This document package includes an addendum to construction drawings and specifications for a federal construction project to renovate the B ground floor of Building 200 at the James H. Quillen Veterans Affairs Medical Center in Mountain Home, Tennessee, as well as the related solicitation.

The construction project will involve renovating the B ground floor of Building 200 to accommodate acute care beds. The addendum provides revisions to the drawings and specifications, including changes to room labels, casework, signage, and other details. The related solicitation is identified as number 36c24920r0065 for Project 621-18-104 to renovate the B ground floor for acute care. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The document package provides key details on the construction requirements and federal procurement for this renovation project at the VA medical center.

View the file

Other files

File Type Posted
AS Built Drawings.pdf PDF
B-Ground Sign in Sheet 27 July.pdf PDF
As Builts SO18382862 Latitude.pdf PDF
Section 22 66 00 - CHEMICAL-WASTE SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES.pdf PDF
Eskola Warranty.pdf PDF
Pre Bid Sign in.pdf PDF
36C24920R0065 0003.pdf PDF
Detail 5A501Revised 2020 08 10.pdf PDF
PPQ - Renovate B Ground for Acute Beds.pdf PDF
36C24920R0065 0002.docx DOCX document
36C24920R0065 0001.docx DOCX document
0 Combined Specs Vol 2 revised 7-10-2020.pdf PDF
S02 - CALCULATION OF SELF PERFORMED WORK.pdf PDF
Fire Protection Set Final Acute Care.pdf PDF
General Set Final Acute Care.pdf PDF
0 Combined Specs Vol 1 revised 7-8-2020.pdf PDF
Price Proposal Template.xlsx XLSX spreadsheet
Structural Set Final Acute Care.pdf PDF
Header List Attachments.txt TXT text file
General Conditions Breakout.xlsx XLSX spreadsheet
0 Combined Specs Vol 2 revised 7 -8 -2020.pdf PDF
36C24920R0065_1.docx DOCX document
Plumbing set Final Acute Care.pdf PDF
WD TN20200111 1-3-2020.pdf PDF
Contractor EMR Certification Form.pdf PDF
Electrical FINAL Acute Care.pdf PDF
Equipment set Final Acute Care.pdf PDF
Mechanical Set Final Acute Care.pdf PDF
Architectural set Final Acute Care.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovate B Ground Floor Building 200 for Acute Care Beds Addendum NO 1 James H. Quillen VAMC Mountain Home, TN Jun 29, 2020 Project NO 621-18-104

Addendum NO 1 - 1

ADDENDUM NO 1

June 29, 2020

The following changes, additions, and/or deletions are hereby made a part of the Contract Documents for the above noted project, fully and completely as if the same were fully contained therein.

Specifications:

1. SECTION 00 01 00, TABLE OF CONTENTS:

a. This section is reissued with the following amendments:

1) Section 23 31 30 title changed to read as follows: “NADCA HVAC Air-Distribution System Cleaning”.

Drawings:

1. Sheet G002, LEGENDS ABBREVIATIONS AND NOTES:

a. PROJECT CODE SUMMARY. The electrical code designation has been changed to read as follows

“NFPA 70, National Electric Code, (NEC), 2020 Edition”.

2. Sheet G004, PHASING PLAN:

a. PHASING NOTES, PHASE 1. Add Note 5 to read as follows: “Site Work as shown on Sheets A001 and A002”.

3. Sheet A001, ARCHITECTURAL SITE PLAN:

a. This sheet has been replaced with the attached drawing A001.

4. Sheets A102, A512:

a. Window Type 1 (2’-0” wide) are located at both ICU Nurse Stations.

5. Sheets A101, A403:

a. Interior windows for B012, B013, B014 and B015 are relabeled on the attached Addendum

Drawing AD1-1.

6. Sheet A103:

a. Respiratory Storage B060B – delete reference to Plan Note 8. Existing door, frame and hardware to remain.

7. Sheet A405:

a. Ante Room C001A casework is elevated on the attached Addendum Drawings AD1-3. This casework shall be furnished by the VA and installed by the Contractor.

8. Sheet A601:

a. Interior Window 6 has been added as shown on the attached Addendum Drawings AD1-2A and

AD1-2B.

9. Sheets A701 and A702:

a. FINISH FLOOR LEGEND. Contact information for manufacturers’ representatives and products are amended as follows:

1) Shaw Contract – Kristen Wormsley: 865-201-5217

2) Tandus Centiva – Brad Hatcher: 615-330-0406

3) Patcraft – Rachele Ransom: 615-587-8206

4) StonHard, Stonblend – Chris Eicher: 615-424-2224; Brian Mastay: 941-387-6297

RES-1 Color to be selected by VA

Renovate B Ground Floor Building 200 for Acute Care Beds Addendum NO 1 James H. Quillen VAMC Mountain Home, TN Jun 29, 2020 Project NO 621-18-104

Addendum NO 1 - 2

RES-2 Color to be Cork

10. Sheet A801:

a. B WING SIGNAGE SCHEDULE. Signage schedule has been amended as follows:

1) Room label B004 ELEC changed to read “B005 ELEC”.

2) Delete sign B060G SOILED UTILITY. Existing sign to remain.

11. Sheets EY101 and EY102:

a. Change New Work Notes 1 and 2 on Sheet EY101 and Key Notes 1 and 2 on Sheet EY102 to read as follows:

“1. ROUTE NEW SPEAKER CABLING FROM THIS SPEAKER TO NEAREST EXISTING SPEAKER

IN ADJACENT CORRIDOR. NEW SPEAKER CABLING SHALL BE BELDEN “5300FE” MULTI-

CONDUCTOR COMMERCIAL AUDIO SYSTEM 2 CONDUCTOR CABLE ROUTED IN A ¾”

CONDUIT. PROVIDE AMPLIFIER AS NECESSARY TO SERVE ALL NEW SPEAKERS

SHOWN.”

“2. ROUTE NEW SPEAKER CABLING FROM SPEAKER TO SPEAKER AS SHOWN. NEW

SPEAKER CABLING SHALL BE BELDEN “5300FE” MULTI-CONDUCTOR COMMERCIAL

AUDIO SYSTEM 2 CONDUCTOR CABLE ROUTED IN ¾” CONDUIT.”

End of Addendum NO 1

Renovate B Ground Floor Building 200 for Acute Care Beds 01-01-20 James H. Quillen VAMC Mountain Home, TN

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 12-18 01 00 00.01 Construction Sign-Text Only 01 00 00.02 Construction Sign-Safety 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 09-19 01 45 00 Quality Control 03-19 01 45 00.01 Quality Control Report 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 04-20 01 45 35.01 Schedule of Special Inspections 01 45 35.02 Statement of Special Inspections 01 57 19 Temporary Environmental Controls 01-11 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 04-20

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 02-16

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 04-20 05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

00 01 10-2

07 21 13 Thermal Insulation 10-17 07 60 00 Flashing and Sheet Metal 09-18 07 81 00 Applied Fireproofing 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17

DIVISION 08 – OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 17 10 Integrated Door Assemblies 02-16 08 42 43 Intensive Care Unit/Critical Care Unit (ICU/CCU)

Entrances

08 71 00 Door Hardware 01-20 08 71 13.11 Low Energy Power Assist Door Operators 08-16 08 80 00 Glazing 10-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 06 00 Schedule for Finishes 04-15 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 09-18 09 30 13 Ceramic/Porcelain Tiling 10-15 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 02-16 09 65 19 Resilient Tile Flooring 05-18 09 67 23.30 Resinous (Epoxy Base) High Performance Decorative

Mortar Flooring (RES 3) 09-18

09 68 00 Carpeting 10-15 09 72 16 Vinyl-Coating Fabric Wall Covering 10-15 09 91 00 Painting 01-16 09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2) 07-14

DIVISION 10 – SPECIALTIES

10 11 13 Chalkboards and Markerboards 10-15 10 14 00 Signage 10-15 10 21 23 Cubicle Curtain Tracks 05-15 10 26 00 Wall and Door Protection 10-15 10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

Not Required

DIVISION 12 – FURNISHINGS

00 01 10-3

12 24 00 Window Shades 08-17 12 32 00 Manufactured Wood Casework 09-15 12 36 61.16 Solid Surfacing Countertops 09-14 12 36 61.19 Quartz Agglomerate Countertops 09-14

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components 01-14

DIVISION 14– CONVEYING EQUIPEMENT

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16 22 05 19 Meters and Gages for Plumbing Piping 09-15 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 11-19 22 13 00 Facility Sanitary and Vent Piping 09-15 22 14 00 Facility Storm Drainage 09-15 22 40 00 Plumbing Fixtures 09-15 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08-17 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 08-17

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 11-16 23 09 23 Direct-Digital Control System for HVAC 09-11 23 09 24 Water Monitoring and Instrumentation 09-24 23 21 13 Hydronic Piping 08-17 23 21 23 Hydronic Pumps 08-17 23 22 13 Steam and Condensate Heating Piping 08-17 23 31 00 HVAC Ducts and Casings 03-13 23 31 30 NADCA HVAC Air-Distribution System Cleaning 23 34 00 HVAC Fans 02-15 23 36 00 Air Terminal Units 02-15

00 01 10-4

23 37 00 Air Outlets and Inlets 02-15 23 40 00 HVAC Air Cleaning Devices 02-12 23 73 00 Indoor Central-Station Air-Handling Units 04-11

DIVISION 25 – INTEGRATED AUTOMATION

Not Required

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 51 00 Interior Lighting 01-18 26 56 00 Site Lighting

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communication Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 52 23 Nurse Call and Code Blue Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and

Security 10-18

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

09-11

28 13 00 Physical Access Control System 10-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Excavation (Short Form) 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

00 01 10-5

DIVISION 33 – UTILITIES

DIVISION 34 – TRANSPORTATION

Not Required

DIVISION 48 – Electrical Power Generation

- - END - -

00 01 10-6

THIS PAGE LEFT BLANK

KEY NOTES

ARCHITECTURAL SITE PLAN

GENERAL NOTES

ARCHITECTURAL SITE PLAN

A001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FINAL CONSTRUCTION

DRAWINGS FOR BID

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

AE DESIGN RENOVATE B GROUND

FLOOR BLDG. 200 FOR ACUTE

CARE BEDS

VAMC AT MOUNTAIN HOME, TN

621-18-104

Project Director

Jun 23, 2020 CRM AH/YK/RSRevisions: Date:

AutoCAD SHX Text

BLDG. 37

AutoCAD SHX Text

BLDG. 200

AutoCAD SHX Text

TG 73.50

AutoCAD SHX Text

TG 73.50

AutoCAD SHX Text

TG 73.50

AutoCAD SHX Text

TG 91.40

AutoCAD SHX Text

TG 72.80

AutoCAD SHX Text

TG 72.80

AutoCAD SHX Text

TG 73.50

AutoCAD SHX Text

TG 73.50

AutoCAD SHX Text

TG 89.50

AutoCAD SHX Text

TG 73.50

AutoCAD SHX Text

TG 86.50

AutoCAD SHX Text

TG 73.50

AutoCAD SHX Text

FIRST FLOOR F.F.E. = 1687.11

AutoCAD SHX Text

BASEMENT F.F.E. = 1674.44

AutoCAD SHX Text

TG 90.22

AutoCAD SHX Text

B GROUND

AutoCAD SHX Text

C GROUND

AutoCAD SHX Text 74.40

AutoCAD SHX Text

AutoCAD SHX Text 74.33

AutoCAD SHX Text 84.83

AutoCAD SHX Text

74.33 BTM OF STEPS

AutoCAD SHX Text 79.83

AutoCAD SHX Text

90.33 TOP OF STEPS

AutoCAD SHX Text 90.41

AutoCAD SHX Text 11'-0"x33'-0" TEMP. CONC. PAD

AutoCAD SHX Text

TEMP. 4'-0" WIDE CONC. WALK

AutoCAD SHX Text

(2) STACKED TEMP. STACKED TEMP. 20X70 DUCTS. SEE MECHANICAL DRAWING

AutoCAD SHX Text

TEMPORARY DUCTS

AutoCAD SHX Text

LP

AutoCAD SHX Text PROVIDE CONTRACTION JOINTS IN SIDEWALKS AT 6'-0" ON CENTER AND EXTEND 1/3 DEPTH OF SLAB. PROVIDE 1/2" EXPANSION JOINTS AT INTERSECTIONS OF DIFFERENT WALKS AND 30'-0" ON CENTER ON STRAIGHT RUNS. REMOVE TREE STUMP AND GRIND BELOW TOPSOIL. FOLLOWING REMOVAL OF TEMPORARY AIR HANDLER AND DUCTWORK AND INSTALLATION OF THE NEW EXTERIOR DUCT, REMOVE TEMPORARY EQUIPMENT SLABS AND TEMPORARY SIDEWALK AT ENTRANCE BETWEEN THE NEW DUCT AND CHAPEL. FINISH GRADE, PLANT GRASS SEED AND FERTILIZE WITHIN THE CONSTRUCTION AREA. ROUTE OF STEPS TO RUN THROUGH EXISTING TREES AS NOTED. VA TO TRIM LOW BRANCHES OF ADJACENT TREES. COORDINATE WITH THE COR. EXISTING LIGHT BOLLARD ON 12” X12” CONCRETE PAD TO X12” CONCRETE PAD TO CONCRETE PAD TO REMAIN, TYPICAL. EXISTING LIGHT BOLLARD TO BE REMOVED AND SALVAGED FOR TEMPORARY AIR HANDLING UNIT AND DUCT CONSTRUCTION. REPLACE AFTER REMOVAL OF TEMPORARY AIR HANDLING UNIT AND DUCT. EXISTING LAMP POST ON 12” X12” CONCRETE PAD. X12” CONCRETE PAD. CONCRETE PAD. EXISTING SIDEWALK TO REMAIN. NEW LIGHT BOLLARD ON 12” X 12” CONCRETE PAD TO MATCH X 12” CONCRETE PAD TO MATCH CONCRETE PAD TO MATCH EXISTING, TYPICAL. REFER TO SHEET EL101. CONCRETE FLUME 30"WIDE x 6"HIGH CLEAR UNDER SIDE WALK. CULVERT HEADER TO RISE 6" ABOVE SIDEWALK.

AutoCAD SHX Text A. ALL SITE WORK TO BE LAID OUT AND STAKED FOR APPROVAL BY COR ALL SITE WORK TO BE LAID OUT AND STAKED FOR APPROVAL BY COR PRIOR TO CONSTRUCTION. B. EXISTING TOPOGRAPHY INFORMATION REFERENCED FROM RECORD EXISTING TOPOGRAPHY INFORMATION REFERENCED FROM RECORD DRAWINGS PROVIDED BY THE VA, PROJECT NUMBER 621-064, DATED JANUARY 13, 1986. THIS INFORMATION IS INCLUSIVE OF EXISTING CONTOURS AND SPOT ELEVATIONS ON STORM INLET GRATES AND BUILDING CORNERS. C. GROUND FLOOR FINISH FLOOR ELEVATION IS 1674.44. GROUND FLOOR FINISH FLOOR ELEVATION IS 1674.44. D. NEW SPOT ELEVATIONS REPRESENT TOP OF FINISHED SIDEWALKS, STEPS NEW SPOT ELEVATIONS REPRESENT TOP OF FINISHED SIDEWALKS, STEPS AND TEMPORARY SLABS. THE DESIGN INTENT IS FOR NEW WORK TO MEET AND ALIGN NEW SIDE WALK ELEVATIONS AT CONNECTIONS WITH EXISTING SIDEWALKS. SHOULD THE CONTRACTOR HAVE ANY QUESTIONS REGARDING EXISTING CONDITIONS OR THE DESIGN INTENT, THE ARCHITECT SHALL BE CONTACTED IMMEDIATELY PRIOR TO COMMENCING WORK. E. PROTECT ALL EXISTING UTILITIES, STRUCTURES, TREES AND SHRUBS. PROTECT ALL EXISTING UTILITIES, STRUCTURES, TREES AND SHRUBS.

AutoCAD SHX Text 74.33

AutoCAD SHX Text A001

AutoCAD SHX Text

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

ENLARGED PLAN DETAIL

AutoCAD SHX Text A001

AutoCAD SHX Text

AutoCAD SHX Text A001

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

RAIL DETAIL

AutoCAD SHX Text

CENTER OF CULVERT

AutoCAD SHX Text

SIDE WALK

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text B

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text Y

AutoCAD SHX Text 103105

AutoCAD SHX Text A001

AutoCAD SHX Text

AutoCAD SHX Text 1"=40'-0"

AutoCAD SHX Text

ARCHITECTURAL SITE PLAN

AutoCAD SHX Text A001

AutoCAD SHX Text

AutoCAD SHX Text 1" = 20'-0"

AutoCAD SHX Text

ENLARGED SITE VIEW PLAN

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 1"=20'

AutoCAD SHX Text 10'

AutoCAD SHX Text 20'

AutoCAD SHX Text 40'

AutoCAD SHX Text 60'

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 1"=40'

AutoCAD SHX Text 20'

AutoCAD SHX Text 40'

AutoCAD SHX Text 80'

AutoCAD SHX Text 120'

AutoCAD SHX Text ADDENDUM No1

AutoCAD SHX Text 06/29/2020

AutoCAD SHX Text A001

AutoCAD SHX Text

AutoCAD SHX Text A510

AutoCAD SHX Text

AutoCAD SHX Text A001

AutoCAD SHX Text

AutoCAD SHX Text A002

AutoCAD SHX Text

ARCHITECT:

AE DESIGN RENOVATE B

GROUND FLOOR BLDG.

200 FOR ACUTE CARE

BEDS

RD STATIONS PARTIAL

FLOOR PLAN - WINDOWS

AD1-1

AutoCAD SHX Text

RD STATION B012

AutoCAD SHX Text

RD STATION B013

AutoCAD SHX Text

RD STATION B014

AutoCAD SHX Text

RD STATION B015

AutoCAD SHX Text Date: 06-29-2020

AutoCAD SHX Text

AD1-1

AutoCAD SHX Text

AutoCAD SHX Text 1/8" = 1'-0"

RD STATIONS PARTIAL FLOOR PLAN - WINDOWS

GROUND FLOOR BLDG.

200 FOR ACUTE CARE

BEDS

SLIDING FRAME WINDOW

DETAILS

AD1-2B

AutoCAD SHX Text

WOOD BLOCKING

AutoCAD SHX Text

34" PLYWOOD SUBSTRATE

AutoCAD SHX Text

ALUM. BASE & SIDE TRACK CHANNEL

AutoCAD SHX Text

TRACK FOR USE WITH STEEL BALL BEARING ROLLERS

AutoCAD SHX Text

STEEL BALL BEARING ROLLER

AutoCAD SHX Text

ALUM. SHOE FOR USE WITH TRACK

AutoCAD SHX Text

J TRIM

AutoCAD SHX Text SOLID SURFACE MATERIAL ADHERED TO " GYP. BD 58" GYP. BD ON AE. SIDE OF 8" MTL. STUD.@ 16 O.C

AutoCAD SHX Text

ALUM. UPPER GUIDE

AutoCAD SHX Text

RUBBER T-GUIDE

AutoCAD SHX Text

ALUM. SHOE FOR USE WITH TRACK

AutoCAD SHX Text

14" CLR. TEMP. GLASS SLIDING DOOR

AutoCAD SHX Text

AD1-2

AutoCAD SHX Text

AutoCAD SHX Text 3" = 1'-0"

AutoCAD SHX Text

SLIDING WINDOW SILL

Date: 06-29-2020

GROUND FLOOR BLDG.

200 FOR ACUTE CARE

BEDS

SLIDING FRAME WINDOW

DETAILS

AD1-2A

AutoCAD SHX Text

TRACK

AutoCAD SHX Text

RECESSED ALUM. BASE& SIDE DOUBLE TRACK CHANNEL

AutoCAD SHX Text

WOOD BLOCKING

AutoCAD SHX Text

PARTITION LINE BELOW

AutoCAD SHX Text

AD1-2A

AutoCAD SHX Text

AutoCAD SHX Text 3" = 1'-0"

AutoCAD SHX Text

SLIDING WINDOW JAMB

AutoCAD SHX Text

NTS

AutoCAD SHX Text

WINDOW TYPES

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text

TURNTABLE PASS BOX

AutoCAD SHX Text 1'-3 "12"

AutoCAD SHX Text 1'-3 "12"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 4'-0"

GROUND FLOOR BLDG.

200 FOR ACUTE CARE

BEDS

ANTE ROOM C011A -

INTERIOR ELEVATION

AD1-3

AutoCAD SHX Text

GLOVE HOLDER

AutoCAD SHX Text

BATTERY CLOCK

AutoCAD SHX Text

HERMAN MILLER COMPASS SYSTEM

AutoCAD SHX Text

AD1-3

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

ANTE ROOM C011A - NORTH VIEW

File details come from the government source that posted it. Updated .