This document provides a template for breaking out general condition costs on a schedule of values for a federal construction contract. The template lists various general condition items such as superintendent, project manager, field office engineer, builder's risk insurance, site maintenance, signage, record document preparation, and more. Costs for each item should be entered on the template. The related federal contract opportunity is solicitation number 36c24920r0065 from the Department of Veterans Affairs for a project to renovate building B-Ground for acute care at a Veterans Health Administration facility.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GC Breakout
| GENERAL CONDITIONS BREAKOUT | |
| When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.236-88 Contract Changes-Supplement, paragraph (b)(10), the following contractual restrictions apply: Overhead and contractor’s fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made therefore. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the contractor’s overhead and/or fee percentage. |
| General Condition Description | Value |
| Superintendent | $ - 0 |
| Project Manager | $ - 0 |
| Field Office Engineer | $ - 0 |
| Builder's Risk Insurance | $ - 0 |
| Other Project Specific Liability Insurance | $ - 0 |
| Site Maintenance and Protection | $ - 0 |
| Progress Photos (per contract specifications) | $ - 0 |
| Dumpsters | $ - 0 |
| Office Trailer | $ - 0 |
| Storage Trailer/POD/CONEX | $ - 0 |
| Telephone (Cell and/or Landline) | $ - 0 |
| Signage (per contract specifications and/or drawings) | $ - 0 |
| Travel (must comply with Federal Travel Regulations) | $ - 0 |
| Lodging (must comply with Federal Travel Regulations) | $ - 0 |
| Record Document Preparation | $ - 0 |
| As-builts (per contract specifications) | $ - 0 |
| Weather Protection (per contract specifications) | $ - 0 |
| Infection Control (per contract specifications) | $ - 0 |
| Information Technology (Internet, etc.) | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| General Conditions Total | $ - 0 |