE WITHIN 8 HOURS OF THE

DEMOLITION OF THE RETURN DUCT CURRENTLY SERVING ROOMS C055 AND

C053.

9. REBALANCE EXISTING AIR DEVICES ASSOCIATED WITH VAV-C4-59 TO

AIRFLOWS SHOWN.

10. REBALANCE EXISTING RETURN AIR REGISTER TO AIRFLOW SHOWN.

DN

DN

DN

DN

C016

ICU 4 - BARIATRIC

C018A

TOILET

C018

ICU-3

CG33

CORRIDOR

C055

ELECTRICAL

C053

TEL

C021

NOURISH

C019

WARD CLERK/

TEAM WORK

CG35

ELEVATOR LOBBY

C006B

WAITING

C026

TOILET

C028

RECYCLING

C029

MECH ROOM

C022B

ANTE ROOM

C026

CONSULT

CO26A

HAC

C030

STAFF CONF/

LOUNGE

C030A

FEMALE LOCKERS

C038

STAFF TOILET

C040

STAFF TOILET

C042

LOGISTICS STOR

C023

MEDS

CG25

CORRIDOR

C034

EMS SOILED

HOLDING

C025

OFFICE

C032

SPS SOILED

C031

LINEN

C031A

STAFF TOILET

B035

PATIENT ROOM

B033

ISOLATION

SURGERY

B037

PATIENT ROOM

B039

PATIENT ROOM

B043

PATIENT ROOM

CO45

ICU-7

C047

ICU-6

C049

ICU-5 BARIATRIC

C051

IT

CG22

CORRIDOR

C037

PROCEDURE

B057

ICU WAITING

ROOM

B065

HAC

B059

TEL

B067

ELECTRICAL

B069

TOILET

B036

ON CALL ROOM

C033A

TOILET

B053

OFFICE

B055A

WOMENS

LOCKERS

B055

HALL

B057B

MEN

B057A

WOMEN

BG03

CORRIDOR

B036A

BATH

C006B

CORRIDOR

B035

TRASH AND LINEN

REMOVAL

C024

STORAGE

C022A

TOILET

C022

ICU-1 ISOLATION

C020

ICU-2C020A

TOILET

C017

CLEAN

C057A

CRASH

C041A

TOILET

C028

RECYCLING

C028A

HOUSE-KEEPING

C030B

MALE LOCKERS

C027A

ALCOVE

C036A

EQUIP

C027

TEAM WORK

B055A

MENS LOCKERS

B002

TELE

B004

ELEC

C035A

TOILET

B037A

TOILET

B039A

TOILET

C036

MED GAS

VAV-AC4-04

VAV-AC4-03

VAV-AC4-26

VAV-AC4-84 VAV-AC4-28

VAV-AC4-07 VAV-AC4-08

VAV-AC4-09

VAV-AC4-10

VAV-AC4-11

VAV-AC4-16VAV-AC4-17VAV-AC4-21

VAV-AC4-23

VAV-AC4-12

VAV-AC4-13

VAV-AC4-14

VAV-AC4-06

VAV-AC4-01

VAV-AC4-02 VAV-AC4-24

VAV-AC4-31

VAV-AC4-18 VAV-AC4-27

VAV-AC4-83

VAV-AC4-72

VAV-AC4-71

VAV-AC4-73

VAV-AC4-75

VAV-AC4-74 VAV-AC4-22

VAV-AC4-76

VAV-AC4-77 VAV-AC4-78

VAV-AC4-82

VAV-AC4-20

SEE MH401

38x16

48x16 66x18 x x

42x1848x24 56x10 48x10 x x

18x16

10x10 x x ø ø ø ø 8 ø ø ø

28x10 24x10 x

10x8

10x8

10x8

30x10 18x10 x x ø1 ø ø x x

10ø

4ø

34x10 x x x

28x10

36x10 x

18x10 x

16x10 12x8 x

8x6 x ø

8ø ø

66x24 x x ø 8 ø ø ø

10x8 x x

VAV-AC4-80

VAV-AC4-81

VAV-AC4-25

VAV-AC4-29

VAV-AC4-15

15161720

H

1921 12.5 12 11 10 9 8

M

O

P

Q

Q.1

R

I

J

K

L

S

P.1

N

N.1

M.5

14.1 14

130 * x

12014x6

8x6

6x6 x x

8x6

6x6

12x8

8x6 x

C049A

TOILET

C047A

TOILET

C045A

TOILET

C043A

TOILET

5ø

6x6 ø ø6 ø x

24x10 16x8 9x6 x ø ø x x

14x8 5ø x x

90*

28x10

26x10 28x12 x x x1

10x8

10x8

10x8

AV-1

AV-2

AV-4

AV-3

ø

7ø

24x10 16x7 x

314x6 x

8x6

8x6

6x6 x x x

8x6

6ø ø

16x12

12x24

VAV-AC4-79

14x28

28x12

FSD

FSD

FSD

FSD

FSD

FSD

FSD

VAV-AC4-05

x

VAV-AC4-32

x

FSD

VAV-AC4-30

FSD FSD

FSD

FSD

200-AC4-19

FSD

FSD

8ø ø ø ø

12ø

10ø 8ø

8ø ø

8ø

4ø 8ø ø

6ø

6ø ø ø1 ø ø ø ø ø ø ø

8ø

10ø

8ø ø

48x14 46x1248x16

34x16 32x1636x16

5 5 5

5 5 x

C024

STRETCHER/

HOLDING

DSP

T

VAV-AC4-71

T T

VAV-AC4-73

VAV-AC4-72

T

VAV-AC4-83

T

VAV-AC4-75

T

VAV-AC4-82

T

VAV-AC4-74

T

T VAV-AC4-79

VAV-AC4-76

T

T

VAV-AC4-77

VAV-AC4-78

T

T VAV-AC4-81

VAV-AC4-80

T

VAV-AC4-84

x x

16ø24x16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 WAW JPN

621-18-104

MH103

FINAL CONSTRUCTION

DRAWINGS FOR BID

HVAC FLOOR PLAN - ICU GROUND

FLOOR

1/8" = 1'-0"1

HVAC FLOOR PLAN - ICU GROUND FLOOR

A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.

B. DUCT CLEANING AND SEALING MUST BE PERFORMED TO THE MAXIMUM

EXTENT PRACTICAL DURING THE TWO SYSTEM OUTAGES REQUIRED TO

PLACE THE TEMPORARY AIR HANDLING UNIT IN SERVICE AND TO PLACE THE

PERMANENT UNIT IN SERVICE. ANY ADDITIONAL OUTAGES REQUIRED TO

CLEAN AND SEAL DUCTS SHALL BE SCHEDULED IN ADVANCE AND

COORDINATED WITH THE COR, AS SPECIFIED. SUCH OUTAGES SHALL HAVE

A MAXIMUM 4 HOURS DURATION, AND NO MORE THAN TWO ICU ROOMS

SHALL HAVE HVAC INTERRUPTED AT A TIME. ADDITIONAL SMALL

TEMPORARY AIR CONDITIONERS AND/OR TEMPORARY DUCT CONNECTIONS

SHALL BE PROVIDED, AS NECESSARY TO MEET THESE REQUIREMENTS.

WORK AREAS AND TEMPORARY MEASURES SHALL BE APPROVED BY THE

COR IN ADVANCE.

C. PROTECT ALL SMOKE AND FIRE/SMOKE DAMPERS, AND ASSOCIATED DUCT

SMOKE DETECTORS, FROM DAMAGE DURING CLEANING AND SEALING

DUCTS.

D. REBALANCE AIRFLOWS IN MEDIUM PRESSURE SUPPLY AIR DUCTS BETWEEN

AHU 200-AC4 AND VAV TERMINAL UNITS ASSOCIATED WITH THE AHU.

AIRFLOWS ARE INDICATED ON VAV TERMINAL UNIT SCHEDULE.

E. REBALANCE AIRFLOWS IN RETURN AIR DUCTS ASSOCIATED WITH AHU 200-

AC4. AIRFLOWS AT AIR DEVICES ARE INDICATED ON THIS DRAWING.

F. REBALANCE AIRFLOWS IN EXHAUST DUCTS ASSOCIATED WITH EXISTING

FANS 200-EF17, -EF18, AND -EF29 AS INDICATED ON THIS DRAWING. PRIOR

TO ANY OTHER WORK, THE AIRFLOWS IN THE EXISTING FIRST AND SECOND

FLOOR EXHAUST BRANCH DUCTS SHALL BE MEASURED AND VERIFIED TO

MATCH THE TABLES BELOW, AND DIFFERENCES SHALL BE REPORTED IN

WRITING. EXHAUST AIRFLOW RATES SHALL BE REBALANCED IN FIRST AND

SECOND FLOOR DUCT BRANCHES FOLLOWING COMPLETION OF ALL OTHER

WORK. EXISTING AIRFLOWS SHALL BE RESTORED DURING REBALANCING.

MANUAL VOLUME DAMPERS SHALL BE ADDED IN THE DUCT BRANCHES TO

PROVIDE A METHOD OF QUICKLY BALANCING THE AIRFLOW FOR EACH

FLOOR. FOLLOWING GROUND FLOOR DUCT MODIFICATIONS AND SEALING.

G. WORK SHOWN ON THIS DRAWING IS PART OF THE PROJECT’S FIRST PHASE.

H. FOR EXISTING VAV TERMINAL UNITS TO BE REPLACED OR RECEIVE NEW

CONTROLS, AS INDICATED IN THE VAV TERMINAL UNIT SCHEDULE, EXISTING

HOT WATER CONTROL VALVES SHALL BE CAREFULLY REMOVED AND

DELIVERED TO THE VAMC’S COR.

I. FOR EXISTING TERMINAL UNITS SCHEDULED TO HAVE CONTROLS

REPLACED, ALL INACTIVE PNEUMATIC CONTROL TUBING SHALL BE

REMOVED TO THE MAXIMUM EXTENT POSSIBLE. PERMANENTLY CAP

DEMOLISHED BRANCHES AT ACTIVE PNEUMATIC CONTROL TUBING

MAINS/BRANCHES. PROVIDE REPLACEMENT WALL TEMPERATURE SENSORS

IN EXISTING LOCATIONS.

3/16" = 1' - 0" 0 5' 10' 20'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

1. EXHAUST DUCT UP TO FAN 200-EF17 ON ROOF.

2. EXHAUST DUCT UP TO FAN 200-EF18 ON ROOF.

3. EXHAUST DUCT UP TO FAN 200-EF29 ON ROOF.

4. EXHAUST AIRFLOW CONTROL VALVE FOR ISOLATION EXHAUST.

5. CLEAN AND SEAL MEDIUM PRESSURE SUPPLY DUCT.

6. CLEAN AND SEAL LOW PRESSURE RETURN DUCT.

7. PROVIDE SENSOR PRIOR TO DUCT DEMOLITION SHOWN ON OTHER

DRAWINGS FOR VFD CONTROL OF EXISTING, TEMPORARY, AND

PERMANENT AIR HANDLING UNITS.

8. DEMOLISH DUCT AND PERMANENTLY CAP OPEN ENDS.

9. LABEL AS ABANDONDED IN PLACE. APPLY LABEL EVERY 10 FEET.

FAN TOTAL 1,540 1,270 N/A

LOCATIONS SERVED BY FAN

200-EF29 (GENERAL EXHAUST)

ORIGINAL

DESIGN

AIRFLOW

(CFM)

REQUIRED

DESIGN

AIRFLOW

(CFM)

DUCT SIZE

FOR ADDED

MVD (W X H,

INCHES)

FAN TOTAL 6,750 6,328 N/A

SECOND FLOOR BRANCH SUBTOTAL 2,020 2,020 12 X 10

FIRST FLOOR BRANCH SUBTOTAL 2,020 2,020 36 X 10

GROUND FLOOR SUBTOTAL 2,710 2,288 28 x 14

LOCATIONS SERVED BY FAN

200-EF18 (GENERAL EXHAUST)

ORIGINAL

DESIGN

AIRFLOW

(CFM)

REQUIRED

DESIGN

AIRFLOW

(CFM)

DUCT SIZE

FOR ADDED

MVD (W X H,

INCHES)

FAN TOTAL 4,040 4,325 N/A

SECOND FLOOR BRANCH SUBTOTAL 875 875 36 X 10

FIRST FLOOR BRANCH SUBTOTAL 1,055 1,055 12 X 10

GROUND FLOOR SUBTOTAL 2,110 2,395 28 X 12

LOCATIONS SERVED BY FAN

200-EF17 (ISOLATION EXHAUST)

ORIGINAL

DESIGN

AIRFLOW

(CFM)

REQUIRED

DESIGN

AIRFLOW

(CFM)

DUCT SIZE

FOR ADDED

MVD (W X H,

INCHES)

STAIR

TOILET

C122A

STAIR

TOILET

C122A

FF

S T

A

IR

TOILET

B121A

S T

A

IR

TOILET

B121A

F

F

STAIR

TOILET

C121A

STAIR

TOILET

C121A

F

S T

A

IR

TOILET

B121A

S T

A

IR

TOILET

B121A

F

15161720 19

E

D

C

B.5

B

A.5 x

R A

8 9

12x8 x x x

0 10

3 245

O

P

Q

Q.1

R

S

P.1

2.5 1.5

RA

20x6 x

14x10

12x8

12x8

15161720 19

E

D

C

B.5

B

A.5

200-EFC2

200-EFC1 2

200-EFC3

3 24

O

P

Q

Q.1

R

S

P.1

2.5 1.5 1

200-EFB1

200-EFB2

200-EFB3

15161720 19

E

D

C

B.5

B

A.5

R A3 x

20x10

12x8

3 245

O

P

Q

Q.1

R

S

P.1

2.5 1.5

RA

20x6

14x10

12x8

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 WAW JPN

621-18-104

MH104

FINAL CONSTRUCTION

DRAWINGS FOR BID

HVAC FLOOR PLAN - CHASES

3/16" = 1' - 0" 0 5' 10' 20'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.

1. ISOLATION EXHAUST FAN AND ROOF CURB.

2. GENERAL EXHAUST FAN ON EXISTING ROOF CURB, WITH ADAPTER CURB.

3. EXHAUST DUCT TO FAN ON ROOF.

4. UP TO 200-EFB1

5. UP TO 200-EFB2. ROUTE DUCTS ABOVE EXISTING PIPE AND DUCTS.

6. UP TO 200-EFB3. ROUTE DUCTS ABOVE EXISTING PIPE AND DUCTS.

7. UP TO 200-EFC1

8. UP TO 200-EFC2. ROUTE DUCTS ABOVE EXISTING PIPE AND DUCTS.

9. UP TO 200-EFC3. ROUTE DUCTS ABOVE EXISTING PIPE AND DUCTS.

10. ABOVE CEILING WORK MUST BE ACCOMPLISHED WITH EXISTING CEILING

GRID IN PLACE.

3/16" = 1'-0"5

FLOOR PLAN - SECOND FLOOR - C WING

3/16" = 1'-0"

FLOOR PLAN - SECOND FLOOR - B WING

3/16" = 1'-0"6

FLOOR PLAN - ROOF - C WING

3/16" = 1'-0"

FLOOR PLAN - ROOF - B WING

3/16" = 1'-0"4

FLOOR PLAN - FIRST FLOOR - C WING

3/16" = 1'-0"

FLOOR PLAN - FIRST FLOOR - B WING

C029

MECH ROOM

C026

TOILET

C024

STORAGE

C028

RECYCLING

66x24

88x24

VAV-AC4-65

T

CWP-AC4/

CTRL VALVE

1 1/2"

LPC

MPS

x

44x60

1720 1921

M

O

P

P.1

N

N.1

F

FD

FD

VAV-AC4-65

F

FS

S

FS

MH402

x

1 1/2"

200-AC4

4" CWR

4" CWS

K

MH402

66x24 x x

1 1/4" D

3/4" D

88x24

3" HWR

3" HWS

4" CWS

4" CWR

4"

6" MPS

LPC

1 1/2" LPC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 WAW JPN

621-18-104

MH401

FINAL CONSTRUCTION

DRAWINGS FOR BID

HVAC FLOOR PLAN - MECHANICAL

ROOM

1/2" = 1'-0"

FLOOR PLAN - MECHANICAL ROOM GROUND FLOOR

A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.

B. WALL LOUVERS PENETRATED FOR ROUTING OF DUCT SYSTEMS SHALL

REMAIN BUT BE COVERED WITH INSULATED SHEET METAL ON INDOOR FACE

WHERE NO LONGER ACTIVE.

C. ALL SHEET METAL SUPPLY AND RETURN DUCT TO BE RE-USED MUST HAVE

INTERIORS CLEANED, AS SPECIFIED. FOLLOWING DUCT CLEANING, ALL SUCH

DUCTS MUST BE SEALED, AS SPECIFIED.

D. WHILE TEMPORARY AIR HANDLING UNIT IS IN SERVICE, CAP ALL OPEN ENDS

OF EXISTING DUCT.

1/2" = 1' - 0" 0 1' 5'6" 2' 3' 4'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

1. PROVIDE AIR HANDLING UNIT AND ALL ASSOCIATED APPURTENANCES.

2. CONNECT TO EXISTING SUPPLY AIR DUCT.

3. ROUTE RELIEF AIR DUCT TO EXISITING WALL PENETRATION AND PROVIDE

ECONOMIZER CONTROL DAMPER.

4. ROUTE OUTSIDE AIR DUCT THROUGH LOUVER AND TO AHU MIXING BOX.

5. CONNECT TO EXISTING RA DUCT.

6. LOCATE RA FAN ABOVE AIR HANDLER AND SUPPORT FROM ABOVE USING

SPRING ISOLATORS AND FOUR THREADED RODS TO TWO L 3 X 3 X 3/16

TRAPEZE HANGERS BELOW SUPPORT FEET ON FAN.

7. DUPLEX CONDENSATE RECEIVER TO REMAIN.

8. CONNECT TO BUILDING STEAM PIPING.

9. CONNECT TO STEAM CONDENSATE PIPING.

10. CONNECT TO CHILLED WATER SUPPLY AND RETURN.

11. ROUTE COOLING COIL CONDENSATE DRAIN PIPING TO NEAREST ACCESSIBLE

FLOOR DRAIN. PARTIAL REMOVAL OF CONCRETE FLOOR WILL BE NECESSARY

TO ACCOMMODATE FLOOR DRAIN AND INSULATION.

12. EXISTING CONTROL PANELS. INSTALL DDC HVAC SYSTEM CONTROLS IN

EXISTING PANELS.

13. EXISTING ELECTRICAL PANEL.

14. EXISTING TRANSFORMER.

15. LOCATE NEW VFDS FOR RETURN FAN AND CHILLED WATER PUMP HERE.

16. OUTDOOR STAINLESS STEEL SHEET METAL PLENUM/DUCT ROUTED UP

BUILDING IN FRONT OF BLANKED OFF LOUVER SECTION.

17. PROVIDE BACKING MATERIAL IN TRAP, AND PLUG AND SEAL FLOOR DRAIN

WITH NON-SHRINK GROUT, MAKING IT FLUSH WITH FINISHED FLOOR.

18. CONNECT 1-1/4" STEAM CONDENSATE FROM ABOVE TO PIPING TO

CONDENSATE RECEIVER.

19. 60 X 36 RETURN AIR TAKE OFF DOWN AND TRANSITION INTO UNIT 76 X 26 WITH

MINIMUM 3" MITERED ATTACHMENT TO HORIZONTAL DUCT.

20. 88 X 22 SUPPLY AIR DISCHARGE FROM UNIT WITH MINIMUM 3" MITERED

ATTACHMENT TO HORIZONTAL DUCT.

21. REROUTE 10 FEET OF HUBLESS CAST IRON DRAIN PIPING AND FITTINGS,

FROM FLOOR DRAIN IN MECHANICAL ROOM ABOVE, TO MAKE ROOM FOR

MODIFIED RETURN AIR DUCT.

GROUND FLOOR

0'-0"

FIRST FLOOR

12'-8"

GROUND FLOOR

0'-0"

FIRST FLOOR

12'-8"

19 22 23 x

24x88

34x65

200-AC4

1 1/2"

MPS

LPC

1 1/2"

TO CONDENSATE

RECEIVER

LPC

52x22

1 1/2"

4" CWR

CWP-AC4/

CTRL VALVE

3/4" D 1 1/4" D

4" CWS

RA FAN

SUPPLY

FAN

VFD

GROUND FLOOR

0'-0"

FIRST FLOOR

12'-8"

SECOND FLOOR

27'-8"

ROOF

42'-8"

GROUND FLOOR

0'-0"

FIRST FLOOR

12'-8"

SECOND FLOOR

27'-8"

ROOF

42'-8"

60x44

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

590 MEANS STREET NW

STE. 200

ATLANTA, GA 30318

F

440 Martin Luther King Jr. Blvd Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

C

U s e rs \J o h n .N ie s e n \D o c u m e n ts \8

T

M M

V A

M t H o m e A c u te C a re

M

J o h n

.N ie s e n . r v t

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

JUN 23, 2020 Checker JPN

621-18-104

MH402

FINAL CONSTRUCTION

DRAWINGS FOR BID

HVAC SECTIONS AND ELEVATIONS

A. REFER TO DRAWING M-001 FOR GENERAL NOTES THAT APPLY HERE.

B. WALL LOUVERS PENETRATED FOR ROUTING OF DUCT SYSTEMS SHALL

REMAIN BUT BE COVERED WITH INSULATED SHEET METAL ON INDOOR FACE

WHERE NO LONGER ACTIVE.

1. LOUVER L-1 ON FRONT FACE AND LOUVER L-2 ON SOUTH FACE.

2. SUPPORT VERTICAL DUCT FROM STEEL STRUCTURE SURROUNDING DUCT

USING SMACNA DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE,

THIRD EDITION, FIGURE 5-8B. PROVIDE SUPPORTS FROM STRUCTURAL

MEMBER AT EACH FLOOR AND ROOF.

3. 60 X 46 DUCT TO RELIEF CHASE.

4. DUCT RUN OUT TO VAV-AC4-65.

5. HUMIDIFIER DRAIN TO FLOOR DRAIN.

6. COOLING COIL CONDENSATE DRAIN TO FLOOR DRAIN.

7. PROVIDE TRAPEZE HANGING SUPPRT FOR RA-FAN 200-AC4. PROVIDE

VIBRATION ISOLATION IN VERTICAL SUPPORT RODS.

8. VIBRATION ISOLATORS.

1/2" = 1'-0"1

MECHANICAL ROOM SECTION

1/2" = 1' - 0" 0 1' 5'6" 2' 3' 4'

GRAPHIC SCALE(S)

KEY PLAN

# KEY NOTES

GENERAL NOTES

1/2" = 1'-0"2

OUTDOOR AIR DUCT RISER ELEVATION

D U

C T

H E

IG

H

T

H1/

H 1/

H

1/

H

6" M

IN

[1 m m

AIR HANDLING UNIT DRAIN TRAP DETAIL

NTS

DRAW THRU X + 1" X/2 + 1

UNIT TYPE A B

WHERE X = STATIC PRESSURE IN PAN

DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE

NIPPLE ON THE DRAIN PAN PIPING SHALL BE RIGID

COPPER TYPE L OR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .